Executive Director, Keltron Controls, Aroor v. Workmen of Keltron Controls, Aroor represented by the General Secretary, Shertallai Taluk Industrial Employees Union (CITU) & ors. (through Director, Ex-SMOSS) and Industrial Tribunal, Alappuzha

Case / Petition Number:
OP No. 201 of 2000 (Y)

Case Synopsis & Summary

This Original Petition (OP No. 201 of 2000) before the Kerala High Court arises out of an Industrial Tribunal award (Ext. P1, 3.3.1990) holding that 27 security personnel employed through a contractor were effectively the employees of the management because the principal employer (Keltron Controls) and the contractor failed to obtain necessary registration/licence under the Contract Labour (Regulation and Abolition) Act, making the contract a sham. The Tribunal directed that the workers be allowed to continue in their places of work, and be reinstated with back wages limited to the date of award publication, with replacement through Kerala Public Service Commission. The Division Bench in Ext. P3 (1998) remanded, holding that mere absence of registration/licence is not the sole determinant; the question depends on evidence before the Tribunal. The Supreme Court later held in Steel Authority of India Ltd. v. National Union Waterfront Workers that absence of registration/licence is not an absolute criterion, and Haryana State Electricity Board’s case was considered to have impliedly overruled that point to an extent. The High Court, after considering these authorities, held that Ext. P4 (1999) again relied solely on absence of licence/registration, and quashed Ext. P4 as improper. It remands the matter for fresh adjudication, directing the Tribunal to evaluate the entire evidence and to pass a fresh award within four months, with parties to appear on 18.01.2010.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • S. SIRI JAGAN
Judgment Date
2009-12-01
Court Decision / Holding
Ext. P4 is quashed. The Industrial Tribunal is remanded for fresh adjudication taking into account the entire evidence, and a fresh award shall be passed expeditiously, within four months from the receipt of the judgment. The parties are to appear before the Tribunal on 18-01-2010.
Final Disposition
Disposed of; Ext. P4 quashed; remand to Tribunal for fresh adjudication with directions to consider entire evidence and pass a fresh award within four months; appearance fixed on 18.01.2010.

Parties to the Case

Appellants / Petitioners

  • The Executive Director, Keltron Controls, Aroor

Respondents

  • The Workmen of Keltron Controls, Aroor, represented by the General Secretary, SHERTALLAI TALUK, INDUSTRIAL EMPLOYEES UNION (CITU), AROOR P.O., SHERTALLAI
  • The Director, Ex-SMOSS, VAYALAR, SHERTALLAI
  • The Industrial Tribunal, ALAPPUZHA

Legal Representation & Advocates

Counsels for Petitioners

  • • M. GOPIKRISHNAN NAMBIAR
  • • T. P. KELU NAMBIAR, SENIOR ADVOCATE

Counsels for Respondents

  • • P. RAMAKRISHNAN

Provisions of Law Cited

Contract Labour (Regulation and Abolition) ActIndustrial Disputes Act

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioner-management contends that Ext. P4 award is vitiated because it relies solely on absence of registration/licence under the Contract Labour (Regulation and Abolition) Act, which in itself does not establish a sham contract. It argues that the Division Bench in Ext. P3 directed a decision based on evidence adduced by both sides, and that the absence of registration/licence cannot be treated as an absolute criterion. The management asserts it had a bonafide, genuine contract for contract labour, with evidence showing that workmen could be employees of the contractor, not the principal employer, and urges remand for fresh adjudication in light of Ext. P3 and Steel Authority of India Ltd. and related precedents.

Contentions of Respondents

The Respondent-Union supports Ext. P4, arguing that absence of registration/licence is a major factor indicating a sham contract and that the evidence before the Tribunal demonstrates a sham arrangement designed to evade the Industrial Disputes Act. It contends that the contract was created to avoid legal consequences and that the workers should have been treated as employees of the principal employer. It defends the Tribunal’s findings on the basis of registration/licence and the relationship with the employer.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (4)

Case NameCitationTreatmentExplanation
Dena Nath and others v. National Fertilizers Ltd. and others1992(1) SCC 695PositiveCited as part of the reasoning leading to the conclusion that there is no strait-Jacketed formula; supports the view that absence of licence/registration is not an absolute determinant.
Haryana State Electricity Board v. Suresh and Others[1999] (3) SCC 601Partly Overruled / LimitedImpliedly overruled to the extent that mere absence of registration/licence cannot alone determine sham vs. genuine contract; Steel Authority of India Ltd. clarifies the scope.
Steel Authority of India Limited v. National Union Waterfront Workers and others[2001] (7) SCC 1PositiveHeld that absence of registration/licence is not the absolute criterion; emphasizes evaluating the contract terms and surrounding factors.
APSRTC and others v. Sreenivas Reddy and others[2006] (3) SCC 674Mentioned OnlyListed among authorities but not elaborated or directly applied in the Court's reasoning.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•1,605 words•~8 min read

In The Court Record

Executive Director, Keltron Controls, Aroor v. Workmen of Keltron Controls, Aroor represented by the General Secretary, Shertallai Taluk Industrial Employees Union (CITU) & ors. (through Director, Ex-SMOSS) and Industrial Tribunal, Alappuzha

## **IN THE HIGH COURT OF KERALA AT ERNAKULAM** **PRESENT :** **THE HONOURABLE MR. JUSTICE S.SIRI JAGAN** **TUESDAY, THE 1ST DECEMBER 2009 / 10TH AGRAHAYANA 1931** ## **OP.No. 201 of 2000(Y)** **---------------------** ## **PETITIONER(S):** **------------------------** **THE EXECUTIVE DIRECTOR, KELTRON CONTROLS, AROOR.** **BY ADVS. MR.M.GOPIKRISHNAN NAMBIAR MR.T.P.KELU NAMBIAR, SENIOR ADVOCATE** ## **RESPONDENT(S):** **---------------** **1. THE WORKMEN OF KELTRON CONTROLS, AROOR, REPRESENTED BY THE GENERAL SECRETARY, SHERTALLAI TALUK, INDUSTRIAL EMPLOYEES UNION (CITU). AROOR P.O., SHERTALLAI,** **2. THE DIRECTOR, EX-SMOSS, VAYALAR, SHERTALLAI.** **3. THE INDUSTRIAL TRIBUNAL,** - **ALAPPUZHA.** **BY ADV.MR.P.RAMAKRISHNAN FOR R1** **THIS ORIGINAL PETITION HAVING BEEN FINALLY HEARD ON 30/11/2009, THE COURT ON 01/12/2009 DELIVERED THE FOLLOWING:** ## **OP.No. 201 of 2000(Y)** ## **APPENDIX** ## **PETITIONER'S EXHIBITS:** - **EXT.P1 - TRUE COPY OF AWARD, DATED 3.3.1990, IN I.D. NO.5/89, INDUSTRIAL TRIBUNAL, ALAPPUZA.** - **EXT.P2 - TRUE COPY OF JUDGMENT DATED 6.2.1992 IN O.P. NO. 10352/90** - **EXT.P3 - TRUE COPY OF JUDGMENT DATED 17-6-1998 IN W.A. NO. 441/92.** - **EXT.P4 - TRUE COPY OF AWARD, DATED 30.6.1999. IN I.D. NO. 5 OF 1989, INDUSTRIAL TRIBUNAL, ALAPPUZHA, PUBLISHED IN THE KERALA GAZETTE NO.37 DATED 21.9.1999.** ## **// TRUE COPY //** ## **PA TO JUDGE** ## **rhs** ## **S. SIRI JAGAN, J** **................................................ O.P. No. 201 of 2000** **................................................. Dated this the 1[st] day of December, 2009** ## **J U D G M E N T** The Management in I.D. No. 5/89 before the Industrial Tribunal, Allapuzha is the petitioner herein who is challenging Ext.P1 award passed by the Tribunal in that I.D. The issue referred for adjudication was the validity of the termination of service of 27 security personnel employed by the Management company through a contractor. Originally by Ext.P1 award dated 3.3.1990, the Tribunal held that since the Contract Labour (Regulation and Abolition) Act prescribes that a principal employer who intends to engage workers through a contractor and the contractor who employs 20 or more workman shall get registration/licence under the Act and the Management company and the contractor did not obtain such licence, the contract between the management and the contractor is a sham contract and therefore the workman are employees of the management themselves and that the workmen were terminated from service without following the procedure prescribed under the Industrial Disputes Act. The Tribunal directed that the workman shall be allowed to continue in their **O.P. No. 201 of 2000** -2- respective places in which they were working, till they are replaced by security guards/ Supervisors through Kerala Public Service Commission. The workmen were directed to be reinstated, but backwages were limited to from the date of publication of the award. Both the management and the workmen challenged the award to the extent the same was not favourable to them. By Ext.P2 common judgment, in O.P. Nos. 10352 and 10766 of 1990 a learned single Judge of this court set aside the award holding that security guards in question are not workmen as defined under the Industrial Disputes Act denying the relief to them. The workmen challenged the same in W.A. No. 441 of 1992. By Ext.P3 judgment, a Division Bench of this Court held that although the mere absence of registrations/licence under the Contract Labour (Regulation and Abolition) Act does not ipso facto lead to the conclusion that the contract is a sham transaction, the question as to whether the workmen are employees of the principal employer depends on evidence adduced by the parties before the Tribunal. In that view, the Division Bench remanded the matter for fresh consideration, on the basis of the evidence to be adduced by both sides. Ext.P3 judgment is dated 17.6.1998. Thereafter the Industrial Tribunal again considered the matter. By that time, the Supreme Court **O.P. No. 201 of 2000** -3- rendered another decision, namely **Secretary, Haryana State Electricity Board v. Suresh and Others** [1999 (3) SCC 601] which held that the mere absence of registration/ licence under the Contract Labour (Regulation and Abolition) Act itself would render the contract between the principal employer and the contractor, a sham transaction and that the workmen are employees of the principal employer. Relying on that decision without going into any other question as directed by the Division Bench, the Tribunal by Ext.P4 award again held that in the absence of the registration/ licence under the Contract Labour (Regulation and Abolition) Act the contract between the petitioner and the contractor is a sham arrangement and therefore the workers concerned were the employees of the management establishment. On that finding the Tribunal by Ext.P4 award, again re-issued the same direction as in Ext.P1 award except regarding backwages. That award is under challenge before me. The petitioner challenges Ext.P4 award on the ground that by Ext.P3 judgment a Division Bench of this court had held that mere absence of registration/licence under the above said Act itself would not be sufficient to hold that the workmen are workmen of the principal employer and directed the Tribunal to consider the matter on the basis of evidence to be adduced by the **O.P. No. 201 of 2000** -4- parties. However, the Tribunal has without considering anything else only on the basis of the absence of registrations/licence held that the workman are direct workman of the petitioner management. According to the petitioner this is in direct violation of Ext.P3 judgment and for that reason alone Ext.P4 liable to be quashed. He would further contend that in this case the management had adduced sufficient evidence to show that the contract between the employer and the contractor is a bonafide, genuine contract for employment of contract labour and therefore the workmen are workmen of the contractor and not that of the principal employer. 2. The 1[st] respondent union would support the award. According to them, the absence of registration / licence is one of the major factors which would support the conclusion that the contract is a sham contract, in view of the decision of the Supreme Court in Haryana State Electricity Board's case. They would further contend that the evidence available before the Tribunal was sufficient to come to the conclusion that the entire transaction was only a sham transaction to avoid the legal consequences flowing from the Industrial Disputes Act in respect of the workmen in question. **O.P. No. 201 of 2000** -5- 3. I have considered the rival contentions in detail. 4. Apart from the decision of **Dena Nath and others v. National Fertilizers Ltd. and others** [1992(1) SCC 695] relied upon by this court in Exts.P2 and P3 judgments and the decision in Haryana State Electricity Board's case several other decisions have been cited before me, namely the **Steel Authority of India Limited and others v. National Union Waterfront Workers and others** [2001 (7) SCC 1] and **APSRTC and others v. Sreenivas Reddy and others** [2006 (3) SCC 674]. I am of opinion that the conclusion which can be drawn from all these decisions is that there cannot be any strait-Jacketed formula for deciding the question as to whether a contract for employment of contract labour is a sham contract or not. It depends on the facts and circumstances of each case. The mere fact that there was no registration/licence under the contract Labour (Regulation and Abolition) Act itself would not lead to the conclusion that it is a sham transaction as held in Steel Authority of India Limited's case. Of course the Haryana State Electricity Board's case was not referred to in steel authority of India Ltd's case. But Dena Nath's case which was approved by the Supreme Court in Steel Authority of India limited's case certainly holds that the absence of **O.P. No. 201 of 2000** -6- registration /licence is not the absolute criterion to decide the question either way. I am of opinion that that question would largely depend upon the contract itself. In other words, the terms of the contract between the principal employer and the contractor should be the main determining factor to decide the question as to whether the contract is a sham contract or not. There would be other factors as well, such as whether the work in question is of perennial nature, whether the work is in the premises of the employer, the control of the principal employer on the workman, the extent of supervision of the work of the workman by the principal employer, whether the work is an integral part of the overall work of the principal employer and the like. The Tribunal has to come to a conclusion after considering the evidence on all these aspects taken together instead of deciding the question solely on the basis of absence of licence/registration under the Contract Labour (Regulation and Abolition) Act. In Ext.P4 award, the Tribunal has decided the matter only on the basis of absence of registration/licence, relying upon the decision in Haryana State Electricity Board's case which should be taken to be impliedly overruled to that extent by the decision in Steel Authority of India Ltd's case. In view of my above findings, necessarily the matter **O.P. No. 201 of 2000** -7- has to be remanded to the Industrial Tribunal for a fresh adjudication taking into account the entire evidence adduced by both sides in accordance with the direction hereinabove. Accordingly, Ext.P4 is quashed. The Tribunal is directed to re-adjudicate the dispute in the light of the finding hereinabove. Fresh award shall be passed, as expeditiously as possible, at any rate, within four months from the date of receipt of a copy of this judgment. The parties shall appear before the Tribunal on 18.1.2010. The original petition is disposed of as above. sd/- **S. SIRI JAGAN, JUDGE** rhs // True copy // PA to Judge
End of Judgment Record
Browse All High Court of Kerala (2009) Decisions
2009-06-26

Nishana Mol.N v Alappuzha Municipality & Secretary, Alappuzha Municipality

This writ petition concerns the registration of a marriage under the Kerala Registration of Marriages (Common) Rules, 2008 (Common Rules). The petitioner Nishana Mol.N, whose marriage was solemnized on 8 March 2009, sought registration of her marriage by the Local Registrar. Her husband was abroad, and she submitted Form No. 1 along with documents; however, the Local Registrar demanded the presence of both spouses for registration, a point contested by the petitioner. The court recalls the apex court’s directions in Seema v. Ashwani Kumar (2006) to frame rules ensuring compulsory registration to protect women and provide evidence of marriage, while noting that registration under the Rules does not itself create a marriage but evidences one solemnized otherwise. The Rules specify that registration is mandatory for marriages solemnized within the state, with various procedural requirements (Rules 5, 6, 9, 10, 11, 13, 16, 17) and mechanisms for correction, appeal, and re-registration. The court clarifies that the presence of both parties is not ordinarily required; the registrar may require appearance only in cases where there is reasonable doubt about identity, and even then as an exception rather than a rule. Ultimately, the court directs that registration and certificate issuance be completed within one month from copy of the judgment, without insisting on joint appearance, provided the memorandum is in order.

2009-07-27

Abdul Majeed Kalathil v. District Collector, Malappuram & Others

This batch of writ petitions concerns the constitutional validity of Section 17 of the Kerala Anti-Social Activities (Prevention) Act, 2007, and the power of District Magistrates to confiscate vehicles used in anti-social activities. The petitions challenge the absence of a substantive prohibition against using vehicles for anti-social activities and the lack of a defined procedure for confiscation or an appellate remedy. In W.P.C. No. 9925 of 2009 (the lead case), Abdul Majeed Kalathil contends that his goods carriage KL 11-B/6651 was seized by the Sub Inspector of Pandikkad Police and reported to the District Collector, Exts.P1–P2. The court scrutinizes Section 17's scope, defining anti-social activity (Section 2(a)) and whether the District Collector’s power to confiscate is constitutionally tenable. It finds Section 17 to be vague and violative of Articles 14, 19(1)(g) and 21, as it rests on subjective police satisfaction with no clear standards or process. It also notes environmental objectives but concludes that fundamental rights must prevail. The court does not sustain confiscation under Section 17; instead, it directs that such vehicles be dealt with under the Kerala Protection of River Banks and Regulation of Removal of Sand Act, 2001 and Rules, with interim release under specified conditions. It further directs initiation of Sand Act proceedings within a month and finalization within another month. The writ petitions are disposed of accordingly, preserving the rule of law and environmental protection.

2009-06-11

WA No. 671 of 2006 (Fertilizers and Chemicals Travancore Ltd v Union of India)

This writ appeal concerns the pay revision and pensionary benefits of employees of the Fertilizers and Chemicals Travancore Ltd (FACT). The long-term settlement covering terms of employment expired on 31 December 1996. A fresh settlement was concluded (notified 28 August 2001) and made retroactive to 1 January 1997, with revisions in wages and benefits. Clause 29 of Ext. P1 provides that arrears relating to wage revision and dearness allowance for the period 1 January 1997 to 30 June 2001 will be reviewed and decided by management/government only when the company earns profits for at least three consecutive years; Clause 33.1 provides that employees who retired on or after 1 January 1997 will be eligible for arrears calculated from 1 January 1997 to the date of retirement, subject to adjustments for interim relief already paid, with any unclaimed amount transferred to a Welfare Fund. The appellants—the retirees who fall in the 1 January 1997 to 1 July 2001 window—argue that they were denied arrears and were paid pensionary benefits at pre-revised rates, creating discrimination. Respondents contend Ext. P1 binds the parties and arrears depend on profits, and that pay revision administered to others does not compel retroactive change. The court held that Ext. P1 terms survive as terms of employment and directed the management to consider terminal benefits at revised rates within two months and to release arrears when paid to current workers, with connected matters following."

2009-05-29

M/S. Palm Fibers & Yars Trading Co. v. State of Kerala & Others

The petitioner, a Small Scale Industrial unit, ran two LT power connections (No.13070 and No.13427) with commercial production starting in July 1994 and July 1995. On 06/02/1992, the Government issued Ext.P1 guaranteeing concessional tariffs (pre-1992 tariff) for five years from the date of commencement or substantial capacity expansion, certified by the District Industries Centre. Ext.P2 certified eligibility for this concession. Subsequently, the petitioner increased power demand to 300 KVA and was reclassified/advised to HT status from 15/05/1998, converting LT supply to HT. The petitioner argued that Ext.P1 benefits should extend for the full five-year period, covering the LT quantities certified in Ext.P2, and that the HT conversion was a mere reclassification directed by the Board, not a cessation of eligibility. The Board argued Ext.P1 targets only those who commenced production during 1992–1996 and that HT conversion from 15/05/1998 falls outside the Ext.P1 window, rendering the petitioner eligible only up to 15/05/1998. Earlier orders (Ext.P3) had set aside a cut-off date for merits, and Ext.P6/Ext.P4 handled appeals. Ultimately, the Court held that the HT conversion was outside Ext.P1’s period, but directed that the LT benefits for the two LT connections be extended only until 23/05/1998 (LT dismantling date) and without reimbursement from the Industries Department, as held in OP No.7622/1998. The petition was disposed of as above.