Supreme Court of IndiaSupreme Court · 1994Division BenchAppeal allowed.

G. Ramachandra Reddy & Co. v. Chief Engineer, Madras Zone, Military Engineering Service

Case / Petition Number:
Civil Appeal No. 4378 of 1994
Neutral Citation:[1994] 3 S.C.R. 808

Case Synopsis & Summary

This is a Supreme Court appeal arising from a Madras High Court decision under the Arbitration Act, 1940. The appellant, G. Ramachandra Reddy & Co., contended that its contract with the respondent, Chief Engineer, Madras Zone, Military Engineering Service, had been terminated, prompting the appellant to invoke arbitration under clause 17 of the General Conditions of Contract. After notice to appoint an arbitrator, the respondent failed to act, and the appellant filed a suit under Section 20 of the Act seeking the court’s appointment of an arbitrator. The High Court, first by a single judge and then by a Division Bench, dealt with the matter by appointing or directing appointment within time limits, culminating in a Division Bench directing the respondent to appoint an arbitrator from among five named arbitrators, failing which the arbitrator appointed by the single Judge would be deemed appointed under Section 20. The appellant urged that failure to appoint gave rise to the court’s jurisdiction under Section 20(4) to appoint an arbitrator of its choosing, and that the Division Bench’s reliance on a list of five named arbitrators overstepped the contract and statutory provisions. The respondents argued for adherence to the contract’s feasibility and the process contemplated by the contract, citing Union of India v. Prafulla Kumar Sangal and Nandyal Co-op. Spinning Mills, among others. The Supreme Court allowed the appeal, holding that Section 20(4) permits court appointment when the contract is not acted upon, and that notice serves as an intimation to comply with the contract. The Division Bench’s approach was found to be erroneous, the single Judge’s appointment was upheld, and the matter was remitted to follow the contract’s intent. The appeal was allowed with each party bearing its own costs.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • K. Ramaswamy
  • N. Venkatachala
Judgment Date
1994-04-29
Court Decision / Holding
Appeal allowed. The Judgment of the Division Bench is set aside and the Judgment of the learned Single Judge is restored. In the circumstances, the parties are to bear their own costs.
Final Disposition
Appeal allowed.

Parties to the Case

Appellants / Petitioners

  • G. Ramachandra Reddy & Co.

Respondents

  • Chief Engineer, Madras Zone, Military Engineering Service

Legal Representation & Advocates

Counsels for Petitioners

  • • K. Parasaran
  • • R. Murari
  • • V. Balachandran

Counsels for Respondents

  • • A.S. Nambiar
  • • T.V. Ratnam
  • • Ms. A. Subhashini

Provisions of Law Cited

Arbitration Act, 1940: Section 8(a)Arbitration Act, 1940: Section 20Arbitration Act, 1940: Section 20(4)

Legal Doctrines & Maxims

  • The contract should always be given effect to.
  • If a party neglects to act upon the contract after notice, the court gains jurisdiction to appoint an arbitrator under Section 20.

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellant contends that once the respondent failed to appoint an arbitrator after valid notices furnished under the contract, the appellant could invoke the civil court’s jurisdiction under Section 20(4) to appoint an arbitrator of its choice. It is argued that Section 8(a) per se does not compel action before filing suit, and the notice to act is an intimation rather than a binding obligation to appoint from among a specified list. The contract did not bind the appellant to select a particular arbitrator from five named candidates in every case; if the parties cannot agree, the court may appoint. The Division Bench’s construction that the appellant must accept one of the five named arbitrators is contrary to the purpose of Section 20 and undermines the contract’s aim to give effect to it. The appellant relies on Prafula Kumar Sangal’s case to emphasize that a court should give effect to the contract and may appoint where the other party neglects to act; the single Judge’s appointment should stand.

Contentions of Respondents

The respondents maintain that the court should consider feasibility under the contract before appointing, following the approach in Union of India v. Prafulla Kumar Sangal and Nandyal Co-op. Spinning Mills. The Division Bench’s instruction to the respondent to appoint within 15 days (or have the arbitrator appointed by the lower court) reflected adherence to the contract’s mechanism and the list of five named arbitrators. They argue that the 15-day notice under Section 8(a) is not rendered obsolete by the contract and that the respondent’s obligation to act should be observed unless and until the parties agree or a named arbitrator is appointed by consent. In their view, the contract’s provisions and the 15-day period are a feasible mechanism to preserve contract integrity and avoid court intervention unless necessary.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (2)

Case NameCitationTreatmentExplanation
Union of India v. Prafulla Kumar Sangal[1979] 3 S.C.C. 631DistinguishedExplained and held inapplicable to the present facts.
Nandyal Co-op. Spinning Mills Ltd. v. K.V. Mohan Rao[1993] 2 S.C.C. 654Mentioned OnlyReferenced in discussion as authority; not directly applied.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,298 words•~11 min read

In The Court Record

G. Ramachandra Reddy & Co. v. Chief Engineer, Madras Zone, Military Engineering Service

• A ## G. RAMACHANDRA REDDY AND CO. _v._ ## CHIEF ENGINEER, MADRAS ZONE, MILITARY ENGINEERING SERVICE B APRIL 29, 1994 [K. RAMASWAMY AND N. VENKATACHALA, JJ.J _Arbitration Act, 1940: Sections 8(a) and 20._ C _Power of Court to appoint Arbitrato,-.Contract-Dispute-Notice to appoint Arbitrator in terms of contrac1'-Failure of party to appoint Arbitrato,-He/d Court can appoint Arbitrator._ The appellant Company's contract was terminated by the respondent. Exercising the option under clause 17 of the General Conditions of D Contract the appellant issued notice to the respondent to appoint arbitrator in terms of the contract for adjudicating the dispute which had arisen between them. On respondents' failure to do so the appellants filed a suit uuder Section 20 of the Arbitration Act, 1940 and a single Judge of the High Court appointed an arbitrator. On appeal a Division Bench of E the High Court agreed with the Single Judge that despite appellant's notice to appoint an Arbitrator no action was taken by the respondent. Though High Court's suggestion that the respondent could agree for appointment of anyone of the five Arbitrators named in the list given by the appellant did not find favour with the respondent, yet the Division Bench directed the respondent to appoint an Arbitrator within 15 days from that date F and declared that in case the respondent failed to do so, the Arbitrator appointed by the single Judge would be deemed to have been appointed under Section 20. In appeal to this court it was contended on behalf of the appellant G that (i) failure on the part of the respondent to appoint Arbitrator gave right to the appellant to invoke the jurisdiction of the Civil Court under Section 20(4) and the Court got jurisdiction to appoint the Arbitrator of its choice and (ii) the Division Bench committed a manifest error of law in interfering with appointment of Arbitrator under section 20(4). H Allowing the appeal and setting aside the judgment of the Division 808 G. RAMACHANDRAREDDY & CO. _v._ MILITARY ENGG. SERVICE 809 A Bench, this Cot•"' HELD : 1. The single Judge rightly exercised the power under Section 20( 4) of the Arbitration Act, 1940 and appointed the Arbitrator. When the notice was given to the opposite contracting party to appoint an arbitrator in terms of the contract and if no action had been taken, it must be deemed that he neglected to act upon the contract. When no agreement was reached, even in the court between the parties, the court got jurisdiction and power to appoint an Arbitrator. [812-H, 813-A-C] B 2. Even if Section 8(a) _per se_ does not apply, notice was an intimation to the opposite contracting party to act upon the terms of the contract C and its non-availment entails the forfeiture of the power to appoint an arbitrator in terms of the contract and gives right to the other party to invoke the court's jurisdiction under section 20. [813-B] 3. The Division Bench was not right in holding that the respondent has by giving option to the appellant to agree for appointment of an arbitrator out of the five named persons had left it to the appellant to appoint an Arbitrator and allowed the appellant to appoint Arbitrator. [813-C] D 4. The appointment of Arbitrator made by the single Judge must be deemed to have been approved by this Court. [813-D] 5. In the absence of any named arbitrator it would be open to the contracting parties to agree for an appointment of an Arbitrator by **agreement even after the proceedings were laid in the Court under section** 20. In the absence of any such agreement, the Court gets jurisdiction and power to appoint an Arbitrator. [811-H, 812-A] E F _Union of India_ v. _Prafu/la Kumar Sangal,_ [1979] 3 S.C.C. 831, explained and held inapplicable. _Nandyal Co-op. Spinning Mill Ltd._ v. _K.V. Mohan Rao,_ [1993] 2 S.C.C. 654, referred to. CIVIL APPELLATE JURISDICTION : Civil Appeal No. 4378 of 1994. From the Judgment and Order dated 5.1.93 of the Madras High Court in 0.S.A. No. 281 of 1992. 810 [1994] 3 S.C.R. SUPREME COURT REPORTS A K. Parasaran, R. Murari and V. Balachandran for the Appellant. A.S. Nambiar, T.V. Ratnam and Ms. A. Subhashini for the Respondents. The following Order of the Court was delivered : B Leave granted. This appeal arises from the judgment of the division bench of Madras High Court in O.S.A. No. 281/92 dated January 5, 1993. C The appellants contract was terminated by the respondent and in consequence thereof, by notices dated July 23, 1991 and August 21, 1991, the appellants exercising the option under clause 17 of General Condition of Contract, called upon the Engineer in Chief of appoint sole Arbitrator, in terms of the contract, to adjudicate the dispute that had arisen between D them. Since no action was taken by the respondents, the appellants filed a suit 011 March 4, 1992 under s.20 of the Arbitration Act, 1940 for short 'the Act', requesting the court to appoint an arbitrator. Learned single Judge of the High Court by his judgment dated Sept. 23, 1992 appointed Justice M.A. Sattar Syeed, a retired Judge of the High Court as Sole Arbitrator. On appeal, a division bench of that High Court agreed with the single E Judge that despite the issue of notice calling upon the respondent to appoint the Arbitrator in terms of the contract, no action was taken by the respondent. Its suggestion that the respondent could agree for appointment of anyone of the five arbitrators named in the list given by the appelhnt did not find favour with the respondent. Yet, the Division Bench directed the resoondent to appoint an arbitrator within 15 days from that date and F declared that in case the respondent failed to do so, the arbitrator appointed by the single Judge would be deemed to have been appointed under s.20. The appellant, feeling aggrieved against the judgment of the division bench, has filed the appeal. Sri K. Parasaran, learned senior counsel for the appellant contended G that once the appellant had issued notice to the respondent calling upon him to appoint an arbitrator in terms of the contract, the failure to do so had given right to the appellant to invoke the jurisdiction of the civil court under s.20( 4) of the Act and that Court got jurisdiction to appoint the Arbitrator of its choice. When the learned single Judge had exercised its H jurisdiction under s.20( 4) of the Act and appointed the arbitrator, the ## G. RAMACHANDRAREDDY & CO. _v._ MILITARY ENGG. SERVICE 811 division bench committed a manifest error of law in interfering with that A **appointment. Sri A.S. Nambiar, the learned senior counsel for the respon-** dent, sought to support the division bench judgment, relying upon the judgment of this court in _Union of India_ v. _Prafulla Kumar Sangal,_ [1979] 3 sec 631, wherein this court had observed that before appointing an arbitrator by the court itself "it is desirable that the court should consider B the feasibility o[ appointing an arhitrator according to the terms of the **contract 11 and the issuance of the notice giving 15 days' time as con-** templated under s. 8( a) of the Act did not arise on the facts in the present case. Therefore, his contention was that though the appellant had not appointed the arbitrator before the expiry of 15 days' notice before the matter was decided by the division bench, the appellant was given an option C to accept anyone among the five named persons to be a Sole Arbitrator and having failed to accept anyone, it is not open to the appellant to impugn the correctness of legality of the appointment of the Arbitrator by **ihe Division Bench) in ter1ns of the contract.** D We find no force in the contentions of Sri Nambiar. This court interpreting s.20( 4) of the Act, has, in _Praful/a Kumar's_ case itself, specifically laid down that sub-s. ( 4) requires "that the court shall make an order **of reference to the arbitrator appointed by the parties under the agreement** or otherwise if such arbitrator had not been appointed when the parties cannot agree to appoint an arbitrafor, the Court may proceed to appoint E an arbitrator by itself. In that case, the parties agreed before this court, expressing their desire that the President should be asked to appoint an arbitrator as contemplated under clause 29 within two months from the date of the order passed by this Court. In that backdrop this Court had expressed the desirability or the feasibility to appoint an arbitrator in terms F of the contract. Those observation of this Court cannot be understood or torn out of context and read in isolation. The court should endeavour that the contract should always be given effect to, though the contracting party had failed to act according to contract. It is to be see!', whether the contract provided for the appointment of a r.amed arbitrator, and if so, the parties normally would be bound by the terms of contract and the court G would not be justified to appoint any arbitrator unless the arbitrator refused or neglected to enter upon the reference, etc. In the absence of **any named arbitrator it would be open to the contracting parties to agree** for an appointment of an arbitrator by agreement even after the proceedings were laid in the Court under s.20 of the Act. In the absence of any **H** E F 812 SUPREME COURT REPORTS [1994] 3 S.C.R. A such agreement, the Court gets jurisdiction and power to appoint an **arbitrator. In** _**Prafulla Kunzar's**_ **case no notice was given to the appellant to appoint as arbitrator in terms of the contract before the suit \Vas filed and** no action was taken pending suit except contending that the matter was **under active consideration. In that context, it was held that in the absence** of any agreement, the court gets jurisdiction. In _Nandyal Co-op. Spinning_ B _Mills Ltd._ v. _KV Mohan Rao,_ [1993) 2 SCC 654, 15 days notice was given **to the respondent to act upon the terms of the contract to appoint an** arbitrator, but it was not done, although it was stated that the matter was under consideration. It was, therefore, held thus: B c D E F G "It would thus be clear that if no arbitrator had been appointed in terms of the contract within 15 days from the date of receipt of the notice, the administr dtive head of the appellant had abdicated himself of the power to appoint arbitrator under the contract. The court gets jurisdiction to appoint an arbitrator in place of the contract by operation of s.S(i)(a). The contention of Shri Rao, therefore, that since the agreement postulated preference to arbitrator appointed by the administrative head of the appellant and if he neglects to appoint, the only remedy open to the contractor **was to have recourse to civil suit is without force. It is seen that** under the contract the respondent contracted out from adjudication of his claim by a civil court. Had the contract provided for **appointment of a named arbitrator and the named persons was** not appointed, certainly the only remedy left to the contracting party was right to suit. That is not the case on hand. The contract did not expressly provide for the appointment of a named arbitrator. Instead power has oeen given to the administrative head of the appellant to appoint sole arbitrator. When he failed to do so within the stipulated period of 15 days enjoined under s.S(l)(a), then the respondent has been b>iven right under Clause 65.2 to avail the remedy under s.S(l)(a) and request the court to appoint an **arbitrator. If the contention of Shri Rao is given acceptance, it** would amount to putting a premium on inaction depriving the contractor of the remedy of arbitration frustrating the contract **itself.Tl** Thus when the notice was given to the opposite contracting party to H appoint an arbitrator in terms of the contract and if no action had been ## G. RAMACHANDRA REDDY & CO. _v._ MILITARY ENGG. SERVICE 813 taken, it must be deemed that he neglected to act upon the contract. When A **no agreement was reached, even in the court between the parties, the court** gets jurisdiction and power to appoint an arbitrator. Even if s.8(a) _per se_ doe> not apply, notice was an intimation to the opposite contracting party to act upon the terms of the contract and his/its non-availment entails the forfeiture of the power to appoint an arbitrator in terms of the contract B and gives right to the other party to invoke the court's jurisdiction under s.20. In the inslonl case the respondent did not appoint an arbitrator, after the notice was received. The respondent averred in the written statement that it was under consideration. Even before the learned single Judge he did not even state that he was willing to appoint an arbitrator. The learned single Judge rightly exercised the power under s.20( 4) of the Act and c appointed the Arbitrator. The division bench, therefore, was not right in holding that the respondent has by giving option to the appellant to agree for appointment of an arbitrator out of the five named persons had left it to the respondent to appoint an arbitrator and allowed respondent to appoint an arbitrator. On the other hand, the appointment of an arbitrator D made by the learned single Judge must be deemed to have been approved by us. The appeal is accordingly allowed. The Judgment of the division bench is set aside and that of the.learned single Judge is restored. In the **circumstances, parties are directed** _**to**_ **bear their own costs.** Appeal allowed. T.N.A. **E** ..
End of Judgment Record
Browse All Supreme Court of India (1994) Decisions
1994-01-28

BILLA JAGAN MOHAN REDDY AND ANR. v. BILLA SANJEEVA REDDY AND ORS.

This is a Supreme Court decision arising from a Land Acquisition Act reference under Section 30, where the appellants (the first party) sought to claim a 1/4 share of compensation based on pre-existing title evidenced by entries in the record of rights and other revenue records. To prove title, the appellants filed copies of family holdings, khasra Pahani, and certified copies from revenue authorities spanning 1954-70 and other documents, and moved for condonation of delay under Order XIII, Rule 1 CPC for production of these public documents. The trial court refused the application, and the High Court affirmed. The Court held that documentary evidence to be produced at or before settlement of issues must be produced in possession and, if not in possession, filed with an application to condone the delay, and the Court shall receive such documents if accompanied by an accurate list. Although there was a delay, the Court emphasized that, if the documents are relevant to decide the real issue and the interest of justice requires it, the appellate court can receive them under Order XLI, Rule 27 CPC. Consequently, the delay was condoned, and the trial court was directed to receive the documents, allow proof and rebuttal, and dispose of the reference according to law. The appeal was allowed.

1994-07-14

M/S Pankaj Jain Agencies v. Union of India

The petitioner, M/s Pankaj Jain Agencies, challenges Notification No. 142/86-Cus., dated 13 February 1986, issued under Section 25(1) of the Customs Act, 1962, which amended the earlier exemption Notification No. 70/85-Cus. The impugned notification pertains to rates of customs duty on imports of parts and sub-assemblies of ball and roller bearings, specifically “cups” supplied from Singapore for component parts of bearings. Two consignments arrived at Bombay Port in January–February 1986; the petitioner filed two Bills of Entry for home consumption. The central issue is whether the notification reduces the exemption and thereby imposes a higher duty, or creates a fresh duty on spare parts not contemplated by the Customs Tariff Act of 1975. The petitioner argued that import was complete before the notification came into force; that the notification was ultra vires Section 25(1) and violated Section 25(3) by exceeding the statutory duty; and that the increased duty violated Article 19(1)(g) by imposing an unreasonable restriction on trade. The Respondents contended that the notification merely curtailed an exemption, the rates did not exceed the statutory duty, and publication in the Official Gazette gave operativeness. The Supreme Court held that subordinate legislation must be published to take effect, and publication sufficed for operativeness; it rejected the ultra vires and fundamental-right challenges, and dismissed the petitions with costs, underscoring the principle that delegated legislation must be published to be effective.

1994-09-14

COMMISSIONER OF INCOME TAX, HYDERABAD v. M/s. P.J. CHEMICALS LTD. ETC.

This judgment addresses whether subsidies granted to industries on a percentage of capital cost should be deducted from the "actual cost" for computing depreciation under Section 43(1) of the Income Tax Act, 1961. Judicial opinions across Indian High Courts diverged: several held such subsidies non-deductible as they are incentives rather than payments toward asset cost, while others (including some Punjab and Haryana, Allahabad, Bombay, Calcutta, and Gauhati courts) treated the subsidy as deductible from actual cost. The matter was heard in two batches: revenue appeals challenging the Andhra Pradesh High Court’s view, and assessee appeals in the opposite camp. The Supreme Court discusses the meaning of "actual cost", urging liberal interpretation, and reinforces the majority view that government subsidies of this nature are incentives to attract investment, not amounts paid toward meeting the asset’s actual cost. It traces the legislative history, including amendments to the 1922 Act and the 1953 amendment, to explain the intended construction of the term. The Court overrules the contrary Punjab and Haryana decision in Jindal Brothers Rice Mills and sustains the rest of the High Court dissents in favor of the assessee. Consequently, Revenue appeals are dismissed and assessee appeals are allowed, with no costs."

1994-02-15

STATE OF KERALA v. MCDOWELL CO. LTD.

The Kerala Abkari Act governs the manufacture, sale and export of Indian made Foreign Liquor (IMFL) within Kerala. Distillers could export liquor outside Kerala with permission, but were required to execute a bond to secure payment of excise duty on export. The Board of Revenue issued a circular in 1982 treating such documents as agreements rather than bonds; the Board later held the instrument was a bond, while the Kerala High Court held it to be an agreement not liable to stamp duty, prompting Kerala to appeal. The central issue was whether Form VI, executed under the Distillery and Warehouse Rules, constitutes a Bond under the Kerala Stamp Act or merely an Agreement, affecting stamp duty liability under Entry 32 (Indemnity Bond) or Entry 13 (Bond) of the Schedule. The Supreme Court majority held that the instrument in Form VI is a bond within the meaning of the Kerala Stamp Act and liable to stamp duty under Entry 32, as it creates an obligation to pay money to the State on breach of conditions, a liability arising from the instrument itself, not merely from the Abkari Act. The dissent (Sahai, J.) argued the instrument arises from the Abkari Act, making it an Agreement rather than a Bond under the Stamp Act, and that duty would not arise from the instrument itself. The appeal was allowed and the writ petition disposed accordingly, with a refund of excess duty where needed.