Executive Engineer, Uttaranchal Power Corporation v. M/S. Kashi Vishwanath Steels Ltd. & Ors.

Case / Petition Number:
Civil Appeal No. 1106 of 2007
Neutral Citation:[2010] 6 S.C.R. 1086

Case Synopsis & Summary

This case concerns the levy of a 15% surcharge on electricity supplied to consumers connected to independent feeders, under the Tariff Rate Schedule HV-2 incorporated in the Uttar Pradesh Regulatory Tariff (Notification dated 07 August 2000). The tariff mandated a 15% surcharge for electricity supplied during peak hours and for those drawing power from independent feeders, conditioned on an assured supply of a minimum 500 hours per month; a shortfall triggered a rebate of 1% for every 10 hours of deficiency. M/s Kashi Vishwanath Steels Ltd. (KVSL) entered into an energy supply agreement with the Uttar Pradesh Power Corporation Ltd. and sought exemption from the 15% surcharge, claiming it did not require the guaranteed 500 hours. The Uttar Pradesh Power Corporation initially granted exemption (24 October 2000) following a circular dated 8 September 2000, but after bifurcation, the Uttarakhand Power Corporation (UPC) withdrew the exemption in December 2001 and issued revised bills. KVSL challenged the surcharge before the Allahabad and Uttarakhand High Courts, which found in KVSL’s favor on some grounds but held no promissory estoppel since no promissory promise had been proven. The Supreme Court later recalled its earlier judgment in related matters and held that no enforceable promise existed by the UP Power Corporation toward KVSL’s case. Ultimately, the Court allowed the Uttarakhand appeal, set aside the High Court order, and awarded costs.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • Harjit Singh Bedi
  • T. S. Thakur
Judgment Date
2010-05-12
Court Decision / Holding
Appeal allowed. The Court held that no enforceable promise was made by the UP Power Corporation to KVSL that supply of energy would be without payment of surcharge. The Uttarakhand State Corporation’s withdrawal of exemption was not actionable against KVSL on promissory estoppel grounds. The High Court’s judgment was set aside, with costs awarded (Rs. 50,000). The matter regarding independent feeder surcharge was left to the regulatory commission to decide in pending matters.
Final Disposition
Appeal allowed; High Court order set aside with costs (Rs. 50,000)

Parties to the Case

Appellants / Petitioners

  • Executive Engineer, Uttaranchal Power Corporation

Respondents

  • M/s Kashi Vishwanath Steels Ltd.

Legal Representation & Advocates

Counsels for Petitioners

  • • Shanti Bhushan
  • • Niraj Sharma
  • • Vikrant Singh Sais
  • • Sumit Kumar Sharma

Counsels for Respondents

  • • K. V. Viswanathan
  • • Amit Bhandari
  • • Neha
  • • Abhishek Kaushik
  • • Vikas Mehta

Provisions of Law Cited

Uttar Pradesh Electricity Reforms Act, 1999Tariff Rate Schedule HV-2 (Notification dated 07-08-2000)Electricity (Supply) Act, 1948Uttar Pradesh Reorganisation Act, 2000 (Section 63)

Legal Doctrines & Maxims

  • Promissory Estoppel
  • Equitable Estoppel (doctrine)

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellant contended that the Circular dated 8 September 2001 modifying the tariff and the subsequent withdrawal of the exemption by UPC created an obligation on the part of the predecessor UP Corporation, and that KVSL should not be penalized for relying on such representations. It was argued that promissory estoppel should apply to uphold the exemption or at least bar recovery of the surcharge during the relevant period, and that the status and actions of UPC’s successor, UPC, should be binding. KVSL asserted that the tariff itself contemplated a 15% surcharge for independent feeders and that the exemption was a valid modification only if legally permissible and consistently applied.

Contentions of Respondents

KVSL argued that the tariff clearly provided for the 15% surcharge for independent feeders and that the 500-hour guarantee was a condition which KVSL freely opted into; it claimed that a promise or assurance by UP Power Corporation conferred a legitimate reliance interest and that promissory estoppel should prevent withdrawal of the exemption by UPC. KVSL contended that the decision to withdraw the exemption and revise bills was legally inappropriate without a promissory estoppel being rebutted, and it asserted that the earlier promises bound the corporation and its successors.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•5,590 words•~26 min read

In The Court Record

Executive Engineer, Uttaranchal Power Corporation v. M/S. Kashi Vishwanath Steels Ltd. & Ors.

# [2010] 6 S.C.R. 1086 # A EXECUTIVE ENGINEER, UTTARANCHAL POWER CORPORATION _v._ M/S. KASHI VISHWANATH STEEL LTD. & ORS. (Civil Appeal No. 1106 of 2007) B MAY 12, 2010 ## **[HARJIT SINGH BEDI AND T.5. THAKUR, JJ.)** - _Uttar Pradesh Electricity Reforms Act, 1999 Notification_ C _dated 07.08.2000_ - _Tariff Rate Schedule for supply of_ - _electricity Levy of 15% surcharge on electricity supplied_ - _directly from independent feeder Agreement between applicant and UP. Power Corporation for supply of electricity_ - - _Confusion as regard interpretation of tariff Issuance of_ D _circular that if consumers connected to independent feeders did not want electricity supply for 500 hours, no surcharge could be levied, provided consumer intimates Executive_ - - _Engineer Grant of exemption to applicant Meanwhile writ petition by some other company challenging levy of_ E _surcharge_ - _High Court holding that consumers drawing power from independent feeders, entitled to rebate @1% for each_ - _10 hours shortfall on bill amount Bifurcation of UP. Power_ - _Corporation Establishment of Uttarakhand Power_ - _Corporation (UPC) Withdrawal of exemption order by UPC_ F _and issuance of revised bill_ - _Challenge to_ - _Writ petition_ - - _allowed Appeal before Supreme Court Allowed holding that UPC did not make any such promise to consumers, thus,_ - _doctrine of promissory estoppel not applicable Said order recalled_ - _On rehearing of appeal, held: In absence of averment that there was a promise made by UP. Power_ G _Corporation regarding supply of energy without payment of surcharge and in absence of any material to show that applicant acted upon any such promise, doctrine of_ - _promissory estoppel not applicable Order of High Court set_ - - _aside Doctrines Promissory estoppel._ H 1086 EXECUTIVE ENGINEER, UTIARANCHAL POWER CORPN. _v._ 1087 KASHI VISHWANATH STEEL LTD. In terms of the Notification dated 07.08.2000, the Uttar A Pradesh Electricity Regulatory Commission stipulated the Tariff Rate Schedule for the supply of electricity. It provided that the consume.rs opting for supply during the restricted/peak hours were to pay an additional surcharge of 15% on the bill amount. The consumers getting power B supply from independent feeders emanating from 400/ 220/132 KV sub-station were to pay an additional surcharge of 15% on the bill amount subject to the assured electricity supply of minimum 500 hours in a month. In case of shortfall of electricity, the consumers c were entitled to a rebate @1 % for each 10 hours shortfall on the bill amo1.mt. The respondent company ~ntered into an agreement with the Uttar Pradesh Power Corporation Ltd. for the supply of electrical energy. There was some confusion in regard to the interpretation of tariff. A D circular was issued that if the consumers connected to independent feeders did not want electricity supply for guaranteed period of 500 hours, no surcharge of 15% could be levied provided they informed the Executive Engineer. The respondent wrote a letter to the Executive E Engineer that they did not require assured supply of electricity for 500 hours and was granted exemption from payment of 15% surcharge from 24.10.2000. Meanwhile, LML company filed writ petition challenging levy of surcharge on the total energy bill payable by it. The High F Court dismissed the petition. It held that the consumers drawing power from the independent feeders, were entitled to a rebate @1 % _tor_ each 10 hours shortfall on the bill amount. D E F Thereafter, upon bifurcation of U.P. Power G Corporation, the Uttarakhand Power Corporation (UPC) was established. By order dated 07.12.2001, UPC withdrew the exemption granted to the respondent by the erstwhile U.P. State Power Corporation Ltd. from 24.10.2000 and issued a revised bill. The respondent filed H ## 1088 SUPREME COURT REPORTS [2010] 6 S.C.R. A writ petition challenging the same. The High Court allowed the ll'lrit petition holding that since the respondent company did not require assured supply of 500 hours electricity in a month, it was not liable to pay 15% surcharge; that the exemption granted by U. P. Power B Corporation Ltd. was valid and in accordance with the Notification, thus struck down the demand raised by the Corporation. Thereafter, UPC as also LML company filed appeal before this Court. It was held that U. P. Power Corporation appears to have made a promise to c consumers and the same was enforceable. As regard UPC it was held that it did not make any such promise to consumers, thus, promissory estoppel will not apply . . The issue regarding surcharge on consumers drawing power from independent feeder was pending before the 0[Regulatory Commission and thus, was withdrawn. The ] CA No. 1106 of 2007 filed on behalf of UPC was allowed. Thereafter, the respondent filed IA in CA No. 1106 of 2007, before this Court seeking clarification of the order that UPC did not make any promise to consumers. The respondent contended that the promise was made by E U.P. Power Corporation which was binding upon the Corporation as also its successor-in-interest-UPC after the same came into existence, thus was enforceable. The IA was disposed of. It was directed that the judgment dated 13.12.2007 of this Court in CA No. 1106 of 2007 be F recalled. Hence the appeal. ## Allowing the appeal, the Court HELD: 1.1 In Writ Petition No. 942 of 2001 filed by the G respondent-KVSL it was unequivocally admitted that the respondent-company was a consumer getting supply from an independent feeder emanating from 400/220/132 KV sub station. With the coming into existence of State of Uttarakhand w.e.f. 9th November, 2000 a new Power Corporation for the said State was established on 1st H April, 2001. The respondent-company's further case is -. EXECUTIVE ENGINEER, UTTARANCHAL POWER CORPN. _v._ 1089 KASHI VISHWANATH STEEL LTD. that Uttarakhand Power Corporation did not charge 15% A surcharge on monthly demand and energy charges for the period April 2001 to October 2001 and that it is only on 7th December, 2001 that the applicant received an intimation that circular dated 8th September had been revoked and letter dated 24th October cancelled. The U.P. B Electricity Regulatory Commission had approved a new tariff by order dated 1st September, 2000 and U.P. State Power Corporation had issued a consequential Notification dated 10th July, 2001. The notification did not any longer provide for 15% surcharge from consumers c getting supply of energy from independent feeders. [Para 17] [1101-B-E] > 1.2. While according to the applicant-KVSL circular issued by the U.P. Power Corporation dated 8th September, 2001 giving an option to the consumers was valid and in accordance with law, there is not even a murmur in the writ petition filed by the respondent~ company to the effect that either the U.P. Power Corporation or its successor had at any point of time made any promise to the company that supply of energy would be without any surcharge notwithstanding the fact that the tariff prescribed by the Regulatory Commission > envisaged the levy of surcharge on electricity supplied directly from an independent feeder. There is similarly no averment whatsoever in the writ petition to the effect that the respondent-KVSL had altered its position acting upon any such promise. Not only that the agreements executed between the parties, namely, KVSL on the one hand and Power Corporation on the other also did not contain any unequivocal promise for supply of energy, no matter the supply was made from an independent feeder. In the absence of even an averment to the effect that there was a promise made by the U.P. State Power Corporation regarding supply of energy without payment of surcharge and in the absence of any material to show D E F G H 1090 SUPREME COURT REPORTS [2010] 6 S.C.R. A that the respondent-KVSL had indeed acted upon any such promise it is difficult to see how the said company can insist upon any such non-existent promise being made good. Before a party can rely upon on the doctrine of promissory estoppel ~t must make a specific B averments and place material on record to demonstrate that a promise was indeed made to it. There is neither any averment nor any material to support the plea of promissory estoppel in the case at hand. [Para 17] (1101E-H; 1102-A-C] ## c 1.3. The High Court of Uttrakhand did not find a case in favour of the respondent-KVSL. It is one thing to say that the plea of promissory estoppel is available to a consumer but an entirely different thing to say that such a plea has been made good by the material on record. D Therefore it cannot be accepted that any promise was made by the U.P. State Power Corporation to the respondent-KVSL which could justify the grant of any mandamus in its favour for making good any such promise. The order passed by the High Court in the writ E petition filed by respondent-KVSL is set aside. [Paras 18, 19 and 20] [1102-F-G] CIVIL APPELLATE JURISDICTION : Civil Appeal No. 1106 of 2007. F From the Judgment and order dated 17.01.2007 of the High Court of Uttaranchal at Nainital in W.P. No. 936 of 2001. Shanti Bhushan, Niraj Sharma, Vikrant Singh Sais and Sumit Kumar Sharma, for the Appellant. G K.V. Viswanathan, Amit Bhandari, Neha, Abhishek Kaushik and Vikas Mehta, for the Respondents. The Judgment of the Court was delivered by H T.S. THAKUR, J. 1. This appeal by special leave arises EXECUTIVE ENGINEER, UTTARANCHAL POWER CORPN. _v._ 1091 KASH! VISHWANA'rH STEEL LTD. [T.S. THAKUR, J.] out of an order dated 17th January, 2007 passed by the High Court of Uttaranchal at Nainital whereby Writ Petition No.936 of 2001 filed by respondent M/s Kashi Vishwanath Steels Ltd. has been allowed and order dated 7th December, 2001 passed by the Executive Engineer (Electricity) Distribution Division, District Udham Singh Nagar, quashed. A s 2. Uttar Pradesh State Eledricity Board was established by the State of Uttar Pradesh in terms of the provisions of the Electricity (Supply) Act, 1948. With the enactment of Uttar Pradesh Electricity Reforms. Act, 1999 the Government constituted Uttar Pradesh Electricity Regulatory Commission. C . In terms of a Notification dated 7th August, 2000 the Commission stipulated the tariff for the supply of electricity effective from 9th August, 2000. The rate schedule for large and heavy power, inter alia, provided that consumers who opt for power supply during the restricted/peak hours shall pay an D additional surcharge of 15% on the amount billed at the "Rate of Charge" under item-4A of the Schedule. It further provided that consumers getting power supply from independent feeders emanating from 400/220/132 KV sub-stations shall pay an additional surcharge of 15% on demand and energy charges · E subject to the condition that these consumers will get assured electricity supply of minimum 500 hours in a month. In case of shortfall in the guaranteed hours of electricity supply, the consumers were entitled to a rebate @ 1 % for each 10 hours shortfall on the bill amount computed under "Rate of Charge". F Relevant portion of the Tariff Rate Schedule HV-2 forming part of Notification dated 7th August, 2000, reads as under: F ## Notes: G (a) In respect of consumers who opt for power supply during restricted/peak hours an additional surcharge of 15% on the amount billed at the "Rate of Charge" under H 1092 SUPREME COURT REPORTS [2010] 6 S.C.R. - A item 4-A above, i.e. Demand Charge and Energy Charge shall be levied. - However, in respect of consumers getting power - supply on independent feeders emanating from 400/220/ 132 KV sub-stations an additional surcharge of 15% on - B demand and energy charges shall be charged further subject to the condition that these consumers will get an assured supply of minimum 500 hours in a month. In case of short fall in above guaranteed hours of supply a rebate @ 1 % for each 10 hours short fall will be admissible on - c the bill amount computed under "Rate of Charge". 3. Respondent- Kashi Vishwanath Steels Ltd. (hereinafter referred to as the 'KVSL' for short) is a public limited company 0 registered under the Companies Act. On 9th November, 1995 it had entered into an agreement with Uttar Pradesh Power Corporation Ltd., Lucknow (respondent no.4 in this appeal) for the supply of electrical energy ipfor the production of Furnace E and Steel Rolling Manufacturing (Process) unit at Narayan Nagar Kashipur in the form of three phase Alternating Current at a declared pressure of 33000 Volts and a power of not exceeding 4800 K.V. amperes. The said agreement was followed by a fresh agreement executed on 28th March, 2000 between the company and the Uttar Pradesh Power F Corporation Ltd., inter alia, providing that the company shall pay for the supply of energy at the rates stipulated by the supplier from time to time and that the rate schedule applicable at the time of execution of the agreement could be revised at the discretion of the supplier. With the tariff prescribed by the U.P. - G Electricity Regulatory Commission becoming effective for the supply received by the consumer-company the latter became liable to pay in terms of the said tariff. Some confusion, however, appears to have arisen in regard to the interpretation of the tariff prescribed by the Commission particularly in relation - H to the levy of 15% surcharge upon consumers who dr~!" power EXECUTIVE ENGINEER, UTTARANCHAL POWER CORPN. _v._ 1093 KASH! VISHWANATH STEEL LTD. [T.S. THAKUR, J.] from independent feeders. The Corporation purported to clear the mist by issuing a circular dated 8th September, 2000 whereunder it purported to give certain guidelines to the concerned subordinate officers and demanded strict compliance thereof. The circular, inter alia, provided that if consumers connected to independent feeders did not want electricity supply for the guaranteed period of 500 hours, no such surcharge of 15% could be levied provided they intimate to the Executive Engineer that they do not want the guaranteed supply for 500 hours. The relevant portion of the circular reads asunder: "2.(a) In the rate schedule HV-2, as a result of the guarantee . of 500 hours electricity supply of independent feeder from 400, 220 and 132 KV sub stations, 15% surcharge shall be levied. Consumers of this category shall be ensured 500 hours electricity supply per month. Due to lesser electricity supply than 500 hours, they shall be given 1% deduction for every ten hours in their electricity bill. If consumers connected with these independent feeders do not want guarantee of 500 hours electricity supply then, in that event, they shall not be imposed 15% surcharge in their bills. Such consumers shall intimate the Executive Engineer distribution by registered post that they do .not want guarantee of 500 hours electricity supply. The Executive Engineer shall issue office memo in this regard . . If any consumer of this category does not give any option then he shall be ensured 500 hours electricity supply and 15% surcharge shall be taken. S.S.O./Junior Engineer shall be responsible to ensure that the consumer in question does not use electricity during the restricted period. If consumers of this category use electricity in the restricted period also then they shall be charged 15+15 = 30% surcharge." 4. It was pursuant to the above circular that the KVSL addressed two letters one dated 6th October, 2000 and the A B C D E F F H 1094 SUPREME COURT REPORTS [2010] 6 S.C.R. A other dated 16th October, 2000 to the Executive Engineer of the Corporation to the effect that the former did not require the assured supply of electrical energy for 500 hours and that they may not be required to pay surcharge at the stipulated rate of 15%. On receipt of the said letters the Executive Engineer B issued an office memo dated 24th October, 2000 granting exemption to the KVSL from payment of 15% surcharge subject to the unit complying with the other conditions stipulated in the memo. 5. In the meantime M/s L.M.L. Limited who had also C entered into an agreement with U.P. State Electricity Board for supply of electrical energy for its factory at Kanpur filed Writ Petition No.40692 of 2000 in the High Court of Judicature at Allahabad challenging levy of surcharge on the total energy bill payable by it. The petitioner's case in that petition was that it D was not only observing the peak hour restrictions but was not consuming power during the restricted hours hence was not liable to pay the surcharge of 15% being demanded from it. In the reply filed on behalf of the electricity supply company it was on the other hand stated that power was being supplied to the E petitioner from an independent feeder emanating from 400/ 220/132 KVS and consequently the petitioner was liable to pay 15% surcharge under the tariff determined by the U.P. Electricity Regulatory Commission. It was also stated that payment of 15% surcharge by consumers drawing energy from an F independent feeder was not subject to the observance of peak hours restrictions because those who consume power between 6 p.m. to 1 p.m. had to pay an additional amount of 1 % surcharge on the energy charge. G 6. A Division Bench of the High Court of Allahabad dismissed the writ petition mentioned above holding that there was absolutely no confusion of any kind in the tariff approved by the Regulatory Commission to call for any clarification in the form of the circular referred to earlier. It was also declared that for consumers drawing power from independent feeders H EXECUTIVE ENGINEER, UTTARANCHAL POWER CORPN. _v._ 1095 KASHI VISHWANATH STEEL LTD. [T.S. THAKUR, J.] emanating from 400/220/132 KVS sub- stations there existed A no provision in the tariff prescribed by theCommission requiring them to exercise any option in the matter. The only benefit that the consumers who drew power from such independent feeders but who do not get supply for the minimum 500 hours in a month were granted a rebate@ 1% for every 10 hours or part thereof B if the continuous supply had failed. The High Court observed: "Ther.e is absolutely no ambiguity or confusion of any kind in the tariff as approved by the Commission. It clearly contemplates two categories of consumers. One category C is of consumers who get power supply on independent feeders emanating from 400/220/132 KV sub stations. The two categories are wholly independent and distinct and they are not inter linked with each other. The third condition mentioned at the bottom of the box clearly shows that a consumer cannot get power supply in restricted D hours as a matter of right and he shall have to take permission from UPPCL with intimation to the Commission. It follows that if a consumer does not apply for permission from UPPCL and such a permission is not granted he shall not get power supply in restricted hours E and he will not be required to pay 15 per cent surcharge. However, so far as consumers getting power supply on independent feeders emanating from 400/220/132 KV sub stations are concerned, they have to pay 15 per cent surcharge on demand and energy charges. This levy of 15 F per cent surcharge is dependent only upon the fact that the consumer is getting power supply on an independent feeder emanating from 400/220/132 KV sub stations and it is not dependent upon getting power supply in restricted hours. It is also noteworthy that for such category of G consumers there is no provision for taking any option to the effect that he does not want an assured supply of 500 hours in a month. The only benefit provided to him in the tariff is that he is assured of supply of minimum 500 hours in a month and in case of shortfall in the guaranteed hours H H 1096 SUPREME COURT REPORTS [2010] 6 S.C.R A of the supply, a rebate @ 1 per cent 10 hours or part thereof shall be admissible on the total amount computed under "Rate of Charge". 7. Relying upon the view taken by the High Court in the B above writ petition the Uttarakhand Power Corporation established upon bifurcation of the U.P. Power Corporation in terms of Section 63 of the U.P. Reorganisation Act issued an order dated 7th December, 2001 withdrawing the exemption granted to KVSL by the erstwhile U.P. State Power Corporation Ltd. The withdrawal order is in the following terms: c "In the aforesaid context, in the light of judgment of the Hon'ble High Court, Allahabad the Uttar Pradesh Power Corporation ltd. vide order No.1423/HC/UPCL/Five1974+204 C/2000 dated 8.9.2000 has been cancelled D from the date of its issuance itself. Accordingly, Memo No.3184Ni.Vi.kha/dated 24.10.2000 is cancelled from the date of issuance 24.10.2000. The bills of M/s Kashiviswanath are ordered to be amended in accordance with the concerned billing tariff since 8.9.2000.." E 8. Aggrieved by the above order KVSL filed writ petition No.936 of 2001 before the High Court of Uttaranchal challenging Note (a) of Clause IV, Rate-Schedule in Category HV-2 List II of the tariff to be unconstitutional and for quashing the revised bill issued to KVSL. A mandamus directing F Uttaranchal Corporation not to levy any surcharge on the supply energy to the consumer was also prayed for. 9.The above petition was allowed by the High Court of Uttaranchal by its order dated 17th January, 2007. The High G Court took the view that since the petitioner KVSL did not require assured supply of 500 hours electricity in a month it was not liable to pay 15% surcharge and that the exemption granted by the U.P. Power Corporation ltd. was valid and in accordance with the provisions of the Notification dated 8th H September, 2000. The demand raised by the Corporation was EXECUTIVE ENGINEER, UTTARANCHAL POWER CORPN. _v._ 1097 KASH! VISHWANATH STEEL LTD. [T.S. THAKUR. J.] accordingly struck down. Aggrieved by the said order the A Uttaranchal Power Corporation filed Civil Appeal No.1106 of 2007 in this Court which was heard alongwith Civil Appeal No.5789 of 2002 filed by LML Ltd. against the order passed by the High Court of Allahabad dismissing Writ Petition No.40692 of 2000 filed by the said company. Similar other B appeals filed by other units against identical orders passed by the High Court of Allahabad were also heard and disposed of by this Court by a common order dated 13th December, 2007. This Court held that in so far as the U.P. Power Corporation had made a promise to anyone of the consumers the same was c enforceable. In the case of Uttarakhand Power Corporation, however, this Court found no such promise to have been made to the consumer. Civil Appeal No.1106/2007 filed by the Utt~rakhand Power Corporation against the judgment of the High Court of Uttarakhand was accordingly allowed on that 0 basis. In so far as appeals arising out of the judgment of the Allahabad High Court and touching the question of surcharge on consumers drawing power from independent feeders were concerned the same were allowed to be withdrawn in view of the fact that several matters involving the said question were E pending before the Regulatory Commission. The appellants were permitted to agitate the said point before the Commission. The relevant portion of the order passed by this Court may at this stage be extracted: "50. Similarly Uttaranchal Power Corporation also does not appear to have made such a promise. The doctrine of promissory estoppel in those cases also will have no application. F 51. In view of the fact that several matters are pending before the Commission on question of independent feeder we need not express any opinion thereupon. If any appeal is pending before the Commission on the said question it would decide the same independent of the same irrespective of the result of this decision. We, therefore, G H 1098 SUPREME COURT REPORTS [2010] 6 S.C.R. .. A without expressing any opinion on the said question, permit the appellants to agitate the same point before the Commission. B c 52. We, therefore, allow these appeals only to the extent mentioned hereinbefore in terms of the promise made by U.P. Power Corporation and allow the appeals on question of independent feeder to be withdrawn subject to the observations made by us hereinabove. 53. Civil Appeal No. 5789 of 2002 which relates to Kanpur Electricity Supply Company is dismissed. 54. Civil Appeal No. 1106 of 2007 filed on behalf of Uttaranchal Power Corporation is allowed. 55. There shall, however, be no order as to costs. D SLP (C) No. 6721 of 2007 The only issue involved in this petition is the question of independent feeder and the appeal being pending before the Commission, this special leave petition is permitted E to be withdrawn. Sd/- (S.B. SINHA) Sd/- F (HARJIT SINGH BEDI)" 10. l.A.No.2 of 2008 in Civil Appeal No.1106 of 2007 was filed in this Court for seeking clarification/modification of the above order primarily on the ground that the observations made G in para 50 are erroneous since Uttarakhand Power Corporation was non-existent during the relevant period. There was according to the applicants no question of any such promise having been made to respondent-KSVL by a non-existent entity. The promise was according to the applicant made by U.P. H Power Corporation which was binding upon the Corporation as EXECUTIVE ENGINEER, UTIARANCHAL POWER CORPN. _v._ 1099 KASHI VISHWANATH STEEL LTD. [T.S. THAKUR, J.) also its successor in-interest, namely, Uttarakhand Power A Corporation after the same came into existence w.e.f. 9th November, 2001. It is further stated that the dispute in the instant case was with regard to the period between September 2000 when the exemption of surcharge was granted to the consumer and 1st September, 2001 when the same was discontinued. B B 11. In substance the case of the applicant was that a representation/promise had been made to it by the U.P. Power Corporation which promise having been held enforceable qua other units similarly situated as the applicant, could not be C ignored in so far as the applicant was concerned. The promise was according to the applicant binding even upon the successor-Corporation, namely, Uttarakhand Power Corporation and the very fact that no promise was made by Uttarakhand Power Corporation did not make any difference so long as the liability arising out of the promise made by the D U.P. State Corporation was clear and legally enforceable. 12. The above application was heard and finally disposed of by a Bench of Hon'ble Harjit Singh Bedi and Hon'ble Aftab Alam, JJ. with the following direction: E "Learned counsel for the parties agree that the judgment dated 13.12.2007 of this Court be recalled in C.A. No.1106 of 2007. We order accordingly. C.A. No.1106 of 2007 will be heard on its own merit." F 13. It is in the light of the above order that this appeal has been heard for disposal afresh. , 14. The order of discontinuing the surcharge w.e.f. 1st September, 2001 reads: G 'The U.P.E.R.C. in terms has recorded that discontinuation of 15% surcharge is due to (i) inability/incapability on the part of UPPCL for technical' and operational reasons to ensure the guaranteed supply of 500 hours, (ii) it was difficult for UPPCL even to distinguish between the two H 1100 SUPREME COURT REPORTS [2010) 6 S.C.R. A consumers on independent feeder who asked for assured supply and who do not, (iii) most of the consumers having opted against this agreement and (iv) the financial implication was also negligible if the scheme was discontinued." B 15. Appearing for the appellant Mr. Shanti Bhushan, learned senior counsel strenuously argued that the circular issued by the U.P. State Corporation modifying the tariff prescribed by the Regulatory Commission was wholly without any jurisdiction and could be recalled by the Uttarakhand Power C Corporation w.e.f. the date the same was issued. Inasmuch as such a withdrawal was ordered by the Corporation it committed no illegality especially when the withdrawal was supported by clear and authoritative pronouncement of the High Court of Allahabad stating that the grant of exemption tantamounted to D modifying the tariff which modification the corporation was not legally competent to make. It was further argued by Mr. Shanti Bhushan that there was no question of any promise having been made either by U.P. State Corporation or the Uttarakhand Power Corporation. In the absence of any such promise and E in the absence of any material to show that the petitioner had acted upon any such promise and changed its position, there was no question of interfering with the order withdrawing the exemption on the basis of the principles of equitable estopple. F 16. On behalf of the respondent-KVSL, it was on the other hand, submitted that since a promise was found to have been made by the U.P. Power Corporation to other consumers and since the said promise has been held to be enforceable, there was no justification for taking a different view insofar as the G respondent-company is concerned. It was also submitted that once U.P. Corporation is held to be bound by the promise made by it the Uttarakhand Corporation which came into existence upon reorganization of the State had no option but to make the said promise good. It could not retrospectively withdraw the same only with a view to recover money which H EXECUTIVE ENGINEER, UTIARANCHAL POWER CORPN. _v._ 1101 KASHI VISHWANATH STEEL LTD. [T.S. THAKUR, J.] even t~e U.P. State Power Corporation would not have been A entitled 1to recover. 17. In Writ Petition No.942 of 2001 filed by the respondentKVSL the material facts were not disputed. It was unequivocally admitted that the respondent-company was a consumer getting B supply from an independent feeder emanating from 400/220/ 132 KV sub station. It was also not in dispute that with the coming into existence of State of Uttarakhand w.e.f. 9th November, 2000 a new Power Corporation for the said State was ~stablished on 1st April, 2001. The respondent-company's C further case is that Uttarakhand Power Corporation did not charge 15% surcharge on monthly demand and energy charges· for the period April 2001 to October, 2001 and that it is only on 7th December, 2001 that the applicant received an intimation that circular dated 8th September had been revoked and letter dated 24th October cancelled. That the U.P. Electricity · D Regulatory Commission had approved· a new tariff by order dated 1st September, 2000 and U.P. State Power Corporation had issued a consequential Notification dated 10th July, 2001 is also not in dispute. The said notification, it is noteworthy, does not any longer provide for 15% surcharge from consumers E getting supply of energy from independent feeders. Suffice it to say that while according to the applicant-KVSL circular issued by the U.P. Power Corporation dated 8th September, 2001 giving an option to the consumers was valid and in accordance with law, there is not even a murmur in the writ F petition filed by the respondent-company to the effect that either the U.P. Power Corporation or its successor had at any point of time made any promise to the company that supply of energy would be without any surcharge notwithstanding the fact that the tariff prescribed by the Regulatory Commission envisaged the G levy of surcharge on electricity supplied directly from an independent feeder. There is similarly no averment whatsoever in the writ petition to the effect that the respondent-KVSL had altered its position acting upon any such promise. Not only that the agreements executed between the parties, namely, KVSL H E F G H 1102 SUPREME COURT REPORTS [2010] 6 S.C.R. - A on the one hand and Power Corporation on the other also did not contain any unequivocal promise for supply of energy, no matter the supply was made from an independent feeder. In the absence of even an averment to the effecrthat there was a promise made by the U.P. State Power Corporation regarding - s supply of energy without payment of surcharge and in the absence of any material to show that the respondent-KVSL had indeed acted upon any such promise it is difficult to see how the said company can insist upon any such non-existent promise being made good. It is trite that before a party can rely - c upon on the doctrine of promissory estoppel it must make a specific averments and place material on record to demonstrate that a promise was indeed made to it. There is neither any averment nor any material to support the plea of promissory estoppel in the case at hand. D 18. It is also noteworthy that the High Court of Uttarakhand did not find a case in favour of the respondent-KVSL on the ground which is now sought to be urged in the present appeal. It is one thing to say that the plea of promissory estoppel is available to a consumer but an entirely different thing to say that E such a plea has been made good by the material on record. > 19. We have, therefore, no hesitation in repelling the contention that any promise was made by the U.P. State Power Corporation to the respondent-KVSL which could justify the F grant of any mandamus in its favour for making good any such promise. 20. We allow this appeal and set aside the order 17 th January, 2007 passed by the High Court of Uttaranchal in Writ Petition No.936 of 2001 filed by respondent-KVSL with costs G of Rs.50,000/-. N.J. Appeal allowed.
End of Judgment Record
Browse All Supreme Court of India (2010) Decisions
2010-09-24

Department of Telecommunications v. Gujarat Co-operative Milk Marketing Federation Ltd.

This Supreme Court decision concerns a billing dispute arising from two bi-monthly telephone bills totaling Rs. 4,54,652 raised against the Managing Director of the Gujarat Co-operative Milk Marketing Federation Ltd. for calls categorized as international “party” or “sex talk” calls. The respondent subscriber alleged mischarging and that calls were made from another number, prompting a complaint to the Department. Verification upheld the bills; an administrative appeal was dismissed; the matter was referred to arbitration under section 7B of the Indian Telegraph Act, 1885, following a High Court direction. The arbitrator, Vineet Bhatia, concluded the bills were proper. The respondent challenged this award by writ petition, which the High Court (Single Judge) quashed, holding that the arbitrator was junior to the appellate authority, and proceeded to find the award invalid on presumptions and inferences unsupported by evidence; a Letters Patent Appeal was dismissed. The Supreme Court reversed, holding that the High Court exceeded its judicial review scope, misapplied the standard for review of arbitral awards under section 7B, and erred in imputing bias based on rank. It affirmed that the arbitrator’s findings were grounded in the department’s records and meters, and that independence was maintained. The appeal is allowed and the writ petition dismissed, with the High Court orders set aside.

2010-11-23

BHAGWAN BUDHA PRATHMIK TECHNICAL TRAINING COLLEGE NIRMALI v. STATE OF BIHAR

This is a consolidated Supreme Court decision in Civil Appeal Nos. 9896 and 9897 of 2010 arising out of Bihar. Bhagwan Budha Prathmik Technical Training College, Nirmali, a minority Buddhist institution established in 1987, challenged Bihar’s and other authorities’ recognition/approval decisions for its teacher-training course in light of the National Council for Teacher Education Act, 1993 (NCTE Act). The central issue is whether, after the NCTE Act’s appointed day (1 July 1995), State Governments retain power to grant recognition to teacher-education institutes and whether students of unrecognized colleges may sit for qualifying examinations. The matter traces a long litigation history: initial directions in the early 1990s required the Government to decide recognition while allowing students to appear at their own risk; subsequent orders and representations culminated in a 16 March 2007 order recognizing the college from 1987-89 on the ground that inspection warranted it, followed by a 2 September 2008 order withdrawing that recognition in light of NCTE’s sole jurisdiction post-appointed day. The High Court affirmed the sequence, but this Court held that a power to issue an order includes a power to withdraw it for valid reasons, and that recognition is vested in the NCTE after the appointed day. The judgment emphasizes that the NCTE Act must be implemented with full force to protect standards in teacher education. Ultimately, the Supreme Court dismissed the appeals, modified a cost order, and held there should be no further costs in these appeals, while acknowledging the students’ plight and the need for orderly implementation of the regulatory regime.

2010-06-03

State of Punjab & ors. v. G.S. Randhawa

This Civil Appeal arises from a petition challenging a demand for additional price under the Punjab Urban Estate (Sale of Sites) Rules, 1965. The Supreme Court hears counsel for the appellant and notes that the respondent did not enter appearance. Relying on the decision in Smt. Fuljit Kaur v. State of Punjab & Ors., (2010) 7 SCR 317, the Court states that, for the reasons recorded in Civil Appeal No. 5292 of 2004 (the Fuljit Kaur decision) decided on this date, the appeal must be allowed. The High Court’s December 6, 2006 order is set aside and the Demand Notice is upheld. The appellant is entitled to recover the additional price in accordance with law. The decision clarifies that liability to pay additional price under the Punjab Urban Estate Rules can be enforced consistent with the Fuljit Kaur framework, upholding the validity of the demand and permitting recovery by the State. The judgment thus resolves the previous split on allotment price adjustments and prescribes a uniform approach for enforcing such recoveries in analogous cases going forward.

2010-07-15

Harish Singh Nagra & Ors. v. Kapil Sibal & Ors.

Mehfil-e-Wukala, a Supreme Court cultural-literal association of lawyers, published a souvenir containing messages, articles, and poems by judges and senior advocates. Kapil Sibal, a senior advocate and then a candidate for President of the Supreme Court Bar Association, sent a message criticizing the junior Bar and urging reforms, which was circulated within Mehfil’s members but not released to the press or sold publicly. Petitioners, five practicing advocates from the Punjab and Haryana High Court, filed criminal contempt proceedings under Article 215 of the Constitution alleging that Sibal conspired with others to bring the administration of justice into disrepute. The High Court transferred the case to this Court. The central issue was whether the message, read in its proper context, amounted to contempt under Section 2(c) of the Contempt of Courts Act, 1971. The Court held that the message, read in its prospective context, did not scandalize or tend to scandalize any court, nor obstruct the administration of justice; it was a fair critique aimed at improving the system. Citing P.N. Duda, Mulgaokar, Ambard, Vishwanath, and others, the Court reaffirmed that freedom of expression under Article 19(1)(a) protects fair, reasoned criticism of judgments and judicial institutions. It noted that the Times of India article excerpt misrepresented the message, but the souvenir’s limited internal distribution and the respondent’s apology supported dismissal. Accordingly, the contempt petition was dismissed and notices discharged.