DELHI ADMINISTRATION THR. SECRETARY, LAND AND BUILDING DEPARTMENT & ORS. v. PAWAN KUMAR & ORS.

Case / Petition Number:
Civil Appeal No. 3646 of 2022
Neutral Citation:[2022] 3 S.C.R. 791

Case Synopsis & Summary

This Supreme Court civil appeal concerns the lapse of land acquisition proceedings under the Land Acquisition Act, 1894 and the interpretation of Section 24(2) of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013. The respondent purchased land (7 Bigha 1 Biswa) in Sayoorpur, Mehrauli, New Delhi on 25.11.2011 after notifications under Sections 4 and 6 and after the Land Acquisition Collector’s award (14.05.1987). The original landowners challenged the acquisition, leading to a writ petition and, ultimately, a High Court decision declaring the proceedings lapsed under Section 24(2) of the 2013 Act due to non-payment of compensation. The appellant contends that the respondent was a purchaser after the publication of notice and after the award, and thus should not benefit from lapse relief; they rely on Delhi Development Authority v. Godfrey Phillips (I) Ltd. and Indore Development Authority to argue about the effect of subsequent purchases and the deposit of compensation. The High Court’s reasoning that the deposit in court could not constitute payment is challenged. The Court cites and distinguishes precedents, including the principle that merely depositing compensation is not payment unless tendered to the interested persons. The Supreme Court sets aside the High Court’s order, holding that the appellant is entitled to succeed; the writ petition is dismissed and the appeal is allowed, clarifying that (i) a subsequent purchaser after notice and award may not be entitled to lapse relief; and (ii) deposit in court must be treated as tender to landowners where appropriate. The judgment reinforces the nuanced application of Section 24(2).

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • Hemant Gupta
  • V. RAMASUBRAMANIAN
Judgment Date
2022-05-06
Court Decision / Holding
The appeal is allowed. The order passed by the High Court is not sustainable and the writ petition filed by the respondent stands dismissed. The matter is decided in favor of the appellants; the decision clarifies that where the purchaser is post-notification and post-award, lapse under Section 24(2) of the 2013 Act is not straightforward and depends on tender to landowners and the precedents discussed.
Final Disposition
Appeal allowed; writ petition dismissed

Parties to the Case

Appellants / Petitioners

  • DELHI ADMINISTRATION THR. SECRETARY, LAND AND BUILDING DEPARTMENT & ORS.

Respondents

  • Pawan Kumar
  • Ors.

Legal Representation & Advocates

Counsels for Petitioners

  • • Ms. Sujeeta Srivastava

Counsels for Respondents

  • • Rajender Pd. Saxena
  • • N. P. Sahni
  • • Vishnu B. Saharya
  • • Viresh B. Saharya
  • • Akshat Agarwal

Provisions of Law Cited

Section 4 of the Land Acquisition Act, 1894Section 6 of the Land Acquisition Act, 1894Section 24(2) of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013Section 31(1) of the Land Acquisition Act, 1894Section 31(2) of the Land Acquisition Act, 1894Section 34 of the Land Acquisition Act, 1894Proviso to Section 24(2) of the 2013 ActSections 77 and 80 of the 2013 ActConstitution of India Article 227

Legal Doctrines & Maxims

  • Deposit in court is not payment to landowners; tender is required to discharge payment obligations (as explained in Indore Development Authority v. Manoharlal & Ors. and Pune Municipal Corporation)
  • Twin conditions for lapse under Section 24(2) – non-payment and/or non-taking of possession; if one is not satisfied, lapse cannot be proclaimed
  • Subsequent purchasers after publication of notice and after award are not automatically entitled to lapse relief (as per Delhi Development Authority v. Godfrey Phillips (I) Ltd.)
  • Payment under Section 31(1) must be tendered to landowners; mere deposit in court does not count as payment
  • Tender of compensation to landowners discharges the obligation to make payment; non-acceptance by landowners does not override the discharge when appropriately tendered

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellants contend that the High Court’s order declaring lapse under Section 24(2) of the 2013 Act cannot be sustained. They submit that the respondent purchaser acquired the land after publication of the notice under Sections 4 and 6 and after the award; relying on Delhi Development Authority v. Godfrey Phillips (I) Ltd. and Indore Development Authority, the appellant contends that a subsequent purchaser is not entitled to lapse relief. They submit that compensation deposited in court was tendered for payment to the landowners, and the High Court erred in treating the deposit as non-payment; deposit did not require immediate acceptance by the landowners. They argue that the twin conditions under the 2013 Act are not triggered because mere deposit and formalities do not automatically invalidate the obligation to pay; the proceedings should not lapse and the order is unsustainable; the view is supported by prior dicta on tender versus deposit and by the authorities on lapsing in favor of a purchaser after notice and award.

Contentions of Respondents

The respondents argue that the purchaser bought after publication and after the award, and thus is not entitled to lapse relief; they rely on the High Court’s reasoning and the line of authorities that require actual payment or proper tender to the landowners under Section 24(2). They emphasize that mere deposit of compensation in court without first offering it to the landowners cannot be treated as payment; they rely on Gyanender Singh and Chatro Devi (Delhi High Court precedents) to show the deposit is not payment, and thus lapse is warranted; they caution that plaintiff’s rights would be prejudiced if lapsing is not recognized, and they invoke the constitutional provision empowering judicial review to support the High Court’s view.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (6)

Case NameCitationTreatmentExplanation
Delhi Development Authority v. Godfrey Phillips (I) Ltd.Civil Appeal No. 3073 of 2022PositiveRelied upon to hold that subsequent purchasers after publication of notice and after award are not entitled to claim lapsing under the 2013 Act.
Indore Development Authority v. Manoharlal & Ors.(2020) 8 SCC 129PositiveUsed to articulate the twin-condition doctrine for lapse under Section 24(2) and its application.
Gyanender Singh & Ors. v. Union of India & Ors.W.P.(C) No. 1393 of 2014PositiveDivision Bench noted deposit not equal to payment and as such supported the deposit principle.
Chatro Devi v. Union of India & Ors.2005 SCC Online Delhi 279Mentioned OnlyCited in background but not central to the decision.
Pune Municipal CorporationSupraPositiveCited for the dictum that payment must be tendered to landowners; influences the interpretation of payment vs. deposit.
Godfrey Phillips (I) Ltd.Civil Appeal No. 3073 of 2022PositiveSeparate judgment cited to support the limitation on relief for subsequent purchasers.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,366 words•~11 min read

In The Court Record

DELHI ADMINISTRATION THR. SECRETARY, LAND AND BUILDING DEPARTMENT & ORS. v. PAWAN KUMAR & ORS.

791 [2022] 3 S.C.R. 791 DELHI ADMINISTRATION THR. SECRETARY, LAND AND BUILDING DEPARTMENT & ORS. A v. PAWAN KUMAR & ORS. (Civil Appeal No. 3646 of 2022) MAY 06, 2022 B ## **[HEMANT GUPTA AND V. RAMASUBRAMANIAN, JJ.]** _Land Acquisition Act, 1894 – ss. 4 and 6 – Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 – s. 24(2) – Lapse of acquisition proceedings – Claim of – Respondent purchased property after the publication of notice u/ss.4 and 6 of the 1894 Act – Appellants had deposited compensation (amount payable to original owners) by filing application in the High Court since the deposit was not accepted by the Additional District Judge, on account of the Court closed for winter vacations – The High Court passed order recording that the same shall be treated as tendered to the Court of Additional District Judge on 30.12.2013 – Respondent filed writ petition before the High Court and claimed lapse of the proceedings under 2013 Act – The High Court declared the acquisition proceedings as lapsed in view of the provisions of s. 24(2) of the 2013 Act – Held: The respondent is a purchaser after the publication of notice u/ss. 4 and 6 of the Act and in fact after the award of the Land Acquisition Collector – Therefore, for the reasons recorded in the matter of Delhi Development Authority v. Godfrey Phillips (I) Ltd., subsequent purchaser is not entitled to claim lapsing of the proceedings under the 2013 Act – Further, the finding that compensation was not offered to the land owners and therefore the deposit in the Court cannot be regarded as payment of compensation is again not tenable in view of the judgment in Indore Development Authority v. Manohar Lal & Ors. – Therefore, the order passed by the High Court is not sustainable and same is set aside – Appeal allowed._ C D E F G _Indore Development Authority v. Manoharlal & Ors_ **(2020) 8 SCC 129;** _Delhi Development Authority v._ H 791 792 SUPREME COURT REPORTS [2022] 3 S.C.R. - A _Godfrey Phillips (I) Ltd._ **(Civil Appeal No. 3073 of 2022 decided by the Supreme Court)** _**–**_ **relied on.** _Chatro Devi v. Union of India & Ors._ **2005 SCC Online Delhi 279 – referred to.** _Gyanender Singh & Ors. v. Union of India & Ors._ B **W.P.(C) No. 1393 of 2014 decided by the Delhi High Court – referred to.** CIVIL APPELLATE JURISDICTION: Civil Appeal No. 3646 of 2022. C From the Judgment and Order dated 03.02.2015 of the High Court of Delhi at New Delhi in Writ Petition (C) No. 5318 of 2014. Ms. Sujeeta Srivastava, Adv. for the Appellants. Rajender Pd. Saxena, N. P. Sahni, Vishnu B. Saharya, Viresh B. Saharya, Akshat Agarwal for M/s Saharya & Co., Advs. for the D Respondents. The Judgment of the Court was delivered by ## **HEMANT GUPTA, J.** 1. The challenge in the present appeal is to a judgment and order E dated 03.02.2015 whereby the writ petition filed by the respondents was allowed in view of the earlier judgment of the Delhi High Court in _**Gyanender Singh & Ors.**_ v. _**Union of India & Ors[1]**_ . 2. The respondent purchased the land measuring 7 Bigha 1 Biswa situated in village Sayoorpur, Tehsil- Mehrauli, New Delhi on 25.11.2011. F The original land owner had filed a Writ Petition No. 2276 of 1985 challenging the notifications under Sections 4 and 6 of the Land Acquisition Act,1894[2] dated 25.11.1980 and 20.05.1985 respectively. The Land Acquisition Collector had announced the award on 14.05.1987. The said writ petition filed by the original land owner was dismissed on 03.03.2005 in view of the order passed on the same date in _**Chatro Devi**_ G v. _**Union of India & Ors.[3]**_ . Subsequently, a review application was filed by the original land owner _inter alia_ on the ground that the objections filed under Section 5A were not considered. It was found by the High 1 W.P.(C) No. 1393 of 2014 - 2 For short the Act H - 3 2005 SCC Online Delhi 279 > DELHI ADMINISTRATION THR. SECRETARY, LAND AND BUILDING 793 DEPARTMENT v. PAWAN KUMAR [HEMANT GUPTA, J.] Court that the original land owner has not given any date of filing of the objection, nor the details as to when and before whom the objections were filed. The objections were not attached with the writ petition either. Consequently, the review application was dismissed on 27.04.2006. It was thereafter, the purchaser has purchased the property on 25.11.2011. 3. The Division Bench in _**Gyanender Singh**_ noticed the payment deposited by the appellant and held as under: “It is absolutely clear from the above extracts that unless and until the compensation is tendered to the persons interested, mere depositing of the compensation in the court would not be sufficient. To be clear, compensation cannot be regarded as having been paid merely on the deposit of the same in court unless and until it has first been offered to the person interested and he has refused to accept the same. In the present case, it is an admitted position that the compensation amount was tendered in this Court without first being offered to the persons interested (petitioners). Therefore, in view of the clear dictum of the Supreme Court in _Pune Municipal Corporation_ (supra), such deposit of compensation in court cannot be regarded as a payment of compensation as contemplated under the provisions of Section 24(2) of the 2013 Act.” 4. The High Court declared the acquisition proceedings as lapsed in view of the provisions of Section 24(2) of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013[4] . 5. Such provision has been interpreted in _**Indore Development Authority**_ v. _**Manoharlal & Ors.[5]**_ wherein it has been held that twin conditions of non-payment of compensation and/or not taking possession would lead to the deemed lapse of proceedings. Therefore, if any of the twin conditions is not satisfied, the proceedings cannot be declared to be lapsed. 6. The stand of the appellant was that even after the dismissal of the writ petition filed by the original land owner, interim orders in respect of the same acquisition in other writ petitions were in operation, therefore, the appellant could not have taken possession of the land. 4 For short, the ‘2013 Act’ 5 (2020) 8 SCC 129 A B C D E F G H 794 SUPREME COURT REPORTS [2022] 3 S.C.R. A 7. It was also pointed out that the compensation was deposited by filing an application before the High Court on 30.12.2013 since the deposit had not been accepted by the Additional District Judge, South on account of the Court being closed for winter vacations. Thus, an application under Article 227 of the Constitution- CM(M) No. 1407 of 2013 was filed before the High Court. The appellant had thus deposited cheques before B the High Court for the amounts payable to original land owner namely Balkishan S/o Ram Ratan Kapayi such as a sum of Rs.14,61,188.25 in respect of land measuring 53 Bigha and 9 Biswa, Rs. 4,21,878.93 for land measuring 13 Bigha and 6 Biswa and Rs.47,798.97 for land measuring 1 Bigha and 12 Biswa. The High Court had passed an order C that the same shall be treated as tendered to the Court of Additional District Judge on 30.12.2013. The High Court passed the following order on 30.12.2013:- “2. As vaguely pleaded in para 10 and as orally explained, the urgency to file these petitions is that if compensation assessed is D not paid or deposited the proceedings under the Land Acquisition Act, 1894 lapse. 3. It is pleaded in paragraph 4 that the concerned Court is presently closed during winter vacations and shall reopen on January 02, 2014. E 4. Enclosed with the petitions as Annexure-2 are cheques drawn in the name of ‘ADJ, Delhi’. 5. A meaningful reading of the petition would reveal that the intentment is to tender the amounts on or before December 31, 2013. - F 6. The petitions stand disposed of recording that without prejudice to the rights and contentions of the land holders the cheques tendered in each petition (being Annexure P-2) would be treated as a tender to the Court of the learned Additional District Judge Delhi as of today i.e. December 30, 2013. G H 7. The Registry is directed to remove the cheques annexed as Annexure 2 and keep them in safe custody till reopening of the Court. On the reopening the cheques shall be sent to the Court of the concerned Additional District Judge Delhi...................” 8. We have heard learned counsel for the parties and find that the 795 ## DELHI ADMINISTRATION THR. SECRETARY, LAND AND BUILDING DEPARTMENT v. PAWAN KUMAR [HEMANT GUPTA, J.] order of the High Court cannot be sustained in law for two reasons. Firstly, the respondent is a purchaser after the publication of notice under Sections 4 and 6 of the Act and in fact after the award of the Land Acquisition Collector. Therefore, for the reasons recorded in a separate judgment delivered today in the matter of _**Delhi Development Authority**_ v. _**Godfrey Phillips (I) Ltd.[6]**_ , subsequent purchaser is not entitled to claim lapsing of the proceedings under the 2013 Act. A B 9. Secondly, the finding that compensation was not offered to the land owners and therefore the deposit in the Court cannot be regarded as payment of compensation is again not tenable in view of the judgment in _**Manohar Lal**_ wherein this Court held as under: C “202. Section 24(2) deals with the expression where compensation has not been paid. It would mean that it has not been tendered for payment under Section 31(1). xxx xxx xxx 205. The word “paid” in Section 31(1) to the landowner cannot include in its ambit the expression “deposited” in court. Deposit cannot be said to be payment made to landowners. Deposit is on being prevented from payment. However, in case there is a tender of the amount that is to mean amount is made available to the landowner that would be a discharge of the obligation to make the payment and in that event such a person cannot be penalised for the default in making the payment. In default to deposit in court, the liability is to make the payment of interest under Section 34 of the 1894 Act. **==> picture [160 x 6] intentionally omitted <==** 207. In our considered opinion, there is a breach of obligation to deposit even if it is taken that amount to be deposited in the Reference Court in exigencies being prevented from payment as provided in Section 31(2). The default will not have the effect of reopening the concluded proceedings. The legal position and consequence which prevailed from 1893 till 2013 on failure to deposit was only the liability for interest and all those transactions were never sought to be invalidated by the provisions contained in Section 24. It is only in the case where in a pending proceeding D E F G > 6 Civil Appeal No. 3073 of 2022 H 796 SUPREME COURT REPORTS [2022] 3 S.C.R. A B C D for a period of five years or more, the steps have not been taken for taking possession and for payment of compensation, then there is a lapse under Section 24(2). In case amount has not been deposited with respect to majority of landholdings, higher compensation has to follow. Both lapse and higher compensation are qualified with the condition of period of 5 years or more. 208. It was submitted that mere tender of amount is not payment. The amount has to be actually paid. In our opinion, when amount has been tendered, the obligation has been fulfilled by the Collector. Landowners cannot be forced to receive it. In case a person has not accepted the amount wants to take the advantage of nonpayment, though the amount has remained (sic unpaid) due to his own act. It is not open to him to contend that the amount has not been paid to him, as such, there should be lapse of the proceedings. Even in a case when offer for payment has been made but not deposited, liability to pay amount along with interest subsist and if not deposited for majority of holding, for that adequate provisions have been given in the proviso also to Section 24(2). The scheme of the 2013 Act in Sections 77 and 80 is also the same as that provided in Sections 31 and 34 of the 1894 Act. ## xxx xxx xxx E F G 366.4. The expression “paid” in the main part of Section 24(2) of the 2013 Act does not include a deposit of compensation in court. The consequence of non-deposit is provided in the proviso to Section 24(2) in case it has not been deposited with respect to majority of landholdings then all beneficiaries (landowners) as on the date of notification for land acquisition under Section 4 of the 1894 Act shall be entitled to compensation in accordance with the provisions of the 2013 Act. In case the obligation under Section 31 of the Land Acquisition Act, 1894 has not been fulfilled, interest under Section 34 of the said Act can be granted. Non-deposit of compensation (in court) does not result in the lapse of land acquisition proceedings. In case of non-deposit with respect to the majority of holdings for five years or more, compensation under the 2013 Act has to be paid to the “landowners” as on the date of notification for land acquisition under Section 4 of the 1894 Act.” H > DELHI ADMINISTRATION THR. SECRETARY, LAND AND BUILDING 797 DEPARTMENT v. PAWAN KUMAR [HEMANT GUPTA, J.] 10. In view of above, and for the reasons recorded in a separate A judgment delivered today in _**Godfrey Phillips (I) Ltd.**_ , the order passed by the High Court is not sustainable and therefore, the same is set aside. The writ petition filed by the respondent stands dismissed. 11. The appeal is allowed. B Ankit Gyan (Assisted by : Rahul Rathi, LCRA) Appeal allowed. C D E F G H
End of Judgment Record
Browse All Supreme Court of India (2022) Decisions
2022-12-09

MOHD. SABEER @ SHABIR HUSSAIN v. RM, U. P. STATE ROAD TRANSPORT CORP.

The appellant, Mohd. Sabeer (also known as Shabir Hussain), a scrap dealer, was a passenger in a UP State Road Transport Corporation bus when the driver rashly and negligently drove the vehicle, causing a collision near Ghaziabad in 2009. He sustained grave injuries including an amputation of the right lower limb and other bodily injuries. The Motor Accident Claims Tribunal (MACT) awarded Rs. 15,76,465 with interest; the High Court of Delhi enhanced the amount to Rs. 16,70,932. The Disability Certificate recorded 70% permanent disability. The High Court had treated the claimant’s functional disability as 35%, relying on post‑accident income reflected in IT returns, and erred in not adequately recognizing the impact on earning capacity of a self‑employed person who cannot drive. The Supreme Court held that the appellant’s functional disability should be treated as 60% for loss of future earning capacity and that permanent disablement warrants consideration of future prospects in addition to future income. It invoked National Insurance Co. v. Pranay Sethi to apply a 40% addition for future prospects, and directed compensation for prosthetic limb purchase and maintenance, as well as enhanced non‑pecuniary damages. The final award was increased to Rs. 38,70,120 with 9% interest from the date of application, and the appeals were allowed, emphasizing liberal, holistic justice to restore the claimant to his pre‑accident position in light of socio‑economic factors.

2022-01-25

Intercontinental Hotels Group (India) Pvt. Ltd. & ANR. v. Waterline Hotels Pvt. Ltd.

Intercontinental Hotels Group (India) Pvt. Ltd. & Anr. v Waterline Hotels Pvt. Ltd. is a Supreme Court decision addressing appointment of a sole arbitrator under Section 11(6) read with Section 11(12)(a) of the Arbitration and Conciliation Act, 1996, in a dispute arising from a Hotel Management Agreement (HMA) for renovating the Holiday Inn & Suites Bengaluru, Whitefield. The petitioners allege breach by Waterline Hotels, including non-payment of incentive management fee and related charges, culminating in Waterline’s email termination of the HMA on 12 October 2018 after rebranding the hotel as Miraya. The petitioners invoked arbitration; Waterline challenged the enforceability of the arbitration clause on the ground that the HMA is an unstamped instrument under the Karnataka Stamp Act. A Karnataka High Court ad‑interim relief was granted in 2018, but the Supreme Court’s judgment focuses on the scope of judicial interference at the pre‑appointment stage. The Court reiterates a pro‑arbitration stance, noting that arbitrability/validity are generally matters for the arbitrators, with a narrow exception to cut deadwood or to refer for authoritative settlement where necessary, invoking Vidya Drolia. It also analyzes stamp duty, observing that stamp duty has been paid (albeit disputed) and that the question of the correct stamp duty may be resolved later, not as a precondition to appointing an arbitrator. Consequently, the Court appoints Justice A. V. Chandrashekara as a sole arbitrator, directs SIAC to proceed under its rules, and allows the petition in terms stated, while leaving stamp duty issues for arbitration to determine later.

2022-02-01

The State of Sikkim v. Jasbir Singh & ANR

This appeal by the State of Sikkim challenges a High Court judgment upholding a Sessions Judge’s order directing a written notice to the Army’s commanding officer to transfer the case to a court-martial. The case concerns concurrent jurisdiction between a court-martial and an ordinary criminal court under the Army Act for an offence allegedly committed by Lance Naik Jasbir Singh during active service in Sikkim, with the FIR under IPC 302 and related charges. The High Court held that the procedure under Sections 125/126 Army Act, the 1978 Rules (Rules 3-5) and CrPC Rule 475 had not been observed and that the Army authorities had exercised their discretion to prefer a court-martial; thus, the court-martial alone would have jurisdiction. The Supreme Court, however, held that the offence falls into a category with concurrent jurisdiction under Sections 69 and 70 of the Army Act, and that where there is concurrent jurisdiction, the first instance discretion to choose the forum lies with the designated officer under Section 125. In the present case there was no decision by the designated officer to institute proceedings before a court-martial, and the sequence of events showed significant cooperation with the CrPC process. Consequently, the Sessions Judge’s competence to proceed in the criminal court was not in error, the High Court’s order is set aside, and the respondent-accused is to be transferred to civil custody to face trial in the criminal court. The appeal is allowed.

2022-07-22

Hemant Kumar Verma & Ors. v. Employees State Insurance Corporation & Ors.

This writ petition concerns whether junior resident doctors in ESIC-run medical colleges should be eligible for the 50% in-service reservation for postgraduate medical courses, a benefit presently available to Insurance Medical Officers Grade-II (IMO-II) recruited through competitive selection. ESIC recruits IMO-II and provides a 50% in-service quota for PG seats; however junior residents, who complete MBBS under bond and serve as part of ESIC's residency scheme, are not deemed in-service doctors. The petitioners argued parity with IMO-II because their qualifications, duties, and work environment are similar, and urged the Court to treat them as in-service to extend the 50% reservation to their batch. ESIC contends that junior residents are contractual, bond-based appointees governed by the ESIC Residency Scheme; IMO-II is a permanent post governed by the ESIC Staff and Condition of Service Regulations 1959; the bond reduction in 2020 and the 2018/2020 memoranda cannot convert junior residents into in-service doctors. The Court relies on precedents establishing institutional preference in PG admissions—Saurabh Chaudri v. Union of India, Yatin Kuma Jasubahi v. State of Gujarat, and Pradeep Jain v. Union of India — to acknowledge the legitimacy of institutional preference, but ultimately holds that junior residents and regular ESIC doctors are distinct categories and the in-service quota cannot be equitably extended to junior residents. The petition is dismissed.