Tenetowl LogoTenetowl
Supreme Court of IndiaSupreme Court · 1985Single JudgeAppeal allowed; remitted to High Court to decid...

Fomento Resorts and Hotels Ltd. v. Gustavo Ranato da Cruz Pinto & Ors.

Case / Petition Number:
Civil Appeal No. 504 of 1985
Neutral Citation:[1985] 2 SCR 938

Case Synopsis & Summary

The Supreme Court addresses a challenge to notifications issued under the Land Acquisition Act, 1894 for land intended for tourism development. The Bombay High Court had quashed the Section 4 and 6 notifications on the sole ground of non-compliance with Rule 4 of the Land Acquisition (Companies) Rules, 1963. The Court reframes the issue: whether compliance with Rule 4 is mandatory before issuing a Section 4 notification. It explains the scheme of the Act and Rules, noting there are two purposes for land acquisition—public purpose and for a company—and that for company acquisitions the government must be satisfied that the acquisition is needed and useful for public need. While Rule 4 sets out matters the government must consider, the Act allows initiation of proceedings if it appears land is needed, either from independent enquiry or information supplied by the company. The Court holds that a Section 4 notification can precede Rule 4 enquiry in appropriate cases and that Rule 4(4) requires certain pre-conditions but does not make Section 4 notification void if Rule 4 has not been complied with in every instance. The judgment emphasizes comprehensively addressing all points in litigation, remitting the matter for disposal of other grounds, and clarifies the interplay of Sections 4, 6, 5A, 41, and 23 in the acquisition-process timeline.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • Chinnappa Reddy
  • E.S. Venkataramaiah
  • Sabyasachi Mukharji
Judgment Date
1985-02-20
Court Decision / Holding
Appeal allowed. The matter is remitted to the Bombay High Court to decide the remaining grounds; costs of this appeal to abide by the result of the High Court decision. The Court clarifies that Section 4 notifications can be issued without strict pre-Rule 4 compliance in appropriate cases, while acknowledging Rule 4’s significance and the need to address other grounds on remand.
Final Disposition
Appeal allowed; remitted to High Court to decide remaining grounds; costs to abide by High Court decision.

Parties to the Case

Appellants / Petitioners

  • Fomento Resorts and Hotels Ltd.

Respondents

  • Gustavo Ranato da Cruz Pinto
  • Other Respondents

Legal Representation & Advocates

Counsels for Respondents

  • • S.C. Desai
  • • M.M. Abdul Khader
  • • Naunit Lal
  • • Kalash Vasdev
  • • Mrs. Vinod Arya
  • • Miss A Subhashini

Provisions of Law Cited

Land Acquisition Act, 1894Land Acquisition (Companies) Rules, 1963Rule 3Rule 4Rule 4(1)Rule 4(4)Section 4Section 5ASection 40Section 41Section 23Section 16Section 11Part VII of the ActRule 5Rule 6Rule 7Rule 8Rule 9

Legal Doctrines & Maxims

  • no sine qua non (for issuance of notification under Section 4)
  • There are two purposes of land acquisition: public purpose and for a company; government must be satisfied accordingly
  • avoid delay and protraction of litigation; dispose of all points rather than resting on a single point

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellants contended that compliance with Rule 4 of the Land Acquisition (Companies) Rules, 1963 is not a mandatory prerequisite before issuing notifications under Section 4 of the Land Acquisition Act, 1894. They argued that Section 4 notifications may be issued where land is needed, with Rule 4 subsequent to or independent of the Section 4 process in appropriate cases.

Contentions of Respondents

The respondents argued that Rule 4(1) and other components of Rule 4 are mandatory before initiating Section 4/6 proceedings; non-compliance invalidates notifications and declarations under the Act.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (5)

Case NameCitationTreatmentExplanation
Babu Barkya Thakur v. State of Bombay (now Maharashtra)AIR 1960 SC 1203PositiveUsed to explain the purpose of Section 4 and the sequencing of proceedings (4 then 6) and the necessity to investigate the purpose of acquisition for public or company needs.
Raj Ram Lalswal v. Collector, Allahabad & Another(1980) 2 ILR Allahabad 269PositiveCited with approval to support the proposition that Rule 4 compliance before Section 4 notification is not always mandatory.
Abdul Husein Tayabali & Ors. v. State of Gujarat & Ors.[1968] SCR 597DistinguishedExplained and distinguished; used to contrast the nature of Rule 4 compliance in various contexts.
General Govt. Servants Co-operative Housing Society Ltd., Agra v. Wahab Uddin & Ors.[1981] 3 SCR 46Mentioned OnlyCited but treated as obiter or non-binding in view of its context and the court's analysis.
Raja Ram Jaiswal v. Collector, Allahabad & Another(1980) 2 ILR Allahabad 269PositiveCited with agreement; supports the view that Rule 4 compliance need not be mandatory before Section 4 notification in certain circumstances.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•5,897 words•~27 min read

In The Court Record

Fomento Resorts and Hotels Ltd. v. Gustavo Ranato da Cruz Pinto & Ors.

- 1 , _931_ FOMENTO RESORTS AND HOTELS LTD. _v._ GUSTAVO RANATO DA CRUZ PINTO & ORS. _20th_ _February,_ _1985_ [0. CHINNAPPA REDDY, E.S. VENKATARAMIAH, SABYASACRI MUKHARJI, JJ.) _Land Acquisition (Companies) Rules; 1963 Rule_ _4-Whether_ _compliance_ _of Rule 4 is mandatory before issuing the Notification under Section 4_ _of the_ _Land Acquisition Act, 1894_ _in_ re~pecL _of acqflisitlon_ _of land for the purpose_ _of_ _a company-Practice and ProcJdure-Where several conte11.tlons_ _factual afld legal_ _are urged in a case and where there_ _is_ _a scope_ _of_ _an appeal_ _from_ _the decision_ _of the Court_ _1_ _High CourtJ and Courts below 3hould not merely rest its decisiPtt_ _on_ _one_ _single point._ The appellant made au application on the lSth November, 1978 under chapter VII of the Land Acquisition Act, 1894 for the acquisition of the lands earlier purchased by Respondent No. 1 herein. The Government issued on the 29th October, 1980 a notification for acquisition of the said land under section 4 or the Act which was published in the Government Gazette dated 30th October, 1980. Respondent No, I objected to the said notification. Subsequently the Government held an enquiry und~r section SA of the Act and, after submitting a report in March 1981, on or about 10th April 1981, the Deputy Collector issued notice to Respondent No. I that enquiry· under rule 4 of the Land Acquisition (Companies) Rules l 963 would be held on the 15th April, 1981 to which the latter filed his objections on merit by his letter dated 4th May, 1981. On 26th October, 1983, agree1neat was executed bt:twcen the government and the acquiring company. A notification under section 6 that the land in question was needed for the purpose of development of tourism, was published in the Government Gazette dated 27th October 1983. Respondent No. I, thereupon, filed a petition under Article 226 of the Constitution challenging the said notifications under sections 4 and 6 of the Land Acquisition Act. The High Court of Bombay (Goa Bench) quashed the said notifications on the first ground alone namely, th• noti· fications were bad for prior non-compliance with Rule 4 of the Land Acquisition (Companies) Rules 1963, and noted that it was not necessary to deal with other grounds of challenge. Hence the appeal by special leave. A B c D E F G A B c D F G 938 SUP!u!l4B COURT REPORTS [1985] 2 S.C.R. Allowing the appeal and remitting the case back, the Court HBLD : 1. On a correct interpretation of the scheme of the Land Acquisition Act, it is not necessary that enquiry under ru1e 4 of the Land Acquisition (Companies) Rules, 1963 must in all cases precede issuance of the ootiftcation under section 4 of ihe Act. In an appropriate case if it is possible, enquiry under rule 4(1) may be held before the issuance of the notification under section 4. But it is not a mandatory requirement that it must precede the issuance of the notification under the Act. [949B-C] _Rqja Ram lalswal_ v. _Collector, Allahabad_ & _Another,_ (1980) 2 !LR Allahabad 269; conclusion approved, _lhlbu B•rt:fa_ _!latur_ v. _State_ _of_ _Bombay_ _(now_ _Maharashtra),_ AIR 1960 SC 1203 at 1206, followed. _Abdul_ _HUJein_ _Tayaball_ & _Ors._ v. _State_ _of_ _Gujarat_ & _Ors.,_ [1968] I SCR 597, explained and distinguished. 2.1. A consepectus of the provisions of the Land Acqui::>i,ion Act as well as Land Acquisition (Companies) Rules 1963 indic.:ite that there are two purposes of acquisition of land-one being for the public purpose and other for the purpose of a company, In case or acquisition for com. pany, the appropriate Government has to satisfy itself that such acquisition is needed and would be useful also for public need. [943E·P] :2.l Land Acquisition proceedings begin with the publication of the preliminary notification under scctiOn 4 of the Land Acquisition Act, 1894. When t.hc acquisition is for a company the purpose has to be investigated under 1ection 5A (by hearing objections and disposing them) or under section 40 necessarily after the notification under section 4 of the Act. Under section 6 if the Government is satisfied after considering the report, if any, made under section SA that any particular land was needed for public purposes or for a company a declaration shall be made to that effect subject to certain conditions stipulated therein. Sub·rule 4 of Rule 4 of the Land Acquisition (Companies) Rules 1963 provides that no declaration shall be made by the Appropriate Government under section 6 of the Act unless (i) the appropriate government had consulted the committee and had considered the report submitted under the said rule and the report if any, submitted under section _SA_ of the Act and (iQ further any agreement under section 41 of the Act executed by the Company. To complete the acquisition proceedings notification under section 6 of the Act is required. Section 6 of the Act enjoins that the government bas to be satisfied that the land is needed for public purpose or for a company and after declaration is made the acquisition is complete after the award i1 made and posse~sion of the land is taken when the land vests under 1ection 16 in the government free from encumbrances. Section 4 .'r ' ' F.R. & HOTELS •• G.R.o.c. PINTO 939 does not require as such thia satisfaction or th1 a:overnment. The government might initiate acquisition proceedings uir it appears'' to the government that land is needed either for public purpose or_ for a coinpany. That miaht appear to the government by_ enquiry _a!Uvufe_ or on a petition or application madC by any company. Whether the noed is proper or ge'nu-ine that can be found by the government subsequently after notice Under section 4 of the Act. An enquiry under ru1e 4 might be mJde before ·issuance of the notification under section 4 of the Act but it is not a _sine_ _qua non_ for the issuance of the notification undCr section _4_ to have an enquir1 under rul~ 4 of the Rules. The scheme and the language of the Act and the Rules do not indicate that. Therefore., section 4 as such does noi require government to be sit.tisfied., it is sufficient if it appears to the government that land is needed either for public purpose or for a compiny. It may so appear to the govornment either by independent inquiry_ or from reports and information received by the go'vernment or evell. from an appJi .. cation by the company concerned. [9HH; 944A·F] 2.3 It is undoubtedly true that a notification under section 4 can be iss;ued after enquiry under rule 4. But under the scheme of the Act., the converse is not correct, i.e., the enquiry Under rule 4 most always precedo notification Under section 4 of the Act. though enquiry under rule - matters which ·4(1) must precede action under section d are required to be d 0one under rule 4 ·-cannot of the Act. Further be done before ·certain - matters which are required to be d 0one under rule 4 ·-cannot be done before because the officCr Or the person antborised by him would have no autho:.;./, ~ity, unless notification under section 4 is issued. [9450-H; 946A] A n o· E F G H " .~ ' R.ulo 4(4) does not prohibit or forbid issuance of notification undCr section 4 of the Act unless rule 4(1) has been compiled with. If Jt is now insisted that ther• 1hould be no issuance of noti!cation under section 4 of the Act before enquiry under rule 4 then this sub-rule has to be re-written by statina: that no notificatioa under section 4 and no declaration under sec- ., tion _6_ issued or made as the caso may be unless the requirements mentioned in,· clauses {iJ and (ii) ofsuh·rule (4) of rule 4 have been complied with. On· the contrary., it will be contrary t.o the scheme and purpose of the acquisi - tion proceedings because the compensation for the acquisition has to be fixed :µoder section 23 of the Act keeping the market rate as oa tho date of . the issuance of the notification under section 4 in view. If it be that the, enquiry as contemplated by rule 4 shou!d also precede issUance Or noti'ce under section 4 of the Act then that may upset the fisation of the market value ·and escalation of price with the passage of time between publication . of the notificiltion under sections 4 and _6_ would make acquisition difficult. (94SA-D] 3. Jn a matter of this nature where several contentions factual and legal are urged and when there is scope of an appeal from the decisions of the Court., it is desirable as was observed by the -_PrivY . Council Jong time ago to avoid delay and protraction of litigatio_n that thC~ cour~ should., _ when dealing with any matter dispose of all the points and · not merely rest · its decision on one single point. [9SOA·B] - - r ' **A** **B** _**940**_ SUPREMB COURT REPORTS (1985] 2 S.C.R. CIVIL APPELLATE JURISDICTION : Civil Appeal No. _504_ of 1985 From the Judgment and Order of the High Court of Bombay, Panaji Bench (Goa) dated the 26th June, 1984, in writ Petition No. 8of1984. _B. Zaiwa/a, Anil B._ _Divan, Usgaonkar, Ravinder Narain,_ and _Aditia Narayan,_ for the Appellant. _S.C. Desai, M.M. Abdul Khader, Naunit Lal, Kai/ash Vasdev,_ _Mrs. Vinod Arya,_ and _Miss A Subhashini_ for the Respondents. **c** The Judgment of the Court was delivered by SABYASACHI MUKHARJI, J. Special leave granted. ' #####, . f , ... ,. **.** ' **D** **E** **F** **G** **ff** This appeal filed by M/s F omento Resorts and Hotels Limited raises the short question as to whether compliance with rule 4 of the Land Acquisition (Companies) Rules, 1963 (hereinafter called the Rules) is necessary before issuing notifications under section 4 of the Land Acquisition Act, 1894 (hereinafter referred to as the Act). It appears that the land in question was purchased by Gustavo Ranato da Cruz Pinto hereinafter referred to as the land owner and the original respondent No. I on 10th of March, 1978. The original respondent No. 2 and the appellant herein on the 15th November, 1978 made an application under Chapter 7 of the Act for the acquisition of the said properties. The government issued on the 29th October, 1980 notification in respect of the land in question under section 4 of the Act which was published in the Government Gazette dated 30th October, 1980. The land owner being respondent No. I to this appeal objected to the said notification under section 4. Subsequently government held enquiry under section _SA_ of the Act and the Deputy Collector submitted the report to the Government in March, 1981. On or about 10th April, 1981, the Deputy Collector issued notice to respondent No. I that enquiry under rule 4 of the Rules would be held on 15th April, 1981. '!he respondent No. I filed his objections on merit by the letter dated 4th May, 1981. On 26th October, 1983, agreement was executed between the government and the acquiring company that the land in question was needed for the purpose of development of tourism. The government issued notification under section 6 of the Act which was published in the government Gazette dated 27th October, 1983. A B c D E F G H , _)_ F.R. & HOTELS'· G.R.o.c. PINTO _(S. Mukhiirji,_ _J.)_ 941 The petition under Article 226 out of which this appeal arises was filed in the Bombay High Court by respondent No. 1 challenging the said notifications under sections 4 and 6 of the Act. The High court of Bombay (Goa Bench) quashed the said notifications under sections 4 and 6 of the Act only on the ground that enquiry under rule 4 of the Rules was not held prior to the notification under section 4 of the Act. The propriety and validity of the said decision of th~ High Court are under challenge in this appeal. The High Court, however, noted that the impugned notificat;on had been challenged on several other grounds but in the view it had taken on the first ground namely that the notifications under sections 4 and 6 of the Act being bad for prior non-compliance with rule 4 of the Rules, the High Court felt that it was not necessary to deal with other grounds. The petition succeeded before the High Court and the notifications under sections 4 and 6 of the Act were quashed. This appeal is filed against the judgment of the High Court. Under the scheme of the Act, it is necessary for the purpose of acquisition of land first to issue a notification under section 4 of the Act, whenever it appears to the approprite government that land in any locality is needed or likely to be needed for any public purpose. The purpose and object of the notification under section 4 of the Act have been explained by this Court in the case of _Babu_ _Barkya Thakur_ vs. _State of_ _Bombay_ _(now_ _Maharastra) and others'_ thus: "The purpose of the notification uncer section 4 is to carry on a preliminary investigation with a view to finding out after necessary survey and taking of levels, and, if necessary, digging or boring into the sub-soil whether the land was adapted for the purpose for which it was sought to be acquired. It is only under S. 6 that a firm declartaion bas to be made by Government that land with proper description and area so as to be identifiable is needed for a public purpose or for a Company. What was a mere - proposal under S. 4 becomes the subject matter of a definite proceedings for acquisition under the Act. Hence, it is not correct to say that any defect in the notification under S. 4 (I) AIR 1960 S. C. 1203 at 1208. A B c D E F G H 942 SIJPlUlMll COURT RllPORTS (1985) 2 s.c.R. is fatal to the vaidity of the proceedings, particularly when the acquisition is for a Company and the purpose has to be investigated under S. _SA_ or S. 40 necessarily after the notification under S. 4 of the Act." This Court emphasised that when the acquisition is for a Compauy the purpose has to be investigated under section _5A_ or section 40 necessarily after the notification under section 4 of the Act. The land acquisition proceedings begin with the publication of the preliminary notification. Section _SA_ enjoins heaing of the objections and disposal of objections. Sections 6 of the Act provides that if the government is satisfied after considering the report, if any, made under section _5_ A, that any particular land was needed for public purpose, or for a Company, a declaration shall be made to that effect subject to certain conditions mentioned in the various sub-sections of section 6 of the Act. After declatation under •ectio11 '· s1ctio11. 7 enjoins the Collector to take order for acqnisition _of_ land. Variou1 steps for the actual acquisition are enumerated in subsequent section of the Act which need not be set out in detail. Section 16 empowers taking of the possession after an award is made under section 11 and thereafter the land shall vest in tho government free from all encumbrances. It is important to note that sect ion 23 of the Act deals with the matters to be considered in determining compensation for acquisition of land and it enjoins that the market value should be determined as on the date of tho publication of the notificatian under section 4. In other words section 23 pegs the market value of the land as on the date of the notification under section 4 as one of the factors to be taken into consideration in determining the compensation to be paid. Part VII of the Act deals with acquisition of land for companies. Section 4l of the Act provides that if the appropriate government is satisfi~d after considering the report, if any, of the Collector under section _5_ A, or on the report of the officer making an enquiry under section 40 of certain matters, the details of which are not necessary for the purpose of appeal to be set out, it shall require the Company to enter into an agreement with the appropriate government providing for the satisfaction of the appropriate government for certain matters enumerated in different sub-sections of section 40. The said provisions need not be set out in detail. Essentially the satisfaction and agreement with the company are to ensure that the r #### ... , F.R. & HOTELS f. G.R.D.C. PINTO($. _Mukharji,_ J.) 943 land in question will be put to such use which **ivill** be useful to the public. Rule 3 of the Rules provides for the constitution of the Land Acquisition Committee. Rule 4 is headed "Appropriate Government to be satisfied with regard to certain matters before initiating proceedings" and sub-rule (I) of _rule_ 4 Jays down certain matters about which the appropriate government has to be satisfied when the acquisition is for the Company. Sub-rule (4) of rule 4 of the Rules provides that no declaration shall be made by the appropriate government under section 6 of the Act unless (i) the appropriate govern ment had consulted the committee and had considered the report su9mitted under the said rule. and the report, if any, submitted under section SA of the Act and (ii) further any agreement under section 41 of the Act executed by the Company. Rule 5 of Rules deals with the matters which are to be provided for in the agreement under section 41 of the Act. Rule 6 similarly deals witll. the additional matters which might be provided in the agreement under section 41 of the Act. Rule 7 provides for submission of periodical reports. Rule 8 of the Rules deals with the conditions under which sanction is to be given for transfer of land. Rule 9 deals with special provisions in relation to certain Companies. It is not nocessar, to discuss these rules in detail for the present purpose. A conspectus of the provisions of the A.ct as weli as the Rules indicate that there are two purposes of acquisition of land-one being for the public purpose and the other for the purpose of a Company. In case of acquisition for Company, the appropriate government has to satisfy itself that such acquisition is needed and would be useful also for public need. Rule 4 of the Rules provides for satisfaction of the appropriate government with regard to various matters before acquisition. The learned judges of the Bombay High Court were of the view that the enquiry under rule 4 was necessary for the initiation of the acquisition proceedings to be satisfied that acquisition was **G** necessary for the Company. We are unable to accept this conclusion for the following reasons: (i) To complete the acquisition proceedings, notification under **H** A **B** c **D** **E** F A B c D E F G H 944 SUPREMll COURT REPORTS [1985) 2 S.C.R. section 6 of the Act is required. Section 6 of the Act enjoins that the government has to be satisfied that the land is needed for public purpose or for a Company arid after declaration is made the acquisition is complete after the award is made and possession of the land is taken the land vests under section 16 in the government free from encumbrances. Section 4 does not require as such this satisfaction of the government. The government might initiate acquisition proceedings "if it appears" to the government that land is needed either for public purpose or for a Company. That might appear to the government by enquiry _aliunde_ or on a petition or application made by any Company. Whether the need is proper or genuine that can be found by the government subsequently after notice under section 4 of the Act. An enquiry under rule 4 might be made before issuance of the notification under section 4 of the Act but it is not a _sine qua non_ for the issuance of the notification under section 4 to have an enquiry under rule 4 of the Rules. The scheme and the language of the Act and the Rules do not indicate that. As noted before, section 4 does not require governrr;ent to be satisfied, it is sufficient if it appears to the government that land is needed either for public pnrpose or for a Company. It may so appear to the government either by independent enquiry or from reports and information received by the government or even from an application by the company concerned. Section 6 undoubtedly requires satisfaction of the government and enquiry contemplated under rule 4 must precede publication of the notification under section 6 of the Act. So also there must be before section 6 notification an enquiry under section 5A. The significant pointer to the scheme is provided in sub-rule (4) of rule 4, the material portion of which reads as follows: "(4) No declaration shall be made by the appropriate Government under section 6 of the Act unless (i) the appropriate Government has consulted the Com mittee and has considered the report submitted under this rule and the report, if any, submitted under section _5A_ of the Act; and (ii) the agreement under section 41 of the Act has been executed by the Company." I "' A B c D E F G H - F.R. & HOTELS _v._ G.l!..D.C. PINTO (s. _Mukharji,_ J.} 945 The said sub-rule significantly does not prohibit or forbid issuance of notification under section 4 of the Act unless rule 4 (l) has been complied with. If it is now insisted that there should be no issuance of notification under section 4 of the Act before enquiry under rule 4 then this sub-rule has to be re-written by stating that no notification under section 4 and no declaration under section 6 issued or made as the case may be unless the requirements mentioned in clauses (i) and (ii) of sub-rule (4) of iule 4 have been complied with. We find no warrant to do that. On the contrary, it will be contrary to the scheme and purpose of the acquisition proceedings because the compensation for the acquisition has to be fixed under section 23 of the Act keeping the market rate as on the date of the issuance of the notification under section 4 in view. If it be that the enquiry as contemplated by rule 4 should also precede issuance of notice under section 4 of the Act then that may upset the fixation of the market value and escalation of price with the passage of time between publication of the notifications under sections 4 and 6 would make acquisition difficult. An argument was sought to be built on the basis of the heading of rule 4 which stipulates that "Appropriate Government to be satisfied with regard to certain matters before initiating acquisition proceedings". It is true that before the initiation of the acquisition proceedings, government had to be satisfied of certain matters mentioned in the various sub-rules of rule 4 as well as various provisions of the Act. Though preliminary steps for initiation of acquisition proceedings are necessary and those can only be taken by the authority of the notification under section 4 as mentioned in the decision of _Babu Barkya Thakur_ v. _State_ _of_ _Bombay_ _(now_ _Maharashtra) and Others,_ (supra) the initiation of t'ie acquisition proceedings for all practical purposes begins after section 6 notification. Satisfaction is necessary for proceeding for acquisition under section 6 of 'the Act but section 4 unlike section 6 does not require for the issuance of the notice to be satisfied but it might act only "when it appears" to it that the land is needed or is likely to be needed for any public purpose. Reading the Act and the Rules and keeping in view the scheme of the Act, it is apparent, in our opinion, that before the issuance of section 4 notification, there is no requirement as such of compliance with the procedure contemplated by rule 4 of the Rules. We are therefore unable to subscribe to the view that A B c D E F G H 946 SliPl!.EME COURT REPORTS (1985) 2 S.C.It. enquiry by rule 4 must precede tlte issuance of notification under section 4 (I) of the Act. Furthermore as indicated before cortain matters which arc required to be done under rule 4 can not be done because the officer or the person authorissd by him would have no authority unless notification under section 4 is issued. R•liance was placed before the Bombay High Court and before us in iUpport of the judgment of the High Court on a decision of this Court in the case of _Abdul Husein Tayabali and_ _Ors._ v. _Stat<_ _of_ _Gujarat and Ors._ (1). There the contention before the Court was that Master was only a Special Land Acquisition Officer and not the Collector within the meaning of rule 4. Further· more, it was urged, in any event, the notification in question did not 'specially' appoint him but was a general notification authorising all the Special Land Acquisition Officers in the State appointed not only before the date of section 4 notification but also those who would be appointed in future. It was further contend<d that notification did not "appoint" but simply authorised him to perform the functions of the Collector, the State Government had not given any directions to him to make a report as required by rule 4; therefore the enquiry held by him under that rule and the report made by him was invalid and cons~quently no notification either under section 4 or section 6 could be validly issued. It was urged, therefore, the section 6 notification was issued without complying with Part VII of the Act and without the valid consent of the State Government as required under section 39(iii), that the acquisition was made malafide and without application of mind to the relevant facts and the acquisition did not involve any public purpose and the State government was bound to give an opportunity of being heard to the appellants before taking a decision under section _SA_ particlarly when the report made by Master was against the acquisition. In this connection our attention was drawn to section 39 of the Act which provides that provisions of sections 6 to 37 (both inclusive) shall not be put into force in order to acquire land for any Company unless with the previous consent of the approprate Government nor unless the Company shall have executed the a&reement !hereinafter mentioned. 'fhis section, in our opinion, has no relevance for determining whether to be a proper acquisition, enquiry contemp!at (1) {1968) 1 SCR $97, - ... ### . , _:_ F.R. & HOTilLS _v._ Q.R.o.c. PINTO (S. _Mukharjl,_ _J.)_ 947 ed under rule 4 must precede issuance of the notification under sec· tion 4 of the Act. In the decision of this Court refrrrod to hereinbefore, this question did not really fall for consideration because there was compliance with rule 4 before issuance of tho notification and the infirmities of the enquiry under rule 4 u1ged on behalf of the appellants were not establi1hed. It was urged before this Court that the enqiry under rule 4 was a quasi-judicial enquiry and therefore it was incumbent on Master to give an opportunity to the appellants to be heard. This Court was of the view that the rule provide that an officer conducting the enquiry has to hear the Company before making his report. Whether he was also to hear the owners of the land or not did not fall for decision in those appeals as the officer had in fact given such an opportunity to the appellants by serving them with notices and recorded the statement of such of them who cared to appear before him. It was then contended thatthe enquiry under rule 4 had to be held after the notification under section 4 was issued and not before and therefore the enquiry held by Master was not valid. This Court observed at page 604 of the report "We do not find anything in rule or in any other rule to warrant such a proposition. The enquiry, the report to be made consequent upon such enqiry, obtaining the opinion of the Land Acquisition Committee, all these intended to enable the 6overnment to come to a tentative conclusion that the lands in question were or were likely to be needed for a public purpose &nd to issue thereafter section 4 notification. In our opinion no objection to the appointment of Master to perform the functions of the Collector under section 3(c) or to his competence to make the enquiry and the report under rule 4 or their legality can be validly made." In our opinion when this Court observed that the report of the enquiry under rule 4 was a factor to be taken into consideration and "to issue thereafter section 4 notification" was by general observation. It is undoubtedly true that a notification under section 4 can be issued after enquiry under rule 4. But under the scheme of the Act, the converse is not correct i.e. the enquiry under rule 4 must always precede notification under section 4 of the Aet. In that decision this Court analysed the importance of section _SA_ and it is after considering th~ report under rule 4 and report under section _SA_ that notification under section 6 will be issued. It is undoubtedly true that A B c D Ii a ff A B c D E F 948 SUPREME COURT REPORTS U985] 2 S.C.R. enquiry under rule 4(1) must precede action under section 6 but we do not find reading the said decision of this Conrt in the context of the facts and circumstances and the contentions urged in that case that this· Court laid down any proposition that enquiry under rule 4(1) must precede issuance of notification under section 4. Indeed as we have mentioned before, notification under section 4 would facilitate the matters to be enquired under rule 4(1). Reliance was also placed on certain observations m the case of _General Govt._ _Servants Co-operative Housing Society Ltd,, Agra_ v. _Wahab_ _Uddin_ & _Ors._ _Etc. Etc._ [1 ] There the scheme of the Act was analysed and what were matters to be required under rule 4 of the Rules were mentioned. This Court observed at pages 53-54 of the report as follows : "No declaration shall be made by the approprfote Government under section 6 of the Act unless the Committee has been consulted by the Government and has considered the report submitted by the Collector under section _SA_ of the Act. In addition, under clause (ii) of sub-rule (4) of rule _4,_ the Company has to execute an agreement under section 41 of the Act. The above consideration ;hows that rule 4 is mandatory ; its compliance is no idle formality, unless the directions enjoined by rule 4 are complied with the notifications under section 6 will be invalid. A consideration of rule 4 also shows that its compliance precedes the notification under section 4 as well as compliance of section 6 of the Act." It may be borne in mind in that decision the notification under section 6 was quashed but notification under Section 4 was not quashed though observations were made about the purpose and the role of compliance with rule 4. Reliance was placed on the following observations at page 54 of the report : "A consideration of rule 4 also shows that its compliance G · precedes the notification under section 4 as well as compliance of section 6 of the Act." It appears to us that the reference to rule 4 in the context in which it was made was inadvertent. What perhaps the Court want H (I) [1981] 3 S.C.R. 46. A B c D E F G H ~. # . , ' F.a. & I-{OTELS _v._ G.RD.C. PINTO _(S._ _Mukharji,_ _J,)_ 949 ed to convey was the need of compliance of entering into agreement under section 41 before the issuance of notification under section 6 of the Act. Otherwise it appears that there was no enquiry under rule 4 of the Rules before issuance of the notification under section 4 yet the notification under section 4 was not quashed. The observation then in any event is _obiter._ On the scheme of the Act, we are of the opinion that on a correct interpretation, it is not necessary that enquiry under rule 4 must in all cases precede issuance of the notification under section 4 of the Act. In an appropriate case if it is possible, enquiry under rule 4(1) may be held before the issuance of the notification under seciion 4. But it is not a mandatory requirem~nt that it must precede before the issuance of the notification under section 4. Our attention was drawn to a Bench decision of the Allahabad High Court in the case of _Raja Ram Jaiswal_ v. _Collector,_ _Allahabad_ & _Another_ ( [1] ), where it was held that it would not be right to say that a case where a company makes an application for acquisition of land to the Collector it was obligatory that the provis;ons of rule 4(1) must be complied with before the Collector could issue a notification under section 4(1) of the Act. With this conclusion we are in agreement, though factually the case was slightly different in the sense that there the Collector was authorised to make a notification under section 4(1) of the Act and not the State Government as in this case. Therefore, though there may be in certain cas\:s compliance with rule 4(1) of the Rules it was not mandatory that before issuance of notification under section 40) of the Act there should be an enquiry in compliance with rule 4(1). In the premises in so far as the Bombay High Court held that non-compliance with rule 4 before the issuance of notification under section 4(1) of the Act is bad is set aside. As mentioned hereinbefore, since the issuance of the notifications was challenged on several other grounds and the High Court had not decided those grounds, we remit the matter back to the High Court to decide those grounds. We request the High Court to dispose of those grounds as early as possible. (I) (1980] 2 ILR Allah•bad 269. ###### ·"' . _)._ ## . ' ' **A** **B** **c** 950 **SUPl.llM!** **COU.T REPORTS** [1985] 2 s.c.R. In a matter of this nature where several contentions factual and legal are urged and when there is scope of an appeal from the decision of the Court, it is desirable as was observed by the Privy Council long time ago to avoid delay and protraction of litigation that the court should, when dealing with any matter dispose of all the points and not merely rest its decision on one single point. In the facts and circumstances of the case, as the matter is being remitted back to the High Court, costs of this appeal will abide by the result of the High Court decision. S.R. _Appeal a/lowed_
End of Judgment Record
Browse All Supreme Court of India (1985) Decisions
1984-09-28

Gurpal Tuli and Ors. v. State of Punjab and Ors.

This Supreme Court decision concerns pay scales for teachers in the Punjab government schools in light of circulars issued in 1967, 1979, and 1957. The appellants—Masters and Mistresses holding M.A., M.Sc., B.T. or B.Ed. degrees—petitioned for the higher Lecturer’s grades set out in paragraph 2 of the Government Circular Letter dated July 29, 1967 (Rs. 300-25-450/25-600 for those with first and second division Master’s degrees; Rs. 250-25-400/25-550 for those with third-class Master’s degrees). They argued that they perform the same work as Lecturers and, under the principle of equal pay for equal work, are entitled to those higher grades; reliance was placed on Randhir Singh v. Union of India. The Punjab and Haryana High Court dismissed the writ petitions, and the Division Bench affirmed. The Court held that paragraph 2 of the July 29, 1967 circular creates a Lecturer’s Grade, and the number of Lecturer posts is limited; entitlement to those grades is contingent on holding Lecturer posts, not merely possessing postgraduate qualifications. The decision distinguishes Randhir Singh and notes that the July 29, 1967 circular operates on a different plane from the 1957 circular. Kirpal Singh Bhatia’s case is deemed of no assistance. Consequently, the appeals are dismissed, preserving the distinction between Lecturer posts and other teaching posts while acknowledging earlier clarifications remain applicable to the relevant posts.

1984-12-11

Goa Sampling Employees' Association v. General Superintendence Co. of India Pvt. Ltd. & Ors.

These appeals address whether the Central Government is the "appropriate Government" to refer five industrial disputes under Section 10(1)(d) of the Industrial Disputes Act, 1947, in the Union Territory of Goa, Daman and Diu. The Goa Sampling Employees' Association contended that iron ore samplers employed at Mormugao Port fall within the Dock Workers (Regulation of Employment) Act, 1948 as "dock workers" and, being in a major port within a Union Territory, the Central Government is the appropriate authority to refer the disputes. They also argued that in a Union Territory there is no State Government and thus the Central Government should perform functions of the State Government for the UT. The Central Government’s references were initially upheld by the Tribunal, but the Bombay High Court quashed them, holding the Central Government not to be the appropriate Government, since Goa, Daman and Diu is administered by an Administrator under Article 239, with the Administrator treated as the State Government for purposes of the Act. The Supreme Court reversed, holding that the General Clauses Act definitions and Constitutional provisions treat the Union Territory administration separately from a State Government; the Central Government is the appropriate Government for UTs in relation to industrial disputes. The Court directed expeditious disposal of the merits and awarded costs against the respondents.

1985-04-23

V. J. THOMAS AND ORS. v. UNION OF INDIA AND ORS.

This is a Supreme Court appeal by Junior Engineers challenging the constitutionality of the Note appended to clause (4) of Appendix I to the Telegraphic Engineering Service (Group B Posts) Recruitment Rules, 1981. The dispute traces to earlier rules: the 1966 Telegraphic Engineering Service (Class II) Recruitment Rules required promotion to Assistant Engineer entirely by promotion through a qualifying departmental examination, with a list prepared by a Departmental Promotion Committee. Sub-clause (4) allowed those recruited and absorbed in that grade against vacancies in a given year (five years prior to the year of announcement) to be eligible for the department exam. The 1981 Rules superseded the 1966 Rules and introduced a qualifying-cum-competitive examination, with a Note stating that the first two examinations would be competitive only for officers who had already qualified in the qualifying examination held before the 1981 Rules. Appellants, recruited in 1973, argued that this Note discriminates against 1973 and later batches by denying them a fair opportunity to contest promotions, despite five years’ service. The Kerala High Court found the Note ultra vires, but the Division Bench disagreed. The Supreme Court ultimately held that the appeal is infructuous due to time and that the Note is not ultra vires, while directing future scheduling of qualifying and competitive examinations, and promotions in light of vacancies. The appeal is disposed of with no costs.

1985-03-27

T. Venkata Reddy v. State of Andhra Pradesh

These writ petitions challenge the constitutional validity of the Andhra Pradesh Abolition of Posts of Part-time Village Officers Ordinance, 1984 (Ordinance No. 1 of 1984), which abolishes part-time village posts and creates Village Assistants. The Governor promulgated the Ordinance under Article 213, arguing administrative reform and expediency in a divided Andhra Pradesh (Andhra Area and Telangana Area) with a long history of hereditary and semi-hereditary village offices governed by pre-constitutional and colonial statutes. The petitions raised three main contentions: (i) lack of mind by the Governor in promulgating the Ordinance, (ii) the Ordinance lapsed due to absence of a replacement Act and thus the abolished posts should be revived, and (iii) the abolition infringed Article 21. The petitioners relied on earlier judgments upholding gubernatorial ordinances and the proposition that an Ordinance should have the same force as an Act, yet require constitutional limits. The Court reviews the constitutional framework (Articles 123 and 213) and explains that Ordinance power is a plenary legislative function exercisable to meet emergencies when the legislature is not in session, with the Ordinance having the force of an Act but subject to six-week or six-month disallowance provisions. It also clarifies that abolition and the creation of Village Assistants are two independent, sequential actions and that disapproval cannot revive completed, already-implemented changes. The Court ultimately dismisses the petitions, noting that the State may create new posts under Article 162 as long as not pre-empted by a statute or rule.