This writ petition challenges the Kerala State Electricity Board’s billing for a period when the meter was allegedly faulty. The petitioner, Dr. M.S.N. Balasubramaniyan, through a power of attorney for Jayalakshmi/Jayasree Metals (a small-scale aluminum powder producer), contends that the meter malfunctions from 2004 to 2008 led to inflated bills. Recurrent meter failures since 1997 culminated in multiple replacements; despite orders from the Electrical Inspector acknowledging faults (Exts. P1–P2), the Board later disputed faultiness, relying on R3(a)–R3(b) inspection reports. In 2008, Exts. P7 and P8 demanded Rs. 2,09,304 and Rs. 3,42,859 for consumption between 2004 and 2008, prompting the petitioner to seek relief. The petitioner argues that, under Section 26(6) of the Indian Electricity Act, 1910, the defective meter should have been verified by the Electrical Inspector and charges should be computed on a six-month average post-06/06/2008 when the meter was replaced. The Board maintains the meter was not faulty. The court cites Nirmala Metal Industries v. K.S.E.B. to emphasise the Board’s duty to ensure meters record correctly and to obtain independent testing, not relying on the Board’s own testing. The judge disposes the petition by setting aside Exts. P7 & P8 and directing revised invoices based on a six-month average for the post-06/06/2008 period, with appropriate credits and adjustments.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • Antony Dominic, J.
Judgment Date
2009-07-03
Court Decision / Holding
Writ petition disposed of with directions: Exts. P7 and P8 are set aside. The 3rd respondent shall quantify the six-month average consumption from 06/06/2008 and issue revised invoices for the period 08/07/2004 to 06/06/2008 on that basis, adjusting any payments already made, crediting excess payments toward future bills, and permitting recovery of any shortfall from the petitioner as applicable.
Final Disposition
Writ petition disposed of with directions as stated above.

Parties to the Case

Appellants / Petitioners

  • Dr. M.S.N. Balasubramaniyan (Petitioner, Representing Jayalakshmi/Jayasree Metals)

Respondents

  • Secretary, Department of Power, Secretariat, Thiruvananthapuram
  • Kerala State Electricity Board (KSEB), represented by the Secretary & Chairman, KSEB, Vaidhyuthi Bhavan, Pattom, Thiruvananthapuram
  • Asst. Engineer, KSEB, Kulathoor Section, Trivandrum-22
  • Chief Electrical Inspector, KSEB, Buildings, Thambanoor, Thiruvananthapuram

Legal Representation & Advocates

Counsels for Petitioners

  • • Dr. M.S.N. Balasubramaniyan (Party in Person)

Counsels for Respondents

  • • Mr. K.C. Santhosh Kumar, Government Pleader
  • • Mr. P.P. Thaju-deen, Senior Counsel, K.S.E.B.

Provisions of Law Cited

Indian Electricity Act, 1910 - Sec. 26(6)Electricity (Supply) Act, 1948 - Sec. 79(J)Indian Electricity Act, 2003Terms & Conditions of Supply framed under Sec. 79(J) of the Electricity (Supply) Act, 1948

Legal Doctrines & Maxims

  • Board must provide trouble-free meters and conduct independent testing of defective meters by an external authority (Electrical Inspector).
  • Certificate from Board’s testing center is not binding on the consumer in case of a defective meter.
  • In disputes of fact, issues must be resolved in appropriate proceedings; the court may direct corrective measures such as revised billing based on fair metrics (e.g., six-month average).

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioner contends that from 08/07/2004 to 06/06/2008 the meter was faulty and should have been tested by the Electrical Inspector under Section 26(6) of the Indian Electricity Act, 1910. He argues that, since testing by independent authorities was omitted, bills must be recalculated on the basis of the average consumption of the six months after the meter replacement on 06/06/2008, and Exts. P7 and P8 should be set aside.

Contentions of Respondents

The Board contends that the meter was not faulty, as supported by Exts. R3(a) and (b) inspection reports. It argues that the disputed invoices were correctly issued and that reliance on the petitioner’s allegations requires factual adjudication in appropriate proceedings. It maintains that the meter testing and billing were performed in accordance with the applicable regulations and that the earlier exams by the Board’s own testing did not bind the consumer.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (1)

Case NameCitationTreatmentExplanation
Nirmala Metal Industries v. K.S.E.B.2006(3) KLT 465PositiveThe case is cited to support the proposition that meters must be tested by an independent authority (Electrical Inspector) and that testing by the Board’s own centre is not binding on the consumer; removal of a defective meter without independent testing is improper.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•1,498 words•~7 min read

In The Court Record

Dr. M.S.N. Balasubramaniyan v. Secretary, Department of Power, Kerala State Electricity Board and Others

## **IN THE HIGH COURT OF KERALA AT ERNAKULAM** **PRESENT :** **THE HONOURABLE MR. JUSTICE ANTONY DOMINIC** **FRIDAY, THE 3RD JULY 2009 / 12TH ASHADHA 1931** ## **WP(C).No. 20390 of 2008(B)** **---------------------------------------** **PETITIONER:** - **-------------------** **DR.M.S.N.BALASUBRAMANIYAN, POWER OF ATTORNEY HOLDER, REPRESENTING JAYALAKSHMI, PROPRIETORIX, M/S. JAYASREE METALS,4/169. AMBALA NAGAR, EXTN KOWDIAR ,P.O. THIRUVANANTHAPURAM -695 003.** **BY DR. M.S. N. BALASUBRAMANIYAN, (PARTY IN PERSON).** **RESPONDENTS:** **------------------------** **1. SECRETARY, DEPARTMENT OF POWER, SECRETARIAT, THIRUVANANTHAPURAM** **2. KERALA STATE ELECTRICITY BOARD, REPRESENTED BY THE SECRETARY, CHAIRMAN, KSEB, VAIDHYUTHI BHAVAN, PATTOM , TRIVANDRUM.** **3. ASST.ENGINEER** **KSEB, KULATHOOR SECTION, TRIVANDRUM-22** **4. CHIEF ELECTRICAL INSPECTOR, KSEB, BUILDINGS, THAMBANOOR, THIRUVANANTHAPURAM.** **R1 BY GOVT. PLEADER MR. K.C. SANTHOSH KUMAR, R2 TO R4 BY MR.P.P.THAJUDEEN, SC, K.S.E.B.** **THIS WRIT PETITION (CIVIL) HAVING COME UP FOR ADMISSION ON 03/07/2009,THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING:** **prv.** ## ANTONY DOMINIC, J. ------------------------- ## W.P.(C.) No.20390 of 2008 --------------------------------Dated, this the 3[rd] day of July, 2009 ## J U D G M E N T In this writ petition though the pleadings are lengthy, the main controversy is regarding the inaccuracy of Exts.P7 & P8 invoices issued by the 3[rd] respondent, calling upon the petitioner to remit the amount mentioned therein. 2. Facts of the case are that the petitioner is a Low Tension consumer running a small scale industry engaged in the production of Aluminum Metal Powder. It is stated that the production in the unit commenced in October, 1993 with a connected load of 47.5 KW, which was subsequently reduced to 25 KW. Since April, 1995, the petitioner has been complaining that the meter was faulty and finally the meter was replaced in February, 1997, which again went out of order in August, 1998. Complaints were repeatedly made and finally, on 02/07/1999, the meter was replaced. Again the meter went out of order and was replaced on 28/09/1999. The replaced meter again went out of order and was changed on WP(C) No.20390/2008 -2- 20/09/2000. It is stated that the same process was repeated on 13/02/2001. The controversy during the aforesaid period was resolved by the Electrical Inspector as per Ext.P1 order dated 20/06/2001, where he confirmed that the meters were faulty and that the bills issued for the period from 20/09/2000 to 13/02/2001 should be revised. 3. The second phase of the controversy starts from 09/05/2002 when the 6[th] replaced meter also went out of order and was replaced. This controversy was again resolved by the Electrical Inspector by Ext.P2 order, where he confirmed that the meter was faulty during the period from 13/02/2001 to 14/01/2003. It is stated that on that basis, the bills were also revised. Although the petitioner has a case that he made excess payment, these are issues requiring resolution of disputed questions of fact and have to be adjudicated in appropriate proceedings. 4. The third phase of the controversy, as already noticed, is in relation to the inaccuracy of Exts.P7 & P8 invoices. The back ground facts are that on 08/07/2004, following a tree fell on the electrical installation, as a result of which the meter went out of WP(C) No.20390/2008 -3- order, and ultimately the supply was also disconnected. It is stated that due to the fault of the meter, consumption recorded in the energy meter was incorrect. The petitioner filed Exts.P3, P5 & P6 complaints to the 3[rd] respondent complaining that the meter is faulty and that it should be sent to the Electrical Inspector for examination. There was no response from the Board. 5. In the meanwhile, he approached the Consumer Disputes Redressal Forum by filing OP NO.220/2004. In the said proceedings, the main claim of the petitioner was for the damages consequent on Exts.P1 & P2 proceedings. The incorrectness of the consumption recorded subsequent to 08/07/2004 was also raised. Pursuant to the orders passed by the Consumer Disputes Redressal Forum, the meter was tested by the 3[rd] respondent himself and Exts.R3(a) & R3(b) reports were submitted confirming that the meters were not faulty. The petitioner objected to the aforesaid test reports by filing Exts.P33 & P34. But, however, further testing was not ordered. 6. While, the proceedings were pending before the CDRF, Ext.P7 invoice dated 08/04/2008 was issued by the respondents WP(C) No.20390/2008 -4- demanding an amount of Rs.2,09,304/-. Subsequently, Ext. P8 dated 08/05/2008 was issued revising Ext.P7 and demanding a total amount of Rs.3,42,859/-. In the meantime, the CDRF dismissed the complaint as not maintainable, and Appeal No.175/2008 filed by the petitioner before the State Commission is pending. It is also stated that subsequently on 06/06/2008, the meter was replaced. 7. Therefore, the complaint of the petitioner is in relation to Exts.P7 & P8, for the period from 08/07/2004 to 06/06/2008. His case is that during the aforesaid period, he was being issued bills on the basis of a meter which was faulty. What he contends is that since the meter was faulty during the aforesaid period, the meter ought to have been verified by the Electrical Inspector in terms of Section 26(6) of the Indian Electricity Act, 1910, and he ought to have been levied charges on the basis of 6 months’ average taken for the period subsequent to 06/06/2008, when the meter was replaced. 8. The answer of the KSE Board in the counter affidavit is that the meter was not faulty, and that the said position has been WP(C) No.20390/2008 -5- confirmed in Exts.R3(a) & (b) inspection reports. 9. I heard the submissions made by both sides. The case of the petitioner is that the meter went out of order on 08/07/2004 and the position continued till 06/06/2008. As on 08/07/2004, although the Indian Electricity Act, 2003 came into force, the Terms & Conditions of Supply came into force only on 01/02/2006. Therefore, at the time when the petitioner made Exts.P3, P5 & P6 complaints, complaints ought to have been dealt with as per the Conditions of Supply of Electrical Energy framed by the Board under the provisions of Section 79(J) of the Electricity (Supply) Act, 1948. If so, the meters ought to have been sent for testing by the Electrical Inspector. In this case, that was not done, despite the repeated complaints made by the petitioner. On the other hand, the meter was tested, though on the orders of the Consumer Disputes Redressal Forum, only by the 3[rd] respondent. The reliability of such a certificate has been examined by a Division Bench of this Court in Nirmala Metal Industries v. K.S.E.B. (2006(3) KLT 465), where the relevant portion of which reads as follows:- “We may indicate that it is the responsibility of the Board to install trouble free meter in the premises of the consumer and see that WP(C) No.20390/2008 -6- the meter is recording correctly the energy consumed. Duty is cast on the Board to get the defective meter tested not at the testing centre of the Board but by an independent authority like the Electrical Inspector. Report obtained from the testing centre of the Board is not binding on the consumer in the case of a defective meter. The Board cannot take away the defective meter from the premises of a consumer and then raise a bill after getting it tested in its own testing centre. By removing the meter from the premises the Board is spoiling the best evidence to the advantage of the consumer.” 10. As in that case, here also, without getting the meter tested by the Electrical Inspector, the Officers of the Board have removed the meter on 06/06/2008. Therefore, there is a failure on the part of the Board in dealing with the complaint of the petitioner that the meter in question was faulty. In such situation, the only manner, in which the grievances of the petitioner can be remedied, is to revise the bills issued to the petitioner adopting the average six months’ consumption for the period subsequent to 06/06/2008 and revising Exts.P7 & P8 bills on that basis. In the circumstances, the writ petition is disposed of with the following directions:- That Exts.P7 & P8 will stand set aside. The 3[rd] respondent shall quantify the average of the six months’ consumption of the petitioner for the period from 06/06/2008, and on that basis, it will WP(C) No.20390/2008 -7- be open to the 3[rd] respondent to issue revised invoice to the petitioner for the period from 08/07/2004 to 06/06/2008, and realize the said amount from the petitioner. Once the quantification is done as above, any payment made by the petitioner during the said period will be given credit and if any further amount is due from the petitioner, it will be open to the respondents to demand the same. On the other hand, if any excess payment has been realized, that will be given credit towards the subsequent bills. 11. I place on record, my deep appreciation of the valuable assistance rendered by Shri.Julian Xavier, who was appointed as Amicus Curiae in this case. The writ petition is disposed of as above. (ANTONY DOMINIC, JUDGE) jg
End of Judgment Record
Browse All High Court of Kerala (2009) Decisions
2009-06-26

Nishana Mol.N v Alappuzha Municipality & Secretary, Alappuzha Municipality

This writ petition concerns the registration of a marriage under the Kerala Registration of Marriages (Common) Rules, 2008 (Common Rules). The petitioner Nishana Mol.N, whose marriage was solemnized on 8 March 2009, sought registration of her marriage by the Local Registrar. Her husband was abroad, and she submitted Form No. 1 along with documents; however, the Local Registrar demanded the presence of both spouses for registration, a point contested by the petitioner. The court recalls the apex court’s directions in Seema v. Ashwani Kumar (2006) to frame rules ensuring compulsory registration to protect women and provide evidence of marriage, while noting that registration under the Rules does not itself create a marriage but evidences one solemnized otherwise. The Rules specify that registration is mandatory for marriages solemnized within the state, with various procedural requirements (Rules 5, 6, 9, 10, 11, 13, 16, 17) and mechanisms for correction, appeal, and re-registration. The court clarifies that the presence of both parties is not ordinarily required; the registrar may require appearance only in cases where there is reasonable doubt about identity, and even then as an exception rather than a rule. Ultimately, the court directs that registration and certificate issuance be completed within one month from copy of the judgment, without insisting on joint appearance, provided the memorandum is in order.

2009-07-27

Abdul Majeed Kalathil v. District Collector, Malappuram & Others

This batch of writ petitions concerns the constitutional validity of Section 17 of the Kerala Anti-Social Activities (Prevention) Act, 2007, and the power of District Magistrates to confiscate vehicles used in anti-social activities. The petitions challenge the absence of a substantive prohibition against using vehicles for anti-social activities and the lack of a defined procedure for confiscation or an appellate remedy. In W.P.C. No. 9925 of 2009 (the lead case), Abdul Majeed Kalathil contends that his goods carriage KL 11-B/6651 was seized by the Sub Inspector of Pandikkad Police and reported to the District Collector, Exts.P1–P2. The court scrutinizes Section 17's scope, defining anti-social activity (Section 2(a)) and whether the District Collector’s power to confiscate is constitutionally tenable. It finds Section 17 to be vague and violative of Articles 14, 19(1)(g) and 21, as it rests on subjective police satisfaction with no clear standards or process. It also notes environmental objectives but concludes that fundamental rights must prevail. The court does not sustain confiscation under Section 17; instead, it directs that such vehicles be dealt with under the Kerala Protection of River Banks and Regulation of Removal of Sand Act, 2001 and Rules, with interim release under specified conditions. It further directs initiation of Sand Act proceedings within a month and finalization within another month. The writ petitions are disposed of accordingly, preserving the rule of law and environmental protection.

2009-06-11

WA No. 671 of 2006 (Fertilizers and Chemicals Travancore Ltd v Union of India)

This writ appeal concerns the pay revision and pensionary benefits of employees of the Fertilizers and Chemicals Travancore Ltd (FACT). The long-term settlement covering terms of employment expired on 31 December 1996. A fresh settlement was concluded (notified 28 August 2001) and made retroactive to 1 January 1997, with revisions in wages and benefits. Clause 29 of Ext. P1 provides that arrears relating to wage revision and dearness allowance for the period 1 January 1997 to 30 June 2001 will be reviewed and decided by management/government only when the company earns profits for at least three consecutive years; Clause 33.1 provides that employees who retired on or after 1 January 1997 will be eligible for arrears calculated from 1 January 1997 to the date of retirement, subject to adjustments for interim relief already paid, with any unclaimed amount transferred to a Welfare Fund. The appellants—the retirees who fall in the 1 January 1997 to 1 July 2001 window—argue that they were denied arrears and were paid pensionary benefits at pre-revised rates, creating discrimination. Respondents contend Ext. P1 binds the parties and arrears depend on profits, and that pay revision administered to others does not compel retroactive change. The court held that Ext. P1 terms survive as terms of employment and directed the management to consider terminal benefits at revised rates within two months and to release arrears when paid to current workers, with connected matters following."

2009-05-29

M/S. Palm Fibers & Yars Trading Co. v. State of Kerala & Others

The petitioner, a Small Scale Industrial unit, ran two LT power connections (No.13070 and No.13427) with commercial production starting in July 1994 and July 1995. On 06/02/1992, the Government issued Ext.P1 guaranteeing concessional tariffs (pre-1992 tariff) for five years from the date of commencement or substantial capacity expansion, certified by the District Industries Centre. Ext.P2 certified eligibility for this concession. Subsequently, the petitioner increased power demand to 300 KVA and was reclassified/advised to HT status from 15/05/1998, converting LT supply to HT. The petitioner argued that Ext.P1 benefits should extend for the full five-year period, covering the LT quantities certified in Ext.P2, and that the HT conversion was a mere reclassification directed by the Board, not a cessation of eligibility. The Board argued Ext.P1 targets only those who commenced production during 1992–1996 and that HT conversion from 15/05/1998 falls outside the Ext.P1 window, rendering the petitioner eligible only up to 15/05/1998. Earlier orders (Ext.P3) had set aside a cut-off date for merits, and Ext.P6/Ext.P4 handled appeals. Ultimately, the Court held that the HT conversion was outside Ext.P1’s period, but directed that the LT benefits for the two LT connections be extended only until 23/05/1998 (LT dismantling date) and without reimbursement from the Industries Department, as held in OP No.7622/1998. The petition was disposed of as above.