Delhi Development Authority v. Rajan Sood & Ors.

Case / Petition Number:
Civil Appeal No. 1927 of 2022; Civil Appeal No. 1928 of 2022
Neutral Citation:[2022] 14 S.C.R. 1060

Case Synopsis & Summary

This civil appeal arises from a Delhi High Court writ petition challenging a Land Acquisition Act, 1894 process commenced by the Delhi Development Authority (DDA) for acquisition of certain lands. The High Court in WP(C) No. 1034/2015 declared that the acquisition proceedings were to be deemed lapsed under subsection 24(2) of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (the 2013 Act). The core dispute centers on whether the possession of the land had been taken, whether compensation was paid or tendered, and whether any stay order affected the applicability of the deemed-lapse provision. The appellants argue that possession was taken on 23.09.1986, a punchnama was drawn, compensation was tendered, Rs. 2 crore was deposited, and a High Court stay from 2011 forestalled coercive action; thus there should be no lapse under the 2013 Act. The respondents contend that possession persisted with them and no compensation was paid or tendered, warranting lapse. The Court relies on Indore Development Authority and overrules Pune Municipal Corporation, clarifying the interpretation of Section 24(2), the effect of possession and payment, and the exclusion of stay periods when calculating the five-year window. The appeals are allowed, the High Court’s judgment is set aside, and there is no cost order.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • M. R. Shah
  • B. V. Nagarathna
Judgment Date
2022-03-29
Court Decision / Holding
Appeals allowed. The impugned judgment and order of the Delhi High Court declaring that the land acquisition proceedings under the Act, 1894 are deemed to have lapsed under Section 24(2) of the 2013 Act is quashed and set aside. There shall be no order as to costs.
Final Disposition
Appeals Allowed; High Court judgment set aside; no cost order.

Parties to the Case

Appellants / Petitioners

  • Delhi Development Authority (DDA)
  • Government of NCT of Delhi

Respondents

  • Rajan Sood and Others

Legal Representation & Advocates

Counsels for Petitioners

  • • Pinky Anand
  • • Anshay Dhatwalia
  • • Kumud Nijhawan
  • • Ashwani Kumar
  • • Saudamini Sharma
  • • Asees Jasmine D Kaur
  • • Love Kumar Gupta
  • • Angad Sandhu
  • • Astha Saxena
  • • Amita Singh Kalkal
  • • Astha Tyagi
  • • Siddharth Raj Agarwal
  • • Ramandeep Kaur

Counsels for Respondents

  • • Divya Pandey
  • • Neha Sharma

Provisions of Law Cited

Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 – Section 24(2)Land Acquisition Act, 1894 – Section 48Land Acquisition Act, 1894 – Section 12(2)Land Acquisition Act, 1894 – Section 4Land Acquisition Act, 1894 – Section 31(1)Land Acquisition Act, 1894 – Section 34Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 – Section 24(1)(a) & Section 24(1)(b)Proviso to Section 24(2) of the 2013 Act

Legal Doctrines & Maxims

  • Deemed lapse under Section 24(2) of the 2013 Act
  • Interpretation of the word 'or' in Section 24(2) between possession and compensation as 'nor' or 'and' (366.3)
  • Tendering compensation completes the obligation under Section 31(1) (366.5)
  • Non-deposit of compensation in court does not by itself cause lapse (366.4)
  • Proviso to Section 24(2) treated as part of Section 24(2) (366.6)
  • Mode of taking possession by inquest/memorandum; no divesting under 24(2) after possession (366.7)
  • Interim stay orders excluded from five-year computation (366.8)
  • 24(2) applies to proceedings pending on 1-1-2014; does not reopen concluded proceedings (366.9)

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellants submit that possession was taken on 23.09.1986 after a punchnama, a recorded owner was tendered compensation under the 1894 Act, and Rs. 2 crores were deposited. They rely on a 2011 stay order to exclude the interim period from five-year computation and contend that Indore Development Authority requires a construction of Section 24(2) that does not deem lapse where possession has been taken or compensation paid/tendered.

Contentions of Respondents

The respondents contend that the writ petitioners continued in actual possession and neither possession was legally taken nor compensation paid/tendered; the High Court correctly held lapse under Section 24(2) of the 2013 Act; reliance on the stay order and on Indore Development Authority is misplaced.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (4)

Case NameCitationTreatmentExplanation
Pune Municipal Corporation and Anr. v. Harakchand Misirimal Solanki and Ors.(2014) 3 SCC 183OverruledConstitution Bench decision in Indore Development Authority overruled Pune Municipal Corporation; the Pune decision cannot prevail.
Indore Development Authority v. Manoharlal and Ors.(2020) 8 SCC 129PositiveConstitution bench decision relied upon and followed; clarifies interpretation of 24(2) and related provisos.
Indore Development Authority v. Shailendra(2018) 3 SCC 412DistinguishedNot placed for consideration; cannot prevail in light of current judgment.
Sree Balaji Nagar Residential Assn. v. State of Tamil Nadu(2015) 3 SCC 353OverruledCannot be said to be laying down good law; overruled.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•3,999 words•~19 min read

In The Court Record

Delhi Development Authority v. Rajan Sood & Ors.

1060 SUPREME COURT REPORTS[2022] 14 S.C.R. 1060 [2022] 14 S.C.R. A ## DELHI DEVELOPMENT AUTHORITY ## v. ## RAJAN SOOD & ORS. B (Civil Appeal No. 1927 of 2022) MARCH 29, 2022 ## **[M. R. SHAH AND B. V. NAGARATHNA, JJ.]** - _Right to Fair Compensation and Transparency in Land_ - _Acquisition, Rehabilitation and Resettlement Act, 2013 – s.24(2) – Land Acquisition Act, 1894 – s.48 – High Court relying on the_ - C _decision in_ Pune Municipal Corporation _case allowed the writ petition filed by Respondent No.1 and 2 original writ petitioners and declared that the acquisition proceedings initiated under the 1894 Act w.r.t the subject lands are deemed to have lapsed u/s.24(2) – On appeal, held: The decision in_ Pune Municipal Corporation _case has been_ - D _overruled by the decision of Constitution bench in_ Indore Development Authority _case – Further, the High Court while passing the impugned judgment observed that the possession of the land in question continued with the original writ petitioners and that the compensation was neither paid nor even tendered – However, it was the specific case on behalf of the authority that the possession_ - E _of the land in question was already taken over on 23.09.1986 and even the compensation amount of Rs.2.00 crores was deposited with the land and building department – Considering the decision in case of_ Indore Development Authority _it cannot be said that the land acquisition proceedings are deemed to have lapsed u/sub-section(2)_ - F _of s.24 – Also, at the time when the Act, 2013 came into force there was a stay granted by the High Court vide order dated 09.11.2011 in writ petition No.7714/2011 restraining the authority taking any coercive action in respect of the land in question – Thus, the impugned judgment passed by the High Court declaring that the land acquisition proceedings are deemed to have lapsed u/sub-_ - G _section (2) of s.24 of the 2013 Act, is unsustainable and is set aside._ _Indore Development Authority v. Manoharlal and Ors._ **(2020) 8 SCC 129 : [2020] 3 SCR 1 – followed.** H 1060 1061 DELHI DEVELOPMENT AUTHORITY v. RAJAN SOOD & ORS. _Pune Municipal Corporation and Anr. v. Harakchand Misirimal Solanki and Ors._ **(2014) 3 SCC 183 : [2014] 1 SCR 783 – referred to.** A ## **Case Law Reference** **[2014] 1 SCR 783 referred to Para 2** B **[2020] 3 SCR 1 followed Para 3.4** CIVIL APPELLATE JURISDICTION: Civil Appeal No. 1927 of 2022. From the Judgment and Order dated 30.08.2016 of the High Court of Delhi at New Delhi in WP (C) No. 1034 of 2015. C With Civil Appeal No. 1928 of 2022 Ms. Pinky Anand, Sr. Adv., Anshay Dhatwalia, Ms. Kumud Nijhawan, Ashwani Kumar, Ms. Saudamini Sharma, Ms. Asees Jasmine D Kaur, Love Kumar Gupta, Angad Sandhu, Ms. Astha Saxena, Ms. Amita Singh Kalkal, Ms. Astha Tyagi, Siddharth Raj Agarwal, Ms. Ramandeep Kaur, Advs. for the appearing parties. The Judgment of the Court was delivered by ## **M. R. SHAH, J.** 1. Feeling aggrieved and dissatisfied with the impugned judgment and order dated 30.08.2016 passed by the High Court of Delhi at New Delhi in Writ Petition (C) No. 1034/2015, by which the High Court has allowed the said writ petition preferred by the private respondents herein – original writ petitioners and has declared that the acquisition proceedings initiated under the Land Acquisition Act, 1894 (hereinafter referred to as the Act, 1894) in respect of the subject lands are deemed to have lapsed under sub-section (2) of section 24 of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (hereinafter referred to as the Act, 2013), Delhi Development Authority (DDA) and Government of NCT of Delhi have preferred the present appeals. 2. Private respondent No.1 and 2 herein - original writ petitioners filed the writ petition before the High Court for a declaration that the acquisition proceedings initiated under the Act, 1894 in respect of the E F G H 1062 SUPREME COURT REPORTS [2022] 14 S.C.R. - A subject lands are deemed to have lapsed under sub-section (2) of section 24 of the Act, 2013. It was the case on behalf of the original writ petitioners before the High Court that as the possession of the land in question is with them and no compensation has been paid, the land acquisition proceedings are deemed to have lapsed. Heavy reliance was placed on the decision of this Court in the case of **Pune Municipal** - B **Corporation and Anr. Vs. Harakchand Misirimal Solanki and Ors, (2014) 3 SCC 183** . 2.1 The petition was opposed by the appellants herein and others. It was the specific case on behalf of the DDA that as such the compensation was tendered to one Shiv Kumar S/o Devi Chand. Relying C upon the decision of this Court in the case of **Pune Municipal Corporation** (supra), the High Court, by the impugned judgment and order has allowed the said writ petition and has declared that the acquisition proceedings initiated under the Act, 1894 in respect of the subject lands are deemed to have lapsed under sub-section (2) of section D 24 of the Act, 2013. 2.2 Feeling aggrieved and dissatisfied with the impugned judgment and order passed by the High Court, DDA and Government of NCT of Delhi have preferred the present appeals. 3. Learned counsel appearing on behalf of the DDA has vehemently E submitted that in the facts and circumstances of the case the High Court has materially erred in declaring that the acquisition proceedings have lapsed under sub-section (2) of section 24 of the Act, 2013. - 3.1 It is submitted on behalf of the DDA that in the present case - as such the possession was already taken over by the Authority on - F 23.09.1986 after following the due procedure as required and even a punchnama was also drawn, which was the requirement while taking over possession. - 3.2 It is urged that even the compensation was tendered to the - recorded owner - Shri Shiv Kumar through notice under section 12(2) of - G the Act, 1894 but recorded owner never came forward to accept the same. It is submitted that therefore, the original writ petitioners cannot be permitted to take the benefit under sub-section (2) of section 24 of the Act, 2013. - 3.3 It is further submitted that even the amount of compensation - H of Rs.2.00 crores was deposited by the DDA with the Land and Building 1063 DELHI DEVELOPMENT AUTHORITY v. RAJAN SOOD & ORS. [M. R. SHAH, J.] Department towards compensation. Therefore, the original writ petitioners A are not entitled to the benefit of deemed lapse. 3.4 It is further contended by learned counsel appearing on behalf of the DDA and the Government of NCT of Delhi that as such the original writ petitioners were not having any locus to file the writ petition as their title to the property is shrouded with fraud and investigation is pending with the Anti-Corruption Branch. It is submitted that as the possession of the land in question was already taken over as far as back on 23.09.1986 and even compensation of Rs.2.00 crores was deposited with the Land and Building Department, in view of the subsequent decision in the case of **Indore Development Authority Vs. Manoharlal and Ors., (2020) 8 SCC 129** , it cannot be said the acquisition proceedings have lapsed under sub-section (2) of section 24 of the Act, 2013. 3.5 It is further submitted on behalf of the appellants that while passing the impugned judgment and order, the High Court has relied on the decision of this Court in the case of **Pune Municipal Corporation** (supra). That, the said decision has been subsequently overruled by the Constitution bench of this Court in the case of **Indore Development Authority** (supra). 3.6 In the alternative, it is submitted by the learned counsel appearing on behalf of the respective appellants that assuming, without admitting that the possession of the land in question remain with the original writ petitioners, in that case also, as there was an order of stay granted by the High Court in the year 2011, in the writ petition filed by the original writ petitioners and the High Court granted the interim order of taking no coercive action/order qua the land, therefore, in view of the decision of this Court in the case of **Indore Development Authority** (supra), the period under which the stay was operative is to be excluded. Reliance is placed on para 366.8 of the decision of this Court in the case of **Indore Development Authority** (supra). 3.7 Making the above submission and relying upon the aforesaid decision, it is prayed to allow the present appeals. 4. Both these appeals are vehemently opposed by Ms. Pinky Anand, learned Senior Advocate appearing on behalf of the original writ petitioners. Counter affidavits have been filed on behalf of private respondent No.1 and 2 – original writ petitioners opposing the present appeals. B C D E F G H 1064 SUPREME COURT REPORTS [2022] 14 S.C.R. A 4.1 It is vehemently submitted by Ms. Anand, learned Senior Advocate appearing on behalf of the original writ petitioners that as such there are specific findings recorded by the High Court that the original writ petitioners continue to be in physical possession and therefore, as neither the actual possession of land in question was taken over nor any compensation was paid and/or even tendered to the original writ B petitioners. It is rightly held that acquisition proceedings have lapsed. - 4.2 It is urged that in fact in the earlier order passed by the High - Court on 09.11.2011 in writ petition No.7714/2011, the Division Bench directed the authority to consider their application under section 48 of the Act, 1894 and to decide it on merits. That as per section 48 of the - C Act, 1894 only in a case where possession of the land is not taken over by the acquiring authority, then only, the application under section 48 of the Act, 1894 would be maintainable. It is submitted therefore, when the Division Bench directed the authority to consider the application of the petitioners under section 48 of the Act, 1894 on merits, it is to be presumed - D that only original writ petitioners continue to remain possession. It is contended that the authority might have taken ex-parte possession on paper as alleged on 23.09.1986, however, the original writ petitioners remained in possession actually. It is further submitted by learned Senior Advocate appearing on behalf of the original writ petitioners that there is also a specific finding recorded by the High Court that the authorities - E have failed to prove that any amount of compensation was paid and/or tendered to the original writ petitioners or even deposited with the treasury. It is submitted that when the original writ petitioners remain in possession and neither the compensation was tendered nor it was paid, the twin conditions to declare the acquisition proceedings as having lapsed under - F sub-section (2) of section 24 of the Act, 2013 have been satisfied. It is therefore submitted that the High Court has not committed any error in declaring that the acquisition proceedings in respect of the subject lands are deemed to have lapsed under sub-section (2) of section 24 of the Act, 2013 G 5. We have heard learned counsel appearing on behalf of the respective parties at length. 6. By the impugned judgment and order the High Court has held and declared that the land acquisition proceedings in respect of the land in question are deemed to have lapsed under sub-section (2) of section H 24 of the Act, 2013. While holding and declaring so the High Court has 1065 DELHI DEVELOPMENT AUTHORITY v. RAJAN SOOD & ORS. [M. R. SHAH, J.] relied upon decision of this Court in the case of **Pune Municipal** A **Corporation** (supra). However, the said decision of this Court has been subsequently overruled by the decision of this Court in the case of **Indore Development Authority** (supra). In paragraph 365 to 366, this Court in the case of **Indore Development Authority** (supra) has observed and held as under: - B **“365.** Resultantly, the decision rendered in _Pune Municipal Corpn._ [ _Pune Municipal Corpn._ v. _Harakchand Misirimal Solanki_ , (2014) 3 SCC 183 : (2014) 2 SCC (Civ) 274] is hereby overruled and all other decisions in which _Pune Municipal Corpn._ [ _Pune Municipal Corpn._ v. _Harakchand Misirimal Solanki_ , (2014) 3 SCC 183 : (2014) 2 SCC (Civ) 274] has been followed, are also overruled. The decision in _Sree Balaji Nagar Residential Assn._ [ _Sree Balaji Nagar Residential Assn._ v. _State of T.N._ , (2015) 3 SCC 353 : (2015) 2 SCC (Civ) 298] cannot be said to be laying down good law, is overruled and other decisions following the same are also overruled. In _Indore Development Authority_ v. _Shailendra_ [ _Indore Development Authority_ v. _Shailendra_ , (2018) 3 SCC 412 : (2018) 2 SCC (Civ) 426], the aspect with respect to the proviso to Section 24(2) and whether “or” has to be read as “nor” or as “and” was not placed for consideration. Therefore, that decision too cannot prevail, in the light of the discussion in the present judgment. C D E **366.** In view of the aforesaid discussion, we answer the questions as under: **366.1.** Under the provisions of Section 24(1)( _a_ ) in case the award is not made as on 1-1-2014, the date of commencement of the 2013 Act, there is no lapse of proceedings. Compensation has to be determined under the provisions of the 2013 Act. **366.2.** In case the award has been passed within the window period of five years excluding the period covered by an interim order of the court, then proceedings shall continue as provided under Section 24(1)( _b_ ) of the 2013 Act under the 1894 Act as if it has not been repealed. **366.3.** The word “or” used in Section 24(2) between possession and compensation has to be read as “nor” or as “and”. The deemed lapse of land acquisition proceedings under Section 24(2) of the F G H 1066 SUPREME COURT REPORTS [2022] 14 S.C.R. A B C D E F G 2013 Act takes place where due to inaction of authorities for five years or more prior to commencement of the said Act, the possession of land has not been taken nor compensation has been paid. In other words, in case possession has been taken, compensation has not been paid then there is no lapse. Similarly, if compensation has been paid, possession has not been taken then there is no lapse. **366.4.** The expression “paid” in the main part of Section 24(2) of the 2013 Act does not include a deposit of compensation in court. The consequence of non-deposit is provided in the proviso to Section 24(2) in case it has not been deposited with respect to majority of landholdings then all beneficiaries (landowners) as on the date of notification for land acquisition under Section 4 of the 1894 Act shall be entitled to compensation in accordance with the provisions of the 2013 Act. In case the obligation under Section 31 of the Land Acquisition Act, 1894 has not been fulfilled, interest under Section 34 of the said Act can be granted. Non-deposit of compensation (in court) does not result in the lapse of land acquisition proceedings. In case of non-deposit with respect to the majority of holdings for five years or more, compensation under the 2013 Act has to be paid to the “landowners” as on the date of notification for land acquisition under Section 4 of the 1894 Act. **366.5.** In case a person has been tendered the compensation as provided under Section 31(1) of the 1894 Act, it is not open to him to claim that acquisition has lapsed under Section 24(2) due to non-payment or non-deposit of compensation in court. The obligation to pay is complete by tendering the amount under Section 31(1). The landowners who had refused to accept compensation or who sought reference for higher compensation, cannot claim that the acquisition proceedings had lapsed under Section 24(2) of the 2013 Act. **366.6.** The proviso to Section 24(2) of the 2013 Act is to be treated as part of Section 24(2), not part of Section 24(1)( _b_ ). **366.7.** The mode of taking possession under the 1894 Act and as contemplated under Section 24(2) is by drawing of inquest report/ memorandum. Once award has been passed on taking possession under Section 16 of the 1894 Act, the land vests in State there is H 1067 DELHI DEVELOPMENT AUTHORITY v. RAJAN SOOD & ORS. [M. R. SHAH, J.] no divesting provided under Section 24(2) of the 2013 Act, as A once possession has been taken there is no lapse under Section 24(2). **366.8.** The provisions of Section 24(2) providing for a deemed lapse of proceedings are applicable in case authorities have failed due to their inaction to take possession and pay compensation for five years or more before the 2013 Act came into force, in a proceeding for land acquisition pending with the authority concerned as on 1-1-2014. The period of subsistence of interim orders passed by court has to be excluded in the computation of five years. **366.9.** Section 24(2) of the 2013 Act does not give rise to new cause of action to question the legality of concluded proceedings of land acquisition. Section 24 applies to a proceeding pending on the date of enforcement of the 2013 Act i.e. 1-1-2014. It does not revive stale and time-barred claims and does not reopen concluded proceedings nor allow landowners to question the legality of mode of taking possession to reopen proceedings or mode of deposit of compensation in the treasury instead of court to invalidate acquisition.” 7. The High Court while passing the impugned judgment and order has observed that the possession of the land in question continued with the original writ petitioners and that the compensation was neither paid nor even tendered to the original writ petitioners. However, by holding that the original writ petitioners have continued to remain in possession, the High Court has relied upon the earlier order dated 09.11.2011 passed in writ petition No.7714/2011, by which the High Court directed the authority to consider their application under section 48 of the Act, 1894 on merits. However, it was the specific case on behalf of the authority before the learned Single Judge that the possession of the land in question was already taken over on 23.09.1986 and even the compensation amount of Rs.2.00 crores was deposited with the land and building department. 7.1 It is the case on behalf of the original writ petitioners that a purported letter dated 23.09.1986 allegedly taking symbolic possession was never disclosed by appellants in the proceedings conducted before the High Court on two separate occasions and the same has been filed for the first time in the present proceedings. The aforesaid is not correct. Even in the impugned order itself in paragraph 2, the High Court has B C D E F G H 1068 SUPREME COURT REPORTS [2022] 14 S.C.R. - A noted the submissions on behalf of the appellants to the effect that the possession was taken over on 23.09.1986. Therefore, it cannot be said such a plea is taken for the first time before this Court. It is the case on behalf of the original writ petitioners, relying upon the earlier order passed by the High Court dated 09.11.2011 in writ petition No.7714/2011 that, the original writ petitioners continue to be in possession and the actual - B possession has never been taken over. However, it is required to be noted that even in the order dated 09.11.2011, there was no specific finding given by the High Court that the original writ petitioners are in possession of the land in question. On the contrary, it is observed that the authority to consider the application under section 48 of the Act, - C 1894 on merits on the assumption of the possession being with the original writ petitioners. Therefore, while passing the order dated 09.11.2011 also, the High Court assumed the original writ petitioners are in possession hence as such no specific finding was given to the effect that the original writ petitioners are in possession. D 7.2 It is next contented on behalf of the original writ petitioners that the alleged possession on 23.09.1986 is illegal and it was a paper possession. However, it is submitted on behalf of the appellants that possession of land in question was taken over by drawing the punchnama which can be said to be sufficient compliance of the requirement while taking possession. The High Court has also doubted the compensation E being tendered as contended on behalf of the appellant. 7.3 Be that as it may. Assuming for the sake of argument that the original writ petitioners are found to be in possession and the compensation was not tendered, in that case also as can be seen from the order passed by the High Court on 09.11.2011 in writ petition No.7714/2011, the F authority was restrained from taking any coercive action in respect of the land in question. Therefore, in view of the subsequent decision of this Court in the case of **Indore Development Authority** (supra - paragraph 366.8), the period, during which the interim order is/was operative, has to be excluded in the computation of five years’ period. In G the present case even, it is the contention on behalf of the original writ petitioners that the order of no coercive action was directed to be continued till the application under section 48 of the Act, 1894 was decided. It is the specific case on behalf of the original writ petitioners before this Court and even so stated in the written submissions that till date no decision is taken on the application under section 48 of the Act, 1894. H 1069 DELHI DEVELOPMENT AUTHORITY v. RAJAN SOOD & ORS. [M. R. SHAH, J.] Meaning thereby the direction/stay granted by the High Court while A passing the order dated 09.11.2011 in writ petition No.7714/2011 continued when the Act, 2013 came into force. 7.4 In that view of the matter and considering the decision of this Court in case of **Indore Development Authority** (supra), it cannot be said that the land acquisition proceedings are deemed to have lapsed B under sub-section (2) of section 24 of the Act, 2013. 8. Applying the law laid down by this Court in the case of **Indore Development Authority** (supra), more particularly, paragraph 366, it cannot be said that the land acquisition proceedings are deemed to have lapsed. 9. In view of the above and for the reasons stated above and on the aforesaid ground alone that at the time when the Act, 2013 came into force there was a stay granted by the High Court vide order dated 09.11.2011 in writ petition No.7714/2011 restraining the authority taking any coercive action in respect of the land in question, the impugned judgment and order passed by the High Court declaring that the land acquisition proceedings are deemed to have lapsed under sub-section (2) of section 24 of the Act, 2013, is unsustainable. 10. In view of the above and for the reasons stated above, the present appeals are allowed. The impugned judgment and order passed by the High Court in Writ Petition (C) No.1043/2015 declaring that the land acquisition proceedings under the Act, 1894 with respect to the land in question are deemed to have lapsed under sub-section (2) of section 24 of the Act, 2013, is hereby quashed and set aside. The present appeals are allowed to the aforesaid extent, accordingly. There shall be no order as to costs. C D E F Divya Pandey (Assisted by : Neha Sharma, LCRA) Appeals allowed. G H
End of Judgment Record
Browse All Supreme Court of India (2022) Decisions
2022-12-09

MOHD. SABEER @ SHABIR HUSSAIN v. RM, U. P. STATE ROAD TRANSPORT CORP.

The appellant, Mohd. Sabeer (also known as Shabir Hussain), a scrap dealer, was a passenger in a UP State Road Transport Corporation bus when the driver rashly and negligently drove the vehicle, causing a collision near Ghaziabad in 2009. He sustained grave injuries including an amputation of the right lower limb and other bodily injuries. The Motor Accident Claims Tribunal (MACT) awarded Rs. 15,76,465 with interest; the High Court of Delhi enhanced the amount to Rs. 16,70,932. The Disability Certificate recorded 70% permanent disability. The High Court had treated the claimant’s functional disability as 35%, relying on post‑accident income reflected in IT returns, and erred in not adequately recognizing the impact on earning capacity of a self‑employed person who cannot drive. The Supreme Court held that the appellant’s functional disability should be treated as 60% for loss of future earning capacity and that permanent disablement warrants consideration of future prospects in addition to future income. It invoked National Insurance Co. v. Pranay Sethi to apply a 40% addition for future prospects, and directed compensation for prosthetic limb purchase and maintenance, as well as enhanced non‑pecuniary damages. The final award was increased to Rs. 38,70,120 with 9% interest from the date of application, and the appeals were allowed, emphasizing liberal, holistic justice to restore the claimant to his pre‑accident position in light of socio‑economic factors.

2022-01-25

Intercontinental Hotels Group (India) Pvt. Ltd. & ANR. v. Waterline Hotels Pvt. Ltd.

Intercontinental Hotels Group (India) Pvt. Ltd. & Anr. v Waterline Hotels Pvt. Ltd. is a Supreme Court decision addressing appointment of a sole arbitrator under Section 11(6) read with Section 11(12)(a) of the Arbitration and Conciliation Act, 1996, in a dispute arising from a Hotel Management Agreement (HMA) for renovating the Holiday Inn & Suites Bengaluru, Whitefield. The petitioners allege breach by Waterline Hotels, including non-payment of incentive management fee and related charges, culminating in Waterline’s email termination of the HMA on 12 October 2018 after rebranding the hotel as Miraya. The petitioners invoked arbitration; Waterline challenged the enforceability of the arbitration clause on the ground that the HMA is an unstamped instrument under the Karnataka Stamp Act. A Karnataka High Court ad‑interim relief was granted in 2018, but the Supreme Court’s judgment focuses on the scope of judicial interference at the pre‑appointment stage. The Court reiterates a pro‑arbitration stance, noting that arbitrability/validity are generally matters for the arbitrators, with a narrow exception to cut deadwood or to refer for authoritative settlement where necessary, invoking Vidya Drolia. It also analyzes stamp duty, observing that stamp duty has been paid (albeit disputed) and that the question of the correct stamp duty may be resolved later, not as a precondition to appointing an arbitrator. Consequently, the Court appoints Justice A. V. Chandrashekara as a sole arbitrator, directs SIAC to proceed under its rules, and allows the petition in terms stated, while leaving stamp duty issues for arbitration to determine later.

2022-02-01

The State of Sikkim v. Jasbir Singh & ANR

This appeal by the State of Sikkim challenges a High Court judgment upholding a Sessions Judge’s order directing a written notice to the Army’s commanding officer to transfer the case to a court-martial. The case concerns concurrent jurisdiction between a court-martial and an ordinary criminal court under the Army Act for an offence allegedly committed by Lance Naik Jasbir Singh during active service in Sikkim, with the FIR under IPC 302 and related charges. The High Court held that the procedure under Sections 125/126 Army Act, the 1978 Rules (Rules 3-5) and CrPC Rule 475 had not been observed and that the Army authorities had exercised their discretion to prefer a court-martial; thus, the court-martial alone would have jurisdiction. The Supreme Court, however, held that the offence falls into a category with concurrent jurisdiction under Sections 69 and 70 of the Army Act, and that where there is concurrent jurisdiction, the first instance discretion to choose the forum lies with the designated officer under Section 125. In the present case there was no decision by the designated officer to institute proceedings before a court-martial, and the sequence of events showed significant cooperation with the CrPC process. Consequently, the Sessions Judge’s competence to proceed in the criminal court was not in error, the High Court’s order is set aside, and the respondent-accused is to be transferred to civil custody to face trial in the criminal court. The appeal is allowed.

2022-07-22

Hemant Kumar Verma & Ors. v. Employees State Insurance Corporation & Ors.

This writ petition concerns whether junior resident doctors in ESIC-run medical colleges should be eligible for the 50% in-service reservation for postgraduate medical courses, a benefit presently available to Insurance Medical Officers Grade-II (IMO-II) recruited through competitive selection. ESIC recruits IMO-II and provides a 50% in-service quota for PG seats; however junior residents, who complete MBBS under bond and serve as part of ESIC's residency scheme, are not deemed in-service doctors. The petitioners argued parity with IMO-II because their qualifications, duties, and work environment are similar, and urged the Court to treat them as in-service to extend the 50% reservation to their batch. ESIC contends that junior residents are contractual, bond-based appointees governed by the ESIC Residency Scheme; IMO-II is a permanent post governed by the ESIC Staff and Condition of Service Regulations 1959; the bond reduction in 2020 and the 2018/2020 memoranda cannot convert junior residents into in-service doctors. The Court relies on precedents establishing institutional preference in PG admissions—Saurabh Chaudri v. Union of India, Yatin Kuma Jasubahi v. State of Gujarat, and Pradeep Jain v. Union of India — to acknowledge the legitimacy of institutional preference, but ultimately holds that junior residents and regular ESIC doctors are distinct categories and the in-service quota cannot be equitably extended to junior residents. The petition is dismissed.