High CourtSingle JudgeAppeals allowed; final order quashing the dispe...

Essco Fabs Pvt. Ltd. & Anr. v. State of Haryana & Anr. (Civil Appeal No. 6580-81 of 2008)

Case / Petition Number:Civil Appeal Nos. 6580-81 of 2008; 6581 of 2008
Neutral Citation:[2008] 15 S.C.R. 779

Case Details & Bench

Court
High Court
Hon'ble Judges
  • C. K. Thakker
  • D. K. Jain
Judgment Date
2008-11-07
Court Decision / Holding
Appeals allowed. The action dispensing with the Section 5A hearing and the final notification under Section 6 were quashed. The authorities may take appropriate action after following the normal procedure under the Act. Contempt petitions were disposed of.
Final Disposition
Appeals allowed; final order quashing the dispensing with Section 5A and final notification; matter to proceed under normal procedure; contempt petition disposed of.

Parties to the Case

Appellants / Petitioners

  • Essco Fabs Pvt. Ltd.
  • Panipat Teachers Housing Co-operative Society Ltd.

Respondents

  • State of Haryana
  • Anr.

Legal Representation & Advocates

Counsels for Petitioners

  • • J. L. Gupta
  • • Ranjit Kumar
  • • Ashok Mathur
  • • Gian Singh
  • • Kusum Singh
  • • Mahinder Singh Dahiya

Counsels for Respondents

  • • Manjit Singh
  • • Annop G. Choudhary
  • • June Choudhary
  • • Govind Goel
  • • T. V. George

Case Synopsis & Summary

Essco Fabs Pvt. Ltd. and Panipat Teachers Housing Co‑operative Society challenged the validity of land acquisition proceedings under the Land Acquisition Act, 1894, initiated by the State of Haryana for a road project linked to Sector 25 Part-II, Panipat. The matter rose from two appeals filed against a Punjab & Haryana High Court decision, challenging notices, urgent invocation of Section 17, and dispensing with the statutory hearing under Section 5A. The Supreme Court scrutinized the statutory framework: Section 4 authorizes preliminary notification; Section 5A requires hearing of objections; Section 6 grants final declaration of public purpose; Section 17 provides special powers in cases of urgency or unforeseen emergency, with Section 17(4) allowing dispensation with 5A only upon a declaration. The Court held that even in urgent cases, the enquiry under 5A cannot be dispensed with ipso facto; a valid Section 17(4) declaration is required and the Government must apply its mind. In the facts, the 2001 notification invoking urgency and the immediate 2002 final notification were quashed for not adhering to due process. While acknowledging prior decisions on urgency, the Court reaffirmed the primacy of hearing and proper procedural compliance, and remitted action for adherence to the Act’s normal procedure. Appeals were allowed with costs, and contempt petitions disposed of.

Provisions of Law Cited

Land Acquisition Act, 1894Section 4(1)Section 5ASection 6(1)Section 9Section 11Section 16Section 17(1)Section 17(2)Section 17(4)Section 3 (Public purpose)

Legal Doctrines & Maxims

  • Eminent domain; public purpose doctrine
  • Right to property under Article 300A of the Constitution
  • Hearing of objections before deprivation of ownership (Section 5A)
  • Dispensation with 5A only upon Section 17(4) declaration; application of mind by Government

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellants contended that the 2001 notification invoking urgency under Section 17 and the immediate 2002 final notification under Section 6 bypassed the mandatory Section 5A hearing, were issued without proper mind and were not justified by urgent necessity. They argued that the Land Acquisition Act requires a hearing, and dispensing with it cannot be justified merely due to delays or administrative negligence; Section 17(4) declarations are required to permit such dispensation. They stressed that the Act’s scheme protects private property and that public purposes must be proven with due process.

Contentions of Respondents

The respondents argued that land was required for public purpose (road construction) and that urgency provisions under Section 17 were applicable. They asserted that dispensing with Section 5A was authorized by a Section 17(4) declaration and that the final notification followed appropriate pre-notifications. They relied on earlier judgments supporting emergency power to expedite acquisition in public interest and contended that delays did not negate the necessity for completion of the project.

Cited Precedents (8)

Case NameCitationTreatmentExplanation
Nandeshwar Prasad & Anr. v. State of Uttar Pradesh & Ors.(1964) 3 SCR 425PositiveCited as an authority that the owner must be heard before deprivation of property; supports requirement of Section 5A hearing before final notification.
Union of India & Ors. v. Mukesh Hans(2004) 8 SCC 14PositiveHeld that dispensing with 5A is not permissible; emphasized the need for application of mind and processing under Section 5A unless 17(4) declaration exists.
Jai Narain & Ors. v. Union of India & Ors.(1996) 1 SCC 9DistinguishedTwo-judge bench view that urgency is based on subjective government satisfaction; current judgment distinguishes this in light of later three-judge opinions.
Chameli Singh & Ors. v. State of U.P. & Anr.(1996) 2 SCC 549DistinguishedEarlier two-judge view permitting dispensation with 5A; current judgment distinguishes in favor of requiring 5A absent 17(4) declaration.
First Land Acquisition Collector & Ors. v. Nirodhi Prakash Gangoli & Anr.(2002) 4 SCC 160PositiveSupports the normal procedure, including 5A, unless a valid 17(4) declaration dispenses with it.
State of Uttar Pradesh v. Radhey Shyam Nigam & Ors.(1989) 1 SCC 591Mentioned OnlyMentioned as a related authority on publication dates, not a controlling basis for the decision in the present case.
State of Haryana & Anr. v. Raghubir Dayal(1995) 1 SCC 133PositiveCited to illustrate urgency-related considerations under Section 17; used alongside Mukesh Hans.
Mohan Singh & Ors. v. International Airport Authority of India & Ors.(1997) 9 SCC 132PositiveCited to reinforce the principle that urgency requires mindful application of the law; supports need for proper procedure.

Diagnostic Tool

Beta

Does this judgment govern your specific facts?

Don't risk relying on a distinguishable precedent. Enter your facts or proposition below. We will test it against Essco Fabs Pvt. Ltd. & Anr. v. State of Haryana & Anr. (Civil Appeal No. 6580-81 of 2008) and instantly map out authorities that support, challenge, or govern your position.

Extracted Judgment Text

Exact text extracted from official judgment records.

[2008] 15 S.C.R. 779 A ESSCO FABS PVT. LTD. & ANR. _v._ # STATE OF HARYANA & ANR. (Civil Appeal No. 6580-81 of 2008) NOVEMBER 7, 2008 [C.K. THAKKER AND D.K. JAIN, JJ.] B _Land Acquisition Act, 1894:_ _ss. 17(1),(2) and (4) rlw ss. 4(1) and 6(1) and s.5-A_ - c _Acquisition of land_ - _State Government invoking urgency clause u/s 17 and dispensing with inquiry and hearing of objections uls 5A_ - _HELD: Before exercise of power of eminent domain, an opportunity of hearing must be afforded to owner of property_ - _Even in cases of_ ' _urgency; or_ 0 _'unforeseen emergency' within the meaning of_ sub-ss. _(1) and (2) of s. 17, enquiry contemplated by_ s. _5-A cannot ipso facto be dispensed with_ - _It is only when the Government makes a declaration under sub-s.(4) of s.17 that it becomes unnecessary to take recourse to procedure uls 5-A_ - _On_ E _facts, no urgency clause could have been invoked nor could inquiry and hearing of objections uls 5-A be dispensed with_ - _Resultantly, actions of the government dispensing with inquiry and hearing of objections u/s. 5-A, and issuance of final notification uls 6 quashed._ c E F The respondent-State Government, on 15.12.1982 issued a notification u/s 4(1) of the Land Acquisition Act, 1984 in respect of the lands in question. However, as the acquisition proceedings could not be completed, the lands were released. Thereafter, a company engaged in export business (the appellant in C.A. No. 6580 of 2008), purchased some of the said lands for expansion of its Export Orient Unit, and made an application on 6.6.1991 for change of user of the land. The said application was G ' H ; 779 [2008] 15 S.C.R. 780 SUPREME COURT REPORTS A rejected on the ground that the land was likely to be required for public purp.ose. The case of the appellant in C.A. No. 6581 of 200Q w~s that it being ,a Cooperative Housing Society, the State Government released some of the !ands in question in its favour- in 1985. The Society B[invested huge amount in developing the land. ][On ][1.8.2001 ] the State Government again issued a notification u/s 4(1) of the Act in respect of the lands in question for development and construction of a link road. The State Government, by applying urgency clause u/s.17 of the c[Act, dispensed with the inquiry and hearing ][of ][objections ] u/s.5·A of the Act and on the next day, i.e. on 2.8.2001, issued the declaration u/s 6(1) of the Act. Both, the export company as also the Housing Cooperative Society, challenged the acquisition proceedings on the grounds D[that ][they ][were ][denied ][their ][valuable ][right ][of ][filing ] objections u/s 5·A, and that it was not a case for invoking the provisions of s.17 of the Act. Since the writ petitioners' plea did not find favour with the High Court, they filed the appeals. ' _i_ > E Allowing the appeals, the Court HELD: 1.1. It is in exercise of power of _eminent domain_ that a sovereign may acquire property which does not belong to him. As a general rule, before exercise of power F of _eminent domain,_ law must provide an opportunity of hearing against the proposed acquisition. Even without a specific p_rovision to that effect, general law requires raising of objections by and affording opportunity of hearing to the owner of the property. Section SA of The G[Land Acquisition Act, 1923 contains such a provision. ] Afte~ ·issuance of preliminary notification u/s 4 and or before 'final n~tification u/s 6 of the Act, the appropriate Goxernment is enjQined to hear person interested in the property before he is deprived of his ownership rights. [Para 27] [798·C·E] H _'f_ _r_ ...... ' _}-,_ ESSCO FASS PVT. LTD. & ANR. _v._ STATE OF HARYANA 781 & ANR. A ~ A 1.2. There may be cases of 'urgency' or 'unforeseen A emergency' which may brook no delay for acquisition of . such property in larger public interest. The Legislature, therefore, thought it appropriate to deal with such cases of exceptional nature and in its wisdom enacted Section 17. Whereas sub-section (1) of Section 17 deals with B cases of 'urgency', sub-section (2) of the said section covers cases of 'sudden change in the channel of any navigable river or other unforeseen emergency'. But even in such cases of 'urgency' or 'unforeseen emergency', enquiry contemplated by Section SA cannot _ipso facto_ be c dispensed with which is clear from sub-s.(4) of s.17. lfthe Government intends to acquire land in cases of 'urgency' or 'unforeseen emergency' falling under or covered by sub-sections (1) and (2) of Section 17 of the Act, it is still required to follow procedure u/s SA of the Act before D issuance of final notification u/s 6 of the Act. It is only when the Government also makes a declaration under sub-s. (4) of s.17 that it becomes unnecessary to take recourse to procedure u/s.SA of the Act. [Para 27-28 and 33] [798-F-H; 799-A; 801-A-B] E _Nandeshwar Prasad_ & _Anr. v. State of Uttar Pradesh_ & _Ors,_ (1964) 3 SCR 42S, relied on. _A,_ > 1.3. The legislative scheme is amply clear which > merely enables the appropriate Government to issue the It notification under sub-section (4) of Section 17 of the Act dispensing with inquiry under Section SA if the Government intends to exercise the said power. The use of the expression 'may' in sub-section (4) of Section 17 leaves no room of doubt that it is discretionary power of G the Government to direct that the provisions of Section SA would not apply to the cases covered by sub-section (1) or (2) of Section 17 of the Act. It would not be correct to say that once a case is covered by sub-section (1) or (2) of Section 17 of the Act, sub-section (4) of Section 17 H Sl)PREME COURT REPORTS 782 [2008] 15 S.C.R. > A would necessarily apply and there is no question of holding inquiry or hearing objections _uls._ 5A of the Act. Such a view will make sub-section (4) of Section 17 totally otiose, redundant and nugatory. [Para 44 and 45] [807-AD] _J..__ B _Union of India_ & _Ors. v. Mukesh Hans,_ (2004) 8 SCC 14, relied on. _Jai Narain_ & _Ors. v. Union of India_ & _Ors._ 1995 Suppl. 5 SCR 769 = (1996) 1 SCC 9; _Chameli Singh_ & _Ors., v. State_ c _of U.P._ & _Anr._ 1995 Suppl. (6) SCR 827 =(1996) 2 SCC 549 and _First Land Acquisition Collector_ & _Ors. v. Nirodhi Prakash Gangoli_ & _Anr.,_ 2002 ( 2 ) SCR 326 = (2002) 4 SCC 160, referred to. D 1.4. In the instant case, the facts are eloquent. Initial action of acquisition of land was taken as early as in 1982 but the proceedings lapsed. In 1991, when the appellant company made an application praying for change of user of land, it was rejected on the ground that the land was E[likely ][to ][be ][required ][for ][public ][purpose. ][Nothing, ] however, was done for about a decade. It is only in 2001 that again a notification u/s 4 was issued and urgency clause was applied. In the facts and circumstances of the case, no urgency clause could have been invoked by the F[respondents ][nor ][the ][inquiry ][and hearing ][of ][objections ] provided by Section 5A of the Act could have been dispensed with. Therefore, the action of the respondentauthority of dispensing with inquiry u/s 5-A and issuance of final notification _uls_ 6 of the Act is quashed. It is, however, open to the authorities to take appropriate G action after following normal procedure laid down in the Act. (Para 47 and 52] [807-H; 808-A, B; 809-E] _Union oflndia_ & _Ors. v. Mukesh Hans,_ (2004) 8 SCC 14, relied on. ' y _)..._ _I_ ·>. H ESSCO FASS PVT. LTD. & ANR. _v._ STATE OF HARYANA 783 & ANR. • \A |ESSCOFASSPVT.LTD.& ANR.ANR._v._STATEOFHARYANA<br>& ANR.ANR.|HARYANA783|| |---|---|---| |CaseLawReference:||/\| |(1964) 3 SCR 425<br>reliedon|para31|| |(2004)asec14<br>reliedon|para35|| |1995 (5)Suppl.SCR 769referredto|para 39|B| |2002 (2) SCR 326<br>referredto|para 42|| CIVIL APPELLATE JURISDICTION : Civil Appeal No. 6580 of 2008. From the final Judgment and Order dated 2.4.2004 of the[c ] High Court of Punjab and Haryana at Chandigarh in C.W.P. No. 1853 of 2003. ## WITH D C.A. No. 6581 of 2008 & Contempt Petition (C) No. 30 of 2007 in C.A. No. 6580 of 2008. J.L. Gupta and Ranjit Kumar, Sr. Advs., Ashok Mathur, Gian Singh, Kusum Singh and Mahinder Singh Dahiya for the Appellants. E Manjit Singh, Addi. Adv. Gen., Annop G. Choudhary and June Choudhary, Sr. Adv., Govind Goel and T.V. George for the Respondents. The Judgment of the Court was delivered by F C.K. THAKKER, J. 1. Leave granted. 2. Both these appeals are filed by the appellants being aggrieved and dissatisfied with the judgment and order dated G April 02, 2004, passed by the High Court of Punjab & Haryana in Civil Writ Petition Nos. 1853 of 2003 and 2077 of 2002. 3. To appreciate the controversy raised in the present appeals, relevant facts in nutshell may be noted. · SUPREME COURT REPORTS [2Q08). 15 S._C.R. · 784 A 4. According to the appellant Essco Fabs Pvt. Ltd. ('Essco' for short), the_ Government of Haryana intended to acquire land for public purpose, viz., for utilization of land as .residential, commercial· ?nd industrial area in Sector Nos. 11, 12 and 25 Part-II by Haryana Urban Development Authority s ('HUDA' for short). Forth·e said ·purpose, 'the Government issyed.a notification under sub-section (1) of Section 4 of the Land Acquisition Act, 1894 (hereinafter referred to as 'the Act') on December 15, 1982. The land mentioned in the said notification situated in village Kheri Nangal was sought to be - C acquired. A final notification under Section 6 of the Act was issued on June 20, 1984. However, the land acquisition proceedings could not be completed within the stipulated period and the notifications lapsed and the land stood released. 5. It was the case of Essco that it bought the land which D was sought to be acquired earlier for expansion of its Export Unit. According the appella.nt, it is engaged in manufacturing and exporting rugs, cushions, bed-spreads, bath mats, fabrics, kitchen towel, aprons, pot hqlders, .gloves,_ mitten, curtains, napkins, carpets, etc. It is Export Oriented Unit and earns E foreign exchange by export of goods manufactured in its unit. In the year 1992, it exported materials over Rs.2 crores. The appellant has stated that on June 6, 1991, it made an application to the Director, Town & Country Planning, Haryana for permission for change of user of land. All necessary F documents were appended to the application. The Director, however, vide an order dated September 5, 1991, rejected the permission on several grounds. One of the grounds weighed with the Director for refusing the permission was that the land in question was proposed to be acquired. The appellant has v - G produced a copy of the application as also an order of rejec;;tion thereof in the present proceedings. But even thereafter,no proceedings.for acquisition of land were initiated for many - . years. 6. On August 1, 2001 i.e. after about twenty years of the H .ESSCO FASS PVT. LTD. & ANR. _v._ STATE OF HARYANA 785 & ANR. [C.K. THAKKER, J.] first notification of 1982 and nine years after rejection of prayer A of the appellant for change of user, the Government of Haryana again issued notification under sub-section ( 1) of Section 4 of the Act for acquisition of land for the development and utilization for construction of road connecting Sanauli Road with G.T. Road for Sector 25 Part-II B, Urban Estate Panipat by HUDA. The B land of the appellant situated in village Kheri Nangal was sought to be included in the notification. Moreover, 'urgency clause' under Section 17 of the Act was applied and a valuable right of raising objections under Section 5-A of the Act was taken away in an arbitrary manner. On the very next day i.e. on August c 2, 2001, final notification under Section 6 of the Act was issu~d by the Government. 7. It is the case of the appellant that the preliminary notification under sub-section ( 1) of Section 4 of the Act was required to be published in the manner laid down in the Act. But it had not been published before issuance of final notification under Section 6 of the Act. The final notification was, therefore, illegal and the appellant could not be deprived of h.is property in a manner not known to law. The right of the appellant . to own, possess and enjoy the property is not merely a Common Law right but also constitutional right under Article 300A of the Constitution which has a 'flavour of fundamental right'. The acquisition proceedings, being not in consonance with law were vitiated and liable to be quashed. 0 E F 8. The appellant, hence, filed Civil Writ Petition No. 1853 of 2003 in the High Court of Punjab & Haryana by invoking Article 226 of the Constitution praying therein for quashing and setting aside acquisition proceedings. The High Court entertained the petition and granted status quo with regard to possession of the land in question. Finally, however, by the impugned judgment it dismissed the petition. The said order is challenged by the appellant in this Court. G 9. The other appeal is filed by the Panipat Teachers H [2008] 15 S.C.R. SUPREME COURT REPORTS 786 A (Recognized Schools)· Housing Co-operative Society Ltd. ('society' for short) challenging the acquisition proceedings. It was the case of the society that pursuant to the representation made by the society, the State Government released 53 kanals and 8 marlas of land by executing an agreement dated October B 19, 1985 and by granting land in favour of the society on conditions mentioned in the agreement. Possession of land was handed over to the society. The land was demarcated and was carved out into plots reserving requisite space for school, parks, temple, overhead water tank, roads, green belt etc. The c[society got the site plan designed strictly in accordance with ] HUDA Rules. The society invested huge amount, approximately Rs.26 lakhs, for developing the land laying down sewer pipe lines, RCC Water pipe lines, construction of roads and boundary walls etc. The site plan, however, has not been cleared D[by the office of the Director, Town & Country Planning, Haryana ] despite numerous attempts by the appellant-society. It is alleged by the society that the matter was kept pending for oblique and ulterior purposes on lame and untenable excuses. It is also stated by the society that HUDA published public notice in 'Daily Bhaskar' dated November 10, 2000 demanding E development charges thereby acknowledging that the society's land has been rightly developed for teachers' colony. The public notice informed and instructed those land/plot owners who were in arrears to pay all the balance development charges and outstanding dues. No dues were shown as against the F appellant-society. Thus, there is nothing due and payable to HUDA by the appellant. _)..._ \. ...,, 10. Ignoring all these material facts and with a view to cause serious prejudice to the appellant-society, a notification G[under sub-section (1) ][of ][Section 4 ][of ][the Act had been issued ] by the State for acquisition of land. 11. We have already stated facts relating to the issuance of preliminary notification, application of urgency clause under Section 17 and issuance of final notification under Section 6 H ESSCO FASS PVT. LTD. & ANR. _v._ STATE OF HARYANA 787 & ANR. [C.K. THAKKER, J.] ,... ~ A of the Act while narrating the facts in the first case of Essco. It is, therefore, not necessary to repeat all those facts in the second matter. 12. The appellant-society, in the circumstances, approached the High Court by filing Civil Writ Petition No. 2077 of 2002 which was also decided along with the petition of Essco and the petition of the appellant-society also came to be dismissed. B 13. Third writ petition (Civil Writ Petition No. 3324 of 2003) was filed by M/s Lord Shiva Exports, Panipat which also met[c ] with the same fate. Lord Shiv Exports, however, has not approached this Court. 14. Notices were issued by this Court and interim relief was granted. Respondents thereafter appeared, affidavits and further affidavits were filed and the matters were ordered to be posted for final hearing. That is how the matters are before us. D 15. We have heard learned counsel for the parties. ... 16. The learned counsel for the appellants Essco and E Teachers' society have challenged the acquisition on several grounds. It was contended that the land was not needed for public purpose as set out in the notification of 2001 and, hence, the acquisition is not legal or lawful. Moreover, initially an action was taken for acquisition of land before more than a quarter F century in the year 1982. Final notification was also issued after more than one and half year of preliminary notification, but even thereafter, nothing was done by the State and the proceedings lapsed. Again, in 1991, when Essco applied for change of user of land, the prayer was turned down, inter alia, on the ground that the land in question was proposed to be acquired for public[G ] purpose. Nothing was done by the State for about a decade. Only in August, 2001, notification under Section 4 was issued. It was strongly urged by the learned counsel for the appellants that preliminary notification was issued on August 1, 2001 and H SUPREME COURT REPORTS [2008] 15 S. C.R. .788 A urgency clause was applied though there was no urgency at all. The notification was published in the official gazette thereafter and in two daily newspapers on August 10 and 12, 2001. Final notification under Section 6, however, was issued immediately on the next day i.e. on August 2, 2001, of the issuance of B[preliminary notification under sub-section ( ][1) ][of ][Section 4. It ] was contended that on the facts of the case, no urgency clause could have been invoked. Even otherwise, the action was bad and de hors the Act since the conditions laid down in subsection (4) of Section 17 of the Act have not been complied c[with ][inasmuch ][as ][there ][was ][neither ][grave ][urgency ][nor ] unforeseen emergency. It was submitted that there was lethargy on the part of officers of the Government in not taking steps for more than twenty years. The State cannot take undue advantage of its negligence or inaction and deprive the owners D[of ][their ][right to property in purported exercise ][of ][power ][of ] eminent domain. The Act is an expropriatory legislation which deprives a person of his property without his consent. The provisions of the Act, hence, have to be construed strictly. It was submitted that Section 5A confers a valuable right on the owners of land of submitting objections against proposed E acquisition and such right cannot be taken away or curtailed by the State. On the facts of the case, invocation of urgency clause was not only uncalled for being contrary to law but otherwise arbitrary and unreasonable and on that ground also, the proceedings are liable to be quashed. It was urged that the F expression 'the date of publication' has been defined in subsection (1) of Section 4 of the Act. While construing the said connotation under Section 17, same meaning as contemplated under Section 4(1) has to be given. Since the final notification under Section 6 had not been published as required by the Act G after 'the last date of publication' of notification under Section 4(1 ), the action is unlaWful and is.liable to be set aside. It was asserted that no notice as required by Section 9 of the Act had been issued nor payment of 80 percent of the compensation as required by sub-section (3A) of Section 17 h_ad been paid. H[There was also total non-application ][of ][mind on the part ][of ][the ] ~ 7' ).._ " ' ESSCO FASS PVT. LTD. & ANR. _v._ STATE OF HARYANA 789 & ANR. [C.K. THAKKER, J.] State Government in not considering the Government policy of[A ] granting exemption to functional units dealing with handloom and other industries. On that count also, the proceedings are liable, to be dropped. " .... 17. On behalf of Teachers'- Society, the learned counsel B adopted all the contentions raised on behalf of Essco. The learned counsel, however, further submitted that the society prayed for allotment of land and the prayer was granted. An agreement was entered into between the Authority and the society, possession of land was handed over to the society, c which has spent substantiai amount of several lakhs for · development. Necessary permission was sought so that construction can be made which was also granted by the Authorities, requisite charges which were to be paid had already been paid and no dues had been shown so far as the . D appellant- society is concerned and yet the impugned action has been taken mala fide and with ulterior motive though the land is not required for public purpose. It was also submitted that even according to the authorities, lhe land of the appellantsociety does not come in 'road line'. It is situate at about 24 meters away (23.94 meters) from road line. It was, therefore, E submitted that the proceedings should be declared against the provisions of law and may be quashed. E 18. Learned counsel for the respondents, on the other hand, submitted that the action of the authorities is legal, lawful and in consonance with law. It was urged that the land was required for public purpose, viz., for construction of road. For acquisition of land, therefore, a notification was issued. It was submitted that there is no element of mala fide or colourable exercise of power which is clear form the fact that even in early eighties, the land was sought to be acquired. Since the proceedings could not be completed within the stipulated period, they lapsed. That, however, does not mean that the land was not needed for public purpose or that the public purpose disappeared or vanished. The counsel submitted that it was F G H SUPREME COURT REPORTS [2008) 15 S.C.R. 790 > A further clear when the prayer of Essco for change of user of land in 1991 was rejected. The applicant was told at that time also that the land was required for public purpose. According to the counsel, Government machinery took some time but it cannot be concluded that the land was not required by the State B[and only with a view ][to ][deprive the appellants of their ownership ] rights acquisition proceedings had been initiated. 19. Regarding notification of August 1, 2001 and August 2, 2001 under Sections 4 and 6 of the Act respectively, it was submitted that both the notifications were in consonance with c law. A preliminary notification under sub-section {1) of Section 4 of the Act was issued showing the intention of the State for acquisition of land for public purpose. Since the acquisition was for construction of road, it was covered by Section 17 of the Act and urgency clause was rightly invoked and in exercise cf D power under sub-section (4) of Section 17, inquiry contemplated by Section 5A of the Act had been dispensed with. The action was in consonance with law and no grievance can be made contending that the inquiry as contemplated by Section 5A and hearing of objections were illegally dispensed E with by the authorities. All actions were consistent with the provisions of the Act and .the appellants have no right to make complaint against tho,se actions. It was, therefore, submitted that the High Court was wholly right in dismissing the writ petitions and the appeals have no substance. F 20. Before we deal with the matter on merits, it would be appropriate if we notice the relevant provisions of the Act. As the Preamble shows, the Act has been enacted with a view "to amend the law for the acquisition of land for public purposes G[(and for Companies)". Section 3 ][is ][a 'definition clause' ][of ] various expressions used in the Act. Clause (f) defines 'public purpose' and the definition is 'inclusive' in nature. Purposes mentioned in Clauses (i) to (viii) are in the nature of 'public purpose' and the land can be acquired for any such purpose. Part II (Sections 4 to 17) deals with 'Acquisition'. Section 4 H ..... , -;.- l.. ESSCO FASS PVT. LTD. & ANR. _v._ STATE OF HARYANA 791 & ANR. [C.K. THAKKER, J.] ' _>.._ > ~ ~ -4, _F_ .. ~ ' A enables the appropriate Government to issue preliminary notification for acquisition of land needed or likely to be needed for public purposes. The said section is relevant and reads thus; - _Section 4 Publication of preliminary notification and powers of officers thereupon-_ (1) Whenever it appears B to the appropriate Government that land in any locality is needed or is likely to be needed for any public purpose or for a company a notification to that effect shall b~ published in the Official Gazette 1 [and in two daily newspapers circulating in that locality of which at least one c shall be in the regional language and the Collector shall cause public notice of the substance of such notification to be given at convenient places in the said locality 1 [the last of the dates of such publication and the giving of such public notice, being hereinafter referred to as the date of D publication of the notification. D (2) Thereupon it shall be lawful for any officer, either, generally or specially authorised by such Government in this behalf, and for his servants and workmen,-- E to enter upon and survey and take levels of any land in such locality; to dig or bore in the sub-soil; ~ > to do all other acts necessary to ascertain whether the land F is adapted for such purpose; to set out the boundaries of the land proposed to be taken and. the intended line of the work (if any) proposed to be made thereon; G to mark such levels, boundaries and line by placing marks and cutting trenches, ~ and, where otherwise the survey cannot be completed and the levels taken and the boundaries and line marked, to H [2008] 15 S.C.R. 792 SUPREME COURT REPORTS 'lo l _r-_ r- A B cut down and clear away any part of any standing crop, fence o~ jungle: Provided that no person shall enter into any building or upon any enclosed court or garden attached to a dwelling-house (unless with the 'consent of the occupier thereof) without previously giving such occupier at least seven days' notice iri writing of his intention to do sci. _)..__ 21. Section 5A is a salutary provision and enables any person interested in the land which is notified under sub-section c ( 1) of Section 4 as being needed or iikely to be needed for a public purpose to lodge objections against the proposed acquisition. It is equally important provision and may be reproduced' D E F G H _Section SA_ - _Objections : Hearing of objections-(1)_ Any person interested in any land which has been notified . under .. section 4, Sub-section (1), as being needed or likely to be needed for a public purpose or for a company may, within thirty days from the date of the publication of the notification, object to the acquisition of the land or of any · land in the locality, as the case may be. (2) Every objection under sub-section ( 1) shall be made to the Collector in writing, and the Collector shall give the objector an 9pportunity of being heard in person or by any person authorised by him in this behalf or by pleader and shall, after hearing all such objections and after making such further inquiry, if any, as he thinks necessary, either make a report in respect of the land which has been notified under section 4, sub-section (1 ), or make different reports in respect of different parcels of such land, to the appropriate Government, containing his recommendations on the objections, together with the record of the proceedings held by him, for the decision of that Government. The decisioh of the Appropriate Governrnent ori tne objections shall be final.· · · · . .,, _>_ _r_ ·1 .,__ 793 ESSCO FASS PVT. LTD. & ANR. _v._ STATE OF HARYANA & ANR. [C.K. THAKKER, J.] --( 1 .., ~ A (3) For the purposes of this section, a person shall be deemed to be interested in land who would be entitled to claim an interest in compensation if the land were acquired under this Act. 22. Then comes Section 6 which ~authorizes the appropriate Government to issue final notification as to declaration that the land is required for public purpose. The said section is also material and reads as under; B 6. _Declaration that land is required for_ a _public purpose.-_ ( 1) Subject to the provisions of Part VI I of this Act, when[c ] the Appropriate Government is satisfied after considering . the report, if any, made under section 5A, sub-section (2), that any particular land is needed for a public purpose, or for a company, a declaration shall be made to that effect under the signature of a Secretary to such Government or D of some officer duly authorised to certify its orders an different declarations may be made from time to time in respect of different parcels of any land covered by the same notification under section 4, sub-section (!), irrespective of whether one report or different reports has E or have been made (wherever required) under section 5- A, sub-section (2): Provided that no declaration in respect of any particular land covered by a notification under section 4, sub-section (1),-- F > (i) published _after_ the commencement of the Land Acquisition (Amendment and Validation) Ordinance, 1967 but before the commencement of the Land Acquisition (Amendment) Act, 1984 shall be made after the expiry of G three years from 'the date of the publication of the notification; or '\ .( (ii) published after the commencement of the Land Acquisition (Amendment) Act, 1984, shC!ll be made ~fter H r- I ' SUPREME COURT REPORTS (2008] 15 S.C.R. 794 _v_ l \ I A B c D E F G H the expiry of one year from the date of the publication of the notification: ·Provided further that no such declaration shall be made unless the compensation to be awarded for such property is to be paid by a company, or wholly or partly out of public revenues or some fund controlled or managed by a local authority. Explanation 1.-ln computing any of the periods referred to in the first proviso, the period during which any action or proceeding to be taken in pursuance of the notification issued under Section 4, sub-section (1 ), is stayed by an order of a Court shall be excluded. Explanation 2.-Where the compensation to be awarded for such property is to be paid out of the funds of a corporation owned or controlled by the State, such compensation shall be deemed to be compensation paid out of public revenues. (2) Every declaration shall be published in the Official Gazette, and in two daily newspapers circulating in the locality in which the land is situate of which at least one shall be in the regional language, and the Collector shall cause public notice of the substance of such declaration to be given at convenient places in the said locality (the last of the date of such publication and the giving of such public notice, being hereinafter referred to as the date of publication of the declaration), and such declaration shall state] the district or other territorial division in which the land is situate, the purpose for which it is needed, its approximate area, and where a plan shall have been made of the land, the place where such plan may be inspected. (3) The said declaration shall be conclusive evidence that the land is needed for a public purpose or for a Company, _).__ \" ~ .... _'f'_ {'r- , _i_ _>_ -; - ESSCO FASS PVT. LTD. & ANR. _v._ STATE OF HARYANA 795 & ANR. [C.K. THAKKER, J.] A _(_ _I_ as the case may be; and, after making such declaration the Appropriate Government may acquire the land in manner hereinafter appearing. 23. Section 9 requires issuance of notice to persons interested. Section 11 requires enquiry to be made and award to be passed by Collector. Section 16 authorises the Collector to take possession of the land acquired under the Act. Thereupon, the land vests absolutely in the Government free from all encumbrances. A B 24. Section 17 is an exception to the normal rule of c acquisition of land and deals with cases of urgency and emergency. The provision is of extreme importance and may be quoted in _extenso._ '¥ ) "' _17. Special powers in cases of urgency.-(1)_ In cases of D urgency, whenever the Appropriate Government so directs, the Collector, though no such award has been made, may, on the expiration of fifteen days from the publication of the notice mentioned in section 9, sub-section (1 ), take possession of any waste or arable land needed for a public E purpose]. Such land shall thereupon vest absolutely in the Government, free from all encumbrances. (2) Whenever, owing to any sudden change in the channel of any navigable river or other unforeseen emergency, it becomes necessary for any Railway administration to F acquire the immediate possession of any land for the maintenance of their traffic or for the purpose of making thereon a river-side or ghat station, or of providing convenient connection with or access to any such station, or the appropriate Government considers it necessary to G acquire the immediate possession of any land for the purpose of maintaining any structure or system pertaining to irrigation, water supply, drainage, road communication or electricity,] the Collector may, immediately after the publication of the notice mentioned in sub-section (1) and H,, ~ SUPREME COURT REPORTS [2008) 15 S.C.R. 796 A B c D E with fhe previous s~nctio~· _cit_ the appropriate Government, enter upon and take possessio'n "of such land, which shall thereupon vest absolutely in the Government free from all encumbrances. f?rovided that the Collector shall not take possession of any buildi~g or part of a building under this sub-sec~ion without giving to the occupier thereof at least forty-eight hours' notice of his intention so to do, or such longer notice as may be reasonably sufficient to enable such occupier to remove his movable property from such building without unnecessary inconvenience. (3) In every case under either of the preceding subsections the Collector shall at the time of taking possession offer to the persons interested, compensation for the standing crops and trees (if any) on such land and for any other damage sustained by them caused by such sudden dispossession and not excepted in section 24; and, in case such offer is not accepted, the value of such crops and trees and the amount of such other damage shall be allowed for in awarding compensation for the land under the provisions herein contained. _y_ (3A) Before taking possession of any land under subsGction.(1) or sub-section (2), the Collector shall, without · prejudice to the provisions of sub-section (3),- F ( a) tende.r payment of eighty per centum of the compensation for such land as estimated by him to the persons interested entitled thereto, and G H (b) pay it to them, unless prevented by some one or more of the contingencies mentioned in section 31, sub-section (~).and where the Collector is so prevented, the provisions of section 31, sub-section (2), (except the second proviso thereto), shall apply as they apply to the payment of compensation under that section. ESSCO FABS PVT. LTD. & ANR. _v._ STATE OF HARYANA 797 & ANR. [C.K. THAKKER, J.] (3-B) The amount paid or deposited under sub-section (3A), shall be taken into account for determining the amount of compensation required to be tendered under section 31, and where the amount so paid or deposited exceeds the compensation awarded by the Collector under section 11, the excess may, unless refunded within three months from the date of the Collector's award, be recovered as an arrear of land revenue. (4) In the case of any land to which, in the opinion of the appropriate Government, the provisions of sub-section (1) or sub-section (2) are applicable, the appropriate Government may direct that the provisions of section SA shall not apply, and, if it does not so direct, a declaration may be made under section 6 in respect of the land at any time after the date of the publication of the notification under section 4, sub-section (1 ). A B C D 25. Whereas Part Ill relates to 'Reference to Court and procedure thereon', Parts IV and V deal with 'Apportionment of compensation' and 'Payment', respectively. E 26. It is vehemently contended on behalf of the appellants that on the facts and in the circumstances of the case, the respondents could not have invoked 'urgency clause' by scuttling enquiry and dispensing with hearing of objections under Section 5A of the Act It was submitted that no action could have been taken in view of the circumstances mentioned earlier. As early as in 1982 proceedings were initiated for acquisition of land but they were allowed to be lapsed in spite of final notification under Section 6 of the Act by not taking appropriate actions in time. Again, in 1991, when Essco Fabs applied for change of user of land, request was turned down on the ground that the land was likely to be needed for public purpose. It was, therefore, submitted that when preliminary notification under Section 4 was issued in 2001, there was no urgent need or compelling necessity nor it was a matter of urgency or emergency under Section 17 of the Act which could F G H 798 SUPREME COURT REPORTS [2008] 15 S.C.R. A justify the action and the proceedings are liable to be quashed. 27. We find considerable force in the above argument of the learned counsel for the appellants. The scheme of the Act is clear which provides for issuance of preliminary notification B[under sub-section ( ][1) ][of Section 4 of the Act empowering the ] appropriate Government to issue such notification for acquisition of land needed or likely to be needed for any public purpose. Since the property belongs to a private individual, unless there is a 'public purpose' as defined in clause (f) of c[Section 3 of the Act, ][no ][acquisition of land can be made. It ][is ] in exercise of power of eminent domain that a sovereign may acquire property which does not belong to him. In the circumstances, as a general rule, before exercise of power of eminent domain, law must provide an opportunity of hearing against the proposed acquisition. Even without a specific D provision to that effect, general law requires raising of objections by and affording opportunity of hearing to the owner of the property. The Lan~ Acquisition (Amendment) Act, 1923 (Act 38 of 1923), however, expressly made such provision by inserting Section 5A in the Act. It is, therefore, clear that after E issuance of preliminary notification under Section 4 before and final notification under Section 6 of the Act, the appropriate Government is enjoined to hear persons interested in the property before he is ·deprived of his ownership rights. But then there may be cases of 'urgency' or 'unforeseen emergency' F which may brooke no delay for acquisition of such property in larger public interest. The Legislature, therefore, thought it appropriate to deal with such cases of exceptional nature and in its wisdom enacted Section 17. 28. Whereas sub-section (1) of Section 17 deals with G cases of 'urgency', sub-section (2) of the said section covers cases of 'sudden change in the channel of any navigable river or other unforeseen emergency'. But even in such cases i.e. cases of 'urgency' or 'unforeseen emergency', enquiry H[contemplated ][by ][Section 5A cannot ] _[ipso facto ]_[be dispensed ] ,.!. 'o; ~ ' _y_ _'f_ _>_ ESSCO FABS PVT. LTD. & ANR. _v._ STATE OF HARYANA 799 & ANR. [C.K. THAKKER, J.] .. ' with which is clear from sub-section (4) of Section 17 of the Act. A 29. Sub-section (4) of Section 17 is an enabling provision and it declares that if in the opinion of the appropriate Government, the provisions of sub-section (1) or (2) are applicable, it _may_ direct that the provisions of Section 5A would B not apply. It is, therefore, clear that the Legislature has contemplated that there may be 'urgencies' or 'unforeseen emergencies' and in such cases, private properties may be acquired. But, it was also of the view that normally even in such cases, i.e. cases of urgencies or unforeseen emergencies, the c owner of property should not be deprived of his right to property and possession thereof without following proper procedure of law as contem_plated by Section 5A of the Act unless the urgency or emergency is of such a nature that the Government is convinced that holding of enquiry or hearing of objections D may be detrimental to public interest. ... _,I.._ 30. In this connection, both the parties invited our attention to several decisions. We will deal with some of the important decisions. E 31. In _Nandeshwar Prasad_ & _Anr. V. State of Uttar Pradesh_ & _Ors,_ (1964) 3 SCR 425, the land was acquired by the Government for public purpose, viz. the Kanpur Development Board under the Kanpur Urban Area Development Act, 1945. The Court considered the scheme of F the Act that after issuance of preliminary notification under Section 4 of the Act, objections are to be heard under Section 5A of the persons interested in the property and thereafter final notification under Section 6 can be issued. The Court, however, noted that to that procedure, there is an exception under Section G 17 which enables the Government to apply urgency clause. Where an action is taken under sub-section (4) of Section 17 of the Act, it is not necessary to follow procedure luid down in Section 5A and notification under Section 6 can be issued without report from the Collector as envisaged by Section 5A. H ESSCO FABS PVT. LTD. & ANR. _v._ STATE OF HARYANA 801 & ANR. [C.K. THAKKER, J.] A 33. From the above observations, it is clear that even in A cases falling under or covered by sub-sections (1) and (2) of Section 17 of the Act and the Government intends to acquire land in cases of 'urgency' or 'unforeseen emergency', it is still required to follow procedure under Section 5A of the Act before issuance of final notification under Section 6 of the Act. It is only B when the Government also makes a declaration under subsection (4) of Section 17 that it becomes unnecessary to take recourse to procedure under Section 5A of the Act. ·" 34. _Nandeshwar Prasad_ was decided by a three Judge c Bench. ~ '\ 35. Recently, in _Union of India_ & _Ors. v. Mukesh Hans,_ (2004) 8 sec 14, a similar question came up for consideration before a three Judge Bench. There land was sought to be acquired at Mehrauli by the appropriate Government for organizing _Anjuman-Saire-e-Gul-Faroshan._ Proceedings were initiated under the Act and urgency clause was applied. The notification mentioned the public purpose as 'Planned Development of Delhi'. It was also stated that Lt. Governor was of the opinion that Section 17(1) of the Act was applicable to the acquisition and he d~rected to dispense with inquiry under Section SA of the Act. Simultaneously, a declaration under Section 6 was issued. Interested parties approached the High Court of Delhi, inter alia, on the ground that decision to dispense with inquiry contemplated by Section 5A of the Act was vitiated by non-application of mind. The High Court upheld the contention and quashed the proceeding. The aggrieved Union approached this Court. D E F 36. It was contended on behalf of the Union that in case of urgency, it was open to the appropriate Government to[G ] dispense with inquiry under Section 5A by invoking sub-section ( 4) of Section 17 of the Act. It was alsQ contended that the urgency contemplated by sub-sections (1) or (2) of Section 17 of the Act was _'by itself_ sufficient to invoke sub-section (4) of H \ SUPREME COURT REPORTS 802 [2008) 15 S.C.R. l ; A Section 17. > 37. Negativing the contention and referring to _Nandeshwar Prasad_ and other judgments, the Court held; B c D E F G H "A careful perusal of the above Section shows that Subsection ( 1) of Section 17 contemplates taking possession of the land in, the case of an urgency without making an award but after the publication of Section 9( 1) notice and after the expiration of 15 days of publication of Section 9( 1) notice. Th'erefore it is seen that if the appropriate Government decides that there is an urgency to invoke Section;17(1) in the normal course Section 4(1) notice will have J6 be published, Section 6 declaration will have to be . .Jllade and after completing the procedure contemplated under Sections 7 and 8, 9(1) notice will have to be given and on expiration of 15 days from the date of such notice the authorities can take possession of the land even before passing of an award. Sub-section (2) of Section 17 contemplates a different type of urgency inasmuch as it should be an unforeseen emergency. Under this Section if the appropriate Government is satisfied that there is such unforeseen emergency the authorities can take possession of the land even without waiting fort 15 days period contemplated under Section 9(1 ). Therefore, in cases, where Government is satisfied that mere is an unforeseen emergency it will have to in the normal course, issue a Section 4(1) notification, hold 5A inquiry, make Section 6 declaration, and issue Section 9(1) notice and possession can be taken immediately thereafter without waiting for the period of 15 days prescribed under Section 9( 1) of the Act. Section 17 ( 4) as noticed above provides that in cases where the appropriate Government has come to the conclusion that there exists an urgency or unforeseen '>;- _y_ _-I_ _r-_ _)_ ESSCO FABS PVT. LTD. & ANR. _v._ STATE OF HARYANA 803 & ANR. [C.K. THAKKER, J.] emergency as required under Sub-sections (1) or (2) of Section 17 it may direct that the provisions of Section 5A shall not apply and if such direction is given then 5A inquiry can be dispensed with and a declaration may be made under Section 6 on publication of 4( 1) notification possession can be made". A B ## 38. The Court, therefore, proceeded to state; _!'_ "f \ "A careful perusal of this provision which is an exception to the normal mode of acquisition contemplated under the Act shows mere existence of urgency or unforeseen c emergency though is a condition precedent for invoking Section 17(4) that by itself is not sufficient to direct the dispensation of 5A inquiry. It requires an opinion to be formed by the concerned government that along with the existence of such urgency or unforeseen emergency there D is also a need for dispensing with 5A inquiry which indicates that the Legislature intended that the appropriate government to apply its mind before dispensing with 5A inquiry. It also indicates the mere existence of an urgency under Section 17(1) or unforeseen emergency under E Section 17(2) would not by themselves be sufficient for dispensing with 5A inquiry. If that. was not the intention of the Legislature then the latter part of Sub-section (4) of Section 17 would not have been necessary and the Legislature in Section 17(1) and (2) itself could have F incorporated that in such situation of existence of urgency or unforeseen emergency automatically 5A inquiry will be dispensed with. But then that is not language of the Section which in our opinion requires the appropriate Government to further consider the need for dispensing with 5A inquiry G in spite of the existence of unforeseen emergency. This understanding of ours as to the requirement of an application of mind by the appropriate Government while dispensing with 5A inquiry does not mean mat in and every case when there is an urgency contemplated under Section H SUPREME COURT REPORTS. [2008] 15 S.C.R. 804 17(1) and unforeseen emergency contemplated under Section 17(2) exists that by itself would not contain the need for dispensing with SA inquiry. It is ppssible in a given case the urgency noticed by the appropriate Government under Section 17(1) or the unforeseen emergency under Section 17(2) itself may be of such degree that it could require the appropriate Government on that very basis to dispense with the inquiry under Section SA but then there is a need for application of mind by the appropriate Government that such an urgency for dispensation of the SA inquiry is inherent in the two types of urgencies contemplated under Section 17(1) and (2) of the Act". A B c 39. The learned counsel for the respondent authorities, however, strongly relied upon a two Judge Bench decision of this Court in _Jai Narain_ & _Ors. v. Union of India_ & _Ors.,_ (1996) D 1 SCC 9. In Jai Narain, the Court held that the question of 'urgency' or 'unforeseen emergency' is the matter which is entirely based on 'subjective satisfaction of the Government' and the Courts do not interfere unless the reasons given are wholly irrelevant and there is non-application of mind. If the E public purpose, on the face of it shows that the land is needed urgently, that by itself is relevant circumstance for justifying the action under Section 17(4) of the Act. D 40. Again, a similar view was taken by a two Judge Bench F[in ] _[Chameli Singh ]_[& ] _[Ors., ][v. ][State ][of ][U.P. ]_[·& ] _[Anr., ]_[(1996) 2 SCC ] S49. In Chameli Singh, land was acquired for public purpose, namely, construction of houses for dalits. Urgency clause under Section 17 was applied which was challenged by the landowners. Holding that the urgency clause was rightly applied and G[inquiry ][under ][Section ][SA ][of ][the ][Act ][has ][been ][correctly ] dispensed with, the Court observed that acquisition of land for providing houses to _dalits,_ tribes and poor would be sufficient to invoke Section 17 of the Act and the land-owners cannot challenge the validity of such acquisition on the ground that inquiry under Section SA cannot be dispensed with. H ·"\; _y_ _t_ _>_ ESSCO FASS PVT. LTD. & ANR. _v._ STATE OF HARYANA & ANR. [C.K. THAKKER, J.] 805 A- ## 41. The Court stated; "It would thus be seen that this Court emphasised the holding of an inquiry on the facts peculiar to that case. Very · often the officials, due to apathy in implementation of the policy and programmes of the Government, themselves adopt dilatory tactics to create cause for the owner of the land to challenge the validity or legality of the exercise of the power to defeat the urgency existing on the date of taking decision under Section 17(4) to dispense with Section 5-A inquiry. 8 c It is true that there was pre- notification and postnotification delay on the part of the officers to finalise and publish the notification. But those facts were present before the Government when it invoked urgency clause and dispensed with inquiry under Section 5A. As held by D this Court, the delay by itself accelerates the urgency: Larger the delay, greater be the urgency. So long as the unhygienic conditions and deplorable housing needs of Dalits, Tribes and the poor are not solved or fulfilled, the urgency continues to subsist When the Government on the E basis of the material, constitutional and international obligation, formed its opinion of urgency, the Court, not being an appellate forum, would not disturb the finding unless the court conclusively finds the exercise of the power male fide. Providing house sites to the Dalits, Tribes and F the poor itself is a national problem, and a constitutional obligation. So long as the problem is not solved and the need is not fulfilled, the urgency continues to subsist. The State is expending money to relieve the deplorable housing condition in which they live by providing decent G housing accommodation with better sanitary conditions. The lethargy on the part of the officers for pre and postnotification' delay would not render the exercise of the power to invoke urgency clause invalid on that account". E F 42. In _First Land Acquisition Collector_ & _Ors., v. Nirodhi_ H SUPREME COURT REPORTS [2008] 15 S.C.R. 806 A _Prakash Gangoli_ & _Anr.,_ (2002) 4 SCC 160, a two Judge Bench again observed that case of existence of urgency under Section 17. of the Act is a matter of subjective satisfaction of appropriate Government and a decision of Government to dispense with inquiry under Section SA by invoking urgency B provision can be challenged only on the ground of nonapplication of mind or mala fide exercise of power by the Government. Burden is always on the person alleging mala fide to prove it on the basis of specific materials. So long as the purpose of acquisition continues to exist, exercise of power c under Section 17 cannot be held to be mala fide. Mere delay of the Government subsequent to its decision to dispense with inquiry under Section SA by exercising power under Section 17 would not invalidate the decision. 43. On the basis of above decisions, it was submitted that D once a decision has been taken by the State Government to apply urgency clause, the decision of the Government cannot be interfered with by a Court exercising writ jurisdiction. 44. In our judgment, from the above case law, it is clear E that normal rule for acquisition of land under the Act is issuance of notification under sub-section (1) of Section 4, hearing of objections under Section SA and issuance of final nctification under Section 6 of the Act. Award will be made by the Collector, notice has to be issued to the land-owners or the person F interested and thereafter possession can be taken. Section 17, no doubt, deals with special situations and exceptional circumstances covering cases of 'urgency' and 'unforeseen emergency'. In case of 'urgency' falling under sub-section (1) of Section 17 or of 'unforeseen emergency' covered by subG section (2) of Section 17, special powers may be exercised by appropriate Government but as held by a three Judge Bench decisions before more than four decades in Nandeshwar Prasad and reiterated by a three Judge Bench decision in Mukesh Hans, even in such cases, inquiry and hearing of H objections under Section SA cannot ipso facto be dispensed _)_ ESSCO FABS PVT. LTD. & ANR. _v._ STATE OF HARYANA 807 & ANR. [C.K. THAKKER, J.] .- ). _I_ "( with unless a notification under sub-section (4) of Section 17 A of the Act is issued. The legislative scheme is amply clear which merely enables the appropriate Government to issue such notification under sub-section (4) of Section 17 of the Act dispensing with inquiry under Section SA if the Government intends to exercise the said power. The use of the expression B _'may'_ in sub-section (4) of Section 17 leaves no room of doubt that it is discretionary power of the Government to direct that the provisions of Section 5A would not apply to such cases covered by sub-section ( 1) or (2) of Section 17 of the Act. 45. In our opinion, therefore, the contention of learned[c ] counsel for the respondent authorities is not well founded and cannot be upheld that once a case is covered by sub-section (1) or (2) of Section 17 of the Act, sub-section (4) of Section 17 would necessarily apply and there is no question of holding inquiry or hearing objections under Section SA of the Act. p Acceptance of such contention or upholding of this argument will make sub-section (4) of Section 17 totally otiose, redundant and nugatory. ~ .... ... '"' 46. It is true that in _Chameli Singh_ and _Jai Narain,_ a two E Judge Bench has observed that acquisition of land for housing accommodation or for construction of residential quarters for dalits and tribals can be said to be of an urgent nature falling under Section 17(1) of the Act. But as already held in _Nandeshwar Prasad_ and _Mukesh Hans,_ even in such cases, F procedure required to be followed under Section 5A cannot be dispensed with unless notification under sub-section (4) of Section 17 is issued. In Mukesh Hans, the Court also held that the provision cannot be pressed in service by officers who were negligent and due to their lethargy, proceedings could not be G initiated for a quite long time. F 47. In the instant case, the facts are eloquent. Initial action of acquisition of land was taken as early as in 1982 but the proceedings lapsed. In 1991, when Essco made an application praying for change of user of land, it was rejected on the ground H SUPREME COURT REPORTS [2008] 15 S.C.R. 808 A that the land was likely to be required for public purpose. Nothing, however, was done for about a decade. It is only in 2001 that·again Notification under Section 4 was issued and urgency clause was applied. We are, therefore, satisfied that the ratio lad down in _Mukesh Hans_ squarely applies to the facts B[of ][the case. No urgency clause could have been invoked by the ] respondents and inquiry and hearing of objections provided by Section 5A of the Act could not have been dispensed with. The actions of issuance of urgency clause under sub-section (4) of Section 17, dispensing with inquiry under Section 5A and c[issuance ][of ][final notification under sub-section (1) ][of ][Section ] 6 are required to be quashed and they are accordingly quashed. 48. The learned counsel for the appellant also contended that even if it is held that the respondent could have issued final D notification without holding inquiry and hearing of objections under Section ·5A of the Act, the notification under Section 6 of the Act is illegal and unlawful in view of the fact that the said notification has not been issued after the last of the dates of the publication and giving of public notice referred to as "the E date of publication of the notification" under sub-section (1) of Section 4 of the Act. ..( \ ..,,, 49. It was submitted that even the said point is concluded by a decision of this Court in _State of Uttar Pradesh_ & _Ors. v._ F _[Radhey Shyam Nigam ]_[& ] _[Ors, ]_[(1989) 1 SCC 591. ] 50. The learned counsel for the respondents, on the other hand, relying on _State of Haryana_ & _Anr. v. Raghubir Dayal,_ (1995) 1 SCC 133 and _Mohan Singh_ & _Ors. v. International Airport Authority of India_ & _Ors.,_ (1997) 9 SCC 132 submitted G that if urgency clause under Section 17(4) is applied by the appropriate Government, final notification under Section 6 of the Act can be issued on the next day of the issuance of preliminary notification under Section 4 of the Act. In the case on hand,· the said procedure is followed. Notification. under H[Section ][4_ ][was issued on August ][1, ][2001. Urgency clause was ] ' _>-_ ESSCO FASS PVT. LTD. & ANR. _v._ STATE OF HARYANA 809 & ANR. [C.K. THAKKER, J.] ~ A _I_ ) '"' ~ ' -...;: ~ A applied and the case was covered by Section 17(4) oft~e Act. On the very next day i.e. on August 2, 2001, final notification under Section 6 was issued. Therefore, the procedure required by law has been strictly followed as held by this Court in _Raghubir Dayal_ and _Mohan Singh._ 8 51. We would have entered into the said question had it been absolutely necessary for us ~o decide it in the case on hand. But as observed hereinabove, we are of the view that the appellants are entitled to succeed on the first ground that on the facts and in the circumstances of the case, the appropriate Government was not justified in invoking urgency clause under[c ] sub-section (4) of Section 17 of the Act by dispensing with inquiry and hearing of objections under Section SA of the Act and the final notification issued under Section 6 of the Act deserves to be set aside on that ground alone, we express no opinion one way or the other on the interpretation of the D expression "the date of publication of the notification" used in sub-section (1) of Section 4, sub-section (4) of Section 17 and Section 6 of the Act. 52. For the foregoing reasons, both the appeals are allowed. The action of the respondent authority of dispensing with the inquiry and hearing of objections under Section SA and issuance of final notification under Section 6 of the Act is hereby quashed and set aside. It is, however, open to the authorities to take appropriate action after following normal procedure laid down in the Act. E F 53. Appeals are accordingly allowed with costs. **CONTEMPT PETITION NO. 30 OF 2007** **IN C.A.NO. 6580 OF 2008 @ S.L.P. (C}NO. 15449 OF 2004** G 54. In the light of judgment in the above appeals, the contempt petition stands disposed of. RP. Appeals allowed. H