Delhi Development Authority v. Asha Jain & Ors.

Case / Petition Number:
Civil Appeal No. 8088 of 2022

Case Synopsis & Summary

This Civil Appeal before the Supreme Court arises from a Delhi High Court writ petition challenging a decision declaring that the land acquisition for planned development in South Delhi had lapsed under Section 24(2) of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (2013 Act). The High Court relied on Pune Municipal Corporation v. Harakchand Misirimal Solanki to hold that since compensation was not paid/deposited and possession was not paid within a five-year window, the acquisition proceedings lapsed. The Supreme Court overturns that view, holding that Pune and several related decisions have been overruled by the Constitution Bench in Indore Development Authority v. Manoharlal (2020) 8 SCC 129. The judgment clarifies the proper interpretation of Section 24(2): (i) if an award was not made as of 1-1-2014, lapse does not automatically occur under 24(1)(a); (ii) if an award was made within the five-year window (excluding time of interim court orders), proceedings continue under Section 24(1)(b) of the 2013 Act; (iii) the word “or” in 24(2) should be read as “nor” or “and” in certain contexts; (iv) non-deposit in court does not by itself cause lapse. It also limits the scope of Section 24(2) to proceedings pending as of 1-1-2014 and rejects reopening concluded actions. The Court holds that the appellant’s appeal succeeds and quashes the High Court’s deeming-lapse order, dismissing the writ petition and disposing of pending applications. It also addresses the status of subsequent purchasers and aligns the law with Indore Development Authority and Shiv Kumar.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Landmark Cases
Hon'ble Judges
  • M.R. Shah
Judgment Date
2022-11-09
Court Decision / Holding
The appeal is allowed. The impugned High Court judgment declaring that the acquisition is deemed to have lapsed under Section 24(2) of the 2013 Act is quashed and set aside. The writ petition filed by the original petitioner is dismissed. No costs. Pending applications, if any, are disposed of.
Final Disposition
Appeal allowed; High Court’s deemed-lapse declaration set aside; writ petition dismissed; no costs; pending applications disposed of.

Parties to the Case

Appellants / Petitioners

  • Delhi Development Authority

Respondents

  • Asha Jain
  • Others

Provisions of Law Cited

Section 24(2) of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013Section 24(1)(a) of the 2013 ActSection 24(1)(b) of the 2013 ActSection 24(2) proviso of the 2013 ActSection 4 of the Land Acquisition Act, 1894Section 31(1) of the Land Acquisition Act, 1894Section 16 of the Land Acquisition Act, 1894Section 34 of the Land Acquisition Act, 1894

Submissions & Arguments

Contentions of Appellants / Petitioners

The Delhi Development Authority (appellant) contends that Section 24(2) of the 2013 Act does not automatically lapse proceedings where possession has been taken or compensation has not been deposited in court. It argues that the 2013 Act governs the compensation regime and its interplay with possession, and that the five-year window and the provision’s proviso must be interpreted in light of Indore Development Authority v. Manoharlal (2020) 8 SCC 129, not the Pune decision (overruled). The appellant asserts that possession was taken in 2005, long before 1-1-2014, and that non-deposit of compensation in court does not trigger lapse in the manner premised by the High Court’s decision. It also maintains that subsequent purchasers do not possess a right to claim lapse, citing later decisions clarifying purchasers’ rights.

Contentions of Respondents

The respondents contend that the acquisition proceedings should be deemed to have lapsed under Section 24(2) due to non-payment/non-deposit of compensation and non-compliance with statutory timelines. They rely on the High Court’s interpretation aligning with Pune and related precedents, arguing that the five-year clock and the inaction of authorities led to deemed lapse before 2014. They emphasize that compensation was not paid/deposited during the relevant period, which would trigger lapse under the 2013 Act, and seek upholding of the High Court’s order recognizing lapse and declaring the acquisition as deems-lapsed.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (9)

Case NameCitationTreatmentExplanation
Pune Municipal Corporation and Anr. v. Harakchand Misirimal Solanki and Ors.(2014) 3 SCC 183OverruledConstitution Bench overruled Pune and related decisions which were followed by the High Court.
Indore Development Authority v. Manoharlal and Ors.(2020) 8 SCC 129PositiveConstitution Bench decision relied upon and followed for interpretation of Section 24(2).
Sree Balaji Nagar Residential Assn. v. State of Tamil Nadu(2015) 3 SCC 353OverruledCannot be said to be good law and is overruled (along with related decisions).
Indore Development Authority v. Shailendra(2018) 3 SCC 412OverruledThis decision too cannot prevail in light of the discussion in the present judgment.
Shiv Kumar and Anr. v. Union of India and Ors.(2019) 10 SCC 229PositiveExpressed similar view regarding purchasers’ rights, followed in the present decision.
Meera Sahni v. Lieutenant Governor of Delhi & Ors.(2008) 9 SCC 173Mentioned OnlyCited among decisions considered by the court; not adopted as controlling law in the current context.
M. Venkatesh & Ors. v. Commissioner, Bangalore Development Authority(2015) 17 SCC 1Mentioned OnlyCited as part of the discussion on subsequent purchasers’ rights; not independently adopted here.
Delhi Development Authority v. Godfrey Phillips (I) Ltd. & Ors.Civil Appeal No. 3073 of 2022PositiveObserved that subsequent purchaser has no right to claim lapse; cited in support of the current reasoning.
Delhi Development Authority v. Shiv Kumar (and Ors.)—PositiveAssociated broader line of authority regarding non-lapse for certain purchasers; treated as supportive.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•1,735 words•~8 min read

In The Court Record

Delhi Development Authority v. Asha Jain & Ors.

**REPORTABLE** ## **IN THE SUPREME COURT OF INDIA CIVIL APPELLATE JURISDICTION** ## **CIVIL APPEAL NO. 8088 OF 2022** **Delhi Development Authority** **…Appellant(s)** ## **Versus** **Asha Jain & Ors. …Respondent(s)** ## **J U D G M E N T** **M.R. SHAH, J.** 1. Feeling aggrieved and dissatisfied with the impugned judgment and order passed by the High Court of Delhi at New Delhi in Writ Petition (C) No. 2987 of 2016 by which the High Court has allowed the said writ petition preferred by the respondent No. 1 herein and has declared that the acquisition with respect to the land in question is deemed to have lapsed by virtue of Section 24(2) of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, Signature Not Verified 2013 (hereinafter referred to as “Act, 2013”), the Delhi Development Digitally signed by NIRMALA NEGI Date: 2022.11.09 17:25:11 IST Reason: Authority (DDA) has preferred the present appeal. 1 2. We have heard the learned counsel for the respective parties at length. 3. At the outset, it is required to be noted that in the present case and even as observed by the High Court, the possession of the land in question was taken over in the year 2005, however, observing that as the compensation has not been paid and/or tendered to the recorded owners / petitioners, relying upon the decision of this Court in the case of **Pune Municipal Corporation and Anr. Vs. Harakchand Misirimal Solanki and Ors., (2014) 3 SCC 183** , the High Court has allowed the writ petition and has declared that the acquisition with respect to the land in question is deemed to have lapsed under Section 24(2) of the Act, 2013. 3.1 The decision of this Court in the case of **Pune Municipal Corporation and Anr. (supra)** relied upon by the High Court while passing the impugned judgment and order has been subsequently overruled by this Court in the Constitution Bench decision of this Court in the case of **Indore Development Authority Vs. Manoharlal and Ors. (2020) 8 SCC 129.** In paragraph 365 and 366, the Constitution Bench of this Court has observed and held as under:- “ **365.** Resultantly, the decision rendered in Pune Municipal Corpn. [Pune Municipal Corpn. v. Harakchand Misirimal Solanki, (2014) 3 SCC 183] is hereby overruled 2 and all other decisions in which Pune Municipal Corpn. [Pune Municipal Corpn. v. Harakchand Misirimal Solanki, (2014) 3 SCC 183] has been followed, are also overruled. The decision in Sree Balaji Nagar Residential Assn. [Sree Balaji Nagar Residential Assn. v. State of T.N., (2015) 3 SCC 353] cannot be said to be laying down good law, is overruled and other decisions following the same are also overruled. In Indore Development Authority v. Shailendra [(2018) 3 SCC 412], the aspect with respect to the proviso to Section 24(2) and whether “or” has to be read as “nor” or as “and” was not placed for consideration. Therefore, that decision too cannot prevail, in the light of the discussion in the present judgment. **366.** In view of the aforesaid discussion, we answer the questions as under: **366.1.** Under the provisions of Section 24(1)(a) in case the award is not made as on 1-1-2014, the date of commencement of the 2013 Act, there is no lapse of proceedings. Compensation has to be determined under the provisions of the 2013 Act. **366.2.** In case the award has been passed within the window period of five years excluding the period covered by an interim order of the court, then proceedings shall continue as provided under Section 24(1)(b) of the 2013 Act under the 1894 Act as if it has not been repealed. **366.3.** The word “or” used in Section 24(2) between possession and compensation has to be read as “nor” or as “and”. The deemed lapse of land acquisition proceedings under Section 24(2) of the 2013 Act takes place where due to inaction of authorities for five years or more prior to commencement of the said Act, the possession of land has not been taken nor compensation has been paid. In other words, in case possession has been taken, compensation has not been paid then there is no lapse. Similarly, if 3 compensation has been paid, possession has not been taken then there is no lapse. **366.4.** The expression “paid” in the main part of Section 24(2) of the 2013 Act does not include a deposit of compensation in court. The consequence of non-deposit is provided in the proviso to Section 24(2) in case it has not been deposited with respect to majority of landholdings then all beneficiaries (landowners) as on the date of notification for land acquisition under Section 4 of the 1894 Act shall be entitled to compensation in accordance with the provisions of the 2013 Act. In case the obligation under Section 31 of the Land Acquisition Act, 1894 has not been fulfilled, interest under Section 34 of the said Act can be granted. Non-deposit of compensation (in court) does not result in the lapse of land acquisition proceedings. In case of non-deposit with respect to the majority of holdings for five years or more, compensation under the 2013 Act has to be paid to the “landowners” as on the date of notification for land acquisition under Section 4 of the 1894 Act. **366.5.** In case a person has been tendered the compensation as provided under Section 31(1) of the 1894 Act, it is not open to him to claim that acquisition has lapsed under Section 24(2) due to non-payment or nondeposit of compensation in court. The obligation to pay is complete by tendering the amount under Section 31(1). The landowners who had refused to accept compensation or who sought reference for higher compensation, cannot claim that the acquisition proceedings had lapsed under Section 24(2) of the 2013 Act. **366.6.** The proviso to Section 24(2) of the 2013 Act is to be treated as part of Section 24(2), not part of Section 24(1)(b). **366.7.** The mode of taking possession under the 1894 Act and as contemplated under Section 24(2) is by drawing of inquest report/memorandum. Once award has 4 been passed on taking possession under Section 16 of the 1894 Act, the land vests in State there is no divesting provided under Section 24(2) of the 2013 Act, as once possession has been taken there is no lapse under Section 24(2). **366.8.** The provisions of Section 24(2) providing for a deemed lapse of proceedings are applicable in case authorities have failed due to their inaction to take possession and pay compensation for five years or more before the 2013 Act came into force, in a proceeding for land acquisition pending with the authority concerned as on 1-1-2014. The period of subsistence of interim orders passed by court has to be excluded in the computation of five years. **366.9.** Section 24(2) of the 2013 Act does not give rise to new cause of action to question the legality of concluded proceedings of land acquisition. Section 24 applies to a proceeding pending on the date of enforcement of the 2013 Act i.e. 1-1-2014. It does not revive stale and time-barred claims and does not reopen concluded proceedings nor allow landowners to question the legality of mode of taking possession to reopen proceedings or mode of deposit of compensation in the treasury instead of court to invalidate acquisition.” In that view of the matter, the impugned judgment and order passed by the High Court is unsustainable. 4. Even otherwise, it is required to be noted that in the present case, the notification under Section 4 of the Land Acquisition Act, 1894 was issued on 25.11.1980; acquisition was for a public purpose, namely, planned development of Delhi by which the large chunk of land in 13 5 villages of South Delhi including Village Neb Sarai was sought to be acquired. As per the record, the land in question originally is the part of Khasra No. 675 recorded in the name of M/s. Laxmichand Bhagaji Limited - a non-banking company. Therefore, M/s. Laxmichand Bhagaji Limited was the recorded owner. From the material on record, it appears that even according to the original writ petitioner, she acquired the right in the land in question pursuant to the Agreement to Sell dated 09.05.2005. Thus, the original writ petitioner was claiming the right in the land in question pursuant to the Agreement to Sell dated 09.05.2005. 4.1 As per the settled position of law, Agreement to Sell by itself does not confer any right, title, or interest. In any case, the original writ petitioner can be said to be subsequent purchaser and/or has acquired the right subsequently. In the recent decision of this Court in the case of **Delhi Development Authority Vs. Godfrey Phillips (I) Ltd. & Ors., Civil appeal No. 3073 of 2022** after considering the other decisions on the right of the subsequent purchaser to claim lapse of acquisition proceedings, i.e., **Meera Sahni Vs. Lieutenant Governor of Delhi & Ors., (2008) 9 SCC 173** and **M. Venkatesh & Ors. Vs. Commissioner, Bangalore Development Authority, (2015) 17 SCC 1** , it is specifically observed and held that subsequent purchaser has no right to claim lapse of acquisition proceedings. Similar view has been expressed by the 6 Larger Bench judgment of this Court in the case of **Shiv Kumar & Anr. Vs. Union of India & Ors., (2019) 10 SCC 229** . 4.2 Under the circumstances also, the High Court has erred in entertaining the writ petition at the instance of the original writ petitioner being subsequent purchaser, praying for a declaration that the acquisition is deemed to have lapsed in view of Section 24(2) of the Act, 2013. Under the circumstances also, the impugned judgment and order passed by the High Court is unsustainable. 5. In view of the above and for the reasons stated above, present appeal succeeds. The impugned judgment and order passed by the High Court, declaring that the acquisition with respect to the land in question is deemed to have lapsed under Section 24(2) of the Act, 2013, is hereby quashed and set aside. Consequently, the writ petition filed by the original writ petitioner before the High Court being Writ Petition (C) No. 2987 of 2016 stands dismissed. Present appeal is accordingly allowed. No costs. Pending application, if any, also stands disposed of. ………………………………….J. **[M.R. SHAH]** NEW DELHI; ………………………………….J. NOVEMBER 09, 2022. **[M.M. SUNDRESH]** 7
End of Judgment Record
Browse All Landmark Cases Judgments
2019-01-22

State of Himachal Pradesh & Anr. v. Pinju Ram & Others; State of Himachal Pradesh & Ors. v. Ganesh Dutt & Anr.

This batch of appeals concerns regularisation and monetary benefits of part‑time employees in Himachal Pradesh who were converted to daily‑wage status. The State had issued a policy on 27 February 2004: part‑time Class‑IV employees who had completed ten years of continuous service as on 31 December 2003 would be made daily wagers with prospective effect, and posts vacated by such employees would stand abolished; Education and Ayurveda were excluded from the policy. Revenue Chowkidars, engaged by Panchayats, were not covered by that policy and received separate treatment. Following writ petitions and an order of the Himachal Pradesh High Court and in light of later developments, the State drew‑up directions in 2011 (22 September) to give seniority to Revenue Chowkidars on the basis of ten years of service, but with wages from the date of actual appointment and without back‑dated monetary benefits; 7 July 2012 further instructions reiterated this stance for remaining part‑time employees, with monetary benefits not guaranteed in the interregnum. The respondents pressed for back wages dating from 1 January 2007 and broader coverage. The Supreme Court held that the 2007 back‑pay direction was unsustainable, clarified that seniority would count from ten years without past benefits, and that the 2011 policy and Moti Singh principle should guide the approach. The appeals are allowed; no costs. The related writ petitions are to be disposed of consistent with these directions.

2018-08-14

Union Bank of India and Others v. C.G. Ajay Babu and Anr.

This is a Supreme Court of India appeal concerning the forfeiture of gratuity under the Payment of Gratuity Act, 1972. The respondent was a branch manager of the appellant bank and was dismissed on 3 June 2004 after disciplinary proceedings. A show-cause notice sought to forfeit gratuity due to misconduct involving moral turpitude, which was ordered on 20 April 2004. The High Court upheld the dismissal but held that gratuity could be paid since there was no financial loss to the bank, and that a bipartite settlement between the bank and employees permitted forfeiture only where misconduct caused financial loss. The Division Bench, however, held that forfeiture under Section 4(6) must be read together with Section 4(5) and that no loss was proven, thus entitling the employee to gratuity in accordance with the bipartite settlement. The Supreme Court agreed with the High Court that forfeiture is not automatic; it is controlled by Sections 4(5) and 4(6) of the Act and by the bipartite settlement, which requires loss to justify forfeiture. The Court emphasized that an act must constitute an offence involving moral turpitude and that conviction is generally required for forfeiture under 4(6)(b)(ii). The appeal is dismissed with no costs.

2018-09-25

Reema Salkan v. Sumer Singh Salkan

This is a Supreme Court of India criminal appeal under the Criminal Appellate Jurisdiction arising from a maintenance dispute under Section 125 Cr.P.C. The parties, married in 2002, had a protracted litigation history. The Family Court granted maintenance to the wife from 17 July 2003 to 8 December 2010, and held no maintenance thereafter. The High Court, in revision, partly allowed the application, directing Rs.9,000 per month from 9 December 2010 onward, while upholding the earlier period’s Rs.10,000 per month. This Court had earlier granted interim maintenance of Rs.20,000 per month in 2014 (Criminal Appeal Nos. 2347-2349 of 2014). The appellant contends there has been no change in circumstances since the interim order and that the respondent’s substantial assets, education, and overseas earnings establish the capacity to pay higher maintenance. The respondent defends the High Court’s reasoning, arguing that the Family Court’s assessment, demeanor observations, and the principle that maintenance should not be perpetual require careful scrutiny, and that the notional minimum wage approach used by the High Court is flawed. The overarching issue is the quantum of monthly maintenance payable to the appellant and whether the interim amount should be augmented beyond the period up to 2010.”

2019-12-03

M/s Embassy Property Developments Pvt. Ltd. v State of Karnataka & Ors.

This judgment concerns three Civil Appeals filed by a Resolution Applicant, the Corporate Debtor (through its Resolution Professional) and the Committee of Creditors, challenging an Interim Order of the Karnataka High Court staying an NCLT order in proceedings under the Insolvency and Bankruptcy Code, 2016. The NCLT Chennai had admitted an application under Section 7 of the IBC against M/s Tiffins Barytes Asbestos & Paints Ltd. and directed a moratorium under Section 14. The Interim Resolution Professional then sought a deemed extension of a mining lease under MMDR Act, 1957 and the Government of Karnataka rejected it. The NCLT, by an order dated 11.12.2018, set aside the Government’s order and directed execution of Supplement Lease Deeds for the period up to 31.03.2020. The Government of Karnataka challenged this in a High Court writ petition, which stayed the impugned NCLT order. The core issues were: (i) whether the High Court may interfere under Article 226/227 with an NCLT order in IBC when an appeal lies to the NCLAT, and (ii) whether fraud can be inquired into by NCLT/NCLAT in CIRP. The Court reiterates that IBC is a complete, umbrella code with a three‑tier mechanism (NCLT, NCLAT, Supreme Court) and that public‑law disputes arising from MMDR Act obligations lie outside IBC. It ultimately holds that while NCLT/NCLAT may inquire into fraud, they cannot adjudicate MMDR‑related public legal disputes; and the High Court’s writ jurisdiction in public‑law contexts remains permissible. The appeals are dismissed.