Supreme Court of IndiaSupreme Court · 1994Division BenchAppeal allowed.

Delhi Development Authority v. Pushpendra Kumar Jain

Case / Petition Number:
Civil Appeal No. 6205 of 1994.
Neutral Citation:(1994) 3 SCR 774

Case Synopsis & Summary

This case concerns the Delhi Development Authority’s (DDA) New Pattern Scheme of 1979 for allotment of flats through draw-of-lots due to high demand. Pushpendra Kumar Jain was selected in a draw held on October 12, 1990, and was informed in January 1991 that allotment would be made and that an allotment-cum-demand letter would follow. Between the draw and the letter, DDA revised land rates by a December 6, 1990 circular, significantly increasing the price Jain would have to pay. Jain argued that only the land rates prevailing on the draw date should apply and that the revised rates could not be charged since they came into force after the draw. The Delhi High Court upheld Jain’s petition, holding that the delay in issuing the allotment letter (attributable to DDA) rendered it improper to charge the revised rates. DDA appealed. The Supreme Court held that the three-month interval between draw and issuance of the allotment letter was not inordinate or deliberate, and that the draw of lots is a selection process, not a guaranteed allotment at the draw-date price. It reaffirmed the principle that the price is determined at the time of communication of the allotment letter, unless the scheme provides otherwise. While roundly noting the validity of the land-rate revision, the Court allowed the appeal and set aside the High Court judgment, directing a revision of the demand consistent with the date of communication (12 Oct 1990).

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • B. P. Jeevan Reddy
  • Suhas C. Sen
Judgment Date
1994-09-23
Court Decision / Holding
Appeal allowed. The judgment and order of the Delhi High Court is set aside. The respondent is to be charged at the rate payable on 12 October 1990 (the date of drawing of lots); the revised demand must be issued within one month. The right to the flat arises on communication of the letter of allotment, and the price prevailing on the date of such communication is applicable unless the Scheme provides otherwise.
Final Disposition
Appeal allowed.

Parties to the Case

Appellants / Petitioners

  • Delhi Development Authority

Respondents

  • Pushpendra Kumar Jain

Legal Representation & Advocates

Counsels for Petitioners

  • • Arun Jaitley
  • • Jayant Bhushan

Counsels for Respondents

  • • Shiv Kumar Suri

Provisions of Law Cited

Clause (11) of the New Pattern, 1979 Registration SchemeClause (14) of the New Pattern, 1979 Registration Scheme

Legal Doctrines & Maxims

  • Draw of lots is a mode to identify the allottee, not an allotment by itself; mere identification does not vest indefeasible right to allotment at the draw-date price.
  • Right to flat arises on communication of the allotment letter; the price prevailing on the date of such communication is applicable unless the Scheme provides otherwise.
  • The prices in the brochure are illustrative and subject to revision/modification depending upon layout, cost of construction, etc.
  • Interval between draw and allotment letter need not be characterized as inordinate or deliberate delay; such interval may be reasonable given administrative processes.

Submissions & Arguments

Contentions of Appellants / Petitioners

The DDA contends that the draw of lots is merely a selection mechanism and does not confer a vested right to allotment at the draw-date price. Clause 14 permits price revisions caused by layout or construction costs, and the scheme does not fix prices on the draw date. The three-month interval before the allotment-letter issuance is not inordinate or deliberate delay given the scale of allotments. The right to the flat arises on communication of the allotment letter; therefore, revised land rates applied after the draw cannot deprive the allottee of the price determined at the time of communication. While the land-rate revision is valid, the High Court’s conclusions are unsustainable; the appellant is entitled to charge rates applicable as of the date of communication and to issue the revised demand within a reasonable period.

Contentions of Respondents

The respondent contends that only land rates in force on the date of the draw should apply; revisions after the draw cannot be charged. Jain asserts entitlement to the flat at the draw-date rates and argues the delay in issuing the allotment letter was due to DDA’s inefficiency. He maintains that revised rates should not retroactively apply to selected allottees who had not yet received notification of allotment, and seeks adherence to draw-date pricing unless the scheme expressly provides otherwise.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,241 words•~11 min read

In The Court Record

Delhi Development Authority v. Pushpendra Kumar Jain

A ## DELHI DEVELOPMENT AUTHORITY _v._ ## PUSHPENDRA KUMAR JAIN ## SEPTEMBER 23, 1994 B ·· [B.P. JEEV AN REDDY AND SUHAS C. SEN, JJ.] _Housing Development Authority-Housing scheme-Draw of lots-Intimation to allottee after three months-Enhancement of rates by authority between the period of draw of flats and intimation-Time of three months_ c _[taken for intimation held not inordinate nor deliberate-Mere ][draw ][of ][lot does ] not vest an indefeasible right in the allottee for allotment at price prevailing on date of draw of_ lot~Right _to flat arises on communication of letter of allotment-Price prevailing on date of such communication is applicable unless otherwise provided in the scheme._ D The respondent was allotted a flat under the scheme of New Pattern of 1979 in the draw conducted on 12th October, 1990, but the allotmentcum-demand letter was sent to him by the appellant-authority on January 9/13,1991. Between the date on which the lot was drawn and the date on which the allotment of flat was communicated to the respondent, the land E rates were revised by the appellant-authority by its circular dated 6th December, 1990 and the respondent was called upon to remit the first instalment of the price determined taking into account the revised land rates. The respondents filed a writ petition before the High Court contendF ing that only the land rates prevailing on the date of draw of lots should be charged from him; that the revised land rates cannot be applied to him inasmuch as the said rates came into force after the draw of lots. The High Court allowed the petition holding that (i) on account of G[inefficiency on the ][part ][of the appellant-authority there was delay ][in ] issuing the allotment-cum-demand letter; since the delay was on the appellant's part it cannot charge the revised rates from the respondent inasmuch as the respondent became entitled to get the Oat on the date of draw of lots i.e. on Oct?ber 12, 1990. H Allowing the appeal and setting aside the judgment of the High 770 D.DA _v._ P.K.JAIN 771 A ## Court, this Court · HELD : 1. Both the grounds assigned by the High Court are unsustainable. There was no material piaced before the High Court ~ nor has any material been brought to the notice of this Court • to record a finding that the interval of three months between the draw oflots and the despatch of allotment-cum-demand letter was on account of inefficiency of the B appellant. The interval of three months between the draw of lots and sending the demand-cum-allotment letters cannot be characterised either as inordinate or as deliberate delay. The scheme itself does not prescribe the period within which allotment. has to be communicated from the date of draw of lots. It has, of course, to be done within a reasonable period. C [774-B to DJ 2. There is no legal basis for holding that the respondent obtained a vested right to allotment on the draw of lots. The system of drawing of lots is only mode, a method, a process to identify the allottee, i.e., it is a process of selection. It is not allotment by itself. Mere identification or selection of the allottee does not clothe the person selected with a legal right to allotment at the price prevailing on the date of draw of lots. The scheme evolved by the appellant does not say so either expressly or by necessary implication. On the contrary, clause (14) thereof say that "the -estimated prices mentioned in the brochure are illustrative and are subject to revision/modification depending upon the exigencies of lay out, cost of construction etc."No provision of law also could be brought to the notice of this Court in support of the proposition that mere draw of lots vests an indefeasible right in the allottee for allotment at the price obtaining on the date of draw of lots. Since the right to flat arises only on the communication of the letter of allotment, the price or rates prevailing on the date of such communication is applicable unless otherwise provided in the Scheme. [774-E to G, 775-A, BJ CIVIL APPELLATE JURISDICTION: Civil Appeal No. 6205 of 1994. G From the Judgment and Order dated 11.11.93 of the Delhi High Court in C.W.P. No. 906 of 1991. Arun J aitley and J ayant Bhushan for the Appellant. Shiv Kumar Suri for the Respondent. 772 SUPREME COURT REPORTS (1994) SUPP. 3 S.C.R. A The Judgment of the Court was delivered by **B.P.** JEEVAN **REDDY, J.** Leave granted. Heard counsel for the parties. B This appeal is preferred against the judgment and order of a Division Bench of the Delhi High Court allowing the writ petition filed by the respondent. The appellant, Delhi Development Authority (D.DA.) prepared and published a scheme called "Registration Scheme of New Pattern, 1979 of intending purchasers of flats to be constructed by Delhi Development C Authority" providing the procedure for allotment of flats constructed by it. Clause (11) of the Scheme, issued as a brochure says that "in case of flat allotted under Hire Purchase basis, the cost of the land plus 20% of the balance cost of the flat will be recovered as initial deposit at the time of allotment and balance amount will be recovered in monthly instalments D spread over a period of 7 years in case of M.I.G. , 10 years· in case of L.I.G. and 15 years in case of Janata flats". Clause (14) says that "it may please be noted that the plinth area of the flats indicated and the estimated prices mentioned in the brochure are illustrative and are subject to revision/modification depending upon the exigencies of layout,' cost of construction etc." E The appellant has been constructing flats in several localities in Delhi and has been selling them to needy citizens from time to time in accordance with the procedure indicated in the said brochure. Since there are always more applicants than the number of flats available, the appellant has been adopting the method ·Of draw of lots among the registered applicants to select the allottees. One of such draws was held on October 12, 1990 for allotment of certain number of flats at which the respondent was successful. An intimation was sent to him on January 9/13, 1991 informing him that a flat No.42-A, Type-3, Pocket-A2, GRP.5 Kondli Gharoli has been allotted to him and that he must remit the initial deposit as per the rules. F G The writ petition was occasioned by the fact that between the date on which lots were drawn and the date on which the allotment of flat was communicated to the respondent, the land rates were revised by the D.D.A. by Circular dated December 6, 1990. There has been a substantial enhancement of land rates in the region of about fifty to seventy per cent. H Since the allotment to the respondent was made on January 9/13, 1991, he 773 D.D.A _v._ P.K JAIN [JEEV AN REDDY, J.] was called upon to remit the first instalment of the price of the flat A determined taking into account the revised land rates aforesaid. The respondent's contention in the writ petition was that only the land rates prevailing on the date of drawl of fots should be charged _to_ him. He submitted that the revised land rates cannot be applied _to_ him inasmuch as the said rates came to into force after the draw of lots. This contention B has been upheld by the Division Bench. The reasoning behind the allowing of writ petition is disclosed from the following extracts from ·the impugned order. (Indeed, it is a short order and what we are extracting hereinbelow represents almost the entire order : "it is the case of the petitioner that though the draw was held on C 12th October, 1990, it was because of the inefficiency of the respondent that the allotment-cum-demand letter was not issued till 9th January - 13th January, 1991. In the meanwhile, the respondent has revised the land rate on 6th December, 1990. Thus, the petitioner was made to pay higher amount for the LIG flat which D he became entitled to get in the draw held on 12th October, 1990. Counter Affidavit has been filed by the respondent and it is admitted that the petitioner became successful in the draw of lot held on 12th October, 1990. There is no reason given for not issuing allotment-cum-demand letter till 9th January- 13th January, 1991. E It is thus clear that the allotment-cum-demand letter was delayed in the office of the respondent. In the meanwhile, even if the land rates have been increased, since the petitioner had become entitled _to_ get the flat on 12th October, 1990, the respondent F could not charge enhanced rate from the petitioner. As such we allow the writ petition and direct the respondent to revise the demand and charge the rate payable by petitioner on 12th October, 1990. The revised demand be issued within one month. No costs." A perusal of the High Court's order shows that it is based upon the G following two reasons : (i) Though the draw was held on October 12, 1990, the allotmentcum-demand letter was issued to the respondent only on January 9/13, 1991. This delay was the result of inefficiency of the D.D.A. H SUPREME COURT REPORTS (1994] SUPP. 3 S.C.R. 774 A (2) Inasmuch as the issue of allotment-cum-demand letter was delayed in the office of D .D .A. it cannot charge the revised land rates to the respondent inasmuch as the respondent became entitled to get the flat on October 12, 1990; the revision of land rates subsequent to the drawl of lots cannot affect the respondent. B In our opinion, both the grounds assigned by the High Court are unsustainable. There was no material placed before the High Court- nor has any material been brought to our notice - to record a finding that the interval of three months between the drawl of lots and the despatch of allotment-cum-demand letter was on account of inefficiency of the appelC lant. The appellant's case is that the draw of lots was held for nearly three thousand flats and since the land rates were revised meanwhile, the process of calculating the cost of each flat and sending of demand-cum-allotment letters to nearly three thousand allottees took some time. In our opinion, the interval of three months cannot be characterised either as inordinate D or as deliberate delay. The scheme itself does- not prescribe the period within which allotment has to be communicated from the date _of_ drawl of lots. It has, of course, to be done within a reasonable period. Now coming to the other ground, we are unable to find any legal basis for holding that the respondent obtained a vested right to allotment E on the drawl of lots. Since D.D.A. is a publi~ authority and because the number of applicants are always more than the number of flats available, the system of drawing of lots is being resorted to with a view to identify the allottee. It is only a mode, a method, a process to identify the allottee, i.e., it is a process of selection. It is not allotment by itself. Mere identificaF tion or selection of the allottee does not clothe the person selected with a legal right to allotment at the price prevailing on the date of drawl of lots. The scheme evolved by the appellant does not say so either expressly or by necessary implication. On the contrary, clause (14) thereof says that "the estimated prices mentioned in the brochure are illustrative and are subject to revision/modification depending upon the exigencies of lay out, cost of G construction etc." It may be noted that registration of applicants under the said scheme opened on September 1, 1979 and closed on September 30, 1979. About, 1,70,000 persons applied~ Flats were being constructed in a continuous process and lots were being drawn from time to time for a given number of flats ready for allotment. Clause (14) of the Scheme has to be H understood in this context-the steady rise in the cost of construction and 775 D.DA _v._ P.K.JAIN [JEEVAN REDDY,J.] of land. No provision of law also could be brought to our notice in support A of the proposition that mere drawl of lots vestes an indefeasible right in the allottee for allotment at the price obtaining on the date of drawl of lots. In our opinion, since the right to flat arises only on the communication of the letter of allotment, the price or rates prevailing on the date of such communication is applicable unless otherwise provided in the Scheme. If _B_ in case the respondent is not willing to take or accept the allotment at such rate, it is always open to him to decline the allotment. We see no unfairness in the above procedure. We may clarify that the ~dity or justification of the revision of land rates by circular dated December 6, 1990 was not questioned in the writ C petition nor has it been pronounced upon by the High Court nor has it been urged before us. We must, therefore, proceed on the assumption that the said revision of land rates is valid. For the above reasons, the appeal is allowed and the judgment and order of the High Court is set aside. D T.N.A. Appeal allowed.
End of Judgment Record
Browse All Supreme Court of India (1994) Decisions
1994-01-28

BILLA JAGAN MOHAN REDDY AND ANR. v. BILLA SANJEEVA REDDY AND ORS.

This is a Supreme Court decision arising from a Land Acquisition Act reference under Section 30, where the appellants (the first party) sought to claim a 1/4 share of compensation based on pre-existing title evidenced by entries in the record of rights and other revenue records. To prove title, the appellants filed copies of family holdings, khasra Pahani, and certified copies from revenue authorities spanning 1954-70 and other documents, and moved for condonation of delay under Order XIII, Rule 1 CPC for production of these public documents. The trial court refused the application, and the High Court affirmed. The Court held that documentary evidence to be produced at or before settlement of issues must be produced in possession and, if not in possession, filed with an application to condone the delay, and the Court shall receive such documents if accompanied by an accurate list. Although there was a delay, the Court emphasized that, if the documents are relevant to decide the real issue and the interest of justice requires it, the appellate court can receive them under Order XLI, Rule 27 CPC. Consequently, the delay was condoned, and the trial court was directed to receive the documents, allow proof and rebuttal, and dispose of the reference according to law. The appeal was allowed.

1994-07-14

M/S Pankaj Jain Agencies v. Union of India

The petitioner, M/s Pankaj Jain Agencies, challenges Notification No. 142/86-Cus., dated 13 February 1986, issued under Section 25(1) of the Customs Act, 1962, which amended the earlier exemption Notification No. 70/85-Cus. The impugned notification pertains to rates of customs duty on imports of parts and sub-assemblies of ball and roller bearings, specifically “cups” supplied from Singapore for component parts of bearings. Two consignments arrived at Bombay Port in January–February 1986; the petitioner filed two Bills of Entry for home consumption. The central issue is whether the notification reduces the exemption and thereby imposes a higher duty, or creates a fresh duty on spare parts not contemplated by the Customs Tariff Act of 1975. The petitioner argued that import was complete before the notification came into force; that the notification was ultra vires Section 25(1) and violated Section 25(3) by exceeding the statutory duty; and that the increased duty violated Article 19(1)(g) by imposing an unreasonable restriction on trade. The Respondents contended that the notification merely curtailed an exemption, the rates did not exceed the statutory duty, and publication in the Official Gazette gave operativeness. The Supreme Court held that subordinate legislation must be published to take effect, and publication sufficed for operativeness; it rejected the ultra vires and fundamental-right challenges, and dismissed the petitions with costs, underscoring the principle that delegated legislation must be published to be effective.

1994-09-14

COMMISSIONER OF INCOME TAX, HYDERABAD v. M/s. P.J. CHEMICALS LTD. ETC.

This judgment addresses whether subsidies granted to industries on a percentage of capital cost should be deducted from the "actual cost" for computing depreciation under Section 43(1) of the Income Tax Act, 1961. Judicial opinions across Indian High Courts diverged: several held such subsidies non-deductible as they are incentives rather than payments toward asset cost, while others (including some Punjab and Haryana, Allahabad, Bombay, Calcutta, and Gauhati courts) treated the subsidy as deductible from actual cost. The matter was heard in two batches: revenue appeals challenging the Andhra Pradesh High Court’s view, and assessee appeals in the opposite camp. The Supreme Court discusses the meaning of "actual cost", urging liberal interpretation, and reinforces the majority view that government subsidies of this nature are incentives to attract investment, not amounts paid toward meeting the asset’s actual cost. It traces the legislative history, including amendments to the 1922 Act and the 1953 amendment, to explain the intended construction of the term. The Court overrules the contrary Punjab and Haryana decision in Jindal Brothers Rice Mills and sustains the rest of the High Court dissents in favor of the assessee. Consequently, Revenue appeals are dismissed and assessee appeals are allowed, with no costs."

1994-02-15

STATE OF KERALA v. MCDOWELL CO. LTD.

The Kerala Abkari Act governs the manufacture, sale and export of Indian made Foreign Liquor (IMFL) within Kerala. Distillers could export liquor outside Kerala with permission, but were required to execute a bond to secure payment of excise duty on export. The Board of Revenue issued a circular in 1982 treating such documents as agreements rather than bonds; the Board later held the instrument was a bond, while the Kerala High Court held it to be an agreement not liable to stamp duty, prompting Kerala to appeal. The central issue was whether Form VI, executed under the Distillery and Warehouse Rules, constitutes a Bond under the Kerala Stamp Act or merely an Agreement, affecting stamp duty liability under Entry 32 (Indemnity Bond) or Entry 13 (Bond) of the Schedule. The Supreme Court majority held that the instrument in Form VI is a bond within the meaning of the Kerala Stamp Act and liable to stamp duty under Entry 32, as it creates an obligation to pay money to the State on breach of conditions, a liability arising from the instrument itself, not merely from the Abkari Act. The dissent (Sahai, J.) argued the instrument arises from the Abkari Act, making it an Agreement rather than a Bond under the Stamp Act, and that duty would not arise from the instrument itself. The appeal was allowed and the writ petition disposed accordingly, with a refund of excess duty where needed.