Supreme Court of IndiaSupreme Court · 1995Division BenchAppeal dismissed; HPCL held as statutory tenant...

G. SRIDHARAMURTI v. HINDUSTAN PETROLEUM CORPORATION LTD. AND ANR.

Case / Petition Number:
Civil Appeal No. 8780 of 1995
Neutral Citation:[1995] SUPP. 3 S.C.R.

Case Synopsis & Summary

This Civil Appeal arises from a landlords’ challenge to an eviction petition filed under the Karnataka Rent Control Act, 1961. The appellant leased the premises to Esso Company in July 1969; Esso was later merged into the respondent HPCL on 14 March 1974. The landlord sought eviction on the ground of sub-letting under section 21(1)(t). Courts below and the Karnataka High Court held that the Esso Company’s tenancy rights, by virtue of the Esso (Acquisition of Undertakings in India) Act, 1974, were transferred to the Central Government and subsequently to the respondent corporation, rendering HPCL a statutory tenant rather than a sub-tenant of the landlord. The appellant contended that, notwithstanding Section 5 and 7 of the Esso Act, the continuance of HPCL in the premises would be deemed a sub-letting under Section 21(1)(t) given the non-obstante clause in Section 23(1) of the Karnataka Act, and that there is a potential inconsistency with central law overriding state law. The Supreme Court examined the statutory framework: it held that the Esso Act creates a vesting and transfer of tenancy rights to the Government and then to the Government company, and that such transfer is not a voluntary intra vivos assignment. It also held that, since the Esso Act is a Central enactment, the non-obstante clause in Section 7 excludes operation of Section 23 of the Karnataka Act, with Article 254 declaring the central Act to prevail to the extent of inconsistency. Parasram Hamand Rao’s ratio was distinguished as inapplicable. The appeal is dismissed, leaving HPCL as statutory tenant.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • K. RAMASWAMY
  • B.P. JEEVAN REDDY
  • B.L. HANSARIA
Judgment Date
1995-09-13
Court Decision / Holding
The appeal is dismissed. HPCL remains the statutory tenant; the Karnataka Act’s provisions are overridden to the extent of inconsistency by the Esso Act under Article 254.
Final Disposition
Appeal dismissed; HPCL held as statutory tenant; the Karnataka Act is overridden to the extent of inconsistency by the Esso Act.

Parties to the Case

Appellants / Petitioners

  • G. Sridharamurti

Respondents

  • Hindustan Petroleum Corporation Ltd.
  • Anr.

Legal Representation & Advocates

Counsels for Petitioners

  • • S.K. Kulkarni

Counsels for Respondents

  • • Santosh Hegde
  • • M.K. Michael
  • • Rajiv Kapur
  • • Wasim Qadri

Provisions of Law Cited

Karnataka Rent Control Act, 1961 — Sections 21(1)(t), 21(1)(f), 23(1)Esso (Acquisition of Undertakings in India) Act, 1974 — Sections 5, 7Article 254(1) of the Constitution — Seventh Schedule, List III, Entry 6

Legal Doctrines & Maxims

  • Non-obstante clause
  • Doctrine of repugnancy/harmonization under Article 254
  • Intra vivos transfer concept (as distinguished from voluntary assignment)

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellant-landlord contends that, despite the Esso Act’s operation, the continuance of the Esso Company’s successor in the premises via the Esso Act would amount to sub-letting under Section 21(1)(t) and Section 23(1) of the Karnataka Act. It relies on the non-obstante clause in Section 23(1) to argue that central legislation cannot entirely displace the state Act in this context, and disputes the notion that statutory transfer under the Esso Act constitutes a true assignment of tenancy rights,” arguing that the transfer of tenancy rights to the Government and then to HPCL should not extinguish the landlord’s rights.

Contentions of Respondents

The respondents (HPCL) argue that the Esso Act, by Sections 5 and 7, statutorily vest rights in the Government and then in a Government company, resulting in HPCL becoming the tenant by operation of law rather than through a voluntary assignment. They contend that HPCL’s occupancy is not a sub-letting and that the Esso Act’s non-obstante clause appropriately excludes application of Karnataka Act provisions to the extent of inconsistency. They further submit that Article 254(1) permits Parliament to legislate on immovable property, and the central Act and state Act cannot exist harmoniously if read to force a different outcome. Disputes over the application of paras from Parasram Hamand Rao are framed as distinguishable.”},

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (1)

Case NameCitationTreatmentExplanation
Parasram Hamand Rao v. Shanti Prasad Narinder Kumar Jain and Anr.[1980] 3 SCR 565DistinguishedThe Court found the Parasram Hamand Rao ratio inapplicable here due to the Esso Act’s statutory operation that transfers tenancy rights in a non-voluntary manner.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•1,849 words•~9 min read

In The Court Record

G. SRIDHARAMURTI v. HINDUSTAN PETROLEUM CORPORATION LTD. AND ANR.

A • ## G. SRIDHARAMURTI _v._ ## HINDUSTAN PETROLEUM CORPORATION LTD. AND ANR. ## SEPTEMBER 13, 1995 ## B ## [K. RAMASWAMY, B.P. JEEVAN REDDY AND B.L. HANSARIA, JJ .] ## _Rent and Eviction :_ C _Kamataka Rent Control Act, 1961/Esso (Acquisition of Undertakings in India) Act, 1974:_ _Sections 21(1)(/) and 23(1)-Non-agricultural <and-Leased out to Essa Company-Essa Company merged into Hindustan Petroleum Corporation-Premises Trans/ erred to Corporation-Landowners application for_ D _ejectment on ground of sub-letting-:-Held, Corporation became statutory tenant-Transfer was not a voluntary act of assignment of interest intra vivas-Application for ejectment dismissed._ ## _Constitution of India :_ E F _Anicle 254( 1)-Seventh Schedule, List III, Entry 6--Laws made by Parliament and Legislature of a State-Inconsistency between-Section_ 7 _of Essa (Acquisition of Undenakings in India) Act, 1974 enacted by Parliament and section 23 of Kamataka Rent Control_ Ac~ _1961 occupying same field-Held, both cannot exist hannoniously-To the extent of inconsistency Kamataka Act becomes void._ The appellant leased out the premises in dispute to Esso Company in July, 1969. The said company was merged into the respondent- Corporation on March 14, 1974. The appellant filed· an eviction petition under section 21 (l)(t) of the Karnataka Rent Control Act, 1961 against the Esso G Company and the respondent-Corporation for ejectment on the ground of sub-letting. The courts below dismissed the application holding that the Esso Company did not sublet the demised premises but by virtue of statutory operation of the Esso (Acquisition of Undertakings in India) Act, 1974 the respondent-Corporation stood transposed as a tenant. The High H Court affirmed the said decision. Aggrieved, the owner of the premises 634 635 G. SRIDHARAMURTI _v._ H.P.C. LTD. A ## filed the appeal by special leave. It was contended by the appellant that in view of the non- obstante clause of sub-section (1) of section 23 of the Karnataka Rent Control Act, 1961, continuance of the respondent-Corporation in the premises would be deemed to be sub-letting within the meaning of section 21 (l) (f) of the Act. B ## Dismissing the appeal, this Court HELD : 1.1. By statutory operation of the Esso (Acquisition of Undertakings in India) Act, 1974, the pre-existing tenancy rights held by Esso Company with the appellant initially stood transferred and vested in C the Central Government, and thereafter, by operation of Section 7 of the Esso Act, the said rights in turn stood transposed and vested in the respondent-Corporation as if the respondent-Corporation statutorily became the tenant of the appellant-landlord. It is not voluntary act of the assignment of interest _intra vivos._ [638-A-B, G) D 1.2. On the Esso Act coming into force, by operation of Sections 5 and 7 thereof, the respondent-Corporation became statutory tenant and thereby it cannot be construed to be an assignment of tenancy rights, which the appellant-landlord had entered int9 with the Esso Company, by the Central Government in favour of the respondent-Corporation. [638-E) E 1.3. Though sub-section (1) of section 23 of the Karnataka Act employing non-obstante clause excluded operation of any other enactment, there is no specific provision in List II of the Seventh Schedule to the Constitution Covering the Act. On the other hand, by virtue of Entry 6 of F List III of the Seventh Schedule, the legislature of the State and also Parliament can enact law in relation to immovable property. Since the Esso Act is a Central enactment, and latter too, the non-obstante clause in Section 7 of the Esso Act excludes the operation of Section 23 of the Karnataka Act. Both, the Karnataka Act and the Esso Act, occupy same G field and both cannot exist harmoniously. So to the extent of inconsistency, the Karnataka Act becomes void by operation of Article 254 of the Con· stitution. [638-C-D] _M/s. Parasram Hamand Rao_ v. _Shanti Prasad Narinder Kumar Jain and Anr.,_ [1980) 3 sec 565; inapplicable. SUPREME COURT REPORTS [1995] SUPP. 3 S.C.R. 636 A CIVIL APPELLATE JURISDICTION: Civil Appeal No. 8780 of 1995. From the Judgment and Order dated 25/26.6.90 of the Karnataka High Court in C.R.P. No. 3628 of 1982. B S.K. Kulkarni for Surya Kant for the Appellant. Santosh Hegde, M.K. Michael, Rajiv Kapur and Wasim Qadri for Ms. Sushma Suri for the Respondents. The following Order of the Court was delivered : c Leave granted. We have heard learned counsel for the parties. An open space measuring 66.6 x 40 feet comprised in Survey No. 432/25 in Ward No. XVII situated at Bangalore-Bellary Trunk Road in the City of Bellary, was in the possession of Esso Company pursuan"l to a lease D dated July 17, 1969 granted by the appellant. Esso Company was merged into respondent-Corporation on March 14, 1974. The appellant filed eviction petition under Section 21(1) (f) of the Karnataka Rent Control Act 1961 (for short, 'the Act') for ejectment on the ground of sub-letting, impleading Esso Company and thereafter, the respondent-Corporation. E The Esso (Acquisition of Undertakings in India) Act, 1974 (for short, 'the. Act) came into force w.e.f. March 13, 1974. The courts below dismissed the application on the ground that the Esso Company had not sublet the demised premises but by virture of statutory operatjon under the Esso Act, the respondent-Corporation stood transposed as a tenant which is an involuntary act pursuant to Section 7 of the Act; and notwithstanding the F specific embargo created under Section 21 (1) (t) of the Act, it cannot be construed to be a sub-letting. The High Court also reached the same conclusion on 25/26th June, 1990 in CRP No. 3628/82. Thus this appeal by special leave. Shri Kulkarni, the learned counsel appearing for the appellant, conG tended that Section 21 (1) (f) of the Act clearly prohibits assignment or transfer "in any manner" of the interest of the tenant deeming it to be a sub-letting. Therefore, in view of the _non-obstante_ clause contained in sub-section (1) of Section 23 of the Act, the continuance of the respondent-Corporation in the premises must be deemed to be due to sub-letting H within the meaning of Section 21 (1) (t) of the Act. In support of his G.SRIDHARAMURTI _v._ H.P.C. LTD. 637 contention, he placed strong reliance on a ratio laid down by this .Court in A _M/s. Parasram Hamand Rao_ v. _Shanti Prasad Narinder Kumar Jain & Anr.,_ {1980] 3 sec 565, inapplicable. To appreciate the contentions, it is necessary to look at the provisions of the Esso Act. B Section 5 of that Act envisages : "5. (1) where any property is held in India by Esso under any lease or under any right of tenancy, the Central Government shall, on and from the appointed day, be deemed to have become the lessee C or tenant, as the case may be, in respect of such property as if the lease or tenancy in relation to such property had been granted to the Central Government, and there upon all the rights under such lease or tenancy shall be deemed to have been transferred to and vested in the Central Government." D Sub-sections (1) and (2) of Section 7 of the Esso Act state : "7. (1) Notwithstanding anything contained in sections 3, 4 and 5, the Central Government may, if it is satisfied that a Government company is willing to comply, or has complied, with such terms E and conditions as that Government may think fit to impose, direct, by notification, that the right, title and interest and the liabilities of Esso in relation to any undertaking in India shall, instead of continuing to vest in the Central Government, vest in the Govern. ment company either on the date of the notification or on such earlier or later date (not being a date earlier than the appointed F ·· day) as may be specified in the notification. (2) Where the right, title and interest and the liabilities of Esso in relation to its undertakings in India vest in a Government company under sub-section (1), the Government company shall, G on and from the date of such vesting, be deemed to have become the owner, tenant or lessee, as· the case may be, in relation to such undertakings, and all the rights and liabilities of the Central Government in relation to such undertakings shall, on and from the date of such vesting, be deemed to have become the rights and liabilities, respectively, of the Government company." H 638 SUPREME COURT REPORTS (1995] SUPP. 3 S.C.R. B c D A It would be clear from above provisions that by statutory operation of Sections _5_ and 7 of the Esso (Acquisition of undertakings in India) Act, 1974, the pre-existing tenancy rights held by Esso Company with the appellant initially stood transferred and vested _in_ the Central Government, and thereafter, by operation of Section 7 of the Esso Act, the said rights in turn stood transposed and vested in the Government company as if the Government company statutorily became the tenant of the appellantlandlord. It is true that sub-section (1) of Section 23 of the Act employing _non-obstante_ clause excluded operation of any other enactment. But it must be remembered that there is no specific provision in List II of the Seventh Schedule to the Constitution covering the Act. On the other hand, by virture of what has been stated in Entry 6 in List III of the Seventh Schedule, the legislature of the State and also Parliament can enact law in relation to immovable property. Since th~ Esso Act is a Central enactment, and latter too, the _non- obstante_ clause in Section 7 of Esso Act excludes the operation of Section 23 of the Act. Both the Act and the Esso Act occupy same field and both cannot exist harmoniously. So to the extent of inconsistency, the Act becomes void by operation of Article 254 of the Constitution. On the Esso Act coming into force, by operation of Sections _5_ and 7 of that Act, the respondent-Corporation became statutory tenant and thereby it cannot be construed to be an assignment of tenancy rights, which the appellant-landlord had entered into with the Esso Company, by the Central Government in favour of the Government company. E The ratio of _M/s. Parasram Hamand Rao's_ case (supra) 1s mapplicable to the facts in this case. Therein, one Laxmi Bank which was a tenant with the appellant was in liquidation. The Official Liquidator had sold the tenancy rights in favour of the respondents. Thereby, the respondents became tenant of the demised premises. The landlord initiated F proceedings under Section 14(1)(b)of the Delhi Rent (Control) Act contending that it amounted to sub-letting. This Court accepting the contention held that in view of the wide language employed in Section 14(1) (b), though the same was made in favour of the respondent through court, it amounted to transfer of an interest _inter se._ The ratio therein does not get G attracted to the facts in this case in view of the statutory operation of Sections _5_ and 7 of Esso Act which is not voluntary act of assignment of interests _intra vivas._ F The appeal is accordingly dismissed. No. costs. H R.P. Appeal dismissed.
End of Judgment Record
Browse All Supreme Court of India (1995) Decisions
1995-02-23

Inder Singh v. State of Punjab

Inder Singh, convicted under Section 302 IPC for the murder of Amar Singh, questions the High Court’s affirmation of his life-term sentence. The prosecution’s version is that Amar Singh, who had gone to see off a tractor driver, did not return home; on the night of 31 March/1 April 1984, the appellant, armed with a barchha, lay in wait behind a heap of manure and suddenly sprang upon Amar Singh, while PW4 (the deceased’s father) and PW5 (the mother) were trying to intervene. Amar Singh died instantaneously from a fatal neck wound, with the post‑mortem revealing injuries that pointed to a lethal strike. The Trial Court convicted the appellant under Section 302 IPC, while acquitting two co‑accused. In the appeal before the Supreme Court, the defence argued that the appellant’s motive was merely to thrash Amar Singh for suspected theft of cauliflowers, and that lying in wait with a weapon did not necessarily prove an intention to kill. The Court rejects this: the manner of the assault, the weapon used, the location and extent of the injuries, and the fact that PW4 was also injured while trying to save Amar Singh indicate a determined intention to cause fatal injury. The Court also notes the prompt FIR, the medical evidence, and the recovery of the weapon as corroboration, sustaining the conviction. The appeal is dismissed.

1995-03-27

SUBORDINATE SERVICES SELECTION BOARD v. BIR SINGH AND ANR./RAM NIWAS AND ORS.

This Supreme Court decision concerns the interpretation of reservation in Ex-Servicemen posts and the eligibility of dependents of ex-servicemen for clerical posts in A-class offices. The case arose from a dispute over whether dependents of ex-servicemen, who possess Matriculation but do not have First Division in Matriculation or Second Division in Intermediate, could be considered for appointment to A-class clerical posts when ex-servicemen are unavailable and vacancies exist in the reserved quota. The government had reserved A-class posts for ex-servicemen and prescribed stratified qualifications for A-class and B-class offices; in 1979, to avoid lapsing of reserved posts, it was decided that dependent sons and daughters of ex-servicemen who fulfilled all prescribed conditions should be considered on merit for posts reserved for ex-servicemen to the extent of non-availability of suitable ex-servicemen. The respondents, dependents of ex-servicemen, argued that the 7.9.1991 advertisement did not distinguish between A- and B-class posts and that their Matriculation alone made them eligible for A-class posts on par with ex-servicemen. The High Court held them eligible, but the Court reversed, holding that such dependents are not entitled unless they meet the prescribed qualifications (Matric with First Division or Intermediate with Second Division) or are ex-servicemen. The appeals were allowed.

1995-11-01

Yadu Nandan Garg v. State of Rajasthan and Ors.

This appeal concerns a preliminary notification under Section 4(1) of the Rajasthan Land Acquisition Act, 1953 for the 'planned development of Jaipur city' and a declaration under Section 6 issued after the improvement scheme had been finalised. The appellant, Yadu Nandan Garg, had purchased part of the land in 1970 and built a residence there, while Anand Nursery nearby obtained an exemption. The challenge focused on: (i) alleged unexplained delay between the preliminary notification and the declaration, (ii) discriminatory treatment in granting exemption to Anand Nursery but not to the appellant, and (iii) misdescriptions of survey numbers in the Section 9 notice, namely 265 vs 265/1. The Rajasthan High Court had dismissed the challenge, and the Supreme Court, in its division bench, upheld the validity of the acquisition. The Court held that a purchaser cannot acquire title against the State by clinging to an encumbrance after the notification and finalisation of the scheme; under Section 16 the State is entitled to possession with absolute title free from encumbrances. It rejected the contention of inordinate delay, noting the usual administrative time involved in finalising the scheme. It also held that wrong exemptions or mis-stated survey numbers do not invalidate the notification under Section 4(1), provided the main survey number is mentioned, and that discrimination claims fail given lack of a universal benefit. Consequently, the appeal was dismissed without costs.

1995-09-19

Controller of Examination, Utkal University and Anr. v. Paurnamasi Das and Anr.

These two Civil Appeals arise from challenges to the awarding of BA honours by Utkal University under its Regulations for pre-degree and final degree examinations, and the operation of the 1990 Hard Case Rule. Regulation 12 prescribes separate classification in pre-degree and final degree exams, to be shown on the diploma, with specific percentage thresholds for Second Class and First Class honours in both stages. Regulation 16(b) makes the final degree honours list depend solely on marks obtained in the final examination, subject to retaining honours in the pre-degree stage. The Hard Case Rule provides grace marks (up to 0.5%) to enable a candidate to retain honours or attain a higher class, but must be applied per part of the examination. The respondents, in two appeals, were short by 4 marks in their final degree honours papers, seeking to add 4 grace marks (0.5% of 800) by aggregating marks across pre-degree and final degree, an approach the High Court accepted but the University challenged. The Court held that the Hard Case Rule applies separately to each examination part, and that only up to 2 grace marks could be added in the final degree examination (not across parts). The High Court’s view was thus incorrect, and the appeals were allowed with writ petitions dismissed."