This appeal concerns the legality of land acquisition under the 2013 Act. The Delhi Development Authority (DDA) and the Government of the NCT of Delhi challenge a Delhi High Court decision holding that the acquisition of certain lands, notified under the Land Acquisition Act, 1894 (Section 4), with an award dated 10 December 1997 and possession handed over to DDA on 26 May 1998, had deemed to have lapsed under Section 24(2) of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (Act, 2013) because compensation was not tendered to the petitioners. The High Court accepted the Land Acquisition Collector’s (LAC) assertion that possession was taken and transferred, and eventually found lapse on the basis that compensation had not been tendered. The Supreme Court found the High Court’s reasoning inconsistent with Constitution Bench authority, particularly Indore Development Authority v. Manoharlal and Ors. (2020) 8 SCC 129, which held that possession having been taken and land vested in the State does not automatically lapse proceedings under Section 24(2). The Court noted that mere non-deposit or non-tender of compensation does not per se cause lapse; five years of inaction prior to 1-1-2014 is the triggering condition. The appeals are allowed, setting aside the High Court judgment, with no order as to costs.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • M. R. Shah
  • S. Ravindra Bhat
Judgment Date
2022-12-15
Court Decision / Holding
Appeals allowed. The High Court’s judgment quashing the acquisition on the ground of deemed lapse under Section 24(2) is set aside. The acquisition is not deemed to have lapsed under Section 24(2) of the Act, 2013. There shall be no order as to costs. Pending applications, if any, stand disposed of.
Final Disposition
Appeals allowed.

Parties to the Case

Appellants / Petitioners

  • Delhi Development Authority
  • Government of NCT of Delhi

Respondents

  • Chandermal
  • Ors.

Legal Representation & Advocates

Counsels for Petitioners

  • • Ms. Malvika Kapila
  • • Ms. Tanwangi Shukla, Advs. for the Appellant

Counsels for Respondents

  • • D K. C. Jain
  • • Haraprasad Sahu
  • • Pranaya Kumar Mohapatra
  • • Ms. Prachi Bajpai, Advs. for the Respondents

Provisions of Law Cited

Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013, s.24(2)Land Acquisition Act, 1894, Section 4Land Acquisition Act, 1894, Section 16Land Acquisition Act, 1894, Section 31Land Acquisition Act, 1894, Section 34Proviso to Section 24(2) of Act, 2013

Legal Doctrines & Maxims

  • The word 'or' used in Section 24(2) between possession and compensation has to be read as 'nor' or as 'and' (para 366.3)
  • Proviso to Section 24(2) of the 2013 Act is to be treated as part of Section 24(2) (para 366.6)
  • Once possession is taken under the 1894 Act, land vests in the State and there is no divesting under Section 24(2) (para 366.7)
  • Non-deposit of compensation in court does not by itself cause lapse under Section 24(2) (para 366.5)
  • Deemed lapse under Section 24(2) applies to inaction lasting five years or more before 1-1-2014 (para 366.8)
  • Indore Development Authority v. Manoharlal and Ors. (2020) 8 SCC 129 – Constitution Bench guidance on interplay of possession and compensation

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellants contended that possession of the subject land was taken by the LAC and handed over to the DDA on 26 May 1998, with the award already declared in 1997. They relied on the counter-affidavits stating that the land vested in the Government, and that the High Court erred in deeming lapse solely on account of non-tender of compensation. Non-mention of taking over in the possession certificate does not negate possession; the crucial fact is handing over to the DDA and the vesting in the State. They urged that Indore Development Authority v. Manoharlal and Ors. governs the proper interpretation of Section 24(2), and the five-year inaction window before 1-1-2014 means the proceedings cannot lapse merely for non-payment of compensation. respondents

Contentions of Respondents

The respondents argued that the possession was taken by the LAC and handed over to DDA; the possession certificate did not explicitly record the taking over by the LAC, which undermines the legality of the possession. They relied on non-tender of compensation and the High Court’s reading of Section 24(2) as evidence of lapse. They also cited the Aboobacker decision as a reference point while contending that the High Court’s approach was consistent with established law until the Indore ruling clarified the proper approach.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (2)

Case NameCitationTreatmentExplanation
E.A. Aboobacker and Ors. v. State of Kerala and Ors.[2018] 12 SCR 263Mentioned OnlyCited in relation to possession issues but not applied or distinguished in the final ruling.
Indore Development Authority v. Manoharlal and Ors.[2020] 3 SCR 1PositiveConstitution Bench decision followed; used to interpret Section 24(2) and the interplay of possession and compensation; basis for quashing High Court’s deeming lapse.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,709 words•~13 min read

In The Court Record

Delhi Development Authority v. Chandermal & Ors.

752 SUPREME COURT REPORTS[2022] 17 S.C.R. 752 [2022] 17 S.C.R. A ## DELHI DEVELOPMENT AUTHORITY ## v. ## CHANDERMAL & ORS. (Civil Appeal No. 9115 of 2022) ## B DECEMBER 15, 2022 ## **[M. R. SHAH AND S. RAVINDRA BHAT, JJ.]** - _Right to Fair Compensation and Transparency in Land_ - _Acquisition, Rehabilitation and Resettlement Act, 2013: s.24(2) – Land Acquisition – Specific case of Land acquisition Collector_ - C _(LAC) before High Court that possession of land in question was taken over by the LAC and was handed over to DDA – High Court also believed the taking over of the possession by the LAC, but thereafter on the ground that the compensation was not tendered to the original writ petitioners, High Court declared that the acquisition_ - D _is deemed to have lapsed under s.24(2) of the Act, 2013 – Appeal by LAC – Held: Before the High Court, a counter affidavit was filed by LAC as well as DDA in which it was specifically mentioned that the land in question was handed over to DDA on 26.05.1998 and therefore, the acquisition is complete and the lands vest in the Government and free from any encumbrances – Nothing is on record_ - E _that at any point of time, the original writ petitioners made any grievance that the possession taken over on 26.05.1998 was not lawful – Even High Court in impugned judgment believed the stand taken by the LAC that the possession of the subject land was taken over – Under the circumstances, it is not permissible on the part of_ - F _the original writ petitioners to now contend that the possession taken over on 26.05.1998 was not lawful – The view taken by the High Court that the acquisition is deemed to have lapsed under s.24(2) of the Act, 2013 on the ground that though the possession of the subject lands was taken over but the compensation in respect of the subject lands was not tendered is contrary to the Constitution Bench_ - G _decision of this Court in the case of_ Indore Development Authority v. Manoharlal and Ors. _– Order of High Court is set aside._ ## **Allowing the appeal, the Court** - **HELD: 1. Before the High Court, a counter affidavit was** - H **filed by LAC as well as DDA and in which it was specifically** 752 DELHI DEVELOPMENT AUTHORITY v. CHANDERMAL & 753 ORS. **mentioned that the land in question was handed over to DDA on 26.05.1998 and therefore, the acquisition is complete and the lands vest in the Government and free from any encumbrances. Nothing is on record that any rejoinder affidavit was filed on behalf of the original writ petitioners to the counter affidavit filed by the LAC or DDA. Nothing is on record that at any point of time, the original writ petitioners – predecessors made any grievance that the possession taken over on 26.05.1998 was not lawful. Even the High Court in the impugned judgment and order has believed the stand taken by the LAC that the possession of the subject land has been taken over. Under the circumstances, it is too late and/or not permissible on the part of the original writ petitioners to now contend that the possession taken over on 26.05.1998 was not lawful. [Para 5][755-F-H; 756-A]** A B C **2. In the present case, a notification under Section 4 of the Land Acquisition Act, 1894 was issued in 1964 and the award was declared on 10.12.1997 and the possession was handed over to DDA on 26.05.1998. So far as the submission on behalf of the original writ petitioners that “in the possession certificate dated 26.05.1998, there was no mention of taking over of possession of the subject lands by the Land Acquisition Collector from the original writ petitioners – predecessors” is concerned, mere nonmention of taking over of possession cannot be a ground not to believe the possession certificate in which it is specifically mentioned that the possession of the land in question is handed over to the DDA. What is relevant is handing over of the possession to the DDA. [Para 5.1][756-B-D]** D E F **3. The view taken by the High Court that the acquisition is deemed to have lapsed under Section 24(2) of the Act, 2013 on the ground that though the possession of the subject lands has been taken over but the compensation in respect of the subject lands has not been tendered is just contrary to the Constitution Bench decision of this Court in the case of Indore Development** G **Authority Vs. Manoharlal and Ors. [Para 5.2][756-E-F]** _Indore Development Authority v. Manoharlal and Ors._ **(2020) 8 SCC 129 : [2020] 3 SCR 1 – followed.** H 754 SUPREME COURT REPORTS [2022] 17 S.C.R. - A _E.LA. Aboobacker and Ors. v. State of Kerala and Ors._ **(2018) 18 SCC 560 : [2018] 12 SCR 263 – referred to.** ## **Case Law Reference** |B|**[2018] 12 SCR 263**|**referred to**|**Para 3**| |---|---|---|---| ||**[2020] 3 SCR 1**|**followed**|**Para 5.2**| ||CIVIL APPELLATE|JURISDICTION: Civil Appeal No. 9115 of|| ||2022.||| From the Judgment and Order dated 03.10.2018 of the High Court C of Delhi at New Delhi in Writ Petition (C) No. 2255 of 2016. With Civil Appeal No. 9123 of 2022. Ms. Malvika Kapila, Ms. Tanwangi Shukla, Advs. for the Appellant. D K. C. Jain, Haraprasad Sahu, Pranaya Kumar Mohapatra, Ms. Prachi Bajpai, Advs. for the Respondents. The Judgment of the Court was delivered by ## **M. R. SHAH, J.** E 1. Feeling aggrieved and dissatisfied with the impugned judgment and order dated 03.10.2018 passed by the High Court of Delhi at New Delhi in Writ Petition(C) No. 2255 of 2016 by which the High Court has allowed the said writ petition preferred by the respondents herein and has declared that the acquisition with respect to the lands in question is F deemed to have lapsed underSection 24(2) of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (hereinafter referred to as “Act, 2013”), the Delhi Development Authority (DDA) as well as the Government of NCT of Delhi have preferred the present appeals. 2. By the impugned judgment and order, the High Court has G declared that the acquisition with regard to the subject land is deemed to have lapsed under Section 24(2) of the Act, 2013 on the ground that the compensation in respect of the subject land has not been tendered to the original writ petitioners – respondents herein. However, it is required to be noted that before the High Court, it was the specific H case on behalf of the appellants, more particularly, the Land Acquisition 755 DELHI DEVELOPMENT AUTHORITY v. CHANDERMAL & ORS. [M. R. SHAH, J.] Collector (LAC) that the possession of the land in question was taken A by the LAC and was handed over to the DDA. The High Court has also believed the taking over of the possession by the LAC, but thereafter on the ground that the compensation has not been tendered to the original writ petitioners, the High Court has declared that the acquisition is deemed to have lapsed. B 3. Referring to the possession certificate dated 26.05.1998 relied upon on behalf of the appellants (Annexure P/4), learned counsel appearing on behalf of the original writ petitioners has submitted that in the said possession certificate, there is no reference of “taking over of the possession of the subject land” by the LAC from the original writ petitioners – predecessors. It is submitted that it only mentions “handing over of possession by the Tehsil staff to the Land and Building Department”. It is submitted that as per Section 16 of the Land Acquisition Act, 1894 only the Collector was empowered to take possession and possession taken by his subordinate cannot be said to be lawful. It is submitted that therefore the possession so alleged to be taken on 26.05.1998 cannot be said to be lawful possession. Reliance is placed on the decision of this Court in the case of **E.A. Aboobacker and Ors. Vs. State of Kerala and Ors., (2018) 18 SCC 560.** It is further submitted that as such the contesting respondents herein disputes the actual taking over of possession and according to them, they are in possession of the land in question. C D E 4. We have heard the learned counsel appearing for the respective parties at length. 5. At the outset, it is required to be noted that before the High Court, a counter affidavit was filed by LAC as well as DDA and in which it was specifically mentioned that the land in question was handed over to DDA on 26.05.1998 and therefore, the acquisition is complete and the lands vest in the Government and free from any encumbrances. Nothing is on record that any rejoinder affidavit was filed on behalf of the original writ petitioners to the counter affidavit filed by the LAC or DDA. Nothing is on record that at any point of time, the original writ petitioners – predecessors made any grievance that the possession taken over on 26.05.1998 was not lawful. Even the High Court in the impugned judgment andorder has believed the stand taken by the LAC that the possession of the subject land hasbeen taken over. Under the circumstances, it is too late and/or not permissible on the part of the F G H 756 SUPREME COURT REPORTS [2022] 17 S.C.R. - A original writ petitioners to now contend that the possession taken over on 26.05.1998 was not lawful. 5.1 As observed and held hereinabove, solely on the ground that the compensation in respect of the subject land has not been tendered to the original writ petitioners, the High Court has declared that the B acquisition proceedings with respect to the land in question is deemed to have been lapsed under Section 24(2) of the Act, 2013. It is required to be noted that in the present case, a notification under Section 4 of the Land Acquisition Act, 1894 was issued in 1964 and the award was declared on 10.12.1997 and the possession was handed over to DDA on 26.05.1998. So far as the submission on behalfof the original writ C petitioners that “in the possession certificate dated 26.05.1998, there was no mentionof taking over of possession of the subject lands by the Land Acquisition Collector from the original writ petitioners – predecessors” is concerned, mere non-mention of taking over of possession cannot be a ground not to believe the possession certificate D in which it is specifically mentioned that the possession of the land in question is handed over to the DDA. What is relevant is handing over of the possession to the DDA. 5.2 The view taken by the High Court that the acquisition is deemed to have lapsed under Section 24(2) of the Act, 2013 on the ground that E though the possession of the subject lands hasbeen taken over but the compensation in respect of the subject lands has not been tendered is just contrary to the Constitution Bench decision of this Court in the case of **Indore Development Authority Vs. Manoharlal and Ors. (2020) 8 SCC 129** . In paragraph 366, it is observed and held by this Courtas under:- F G H “ **366.** In view of the aforesaid discussion, we answer the questions as under: **366.1.** Under the provisions of Section 24(1)(a) in case the award is not made as on 1-1-2014, the date of commencement of the 2013 Act, there is no lapse of proceedings. Compensation has to be determined under the provisions of the 2013 Act. **366.2.** In case the award has been passed within the window period of five years excluding the period covered by an interim order of the court, then proceedings shall continue as provided under Section 24(1)(b) of the 2013 Act under the 1894 Act as if it has not been repealed. 757 DELHI DEVELOPMENT AUTHORITY v. CHANDERMAL & ORS. [M. R. SHAH, J.] **366.3.** The word “or” used in Section 24(2) between possession and compensation has to be read as “nor” or as “and”. The deemed lapse of land acquisition proceedings under Section 24(2) of the 2013 Act takes place where due to inaction of authorities for five years or more prior to commencement of the said Act, the possession of land has not been taken nor compensation has been paid. In other words, in case possession has been taken, compensation has not been paid then there is no lapse. Similarly, if compensation has been paid, possession has not been taken then there is no lapse. **366.4.** The expression “paid” in the main part of Section 24(2) of the 2013 Act does not include a deposit of compensation in court. The consequence of non-deposit is provided in the proviso to Section 24(2) in case it has not been deposited with respect to majority of landholdings then all beneficiaries (landowners) as on the date of notification for land acquisition under Section 4 of the 1894 Act shall be entitled to compensation in accordance with the provisions of the 2013 Act. In case the obligation under Section 31 of the Land Acquisition Act, 1894 has not been fulfilled, interest under Section 34 of the said Act can be granted. Non-deposit of compensation (in court) does not result in the lapse of land acquisition proceedings. In case of non-deposit with respect to the majority of holdings for five years or more, compensation under the 2013 Act has to be paid to the “landowners” as on the date of notification for land acquisition under Section 4 of the 1894 Act. A B C D E **366.5.** In case a person has been tendered the compensation as provided under Section 31(1) of the 1894 Act, it is not open to F him to claim that acquisition has lapsed under Section 24(2) due to non-payment or non-deposit of compensation in court. The obligation to pay is complete by tendering the amount under Section 31(1). The landowners who had refused to accept compensation or who sought reference for higher compensation, cannot claim that the acquisition proceedings had lapsed under Section 24(2) G of the 2013 Act. **366.6.** The proviso to Section 24(2) of the 2013 Act is to be treated as part of Section 24(2), not part of Section 24(1)(b). **366.7.** The mode of taking possession under the 1894 Act and as contemplated under Section 24(2) is by drawing of inquest H 758 SUPREME COURT REPORTS [2022] 17 S.C.R. A report/memorandum. Once award has been passed on taking possession under Section 16 of the 1894 Act, the land vests in State there is no divesting provided under Section 24(2) of the 2013 Act, as once possession has been taken there is no lapse under Section 24(2). B **366.8.** The provisions of Section 24(2) providing for a deemed lapse of proceedings are applicable in case authorities have failed due to their inaction to take possession and pay compensation for five years or more before the 2013 Act came into force, in a proceeding for land acquisition pending with the authority concerned as on 1-1-2014. The period of subsistence of interim orders passed C by court has to be excluded in the computation of five years. **366.9.** Section 24(2) of the 2013 Act does not give rise to new cause of action to question the legality of concluded proceedings of land acquisition. Section 24 applies to a proceeding pending on the date of enforcement of the 2013 Act i.e. 1-1-2014. It does not D revive stale and time-barred claims and does not reopen concluded proceedings nor allow landowners to question the legality of mode of taking possession to reopen proceedings or mode of deposit of compensation in the treasury instead of court to invalidate acquisition.” E 6. In view of the above and for the reasons stated above, the impugned judgment and order passed by the High Court is unsustainable and the same deserves to be quashed and set aside and is accordingly quashed and set aside. Present appeals are accordingly allowed. However, in the facts F and circumstances of the case, there shall be no order as to costs. Pending applications, if any, also stand disposed of. Devika Gujral G H Appeals allowed.
End of Judgment Record
Browse All Supreme Court of India (2022) Decisions
2022-12-09

MOHD. SABEER @ SHABIR HUSSAIN v. RM, U. P. STATE ROAD TRANSPORT CORP.

The appellant, Mohd. Sabeer (also known as Shabir Hussain), a scrap dealer, was a passenger in a UP State Road Transport Corporation bus when the driver rashly and negligently drove the vehicle, causing a collision near Ghaziabad in 2009. He sustained grave injuries including an amputation of the right lower limb and other bodily injuries. The Motor Accident Claims Tribunal (MACT) awarded Rs. 15,76,465 with interest; the High Court of Delhi enhanced the amount to Rs. 16,70,932. The Disability Certificate recorded 70% permanent disability. The High Court had treated the claimant’s functional disability as 35%, relying on post‑accident income reflected in IT returns, and erred in not adequately recognizing the impact on earning capacity of a self‑employed person who cannot drive. The Supreme Court held that the appellant’s functional disability should be treated as 60% for loss of future earning capacity and that permanent disablement warrants consideration of future prospects in addition to future income. It invoked National Insurance Co. v. Pranay Sethi to apply a 40% addition for future prospects, and directed compensation for prosthetic limb purchase and maintenance, as well as enhanced non‑pecuniary damages. The final award was increased to Rs. 38,70,120 with 9% interest from the date of application, and the appeals were allowed, emphasizing liberal, holistic justice to restore the claimant to his pre‑accident position in light of socio‑economic factors.

2022-01-25

Intercontinental Hotels Group (India) Pvt. Ltd. & ANR. v. Waterline Hotels Pvt. Ltd.

Intercontinental Hotels Group (India) Pvt. Ltd. & Anr. v Waterline Hotels Pvt. Ltd. is a Supreme Court decision addressing appointment of a sole arbitrator under Section 11(6) read with Section 11(12)(a) of the Arbitration and Conciliation Act, 1996, in a dispute arising from a Hotel Management Agreement (HMA) for renovating the Holiday Inn & Suites Bengaluru, Whitefield. The petitioners allege breach by Waterline Hotels, including non-payment of incentive management fee and related charges, culminating in Waterline’s email termination of the HMA on 12 October 2018 after rebranding the hotel as Miraya. The petitioners invoked arbitration; Waterline challenged the enforceability of the arbitration clause on the ground that the HMA is an unstamped instrument under the Karnataka Stamp Act. A Karnataka High Court ad‑interim relief was granted in 2018, but the Supreme Court’s judgment focuses on the scope of judicial interference at the pre‑appointment stage. The Court reiterates a pro‑arbitration stance, noting that arbitrability/validity are generally matters for the arbitrators, with a narrow exception to cut deadwood or to refer for authoritative settlement where necessary, invoking Vidya Drolia. It also analyzes stamp duty, observing that stamp duty has been paid (albeit disputed) and that the question of the correct stamp duty may be resolved later, not as a precondition to appointing an arbitrator. Consequently, the Court appoints Justice A. V. Chandrashekara as a sole arbitrator, directs SIAC to proceed under its rules, and allows the petition in terms stated, while leaving stamp duty issues for arbitration to determine later.

2022-02-01

The State of Sikkim v. Jasbir Singh & ANR

This appeal by the State of Sikkim challenges a High Court judgment upholding a Sessions Judge’s order directing a written notice to the Army’s commanding officer to transfer the case to a court-martial. The case concerns concurrent jurisdiction between a court-martial and an ordinary criminal court under the Army Act for an offence allegedly committed by Lance Naik Jasbir Singh during active service in Sikkim, with the FIR under IPC 302 and related charges. The High Court held that the procedure under Sections 125/126 Army Act, the 1978 Rules (Rules 3-5) and CrPC Rule 475 had not been observed and that the Army authorities had exercised their discretion to prefer a court-martial; thus, the court-martial alone would have jurisdiction. The Supreme Court, however, held that the offence falls into a category with concurrent jurisdiction under Sections 69 and 70 of the Army Act, and that where there is concurrent jurisdiction, the first instance discretion to choose the forum lies with the designated officer under Section 125. In the present case there was no decision by the designated officer to institute proceedings before a court-martial, and the sequence of events showed significant cooperation with the CrPC process. Consequently, the Sessions Judge’s competence to proceed in the criminal court was not in error, the High Court’s order is set aside, and the respondent-accused is to be transferred to civil custody to face trial in the criminal court. The appeal is allowed.

2022-07-22

Hemant Kumar Verma & Ors. v. Employees State Insurance Corporation & Ors.

This writ petition concerns whether junior resident doctors in ESIC-run medical colleges should be eligible for the 50% in-service reservation for postgraduate medical courses, a benefit presently available to Insurance Medical Officers Grade-II (IMO-II) recruited through competitive selection. ESIC recruits IMO-II and provides a 50% in-service quota for PG seats; however junior residents, who complete MBBS under bond and serve as part of ESIC's residency scheme, are not deemed in-service doctors. The petitioners argued parity with IMO-II because their qualifications, duties, and work environment are similar, and urged the Court to treat them as in-service to extend the 50% reservation to their batch. ESIC contends that junior residents are contractual, bond-based appointees governed by the ESIC Residency Scheme; IMO-II is a permanent post governed by the ESIC Staff and Condition of Service Regulations 1959; the bond reduction in 2020 and the 2018/2020 memoranda cannot convert junior residents into in-service doctors. The Court relies on precedents establishing institutional preference in PG admissions—Saurabh Chaudri v. Union of India, Yatin Kuma Jasubahi v. State of Gujarat, and Pradeep Jain v. Union of India — to acknowledge the legitimacy of institutional preference, but ultimately holds that junior residents and regular ESIC doctors are distinct categories and the in-service quota cannot be equitably extended to junior residents. The petition is dismissed.