Delhi Development Authority v. Bhagwat Singh & Ors.

Case / Petition Number:
Civil Appeal No. 7961 of 2022
Neutral Citation:[2022] 16 S.C.R. 593

Case Synopsis & Summary

This is a Civil Appeal by the Delhi Development Authority challenging a Delhi High Court writ petition (W.P.(C) No.10359 of 2015) which held that land acquisition under the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (Act, 2013) had lapsed under Section 24(2). The High Court relied on Pune Municipal Corporation v. Harakchand Misirimal Solanki to hold non-payment of compensation as the trigger for deemed lapse. The Supreme Court, however, overruled Pune via the Constitution Bench decision in Indore Development Authority v. Manoharlal and Ors. (2020), and clarified the correct interpretation of Section 24(2) and its interplay with the 1894 Act. The Court held that lapse under Section 24(2) occurs only where five years have elapsed with no possession and no payment prior to 1-1-2014, and that possession already taken or compensation paid negates lapse. It explained that the proviso to Section 24(2) forms part of that subsection, and non-deposit of compensation (in court) does not by itself cause lapse. The decision set aside the High Court’s order and allowed the appeal, dismissing the writ petition. The judgment emphasizes that the Indore standard governs and that Pune’s reasoning has been overruled.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • M. R. Shah
  • M. M. Sundresh
Judgment Date
2022-11-02
Court Decision / Holding
Appeal allowed. The impugned judgment and order of the Delhi High Court is quashed and set aside; the original writ petition is dismissed; the acquisition does not lapse under Section 24(2) based on the reasoning overruling Pune and applying Indore Development Authority.
Final Disposition
Appeal allowed; writ petition dismissed; High Court judgment set aside.

Parties to the Case

Appellants / Petitioners

  • Delhi Development Authority

Respondents

  • Bhagwat Singh
  • Ors.

Legal Representation & Advocates

Counsels for Petitioners

  • • Nitin Mishra, Adv.

Counsels for Respondents

  • • Mohit Kumar Gupta
  • • Mohd. Hashim Miyan
  • • Mann Bidhuri, Advs.

Provisions of Law Cited

Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 - Section 24(2)Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 - Section 24(1)(a)Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 - Section 24(1)(b)Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 - Proviso to Section 24(2)Land Acquisition Act, 1894 - Section 4Land Acquisition Act, 1894 - Section 16Land Acquisition Act, 1894 - Section 31(1)Land Acquisition Act, 1894 - Section 34

Legal Doctrines & Maxims

  • Read the word 'or' between possession and compensation as 'nor' or as 'and' for the purpose of Section 24(2)
  • Proviso to Section 24(2) is part of Section 24(2) and governs the deemed lapse
  • Non-deposit of compensation in court does not by itself result in lapse under Section 24(2)
  • Possession taken under the 1894 Act vests land in the State and negates lapse under Section 24(2) once possession is complete

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellant contends that the High Court erred in applying Pune Municipal Corporation (2014) 3 SCC 183 to hold that the land acquisition had lapsed under Section 24(2) by reason of non-payment of compensation, especially since possession had already been taken and the 2013 Act’s transitional framework should be interpreted in light of Indore Development Authority over Pune. It argues that (i) possession having been taken and/or compensation tendered/deposited under the 1894 Act prevents lapse; (ii) the proviso to Section 24(2) and the five-year window prior to 1-1-2014 limit any lapse; (iii) non-deposit in court does not trigger lapse; (iv) Indore overruled Pune and guides correct interpretation.

Contentions of Respondents

The respondents supported the High Court’s view that the acquisition could lapse under Section 24(2) for non-payment/non-deposit of compensation within the required period, relying on Pune Municipal Corporation’s interpretation. They argued that the statutory framework should be interpreted to protect landowners where compensation was not paid or deposited and that the earlier decision's reasoning remained applicable until overruled by Indore Development Authority.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (4)

Case NameCitationTreatmentExplanation
Indore Development Authority v. Manoharlal & Ors.(2020) 8 SCC 129; [2020] (3) SCR 1PositiveConstitution Bench decision overruling Pune and guiding the interpretation adopted by the present judgment.
Pune Municipal Corporation and Anr. v. Harakchand Misirimal Solanki & Ors.(2014) 3 SCC 183; [2014]OverruledOverruled by Indore Development Authority (2020) 8 SCC 129; not to be followed for lapse under Section 24(2).
Pune Municipal Corporation and Anr. v. Harakchand Misirimal Solanki & Ors.(2014) 3 SCC 183; [2014]Mentioned OnlyCited by High Court and referred to in the Case Law Reference as a pre-induction decision; subsequently overruled.
SCR 783Mentioned OnlyReferred to in the Case Law Reference; name not provided in text.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•1,571 words•~8 min read

In The Court Record

Delhi Development Authority v. Bhagwat Singh & Ors.

593 [2022] 16 S.C.R. 593 ## DELHI DEVELOPMENT AUTHORITY A v. BHAGWAT SINGH & ORS. (Civil Appeal No. 7961 of 2022) NOVEMBER 02, 2022 B ## **[M. R. SHAH AND M. M. SUNDRESH, JJ.]** _Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013: s. 24(2) – Land acquisition process under Act No. 1 of 1894 shall be deemed to have lapsed in certain cases – Writ petition by the landowners claiming that acquisition with respect to the land deemed to be lapsed u/s. 24(2) – Allowed by the High Court – On appeal, held: High Court relying upon the decision of this Court in_ Pune Municipal Corporation’s _case ordered lapsing of the land in question u/s. 24 on the ground that the compensation was not paid to the landowners – Said decision-_ Pune Municipal Corporation’s _case has been overruled by the Constitution Bench decision of this Court in_ Indore Development Authority’s _case – Furthermore, before the High Court, it was the specific case of the Development Authority-appellant that the possession of the land in question has already been taken – In view thereof, the order passed by the High Court is unsustainable and is set aside._ C D E _Indore Development Authority Vs. Manoharlal and Ors._ **(2020) 8 SCC 129 : [2020] (3) SCR 1 – followed.** _Pune Municipal Corporation and Anr. Vs. Harakchand Misirimal Solanki and Ors._ **(2014) 3 SCC 183 : [2014]** F **(1) SCR 783 – referred to.** ## **Case Law Reference** |**[2014] (1) SCR**|**783**|**referred to**|**Para**|**2,**|**3,**|**4**|| |---|---|---|---|---|---|---|---| ||||||||G| |**[2020] (3) SCR**|**1**|**followed**|**Para**|**4**|||| CIVIL APPELLATE JURISDICTION: Civil Appeal No. 7961 of 2022. From the Judgment and Order dated 11.12.2017 of the High Court of Delhi at New Delhi in W.P. (C) No.10359 of 2015. H 593 594 [2022] 16 S.C.R. SUPREME COURT REPORTS - A Nitin Mishra, Adv. for the Appellant. Mohit Kumar Gupta, Mohd. Hashim Miyan, Mann Bidhuri, Advs. for the Respondents. The Judgment of the Court was delivered by ## B **M. R. SHAH, J.** 1. Feeling aggrieved and dissatisfied with the impugned judgment and order passed by the High Court of Delhi at New Delhi in Writ Petition(C) No. 10359 of 2015 by which the High Court has allowed the said writ petition preferred by the private respondent herein – original C writ petitioner, and has held and declared that the acquisition with respect to the land in question has lapsed under Section 24(2) of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (hereinafter referred to as “Act, 2013”), the Delhi Development Authority has preferred the present appeal. D 2. Having gone through the Impugned judgment and order passed by the High Court, it is seen that the High Court has ordered lapsing of the land in question under Section 24 of the Act, 2013 relying upon the decision of this Court in the case of **Pune Municipal Corporation and Anr. Vs. Harakchand Misirimal Solanki and Ors. (2014) 3 SCC** E **183** and on the ground that the compensation has not been paid to the landowners. However, it is required to be noted that before the High Court, it was the specific case on behalf of the Delhi Development Authority that the possession of the land in question has already been taken. As observed hereinabove on the ground that the compensation has not been paid to the landowner relying upon the decision of this F Court in the case of **Pune Municipal Corporation and Anr. (supra)** , the High Court has allowed the said writ petition and has declared that the acquisition with respect to the land in question has lapsed. 3. The decision of this Court in the case of **Pune Municipal Corporationand Anr. (supra)** relied upon by the High Court has been G overruled by the Constitution Bench decision of this Court in the case of **Indore Development Authority Vs. Manoharlal and Ors. (2020) 8 SCC 129** and in paragraph 366, it is ultimately concluded as under:- - H - **“366.** In view of the aforesaid discussion, we answer the - questions as under: DELHI DEVELOPMENT AUTHORITY v. BHAGWAT SINGH & 595 ORS. [M. R. SHAH, J.] **366.1.** Under the provisions of Section 24(1)( _a_ ) in case the A award is not made as on 1-1-2014, the date of commencement of the 2013 Act, there is no lapse of proceedings. Compensation has to be determined under the provisions of the 2013 Act. **366.2.** In case the award has been passed within the window period of five years excluding the period covered by an interim B order of the court, then proceedings shall continue as provided under Section 24(1)( _b_ ) of the 2013 Act under the 1894 Act as if it has not been repealed. **366.3.** The word “or” used in Section 24(2) between possession and compensation has to be read as “nor” or as “and”. The deemed lapse of land acquisition proceedings under Section 24(2) of the 2013 Act takes place where due to inaction of authorities for five years or more prior to commencement of the said Act, the possession of land has not been taken nor compensation has been paid. In other words, in case possession has been taken, compensation has not been paid then there is no lapse. Similarly, if compensation has been paid, possession has not been taken then there is no lapse. C D **366.4.** The expression “paid” in the main part of Section 24(2) of the 2013 Act does not include a deposit of compensation in E court. The consequence of non-deposit is provided in the proviso to Section 24(2) in case it has not been deposited with respect to majority of landholdings then all beneficiaries (landowners) as on the date of notification for land acquisition under Section 4 of the 1894 Act shall be entitled to compensation in accordance with the provisions of the 2013 Act. In case the obligation under Section F 31 of the Land Acquisition Act, 1894 has not been fulfilled, interest under Section 34 of the said Act can be granted. Non-deposit of compensation (in court) does not result in the lapse of land acquisition proceedings. In case of non-deposit with respect to the majority of holdings for five years or more, compensation under the 2013 Act has to be paid to the “landowners” as on the date of G notification for land acquisition under Section 4 of the 1894 Act. **366.5.** In case a person has been tendered the compensation as provided under Section 31(1) of the 1894 Act, it is not open to him to claim that acquisition has lapsed under Section 24(2) due to non-payment or non-deposit of compensation in court. The H 596 [2022] 16 S.C.R. SUPREME COURT REPORTS A B C D obligation to pay is complete by tendering the amount under Section 31(1). The landowners who had refused to accept compensation or who sought reference for higher compensation, cannot claim that the acquisition proceedings had lapsed under Section 24(2) of the 2013 Act. **366.6.** The proviso to Section 24(2) of the 2013 Act is to be treated as part of Section 24(2), not part of Section 24(1)( _b_ ). **366.7.** The mode of taking possession under the 1894 Act and as contemplated under Section 24(2) is by drawing of inquest report/memorandum. Once award has been passed on taking possession under Section 16 of the 1894 Act, the land vests in State there is no divesting provided under Section 24(2) of the 2013 Act, as once possession has been taken there is no lapse under Section 24(2). **366.8.** The provisions of Section 24(2) providing for a deemed lapse of proceedings are applicable in case authorities have failed due to their inaction to take possession and pay compensation for five years or more before the 2013 Act came into force, in a proceeding for land acquisition pending with the authority concerned as on 1-1-2014. The period of subsistence of interim orders passed by court has to be excluded in the computation of five years. E **366.9.** Section 24(2) of the 2013 Act does not give rise to new cause of action to question the legality of concluded proceedings of land acquisition. Section 24 applies to a proceeding pending on the date of enforcement of the 2013 Act i.e. 1-1-2014. It does not revive stale and time-barred claims and does not reopen concluded proceedings nor allow landowners to question the legality of mode of taking possession to reopen proceedings or mode of deposit of compensation in the treasury instead of court to invalidate acquisition.” F 4. In view of the decision of this Court in the case of **Indore** G **Development Authority (supra)** , specifically overruling the decision of this Court in the case of **Pune Municipal Corporation and Anr. (supra)** relied upon by the High Court while passing the impugned judgment and order, the impugned judgment and order passed by the High Court is unsustainable and the same deserves to be quashed and set aside. H DELHI DEVELOPMENT AUTHORITY v. BHAGWAT SINGH & 597 ORS. [M. R. SHAH, J.] 5. In view of the above and for the reasons stated above, present A appeal succeeds. The impugned judgment and order passed by the High Court is hereby quashed and set aside. Consequently, the original writ petition preferred by the original writ petitioner stands dismissed. Nidhi Jain > Appeal allowed. B C D E F G H
End of Judgment Record
Browse All Supreme Court of India (2022) Decisions
2022-12-09

MOHD. SABEER @ SHABIR HUSSAIN v. RM, U. P. STATE ROAD TRANSPORT CORP.

The appellant, Mohd. Sabeer (also known as Shabir Hussain), a scrap dealer, was a passenger in a UP State Road Transport Corporation bus when the driver rashly and negligently drove the vehicle, causing a collision near Ghaziabad in 2009. He sustained grave injuries including an amputation of the right lower limb and other bodily injuries. The Motor Accident Claims Tribunal (MACT) awarded Rs. 15,76,465 with interest; the High Court of Delhi enhanced the amount to Rs. 16,70,932. The Disability Certificate recorded 70% permanent disability. The High Court had treated the claimant’s functional disability as 35%, relying on post‑accident income reflected in IT returns, and erred in not adequately recognizing the impact on earning capacity of a self‑employed person who cannot drive. The Supreme Court held that the appellant’s functional disability should be treated as 60% for loss of future earning capacity and that permanent disablement warrants consideration of future prospects in addition to future income. It invoked National Insurance Co. v. Pranay Sethi to apply a 40% addition for future prospects, and directed compensation for prosthetic limb purchase and maintenance, as well as enhanced non‑pecuniary damages. The final award was increased to Rs. 38,70,120 with 9% interest from the date of application, and the appeals were allowed, emphasizing liberal, holistic justice to restore the claimant to his pre‑accident position in light of socio‑economic factors.

2022-01-25

Intercontinental Hotels Group (India) Pvt. Ltd. & ANR. v. Waterline Hotels Pvt. Ltd.

Intercontinental Hotels Group (India) Pvt. Ltd. & Anr. v Waterline Hotels Pvt. Ltd. is a Supreme Court decision addressing appointment of a sole arbitrator under Section 11(6) read with Section 11(12)(a) of the Arbitration and Conciliation Act, 1996, in a dispute arising from a Hotel Management Agreement (HMA) for renovating the Holiday Inn & Suites Bengaluru, Whitefield. The petitioners allege breach by Waterline Hotels, including non-payment of incentive management fee and related charges, culminating in Waterline’s email termination of the HMA on 12 October 2018 after rebranding the hotel as Miraya. The petitioners invoked arbitration; Waterline challenged the enforceability of the arbitration clause on the ground that the HMA is an unstamped instrument under the Karnataka Stamp Act. A Karnataka High Court ad‑interim relief was granted in 2018, but the Supreme Court’s judgment focuses on the scope of judicial interference at the pre‑appointment stage. The Court reiterates a pro‑arbitration stance, noting that arbitrability/validity are generally matters for the arbitrators, with a narrow exception to cut deadwood or to refer for authoritative settlement where necessary, invoking Vidya Drolia. It also analyzes stamp duty, observing that stamp duty has been paid (albeit disputed) and that the question of the correct stamp duty may be resolved later, not as a precondition to appointing an arbitrator. Consequently, the Court appoints Justice A. V. Chandrashekara as a sole arbitrator, directs SIAC to proceed under its rules, and allows the petition in terms stated, while leaving stamp duty issues for arbitration to determine later.

2022-02-01

The State of Sikkim v. Jasbir Singh & ANR

This appeal by the State of Sikkim challenges a High Court judgment upholding a Sessions Judge’s order directing a written notice to the Army’s commanding officer to transfer the case to a court-martial. The case concerns concurrent jurisdiction between a court-martial and an ordinary criminal court under the Army Act for an offence allegedly committed by Lance Naik Jasbir Singh during active service in Sikkim, with the FIR under IPC 302 and related charges. The High Court held that the procedure under Sections 125/126 Army Act, the 1978 Rules (Rules 3-5) and CrPC Rule 475 had not been observed and that the Army authorities had exercised their discretion to prefer a court-martial; thus, the court-martial alone would have jurisdiction. The Supreme Court, however, held that the offence falls into a category with concurrent jurisdiction under Sections 69 and 70 of the Army Act, and that where there is concurrent jurisdiction, the first instance discretion to choose the forum lies with the designated officer under Section 125. In the present case there was no decision by the designated officer to institute proceedings before a court-martial, and the sequence of events showed significant cooperation with the CrPC process. Consequently, the Sessions Judge’s competence to proceed in the criminal court was not in error, the High Court’s order is set aside, and the respondent-accused is to be transferred to civil custody to face trial in the criminal court. The appeal is allowed.

2022-07-22

Hemant Kumar Verma & Ors. v. Employees State Insurance Corporation & Ors.

This writ petition concerns whether junior resident doctors in ESIC-run medical colleges should be eligible for the 50% in-service reservation for postgraduate medical courses, a benefit presently available to Insurance Medical Officers Grade-II (IMO-II) recruited through competitive selection. ESIC recruits IMO-II and provides a 50% in-service quota for PG seats; however junior residents, who complete MBBS under bond and serve as part of ESIC's residency scheme, are not deemed in-service doctors. The petitioners argued parity with IMO-II because their qualifications, duties, and work environment are similar, and urged the Court to treat them as in-service to extend the 50% reservation to their batch. ESIC contends that junior residents are contractual, bond-based appointees governed by the ESIC Residency Scheme; IMO-II is a permanent post governed by the ESIC Staff and Condition of Service Regulations 1959; the bond reduction in 2020 and the 2018/2020 memoranda cannot convert junior residents into in-service doctors. The Court relies on precedents establishing institutional preference in PG admissions—Saurabh Chaudri v. Union of India, Yatin Kuma Jasubahi v. State of Gujarat, and Pradeep Jain v. Union of India — to acknowledge the legitimacy of institutional preference, but ultimately holds that junior residents and regular ESIC doctors are distinct categories and the in-service quota cannot be equitably extended to junior residents. The petition is dismissed.