High Court of KeralaSingle JudgeDismissed

E.R Chandran v. Power Grid Corporation of India Ltd.

Case / Petition Number:CRP Nos. 388/21 & 171/22

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • V.G. Arun
Judgment Date
2024-03-07
Court Decision / Holding
The civil revision petitions are dismissed. The enhanced compensation fixed by the court below shall be paid within three months of receipt of a copy of this order. If any portion of the enhanced compensation has already been deposited, it shall be disbursed to the claimant on appropriate application.
Final Disposition
Dismissed

Parties to the Case

Appellants / Petitioners

  • E.R Chandran
  • Power Grid Corporation of India Ltd. Construction Area Office, Kakkanad, Kochi

Respondents

  • Power Grid Corporation of India Ltd. Construction Area Office, Kakkanad, Kochi
  • The Special Tahsildar (LA), Power Grid Corporation of India Ltd., Kozhikode
  • E.R Chandran

Legal Representation & Advocates

Counsels for Petitioners

  • • P. T. Jose
  • • Millu Dandapani

Counsels for Respondents

  • • Millu Dandapani
  • • P. T. Jose

Case Synopsis & Summary

The Kerala High Court, hearing CRP Nos. 388/21 and 171/22, dealt with challenges to an order granting compensation for damages caused by the drawing of 400 kV transmission lines across land owned by E.R. Chandran and related claims by Power Grid Corporation of India Ltd. The claimant contended that the compensation awarded for the loss in land value due to the lines was inadequate and that compensation for trees felled should also be enhanced. The court below rejected the enhancement for tree value, and determined diminution in land value by applying 40% of land value for the central corridor and 20% for the outer corridor, relying on Ext. A7 and a commission report, while noting the trees had been cut earlier and the Commissioner's assessment was based on later inspection. The revision petitions argued the court below erred in not accepting the Commissioner's findings and in adopting the percentages of land-value diminution. The respondents urged that the enhanced compensation was excessive and that interest on compensation at 9% per annum was appropriate given precedents. The High Court upheld the impugned order, found no illegality in the calculations, and stated that the enhanced compensation had been properly determined considering the land’s nature, location, and impact of the corridor, with the 9% interest previously fixed by this Court being in line with precedent. Both petitions were dismissed, with the enhanced amount to be paid within three months and deposited amounts to be disbursed on application.

Provisions of Law Cited

Code of Civil Procedure, Section 115

Legal Doctrines & Maxims

  • KSEB v. Livisha (2007) 6 SCC 792
  • Jayaram v Kerala State Electricity Board [2015] 3 KHC 453

Submissions & Arguments

Contentions of Appellants / Petitioners

The claimant contended that the court below erred by refusing to enhance compensation for the value of trees cut and by relying on the Advocate Commissioner’s report, which was based on post-event inspection while the grounds for action arose when initial compensation was paid. He urged that the extent of land value diminution due to central and outer corridors be assessed by broader evidentiary basis, arguing for higher compensation in line with the loss in land value and the impact on land usability. The claimant emphasized the need to account for the commercial value and the changed use of the land after the lines’ installation, urging re-evaluation after considering Ext. A7 and the commission’s assessments as credible.

Contentions of Respondents

The respondent argued that the enhanced compensation for land value is excessive and that the court below’s 40% (central corridor) and 20% (outer corridor) fixation were reasonable, based on the market value and surrounding factors. They challenged reliance on the commission report and Ext. A7, noting that laying high-tension lines does not completely prohibit agricultural use or construction and that the interest at 9% was already established in precedent (V.V. etc.). They submitted that the court correctly did not disturb the commission’s findings and that any excess was unwarranted; consequently, the revision petitions should be dismissed.

Cited Precedents (2)

Case NameCitationTreatmentExplanation
KSEB v. Livisha(2007) 6 SCC 792PositiveUsed to set out the factors such as situs, distance, extent, and other relevant factors determining land value when high tension lines affect land.
Jayaram v Kerala State Electricity Board(2015) 3 KHC 453PositiveUsed to justify fixing interest on compensation towards diminution in land value at 9% per annum.

Diagnostic Tool

Beta

Does this judgment govern your specific facts?

Don't risk relying on a distinguishable precedent. Enter your facts or proposition below. We will test it against E.R Chandran v. Power Grid Corporation of India Ltd. and instantly map out authorities that support, challenge, or govern your position.

Extracted Judgment Text

Exact text extracted from official judgment records.

## **IN THE HIGH COURT OF KERALA AT ERNAKULAM** ## **PRESENT** ## **THE HONOURABLE MR.JUSTICE V.G.ARUN** **THURSDAY, THE 7[TH] DAY OF MARCH 2024 / 17TH PHALGUNA, 1945 CRP NO. 388 OF 2021** **AGAINST THE ORDER/JUDGMENT DATED 31.03.2021 IN OPELE NO.716 OF 2014 OF VI ADDITIONAL DISTRICT COURT, ERNAKULAM REVISION PETITIONER/S:** **E.R. CHANDRAN AGED 63 YEARS S/O.RAMAN, ELLIKKAKUDI, KOOVAPPADI P.O., AYMURI, KOOVAPPADY VILLAGE, KUNNATHUNADU TALUK, ERNAKULAM DISTRICT - 683 544.** ## **RESPONDENT/S:** |**1**|**POWER GRID CORPORATION OF INDIA LTD.**| |---|---| ||**CONSTRUCTION AREA OFFICE, KAKKANAD, NOW IN**| ||**PAO/400, 220KV SUB STATION, KUMARAPURAM P.O.,**| ||**PALLIKARA, KOCHI - 682 303 REP. BY DEPUTY**| ||**MANAGER.**| |**2**|**THE SPECIAL TAHSILDAR (L.A.)**| ||**POWERGRID CORPORATION OF INDIA LTD.,**| ||**CHEVARAMBALAM,KOZHIKODE - 673 017, NOW IN**| ||**THRIKKAKARA VILLAGE, KANAYANNOOR TALUK, KAKKANAD**| ||**P.O. - 682 030.**| **THIS CIVIL REVISION PETITION HAVING BEEN FINALLY HEARD ON** **18.01.2024, ALONG WITH CRP 171/22, THE COURT ON 07.03.2024,** **DELIVERED THE FOLLOWING:** CRP Nos.388/21 & 171/22 -2- ## **IN THE HIGH COURT OF KERALA AT ERNAKULAM** ## **PRESENT** **THE HONOURABLE MR.JUSTICE V.G.ARUN** **THURSDAY, THE 7[TH] DAY OF MARCH 2024 / 17TH PHALGUNA, 1945 CRP NO. 171 OF 2022** **AGAINST THE ORDER/JUDGMENT DATED IN OPELE NO.716 OF 2014 OF VI ADDITIONAL DISTRICT COURT, ERNAKULAM** ## **REVISION PETITIONER/S:** **POWER GRID CORPORATION OF INDIA CONSTRUCTION AREA OFFICE, MAVELIPURAM COLONY, KAKKANAD, COCHIN - 682 030, PRESENTLY AT CONSTRUCTION AREA OFFICE, 400/220, KV SUB STATION, KUMARAPURAM P.O, PALLIKKARA, ERNAKULAM - 683 565, REPRESENTED BY ITS SENIOR GENERAL MANAGER, PIN - 682030** **BY ADV MILLU DANDAPANI** ## **RESPONDENT/S:** **1 E.R CHANDRAN , S/O RAMAN, AGED 63 YEARS, ILLIKKAKUDI, KOOVAPPADY P O, AYMURI , KOOVAPADI VILLAGE , KUNNATHUNADU TALUK, ERNAKULAM DISTRICT, PIN - 683544 2 THE SPECIAL TAHSILDAR (LA) POWER GRID CORPORATION OF INDIA LTD. CHEVARAMBALAM, KOZHIKODE, PIN - 673017 BY ADV P.T.JOSE** **OTHER PRESENT:** ## **SRI.K.P.HARISH-SR.GP** **THIS CIVIL REVISION PETITION HAVING BEEN FINALLY HEARD ON 18.01.2024, ALONG WITH CRP 388/21, THE COURT ON 07.03.2024, DELIVERED THE FOLLOWING:** CRP Nos.388/21 & 171/22 -3- ## **ORDER** Dated this the 07[th] day of March, 2024 These revision petitions are filed challenging the order passed by the Additional District Judge-VI, Ernakulam in O.P.(Electricity) No.716 of 2014. The original petition was filed by the revision petitioner in CRP No.388 of 2021 (hereinafter called “the claimant”), being dissatisfied with the compensation awarded towards the damage and loss sustained due to the drawing of 400 KV lines across his property by the Power Grid Corporation of India Ltd (hereinafter called “the Corporation”). The essential facts are as under; The claimant is in ownership and possession of landed property having an extent of 28 cents comprised in Sy.No.220/11-2-3 in Koovappady Village in Kunnathunadu Taluk. The land was cultivated with various yielding and non- CRP Nos.388/21 & 171/22 -4- yielding trees. According to the claimant, to facilitate drawing of the lines and smooth transmission of power, large number of trees were cut from his property. The drawing of high tension lines rendered the land underneath and adjacent to the lines useless, resulting in diminution of the value of the property. In spite of the huge loss suffered by the claimant, only an amount of Rs.91,693/- was paid as compensation towards the value of yielding and non-yielding trees cut. Surprisingly, no compensation was granted for diminution in land value. Hence, the original petition was filed, seeking enhanced compensation towards the value of trees cut and diminution in land value. 2. The court below rejected the claim for enhanced compensation for the value of trees cut since no evidence in support of the claim was produced. As far as the claim for enhanced compensation towards diminution in land value is concerned, the court below relied on Ext.A7 CRP Nos.388/21 & 171/22 -5- document as well as Exts.C5 and C5(a) commission report and sketch. Relying on Ext.C5(a) sketch, the extent of central corridor was held to be 0.125 cent and that of the outer corridor, 6.670 cents. For the central corridor, 40% of the land value was granted as compensation and for outer corridor, 20% of the land value. Accordingly, the claimant was found entitled to compensation of Rs.2,35,196/-. Dissatisfied with the quantum of enhancement, the claimant has filed CRP No.388 of 2021, whereas the Corporation has filed CRP No.171 of 2022 contending that the enhancement ordered is far in excess of the actual damage sustained. 3. Heard Adv.P.T.Jose for the claimant and Adv.Millu Dandapani for the Corporation. 4. Learned Counsel for the claimant contended that the court below committed gross illegality in refusing to grant enhanced compensation for the loss sustained due to the cutting of valuable trees, in spite of the Advocate Commissioner CRP Nos.388/21 & 171/22 -6- assessing and reporting the loss. The findings in the Commissioner's report were not relied on by the court below for the reason that the property was inspected much after the trees were cut. The said reasoning is flawed since the trees were cut much after issuance of notification by the Corporation and the cause of action for filing the original petition arose only on payment of the initial compensation, even later. 5. It is submitted that the court below grossly erred in granting only 40% of the land value for the central corridor and only 20% for outer corridor. Considering the extent of damage sustained and the diminution in land value consequent to the drawing of lines, the court below ought to have granted compensation as claimed. 6. Learned Counsel for the Corporation contended that, compensation towards diminution in land value granted is exorbitant and there is no rationale in granting 9% interest on that CRP Nos.388/21 & 171/22 **==> picture [19 x 7] intentionally omitted <==** amount. The court below also erred in relying on Ext.A7 for fixing the land value of the claimant's property. As the drawing of electric lines does not prohibit the landowner from conducting agricultural activities and putting up small structures, 40% of land value granted for central corridor and 20% for the outer corridor are exorbitant. 7. A careful scrutiny of the impugned order reveals that the claim for enhancement of compensation towards the value of trees cut was rightly rejected since no supporting material, other than the findings in the Advocate Commissioner's report, was made available. As found by the court below, apart from the interested testimony of a witness, who is the claimant in some of the connected cases, no other witnesses were examined. It is also noticed by the court below that the trees were cut and removed in the year 2011 and the Commissioner inspected the property after a long period. CRP Nos.388/21 & 171/22 -8- Therefore, the court below rightly refused to accept the assessment made by the Commissioner, which was based on the standing trees in the claimant's property and the neighbouring property. On the other hand, the court below found the Corporation to have assessed the yield on the basis of local inspection, enquiry and data furnished by the Government departments. It was therefore held that the evidence let in by the claimant was not sufficient to discard the contemporaneous valuation statement prepared at the instance of the Corporation. 8. As far as the diminution in land value is concerned, the factors to be taken into consideration, as laid down in _**KSEB v. Livisha**_ ## _**[(2007) 6 SCC 792]**_ are as under; “ _10. The situs of the land, the distance between the high voltage electricity line laid thereover, the extent of the line thereon as also the fact as to whether the high voltage line passes over a small tract of land or through the middle of the land and_ CRP Nos.388/21 & 171/22 -9- _other similar relevant factors in our opinion would be determinative. The value of the land would also be a relevant factor. The owner of the land furthermore, in a given situation may lose his substantive right to use the property for the purpose for which the same was meant to be used.”_ On careful scrutiny of the impugned order, it is seen that the compensation was enhanced after taking all the above factors into consideration. The nature of the land, the commercial importance of the area and the manner in which the land was affected by drawing of the lines are all seen considered for fixing the land value as well as the percentage of diminution. The court below has adopted the land value in Ext.A7 document, which according to me, is reasonable. The discretion was properly exercised in granting 40% of the land value as compensation for the central corridor and 20% for the outer corridor. It is pertinent to note that the court below had followed the decision of this Court in _**V.V.**_ CRP Nos.388/21 & 171/22 -10- ## _**Jayaram v Kerala State Electricity Board [2015**_ _**(3) KHC 453]**_ to fix the rate of interest at 9% per annum on the compensation towards diminution in land value. As such, there is no illegality or material irregularity in the impugned order, warranting intervention by this Court in exercise of the revisional power under Section 115 of the Code of Civil Procedure. For the aforementioned reasons, the civil revision petitions filed by the claimant as well as the Corporation are dismissed. The enhanced compensation fixed by the court below shall be paid within three months of receipt of a copy of this order. If any portion of the enhanced compensation is deposited by the Corporation, that shall forthwith be disbursed to the claimant on appropriate application being filed. **==> picture [43 x 12] intentionally omitted <==** **V.G.ARUN JUDGE** Scl/