High Court of KeralaSingle JudgeCivil revision petitions filed by the claimant ...

E.K. Sivan v Power Grid Corporation of India Ltd. & Others

Case / Petition Number:CRP Nos.357/21 & 297/22

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • V.G. Arun
Judgment Date
2024-03-07
Court Decision / Holding
The civil revision petitions filed by both the claimant and the corporation are dismissed. The court affirmed the enhanced compensation fixed by the lower court and directed payment within three months of receipt of a copy of this order. If any portion of the enhanced compensation has been deposited, it shall be disbursed to the claimant on appropriate application.
Final Disposition
Civil revision petitions filed by the claimant and the corporation are dismissed. The enhanced compensation fixed by the lower court shall be paid within three months; any deposited amount shall be disbursed to the claimant on appropriate application.

Parties to the Case

Appellants / Petitioners

  • E.K. Sivan
  • Power Grid Corporation of India Ltd.

Respondents

  • Power Grid Corporation of India Ltd.
  • The Special Tahsildar (LA)
  • State of Kerala
  • Kerala State Electricity Board (KSEB)

Legal Representation & Advocates

Counsels for Petitioners

  • • P. T. Jose
  • • Millu Dandapani

Counsels for Respondents

  • • P. T. Jose
  • • S. Ashitha

Case Synopsis & Summary

This is a pair of Civil Revision Petitions filed in the Kerala High Court challenging an order of the VI Additional District Court, Ernakulam in O.P.(Electricity) No.516 of 2013, awarding compensation for damages caused by the drawing of 400 KV transmission lines by the Power Grid Corporation of India Ltd. The claimant, E.K. Sivan, owns 46 ares in Koovappady, where several trees were felled to facilitate the corridor; he was paid only Rs. 21,788 for yielding and non-yielding trees and received no compensation for diminution in land value. The petitions sought enhanced compensation for trees and for the loss in land value due to the central and outer corridors. The court below rejected the claim for enhanced compensation for trees for lack of supportive evidence, and awarded only 40% of land value for the central corridor and 20% for the outer corridor based on Ext.A7, C3 and C3(a). The petitioners argued that the Commissioner’s report and Ext.A7 should be relied upon, as the cause of action arose on initial payment and the trees were cut after notification. The respondents contended that the enhancement was exorbitant and that 9% interest on land-value compensation was unwarranted. The High Court upheld the lower court’s approach, applying KSEB v. Livisha and Jayaram v. Kerala SEB to justify the land-value factors and the interest rate, and dismissed both petitions. The enhanced compensation awarded by the lower court is to be paid within three months.

Provisions of Law Cited

Code of Civil Procedure, Section 115

Submissions & Arguments

Contentions of Appellants / Petitioners

The claimant argued that the court below committed illegality by denying enhanced compensation for the loss due to valuable trees; the Advocate Commissioner’s report, though based on inspections after the trees were cut, should be given weight since the cause of action arose when initial compensation was paid. He contended that Central and Outer corridor percentages (40% and 20%) undervalue the diminution in land value and that Ext.A7, Exts.C3 and C3(a) support a higher assessment; the court should consider the effect of the corridor and the nature and commercial importance of the land. The claimant sought higher compensation for trees and the land value diminution and challenged the 9% interest rate as inconsistent with prior precedents if improper.

Contentions of Respondents

The Power Grid Corporation argued that the enhancement of compensation is exorbitant and the 9% interest on land-value compensation is unwarranted. It submitted that relying on Ext.A7 for land-value fixation is erroneous and that drawing lines does not prohibit agricultural use, structures, etc. The corporation contended that the court below’s 40% central corridor and 20% outer corridor are excessive and not justified by the surrounding factors, and that the Commissioner’s report was not reliable due to the time gap between the cutting of trees and the inspection; The respondents urged adherence to precedents such as KSEB v. Livisha to determine diminution in land value and challenged the imposition of a high rate of interest without justification.

Cited Precedents (2)

Case NameCitationTreatmentExplanation
KSEB v. Livisha[(2007) 6 SCC 792]PositiveCited to articulate the factors to determine diminution in land value and the situs of land affected by high-tension lines, which informed the court’s approach to compensation in this case.
V.V. Jayaram v Kerala State Electricity Board[(2015) (3) KHC 453]PositiveCited to justify the rate of interest on compensation for diminution in land value (9%), as adopted by the lower court.

Diagnostic Tool

Beta

Does this judgment govern your specific facts?

Don't risk relying on a distinguishable precedent. Enter your facts or proposition below. We will test it against E.K. Sivan v Power Grid Corporation of India Ltd. & Others and instantly map out authorities that support, challenge, or govern your position.

Extracted Judgment Text

Exact text extracted from official judgment records.

## **IN THE HIGH COURT OF KERALA AT ERNAKULAM** ## **PRESENT** ## **THE HONOURABLE MR.JUSTICE V.G.ARUN** **THURSDAY, THE 7[TH] DAY OF MARCH 2024 / 17TH PHALGUNA, 1945** ## **CRP NO. 357 OF 2021** **AGAINST THE ORDER/JUDGMENT DATED IN OPELE NO.516 OF 2013 OF VI** ## **ADDITIONAL DISTRICT COURT, ERNAKULAM** ## **REVISION PETITIONER/S:** - **E.K.SIVAN AGED 57 YEARS S/O. KANDAKORAN, EETTUNGAPPADI, CHERANELLUR, KOVAPPADY VILLAGE, KUNNATHUNADU BY ADV P.T.JOSE** ## **RESPONDENT/S:** - **1 POWER GRID CORPORATION OF INDIA LTD. CONSTRUCTION AREA OFFICE, KAKKANAD, NOW IN PAO/400,220 KV SUB STATION, KUMANRAPURAM P.O., PALLIKARA, KOCHI-682 303, REP BY DEPUTY MANAGER** - **2 THE SPECIAL TAHASILDAR (L.A.), POWER GRID CORPORATION OF INDIA LTD., CHERVARAMBALAM, KOCZIKODE, NOW IN KAKKANAD P.O.,-682 030** - **3 STATE OF KERALA, REPRESENTED BY DISTRICT COLLECTOR, ERNAKULAM, KOCHI682 021** - **4 KERALA STATE ELECTRICITY BOARD, REPRESENTED BY CHAIRMAN AND MANAGING DIRECTOR, KSEB LTD., THIRUVANANTHAPURAM-695 001 BY ADV R.HARISHANKAR** ## **OTHER PRESENT:** **SRI.V.TEKCHAND-SR.GP.,SRI.A.ARUNKUMAR-SC** ## **THIS CIVIL REVISION PETITION HAVING BEEN FINALLY HEARD ON** **19.02.2024, ALONG WITH CRP.297/2022, THE COURT ON 07.03.2024 DELIVERED THE FOLLOWING:** CRP Nos.357/21 & 297/22 -2- ## **IN THE HIGH COURT OF KERALA AT ERNAKULAM** ## **PRESENT** **THE HONOURABLE MR.JUSTICE V.G.ARUN** **THURSDAY, THE 7[TH] DAY OF MARCH 2024 / 17TH PHALGUNA, 1945** **CRP NO. 297 OF 2022** **AGAINST THE ORDER/JUDGMENT DATED IN OPELE NO.516 OF 2013 OF VI ADDITIONAL DISTRICT COURT, ERNAKULAM** **REVISION PETITIONER/S:** **POWER GRID CORPORATION OF INDIA CONSTRUCTION AREA OFFICE, MAVELIPURAM COLONY, KAKKANAD, COCHIN - 682 030, PRESENTLY AT CONSTRUCTION AREA OFFICE, 400/220, KV SUB STATION, KUMARAPURAM P.O, PALLIKKARA, ERNAKULAM , REPRESENTED BY ITS SENIOR GENERAL MANAGER, PIN - 683565 BY ADV MILLU DANDAPANI** ## **RESPONDENT/S:** |**1**|**E K SIVAN**| |---|---| ||**S/O KANDAKORAN , AGED 66 YEARS, EATTUNGAPPADI,**| ||**CHERANELLOR, KOOVAPPADY VILLAGE, KUNNATHUNAD TALUK,**| ||**PIN - 683544**| |**2**|**THE SPECIAL TAHSILDAR (LA)**| ||**POWER GRID CORPORATION OF INDIA LTD. CHEVARAMBALAM,**| ||**KOZHIKODE, PIN - 673017**| |**3**|**STATE OF KERALA**| ||**, REPRESENTED BY DISTRICT COLLECTOR, ERNAKULAM,**| ||**KOCHI, PIN - 682030**| |**4**|**KERALA STATE ELECTRICITY BOARD - KSEB**| ||**, REPRESENTED BY ITS CHAIRMAN & MANAGING DIRECTOR**| ||**KSEB LTD., THIRUVANANTHAPURAM, PIN - 695001**| ||**BY ADVS.**| ||**P.T.JOSE**| ||**S.ASHITHA(K/000357/2018)**| **THIS CIVIL REVISION PETITION HAVING BEEN FINALLY HEARD ON** **19.02.2024, ALONG WITH CRP.357/2021, THE COURT ON 07.03.2024 DELIVERED THE FOLLOWING:** CRP Nos.357/21 & 297/22 -3- ## **ORDER** Dated this the 07[th] day of March, 2024 These revision petitions are filed challenging the order passed by the Additional District Judge-VI, Ernakulam in O.P.(Electricity) No.516 of 2013. The original petition was filed by the revision petitioner in CRP No.357 of 2021 (hereinafter called “the claimant”), being dissatisfied with the compensation awarded towards the damage and loss sustained due to the drawing of 400 KV lines across his property by the Power Grid Corporation of India Ltd (hereinafter called “the Corporation”). The essential facts are as under; The claimant is in ownership and possession of landed property having an extent of 46 Ares comprised in Sy.No.40/3 in Koovappady Village in Kunnathunadu Taluk. The land was cultivated with various yielding and non- yielding trees. CRP Nos.357/21 & 297/22 -4- According to the claimant, to facilitate drawing of the lines and smooth transmission of power, large number of trees were cut from his property. The drawing of high tension lines rendered the land underneath and adjacent to the lines useless, resulting in diminution of the value of the property. In spite of the huge loss suffered by the claimant, only an amount of Rs.21,788/was paid as compensation towards the value of yielding and non-yielding trees cut. Surprisingly, no compensation was granted for diminution in land value. Hence, the original petition was filed, seeking enhanced compensation towards the value of trees cut and diminution in land value. 2. The court below rejected the claim for enhanced compensation for the value of trees cut since no evidence in support of the claim was produced. As far as the claim for enhanced compensation towards diminution in land value is concerned, the court below relied on Ext.A7 CRP Nos.357/21 & 297/22 -5- document as well as Exts.C3 and C3(a) commission report and sketch. Relying on Ext.C3(a) sketch, the extent of central corridor was held to be 2.421 cents and that of the outer corridor, 6.968 cents. For the central corridor, 40% of the land value was granted as compensation and for outer corridor, 20% of the land value. Accordingly, the claimant was found entitled to compensation of Rs.4,01,397/-. Dissatisfied with the quantum of enhancement, the claimant has filed CRP No.357 of 2021, whereas the Corporation has filed CRP No.297 of 2022 contending that the enhancement ordered is far in excess of the actual damage sustained. 3. Heard Adv.P.T.Jose for the claimant and Adv.Millu Dandapani for the Corporation. 4. Learned Counsel for the claimant contended that the court below committed gross illegality in refusing to grant enhanced compensation for the loss sustained due to the cutting of valuable trees, in spite of the Advocate Commissioner CRP Nos.357/21 & 297/22 -6- assessing and reporting the loss. The findings in the Commissioner's report were not relied on by the court below for the reason that the property was inspected much after the trees were cut. The said reasoning is flawed since the trees were cut much after issuance of notification by the Corporation and the cause of action for filing the original petition arose only on payment of the initial compensation, even later. 5. It is submitted that the court below grossly erred in granting only 40% of the land value for the central corridor and only 20% for outer corridor. Considering the extent of damage sustained and the diminution in land value consequent to the drawing of lines, the court below ought to have granted compensation as claimed. 6. Learned Counsel for the Corporation contended that, compensation towards diminution in land value granted is exorbitant and there is no rationale in granting 9% interest on that CRP Nos.357/21 & 297/22 -7- amount. The court below also erred in relying on Ext.A7 for fixing the land value of the claimant's property. As the drawing of electric lines does not prohibit the landowner from conducting agricultural activities and putting up small structures, 40% of land value granted for central corridor and 20% for the outer corridor are exorbitant. 7. A careful scrutiny of the impugned order reveals that the claim for enhancement of compensation towards the value of trees cut was rightly rejected since no supporting material, other than the findings in the Advocate Commissioner's report, was made available. As found by the court below, apart from the interested testimony of the claimant, no other witnesses were examined. It is also noticed by the court below that the trees were cut and removed in the year 2011 and the Commissioner inspected the property after a long period. Therefore, the court below rightly refused to CRP Nos.357/21 & 297/22 -8- accept the assessment made by the Commissioner, which was based on the standing trees in the claimant's property and the neighbouring property. On the other hand, the court below found the Corporation to have assessed the yield on the basis of local inspection, enquiry and data furnished by the Government departments. It was therefore held that the evidence let in by the claimant was not sufficient to discard the contemporaneous valuation statement prepared at the instance of the Corporation. 8. As far as the diminution in land value is concerned, the factors to be taken into consideration, as laid down in _**KSEB v. Livisha**_ ## _**[(2007) 6 SCC 792]**_ are as under; “ _10. The situs of the land, the distance between the high voltage electricity line laid thereover, the extent of the line thereon as also the fact as to whether the high voltage line passes over a small tract of land or through the middle of the land and other similar relevant factors in our opinion would be determinative. The value of the land_ CRP Nos.357/21 & 297/22 -9- _would also be a relevant factor. The owner of the land furthermore, in a given situation may lose his substantive right to use the property for the purpose for which the same was meant to be used.”_ On careful scrutiny of the impugned order, it is seen that the compensation was enhanced after taking all the above factors into consideration. The nature of the land, the commercial importance of the area and the manner in which the land was affected by drawing of the lines are all seen considered for fixing the land value as well as the percentage of diminution. The court below has adopted the land value in Ext.A7 document, which according to me, is reasonable. The discretion was properly exercised in granting 40% of the land value as compensation for the central corridor and 20% for the outer corridor. It is pertinent to note that the court below had followed the decision of this Court in _**V.V.**_ ## _**Jayaram v Kerala State Electricity Board [2015**_ _**(3) KHC 453]**_ to fix the rate of interest at 9% CRP Nos.357/21 & 297/22 -10- per annum on the compensation towards diminution in land value. As such, there is no illegality or material irregularity in the impugned order, warranting intervention by this Court in exercise of the revisional power under Section 115 of the Code of Civil Procedure. For the aforementioned reasons, the civil revision petitions filed by the claimant as well as the Corporation are dismissed. The enhanced compensation fixed by the court below shall be paid within three months of receipt of a copy of this order. If any portion of the enhanced compensation is deposited by the Corporation, that shall forthwith be disbursed to the claimant on appropriate application being filed. **==> picture [35 x 13] intentionally omitted <==** **V.G.ARUN JUDGE** Scl/