D. Swamy v. Karnataka State Pollution Control Board and Ors.

Case / Petition Number:
Civil Appeal No. 3132 of 2018
Neutral Citation:[2022] 15 S.C.R. 547

Case Synopsis & Summary

This is a Civil Appeal under Section 22 of the National Green Tribunal Act, 2010, challenging the National Green Tribunal's dismissal of a petition by D. Swamy seeking closure of a Common Bio-Medical Waste Treatment Facility (CBMWTF) operated by Respondent No.3 in Mysore, Karnataka, for alleged non-compliance with the Environmental Impact Assessment Notification, 2006 (as amended in 2015). Respondent No.1, Karnataka State Pollution Control Board (KSPCB), had granted consent to establish and later to operate the CBMWTF under the Water (Prevention and Control of Pollution) Act, 1974 and the Air (Prevention and Control of Pollution) Act, 1981. Villagers filed representations seeking closure and alleged non-compliance, and the NGT initially dismissed the application. Subsequently, the Central Government issued a notification (S.O. 804(E) of 2017) enabling ex post facto Environmental Clearance (EC) for cases of violation, and the MoEFCC issued a Standard Operating Procedure (SoP) on 7 July 2021, providing a framework to deal with violations, applying proportionality and polluter pays principles. The Supreme Court held that while compliance with EC is non-negotiable and ex post facto clearance should be rare, such clearances can be considered in exceptional circumstances when environmental norms are otherwise met and public interest is served. However, it found no substantial questions of law and dismissed the appeal, upholding the NGT’s decision and the delay bar, thereby preserving the status quo.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • Indira Banerjee
  • J. K. Maheshwari
Judgment Date
2022-09-22
Court Decision / Holding
Appeal dismissed. The Court held that the NGT’s decision stands; the appeal is barred by delay and does not raise substantial questions of law, thus upholding the judgment and maintaining the current status without ordering closure.
Final Disposition
Appeal dismissed

Parties to the Case

Appellants / Petitioners

  • D. Swamy

Respondents

  • Karnataka State Pollution Control Board
  • Respondent No.3 (Common Bio-Medical Waste Treatment Facility operator)

Legal Representation & Advocates

Counsels for Petitioners

  • • Anand Sanjay M. Nuli
  • • Suraj Kaushik
  • • Agam Sharma
  • • Dharm Singh

Counsels for Respondents

  • • S. J. Amith
  • • Purushottam Sharma Tripathi
  • • Mukesh Kumar Singh
  • • Ms. Mani Vyas

Provisions of Law Cited

National Green Tribunal Act, 2010: Section 22Environment (Protection) Act, 1986Water (Prevention and Control of Pollution) Act, 1974Air (Prevention and Control of Pollution) Act, 1981Environment Impact Assessment Notification, 2006 (as amended 17 April 2015)S.O. 804(E) dated 14 March 2017Environment (Protection) RulesSection 3(1) and Section 3(2)(v) of the EP Act and Rule 5(3)(d) of the EP RulesGeneral Clauses Act, 1897, Section 21SoP dated 7 July 2021 (MoEFCC)Delegation: S.O. 327 (E) dated 10 April 2001

Legal Doctrines & Maxims

  • Doctrine of proportionality
  • Polluter pays principle
  • Sustainable development
  • Intergenerational equity
  • Ex post facto environmental clearance doctrine

Submissions & Arguments

Contentions of Appellants / Petitioners

Appellants contended that the CBMWTF operated by Respondent No.3 without prior Environmental Clearance violates the Environmental Impact Assessment Notification, 2006 as amended. They argued EC is mandatory for such facilities and ex post facto clearance should not be routinely granted; denial of EC serves environmental safeguards and public health. They challenged the SoP (7 July 2021) as an extra-statutory relaxation and pressed for closure of the facility unless compliance with norms is demonstrably ensured. They relied on precedents emphasizing strict adherence to EIA requirements and highlighted that ex post facto measures must be exceptional and circumscribed by legal processes.

Contentions of Respondents

Respondents argued that the CBMWTF had valid consent to operate under the Water and Air Acts and that closure solely for lack of EC is unwarranted where the unit complies with pollution norms. They maintained that ex post facto EC can be considered in exceptional circumstances under the 2017 notification, with the SoP guiding action against violations, consistent with the polluter pays principle and proportionality. They urged upholding the NGT order and noted potential public interest and livelihood implications if operations are abruptly halted.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (7)

Case NameCitationTreatmentExplanation
Electrosteel Steels Limited v. Union of India2021 SCC OnLine SC 1247PositiveCited to justify that ex post facto EC may be granted in exceptional circumstances when projects conform to environmental norms, aligning with pollution-control objectives and public interest.
Alembic Pharmaceuticals Ltd. v. Rohit Prajapati & Others2020 SCC OnLine SC 347DistinguishedDistinguished on the ground that Alembic dealt with a circular contrary to the statutory EIA Notification, whereas the present matter concerns ex post facto clearance under later statutory amendments.
Shree Sidhbali Steels Ltd. & Others v. State of Uttar Pradesh & Others(2011) 3 SCC 193; [2011] 3 SCR 134Mentioned OnlyCited for general principle on amendment/rescission of notifications via General Clauses Act, not directly controlling the present dispute.
Narmada Bachao Andolan v. Union of India(2000) 10 SCC 664; [2000] 4 Suppl. SCR 94Mentioned OnlyCited to discuss prospective nature of EIA Notification amendments; used as a reference rather than a direct ruling in the instant decision.
Lafarge Umiam Mining Private Limited v. Union of India(2011) 7 SCC 338PositiveCited to illustrate the doctrine of proportionality and its application in environmental judicial review.
Pahwa Plastics Pvt. Ltd. and Anr. v. Dastak NGO and Ors.2022 SCC Online SC 362PositiveReiterates that ex post facto clearance should not be granted routinely, but may be allowed under strict compliance with EP Act and related norms.
Puducherry Environment Protection Association v. Union of India(2017) SCC OnLine Mad 7056Mentioned OnlyCited for discussion of one-time relaxation; later distinguished in light of statutory frameworks enacted thereafter.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•7,860 words•~36 min read

In The Court Record

D. Swamy v. Karnataka State Pollution Control Board and Ors.

547 [2022] 15 S.C.R. 547 **==> picture [56 x 8] intentionally omitted <==** A **==> picture [8 x 6] intentionally omitted <==** KARNATAKA STATE POLLUTION CONTROL BOARD AND ORS. (Civil Appeal No. 3132 of 2018) B ## SEPTEMBER 22, 2022 ## **[INDIRA BANERJEE AND J. K. MAHESHWARI, JJ.]** _National Green Tribunal Act, 2010: s. 22 – Environmental Impact Assessment Notification 2006 –_ Ex Post facto _Environmental clearance (EC) – Respondent No.3 applied to the respondent no.1State Pollution Control Board for consent to establish a Common Bio-Medical Waste Treatment Facility – Respondent no.1 accorded consent – Thereafter, in terms of amended Entry 7(da) of the Notification of 2006, the Bio-Medical Waste Treatment Facilities were required to obtain EC from the Ministry of Environment and Forests-MOEF – Representation by villagers seeking order banning establishment of Common Bio-Medical Waste Treatment Facility by respondent No. 3 – Respondent No.1 then issued notices to the respondent No.3, calling upon it to submit a report of compliance of pollution norms – Pursuant thereto, instructions by the respondent no. 1 that the application for consent to be accompanied with EC – Respondent no 3 re-submitted its application for consent which had earlier been rturned – Respondent No.1 granted the respondent No.3 consent to operate its Common Bio-Medical Waste Treatment Facility – Appellant challenged the consent granted to the respondent no.3 and sought direction for closure of the Common Bio-Medical Waste Treatment Facility run by the respondent No.3, on the ground of alleged non-compliance of the provisions of the notification of 2006, as amended – Dismissal of the application by NGT – Meanwhile, the Central Government issued a Notification which provided for grant of_ ex post facto _EC for project proponents who had commenced, continued or completed a project without obtaining EC under the EP Act/EP Rules or the Notification – On appeal, held: Need to comply with the requirement to obtain EC is nonnegotiable – However, the EP Act does not prohibit ex post facto EC –_ Ex post facto _environmental clearance should ordinarily not be granted routinely, but in exceptional circumstances taking into_ C D E F G H 547 548 SUPREME COURT REPORTS [2022] 15 S.C.R. - A _account all relevant environmental factors – Where the adverse consequences of denial of_ ex post facto _approval outweigh the consequences of regularization of operations by grant of_ ex post facto _approval, and the establishment concerned otherwise conforms to the requisite pollution norms,_ ex post facto _approval should be given – Operation of a Bio-Medical Waste Treatment Facility is in_ - B _the interest of prevention of environmental pollution – Closure of the facility only on the ground of want of prior Environmental Clearance would be against public interest – Thus, no grounds to interfere with the judgment and order of the NGT – Water (Prevention and Control of Pollution) Act, 1974 – Air (Prevention and Control_ - C _of Pollution) Act, 1981._ ## **Dismissing the appeal, the Court** **HELD: 1.1 The SoP was formulated by the said Office Memorandum dated 7th July 2021. In terms of the SoP, the proposal for grant of EC in cases of violation are to be considered** D **on merits, with prospective effect, applying principles of proportionality and the principle that the polluter pays and is liable for costs of remedial measures. [Para 31 and 32][559-C-D]** **1.2 Words and phrases and/or sentences in a judgment cannot be read in the manner of a statute, and that too out of** E **context. The observation of the Division Bench that a one time relaxation was permissible, is not to be construed as a finding that relaxation cannot be made more than once. If power to amend or modify or relax a notification and/or order exists, the notification and/or order may be amended and/or modified as many times, as** F **may be necessary. [Para 36][562-D-E]** **1.3 The Division Bench of Madras High Court fell in error in staying the said office memorandum, by relying on observations made by this Court in** _**Alembic Pharmaceuticals Ltd.’s**_ **case, in the context of a circular which was contrary to the statutory** G **Environment Impact Notification of 1994. The attention of the High Court was perhaps not drawn to the fact that the notification of 7th July 2021 was in pursuance of the statutory notification of 2017 which was valid. [Para 37][562-F-H]** H D. SWAMY V. KARNATAKA STATE POLLUTION CONTROL 549 BOARD AND ORS. **1.4 Ex post facto EC should not ordinarily be granted, and certainly not for the asking. At the same time ex post facto clearances and/or approvals and/or removal of technical irregularities in terms of a Notification under the EP Act cannot be declined with pedantic rigidity, oblivious of the consequences of stopping the operation of mines, running factories and plants. [Para 40][564-G-H]** **1.5 The EP Act does not prohibit ex post facto Environmental Clearance. Grant of ex post facto EC in accordance with law, in strict compliance with Rules, Regulations, Notifications and/or applicable orders, in appropriate cases, where the projects are in compliance with, or can be made to comply with environment norms, is not impermissible. The Court cannot be oblivious to the economy or the need to protect the livelihood of hundreds of employees and others employed in the project and others dependent on the project, if such projects comply with environmental norms. [Para 41][564-A-B]** **1.6 The need to comply with the requirement to obtain EC is non-negotiable. A unit can be set up or allowed to expand subject to compliance of the requisite environmental norms. EC is granted on condition of the suitability of the site to set up the unit, from the environmental angle, and also existence of necessary infrastructural facilities and equipment for compliance of environmental norms. To protect future generations and to ensure sustainable development, it is imperative that pollution laws be strictly enforced. Under no circumstances can industries, which pollute, be allowed to operate unchecked and degrade the environment. [Para 46][567-B-D]** **1.7 Ex post facto environmental clearance should ordinarily not be granted routinely, but in exceptional circumstances taking into account all relevant environmental factors. Where the adverse consequences of denial of ex post facto approval outweigh the consequences of regularization of operations by grant of ex post facto approval, and the establishment concerned otherwise conforms to the requisite pollution norms, ex post facto approval should be given in accordance with law, in strict conformity with** A B C D E F G H 550 SUPREME COURT REPORTS [2022] 15 S.C.R. - A **the applicable Rules, Regulations and/or Notifications. In a given case, the deviant industry may be penalised by an imposition of heavy penalty on the principle of ‘polluter pays’ and the cost of restoration of environment may be recovered from it. [Para 47][567-D-F]** - B **1.8 The EP Act does not prohibit ex post facto EC. Some relaxations and even grant of ex post facto EC in accordance with law, in strict compliance with Rules, Regulations, Notifications and/or applicable orders, in appropriate cases, where the projects are in compliance with environment norms, is not impermissible. This Court cannot be oblivious to the economy** - C **or the need to protect the livelihood of hundreds of employees and others employed in the units and dependent on the units for their survival. [Para 48][567-F-H]** - **1.9 Ex post facto EC should not ordinarily be granted, and** - **certainly not for the asking. At the same time ex post facto** - D **clearances and/or approvals cannot be declined with pedantic rigidity, regardless of the consequences of stopping the operations. [Para 49][568-A-B]** - **1.10 The NGT rightly found that when the Bio-Medical** - **Waste Treatment facility of the appellant was being operated with** - E **the requisite consent to operate, it could not be closed on the ground of want of prior Environmental Clearance. This Court cannot lose sight of the fact that the operation of a Bio-Medical Waste Treatment Facility is in the interest of prevention of environmental pollution. The closure of the facility only on the** - F **ground of want of prior Environmental Clearance would be against public interest. There are no grounds to interfere with the judgment and order of the NGT in appeal as rightly argued by KSPCB and the Respondent No.3. The appeal is barred by delay. In any case, the appeal does not raise any substantial question of law. [Para 50][568-B-D]** - G _Electrosteel Steels Limited v. Union of India_ **2021 SCC OnLine SC 1247 – relied on.** _Alembic Pharmaceuticals Ltd. v. Rohit Prajapati & Others_ **2020 SCC OnLine SC 347 – distinguished.** - H ## D. SWAMY V. KARNATAKA STATE POLLUTION CONTROL 551 BOARD AND ORS. _Shree Sidhbali Steels Ltd. & Others v. State of Uttar Pradesh & Others_ **(2011) 3 SCC 193 : [2011] 3 SCR 134;** _Narmada Bachao Andolan v. Union of India_ **(2000) 10 SCC 664 : [2000] 4 Suppl. SCR 94;** _Fatima v. Union of India) ; Puducherry Environment Protection Association v. Union of India_ **2017 SCC OnLine Mad 7056;** _Pahwa Plastics Pvt. Ltd. and Anr. v. Dastak NGO and Ors_ . **2022 SCC Online SC 362;** _Lafarge Umiam Mining Private Limited v. Union of India_ **(2011) 7 SCC 338 : [2011] 7 SCR 954 - referred to.** A B ## **Case Law Reference** |**[2011] 3 SCR 134**<br>**[2000] 4 Suppl. SCR**<br>**[2011] 7 SCR 954**|C<br>**referred to**<br>**Para 23**<br>**94**<br>**referred to**<br>**Para 26**<br>**referred to**<br>**Para 42**| |---|---| CIVIL APPELLATE JURISDICTION: Civil Appeal No. 3132 of 2018. D From the Judgment and Order dated 10.05.2017 of the National Green Tribunal, Southern Zone, Chennai in Application No.169/2016(SZ). Anand Sanjay M. Nuli, Suraj Kaushik, Agam Sharma, Dharm Singh for M/s Nuli & Nuli, Advs. for the Appellant. E S. J. Amith, Purushottam Sharma Tripathi, Mukesh Kumar Singh, Ms. Mani Vyas, Advs. for the Respondents. The Judgment of the Court was delivered by ## **INDIRA BANERJEE, J.** This appeal, under Section 22 of the National Green Tribunal Act 2010, is against a final order dated 10[th] May 2017 passed by the National Green Tribunal, Southern Zone, Chennai, dismissing the Application No.169 of 2016 (SZ) filed by the Appellant under Section 18(1) read with Section 14 of the National Green Tribunal Act 2010, whereby the Appellant had prayed for a direction for closure of the Common BioMedical Waste Treatment Facility run by the Respondent No.3, on the ground of alleged non-compliance of the provisions of the Environmental Impact Assessment Notification 2006, hereinafter referred to as “the 2006 EIA Notification” as amended on 17[th] April 2015. F G H 552 SUPREME COURT REPORTS [2022] 15 S.C.R. A 2. In the meanwhile, by a notification being S.O. 327 (E) dated 10[th] April 2001, published in the Gazette of India on 12[th] April 2001, the Central Government has delegated the powers vested in it under the Environment (Protection) Act, 1986 (EP Act) to the Chairpersons of the respective State Pollution Control Boards/Committees to issue directions to any industry or any local or other authority to prevent violation of the B Rules. A 3. On or about 25[th] February 2012, the Respondent No.3 applied to the Respondent No.1, Karnataka State Pollution Control Board (hereinafter referred to as “KSPCB”) for consent to establish a Common Bio-Medical Waste Treatment Facility over the land bearing Survey No. C 82 and 38/2 at Gujjegowdanapura village, Jayapura Hobli, Mysore Taluk and District. 4. By a letter dated 24[th] November 2012, the Respondent No.1 KSPCB accorded consent to the Respondent No.3 to establish the Common Bio-Medical Waste Treatment Facility under the provisions of D the Water (Prevention and Control of Pollution) Act, 1974 and the Air (Prevention and Control of Pollution) Act, 1981 for collection, reception, transportation, treatment and disposal of Bio-Medical Waste. The said consent was valid for a period of five years. 5. It appears that M/s Shree Consultant who had been operating E a Common Bio-Medical Waste Treatment Facility at Survey No.25 at Mysore and had been collecting Bio-Medical Waste from four districts could not collect Bio-Medical Waste from the district of Hassan because of the Common Bio-Medical Waste Treatment Facility established by the Respondent No.3. F 6. M/s Shree Consultant filed appeals bearing Nos.48 and 49 of 2012 before the Karnataka State Environment Appellate Authority, Bangalore challenging the consent granted to the Respondent No.3 to establish the Common Bio-Medical Waste Treatment Facility. The Karnataka State Environment Appellate Authority, Bangalore granted an interim stay of the order granting consent to the Respondent No.3 to G establish the Common Bio-Medical Waste Treatment Facility. Ultimately however, the appeal was dismissed by a common judgment and order dated 20[th] April 2013. 7. M/s Shree Consultant filed Appeal Nos. 46-47 of 2013 before the National Green Tribunal, Southern Zone, Chennai against the common H judgment and order dated 20[th] April 2013 passed by the Karnataka State D. SWAMY V. KARNATAKA STATE POLLUTION CONTROL 553 BOARD AND ORS. [INDIRA BANERJEE, J.] Environment Appellate Authority, Bangalore in Appeal Nos.48-49 of 2012. 8. By a judgment and order dated 28[th] November 2013, the Principal Bench of the National Green Tribunal at New Delhi held that Bio-Medical Waste Treatment Plants were required to obtain an Environmental Clearance (EC) from the Ministry of Environment and Forests, Government of India, hereinafter referred to as “MoEF&CC”, in terms of Entry 7(d) of the Notification dated 14[th] September 2006. The National Green Tribunal had also directed the parties who had been running Common Bio-Medical Waste Treatment Facilities to apply to the MoEF&CC for EC. A B C 9. On 26[th] February 2014, the Central Pollution Control Board issued guidelines for Common Bio-Medical Waste Treatment Facilities. On 14[th] July 2014, the National Green Tribunal, Southern Zone, Chennai passed a judgment and order dismissing Appeal Nos. 46-47 of 2013 filed by M/s Shree Consultant and held that the Respondent No.1 had rightly given consent to the Respondent No.3 for establishing its Common BioMedical Waste Treatment Facility. D 10. On 4[th] March 2015, the Respondent No.3 applied for grant of consent to operate the Common Bio-Medical Waste Facility under the provisions of the relevant Water Pollution and Air Pollution Acts. E 11. On 17[th] April 2015, MoEF&CC amended the Notification dated 14[th] September 2006, in view of the Judgment dated 28[th] November 2013 passed by the National Green Tribunal, Principal Bench, New Delhi in Appeal No. 63 of 2012. By the amendment Entry 7(da) was inserted after Entry 7(d) in the Schedule. Entry 7(da) provided that Common Bio-Medical Waste Treatment Facilities would be required to obtain EC from the Ministry of Environment and Forest. 12. It appears that on 13[th] July 2015, the villagers of the Gujjegowdanapura, Manadalli, Harohalli, Chunchunarayahundi, Kallahalli, Arinakere, Mahadevpura at Jayapura Hobli, Mysore made a representation to the Respondent No.1 seeking an order banning the establishment of Common Bio-Medical Waste Treatment Facility by the Respondent No.3. 13. Thereafter, the Respondent No.1 issued notices to the Common Bio-Medical Waste Treatment Facility of the Respondent No.3, calling upon it to submit a report of compliance of pollution norms. F G H 554 SUPREME COURT REPORTS [2022] 15 S.C.R. A B C D 14. On 1[st] December 2015, the State Level Environment Impact Assessment Authority, Karnataka (SEIAA) issued directions to the Respondent No.1 under Section 5 of the Environment (Protection) Act, 1986 to issue consent for operation of the Common Bio-Medical Waste Treatment Facility and other projects attracting the 2006 EIA Notification and the amendments thereto. 15. By its letter dated 28[th] December 2015, the Respondent No.1 instructed all the concerned officers of the KSPCB that application for consent to establish or operate projects attracting the 2006 EIA Notification and amendments thereto were to be received by the KSPCB only if EC was attached to the application. 16. On 19[th] January 2016, the Respondent No.3 resubmitted its application for consent to operate the Common Bio-Medical Waste Treatment Facility, which had earlier been returned by the Respondent No.1. On 11[th] February 2016, the Respondent No.1 granted the Respondent No.3 consent to operate its Common Bio-Medical Waste Treatment Facility at Gujjegowdanapura village, Jayapura Hobli in Mysore district. The said consent was valid for the period from 1[st] July 2015 to 30[th] June 2016. 17. The Appellant filed Appeal No.3 of 2016 before the Karnataka State Environment Appellate Authority under Section 28 of the Water E (Prevention and Control of Pollution) Act, 1974 challenging the consent to the Respondent No.3 to operate the Common Bio-Medical Waste Treatment Facility. Very soon thereafter the MoEF&CC revised the Bio-Medical Waste (Management and Handling) Rules 1998 under Section 6, 8 and 25 of the EP Act. F G H 18. The Appeal No.3 of 2016 filed by the Appellant before the Karnataka State Environment Appellate Authority, against the consent order dated 11[th] February 2016 passed by the Respondent No.1 came to be withdrawn by the Appellant because the said appeal had become infructuous in view of the expiration of the period of consent to operate granted to the Respondent No.3 on 30[th] June 2016. 19. By an order dated 17[th] August 2016, the National Green Tribunal, Southern Zone, Chennai directed that the application for renewal of consent to operate, pending before the Respondent No.1 might be processed in accordance with law subject to the final order passed by the Tribunal. ## D. SWAMY V. KARNATAKA STATE POLLUTION CONTROL 555 BOARD AND ORS. [INDIRA BANERJEE, J.] 20. Pursuant to the aforesaid order dated 17[th] August 2016, the Respondent No.1 renewed the consent order to operate the Common Bio-Medical Waste Treatment Facility in favour of the Respondent No.3 which was valid for the period from 17[th] August 2016 to 30[th] June 2021. 21. In exercise of power under Section 3(1) and Section 3(2)(v) of the EP Act read with Rule 5(3)(d) of the EP Rules, the Central Government issued a Notification being S.O. 804(E) dated 14[th] March 2017 which provides for grant of _ex post facto_ EC for project proponents who had commenced, continued or completed a project without obtaining EC under the EP Act/EP Rules or the Environmental Impact Notification issued thereunder. Paragraphs 3, 4 and 5 of the said notification, read as hereunder: _“(3) In cases of violation, action will be taken against the project proponent by the respective State or State Pollution Control Board under the provisions of section 19 of the Environment (Protection) Act, 1986 and further, no consent to operate or occupancy certificate will be issued till the project is granted the environmental clearance._ _(4) The cases of violation will be appraised by respective sector Expert Appraisal Committees constituted under sub-section (3) of Section 3 of the Environment (Protection) Act, 1986 with a view to assess that the project has been constructed at a site which under prevailing laws is permissible and expansion has been done which can be run sustainably under compliance of environmental norms with adequate environmental safeguards; and in case, where the finding of the Expert Appraisal Committee is negative, closure of the project will be recommended along with other actions under the law._ _(5) In case, where the findings of the Expert Appraisal Committee on point at sub-para(4) above are affirmative, the projects under this category will be prescribed the appropriate Terms of Reference for undertaking Environment Impact Assessment and preparation of Environment Management Plan. Further, the Expert Appraisal Committee will prescribe a specific Terms of Reference for the project on assessment of ecological damage, remediation plan and natural and_ A B C D E F G H 556 SUPREME COURT REPORTS [2022] 15 S.C.R. _community resource augmentation plan and it shall be prepared as an independent chapter in the environment impact assessment report by the accredited consultants. The collection and analysis of data for assessment of ecological damage, preparation of remediation plan and natural and community resource augmentation plan shall be done by an environmental laboratory duly notified under Environment (Protection) Act, 1986, or a environmental laboratory accredited by National Accreditation Board for Testing and Calibration Laboratories, or a laboratory of a Council of Scientific and Industrial Research institution working in the field of environment.”_ A B C 22. The Notification of 2017 is a valid statutory notification issued by the Central Government in exercise of power under Sections 3(1) and 3(2)(v) of the EP Act read with Rule 5(3)(d) of the EP Rules in the same manner as the EIA Notification dated 27th January 1994 and the Notification dated 14th September 2006. D 23. Section 21 of the General Clauses Act, 1897 provides that where any Central Act or Regulations confer a power to issue notifications, orders, rules or bye-laws, that power includes the power, exercisable in the like manner, and subject to like sanction and conditions, if any, to add to, amend, vary or rescind any notification, order, rule or E bye-law so issued. The authority, which had the power to issue Notifications dated 27[th] January 1994 and 14[th] September 2006 undoubtedly had, and still has the power to rescind or modify or amend those notifications in like manner. As held by this Court in _**Shree Sidhbali Steels Ltd. & Others v. State of Uttar Pradesh & Others[1]**_ , power under Section 21 of the General Clauses Act to amend, vary or rescind F notifications, orders, rules or bye-laws can be exercised from time to time having regard to the exigency. 24. Puducherry Environment Protection Association filed a Writ Petition being W.P. No.11189 of 2017 in the High Court of Madras assailing the said notification dated 14[th] March 2017. By a judgment G and order dated 13[th] October 2017, a Division Bench of the High Court refused to interfere with the said notification, holding that the impugned notification did not compromise with the need to preserve environmental purity. - H 1 (2011) 3 SCC 193 ## D. SWAMY V. KARNATAKA STATE POLLUTION CONTROL 557 BOARD AND ORS. [INDIRA BANERJEE, J.] 25. The MoEF&CC issued a draft Notification dated 23[rd] March 2020 which was duly published in the Gazette of India Extraordinary Part II. The Notification was proposed to be issued in exercise of powers conferred by subsection (1) and clause (v) of sub-section (2) of Section 3 of the EP Act for dealing with cases of violation of the notification with regard to EC. It was proposed that cases of violation would be appraised by the Appraisal Committee with a view to assess whether the project had been constructed or operated at a site which was permissible under prevailing laws and could be run sustainably on compliance of environmental norms with adequate environmental safeguards. Closure was to be recommended if the findings of the Appraisal Committee were in the negative. If the Appraisal Committee found that such unit had been running sustainably upon compliance of environmental norms with adequate environment safeguards, the unit would be prescribed appropriate Terms of Reference (TOR) after which the procedure for grant of EC would follow. 26. The appeal has been opposed by the KSPCB. On behalf of the KSPCB, it is submitted that the appeal is liable to be dismissed on the ground of delay of 62 days in filing the appeal. Reasons for the delay, it is submitted, does not make out sufficient cause for the inordinate delay. It is next contented that there is no substantial question of law of general importance involved in this appeal. The appeal is liable to be dismissed on that ground. It is also contended that the appeal suffers from suppression of facts. On behalf of KSPCB, it is contended that the 2015 amendment dated 17[th] April 2015 to the EIA Notification is prospective in the light of the law laid down in _**Narmada Bachao Andolan v. Union of India[2] .**_ The Respondent No.3 had applied to the KSPCB for consent to operate before the EIA Notification dated 17[th] April 2015, for no prior ECl was required for projects which came to existence after 14[th] September 2006 but before 17[th] April 2015. 27. On 21[st] December 2016, the Central Pollution Control Board, MoEF&CC, Government of India issued revised guidelines for Common Bio-Medical Wastes Treatment and Disposal Facility. 28. By final judgment and order dated 10[th] May 2017, which is impugned in this appeal, the National Green Tribunal has dismissed the appeal filed by the Appellant, with the observation that the Respondent No.3 could not be directed to be closed down for want of EC. A B C D E F G > 2 (2000) 10 SCC 664 H 558 SUPREME COURT REPORTS [2022] 15 S.C.R. A 29. By an Office Memorandum, being F. No. 22-21/2020-1A III, dated 7[th] July 2021, the MoEF&CC issued Standard Operating Procedure (SoP) for identification and handling of violation cases under 2006 EIA Notification. 30. The said Office Memorandum, inter alia, reads: B C _“The Ministry had issued a notification number S.O.804(E), dated the 14[th] March, 2017 detailing the process for grant of Terms of Reference and Environmental Clearance in respect of projects or activities which have started the work on site and/or expanded the production beyond the limit of Prior EC or changed the product mix without obtaining Prior EC under the EIA Notification, 2006._ _2. This Notification was applicable for six months from the date of publication i.e. 14.03.2017 to 13.09.2017 and further based on court direction from 14.03.2018 to 13.04.2018._ D E F G H _3. Hon’ble NGT in Original Application No.287 of 2020 in the matter of Dastak N.G.O. v Synochem Organics Pvt. Ltd. & Ors. and in applications pertaining to same subject matter in Original Application No. 298 of 2020 in Vineet Nagar v Central Ground Water Authority & Ors., vide order dated 03.06.2021 held that “(...) for past violations, the concerned authorities are free to take appropriate action in accordance with polluter pays principle, following due process”._ _4. Further, the Hon’ble National Green Tribunal in O.A. No. 34/2020 WZ in the matter of Tanaji B. Gambhire vs. Chief Secretary, Government of Maharashtra and Ors., vide order dated 24.05.2021 has directed that”...._ _**a proper SoP be laid down for grant of EC in such cases so as to address the gaps in binding law and practice being currently followed. The MoEF may also consider circulating such SoP to all SEIAAs in the country** ”._ _5. Therefore, in compliance to the directions of the Hon’ble NGT a Standard Operating Procedure (SoP) for dealing with violation cases is required to be drawn. The Ministry is also seized of different categories of ‘violation’ cases which have been pending for want of an approved structural/procedural framework based on ‘Polluter Pays Principle’ and ‘Principle_ ## D. SWAMY V. KARNATAKA STATE POLLUTION CONTROL 559 BOARD AND ORS. [INDIRA BANERJEE, J.] _of Proportionality’. It is undoubtedly important that action under statutory provisions is taken against the defaulters/ violators and a decision on the closure of the project or activity or otherwise is taken expeditiously._ _6. In the light of the above directions of the Hon’ble Tribunal and the issues involved, the matter has accordingly been examined in detail in the Ministry. A detailed SoP has accordingly been framed and is outlined herein. The SoP is also guided by the observations/decisions of the Hon’ble Courts wherein principles of proportionality and polluters pay have been outlined.”_ A B C 31. The SoP formulated by the said Office Memorandum dated 7[th] July 2021 refers to and gives effect to various judicial pronouncements including the judgment of this Court in _**Alembic Pharmaceuticals Ltd. v. Rohit Prajapati & Others[3]** ._ 32. In terms of the SoP, the proposal for grant of EC in cases of violation are to be considered on merits, with prospective effect, applying principles of proportionality and the principle that the polluter pays and is liable for costs of remedial measures. 33. A Public Interest Litigation being W.P. (MD) No. 11757 of 2021 ( _**Fatima v. Union of India**_ ) was filed before the Madurai Bench of the Madras High Court challenging the said Memorandum dated 7[th] July 2021. By an interim order dated 15[th] July 2021 a Division Bench of the Madras High Court admitted the Writ Petition and stayed the said memorandum. 34. The Madurai Bench of the Madras High Court observed and held:- D E F _“This writ petition has been filed as a public interest litigation challenging the validity of the office memorandum dated 07.07.2021, issued by the respondent._ _2. We have heard Mr. A. Yogeshwaran, learned counsel appearing for the writ petitioner and Mr.L.Victoria Gowri, learned Assistant Solicitor General of India, accepts notice for the respondent._ G > 3 2020 SCC OnLine SC 347 H 560 SUPREME COURT REPORTS [2022] 15 S.C.R. A B C D E F _3. The impugned office memorandum is challenged as being wholly without jurisdiction, contrary to the Environment Impact Assessment Notification, 2006, ultra vires the powers of the respondent under the Environment (Protection) Act, 1986 and violative of the various principles enunciated by the Hon’ble Supreme Court, while interpreting Article 21 and Article 48-A of the Constitution of India._ _4. Further, it is submitted that the impugned notification is in gross violation of the undertaking given before the Hon’ble Full Bench of this Court in W.P.No.11189 of 2017, wherein, the Court took note of the submissions made on behalf of the Government of India, that the notification impugned therein is only a one-time measure. Further, it is submitted that the respondent failed to see that concept of ex-post facto approval is alien to environment jurisprudence and it is anathema to the Environment Impact Assessment Notification, 2006._ _5. Further, it is submitted that the impugned notification is in gross violation of the judgment of the Hon’ble Supreme Court in the case of Alembic Pharmaceuticals Ltd. v Rohit Prajapati, 2020 SCC Online SC 347 and the orders passed by the National Green Tribunal, Principal Bench, New Delhi, in the case of S.P.Muthuraman v Union of India & Another, 2015 SCC Online NGT 169._ _6. Identical grounds were considered by us in a challenge to an office memorandum dated 19.02.2021, which provided a procedure for granting post facto clearance under Coastal Regulation Zone (CRZ) Notification 2011, on the ground that despite no such provisions in the notification and being contrary to the earlier judgments and undertaking. The said writ petition in W.P(MD).No.8866 of 2021 was admitted and by order dated 30.04.2021, the said office memorandum dated 19.02.2021 has been stayed._ G H _7. The core issue in this writ petition is whether the Government of India could have issued the office memorandum and brought about the Standard Operating Procedure for dealing with violators, who failed to comply with the mandatory condition of obtaining prior environment clearance under the Environment Impact Assessment_ D. SWAMY V. KARNATAKA STATE POLLUTION CONTROL 561 BOARD AND ORS. [INDIRA BANERJEE, J.] _Notification 2006, read with the provisions of Environment_ A _(Protection) Act, 1986. This issue was considered by the Hon’ble Supreme Court in_ _**Alembic Pharmaceuticals Ltd (supra)** , and it was held that such office memorandum in the nature of circular is without jurisdiction. The operative portion of the judgment reads as follows:_ B _“...What is sought to be achieved by the administrative circular dated 14 May 2002 is contrary to the statutory notification dated 27 January 1994. The circular dated 14 May 2002 does not stipulate how the detrimental effects on the environment would be taken care of if the project proponent is granted an ex post facto EC. The EIA notification of 1994 mandates a prior environmental clearance. The circular substantially amends or alters the application of the EIA notification of 1994. The mandate of not commencing a new project or expanding or modernising an existing one unless an environmental clearance has been obtained stands diluted and is rendered ineffective by the issuance of the administrative circular dated 14 May 2002. This discussion leads us to the conclusion that the administrative circular is not a measure protected by Section 3. Hence there was no jurisdictional bar on the NGT to enquire into its legitimacy or vires. Moreover, the administrative circular is contrary to the EIA Notification 1994 which has a statutory character. The circular is unsustainable in law.”_ C D E _8. Despite the above decision, once again the Government of India, Ministry of Environment, Forest and Climate Change have chosen to adopt the route of issuing the office memorandum and virtually setting at naught the provisions of the Environment Impact Assessment Notification and the Environment (Protection) Act._ F G _9. Before the Hon’ble First Bench, a public interest litigation was filed by the Puducherry Environment Protection Association, challenging the notification dated 14.03.2017, on identical grounds and the Hon’ble First Bench by judgment dated 13.10.2017, recorded the submissions of the learned Assistant Solicitor General of India that the said notification_ H 562 SUPREME COURT REPORTS [2022] 15 S.C.R. - A _was a one-time measure and accordingly, disposed of the writ petition._ _10. Once again, the Ministry of Environment, Forest and Climate Change have issued the impugned office memorandum. Thus, from what we have noted above, we are_ B _of the clear view that the petitioner has made out a prima facie case for entertaining the writ petition. Accordingly, the writ petition is_ _**admitted** and there shall be an order of interim stay.”_ 35. It is true that in the case of _**Puducherry Environment**_ C _**Protection Association v. Union of India[4]**_ , the Division Bench of Madras High Court took note of and recorded the submission made on behalf of the Union of India that the relaxation was a one time relaxation. In view of such submission, this Court held that a one time relaxation was permissible. 36. It is, however, well settled that words and phrases and/or sentences in a judgment cannot be read in the manner of a statute, and D that too out of context. The observation of the Division Bench that a one time relaxation was permissible, is not to be construed as a finding that relaxation cannot be made more than once. If power to amend or modify or relax a notification and/or order exists, the notification and/or order may be amended and/or modified as many times, as may be necessary. E A statement made by counsel in Court would not prevent the authority concerned from making amendments and/or modifications provided such amendments and/or modifications were as per the procedure prescribed by law. 37. The Division Bench of Madras High Court fell in error in F staying the said office memorandum, by relying on observations made by this Court in _**Alembic Pharmaceuticals Ltd**_ . (supra), in the context of a circular which was contrary to the statutory Environment Impact Notification of 1994. The attention of the High Court was perhaps not drawn to the fact that the notification of 7[th] July 2021 was in pursuance of the statutory notification of 2017 which was valid. The judgment of G this Court in _**Alembic Pharmaceuticals Ltd.**_ (supra), was clearly distinguishable and could have no application to the office memorandum dated 7[th] July 2021 which was issued pursuant to the notification dated 14[th] March 2017. - H 4 2017 SCC OnLine Mad 7056 ## D. SWAMY V. KARNATAKA STATE POLLUTION CONTROL 563 BOARD AND ORS. [INDIRA BANERJEE, J.] 38. In _**Electrosteel Steels Limited v. Union of India[5]**_ , this Court A held:- _“_ _**82. The question is whether an establishment contributing to the economy of the country and providing livelihood to hundreds of people should be closed down for the technical irregularity of shifting its site without prior environmental clearance, without opportunity to the establishment to regularize its operation by obtaining the requisite clearances and permissions, even though the establishment may not otherwise be violating pollution laws, or the pollution, if any, can conveniently and effectively be checked. The answer has to be in the negative.**_ _83. The Central Government is well within the scope of its powers under Section 3 of the 1986 Act to issue directions to control and/or prevent pollution including directions for prior Environmental Clearance before a project is commenced. Such prior Environmental Clearance is necessarily granted upon examining the impact of the project on the environment. ExPost facto Environmental Clearance should not ordinarily be granted, and certainly not for the asking._ _**At the same time ex post facto clearances and/or approvals and/or removal of technical irregularities in terms of Notifications under the 1986 Act cannot be declined with pedantic rigidity, oblivious of the consequences of stopping the operation of a running steel plant.**_ _84._ _**The 1986 Act does not prohibit ex post facto Environmental Clearance** . Some relaxations and even grant of ex post facto EC in accordance with law, in strict compliance with Rules, Regulations Notifications and/or applicable orders, in appropriate cases, where the projects are in compliance with, or can be made to comply with environment norms, is in over view not impermissible. The Court cannot be oblivious to the economy or the need to protect the livelihood of hundreds of employees and others employed in the project and others dependent on the project, if such projects comply with environmental norms._ B C D E F G > 5 2021 SCC OnLine SC 1247 _***_ H 564 SUPREME COURT REPORTS [2022] 15 S.C.R. A _88. The Notification being SO 804(E) dated 14[th] March, 2017 was not an issue in Alembic Pharmaceuticals (supra). This Court was examining the propriety and/or legality of a 2002 circular which was inconsistent with the EIA Notification dated 27[th] January, 1994, which was statutory. Ex post facto environmental clearance should not however be granted_ B _routinely, but in exceptional circumstances taking into account all relevant environmental factors. Where the adverse consequences of ex post facto approval outweigh the consequences of regularization of operation of an industry by grant of ex post facto approval and the industry or_ C _establishment concerned otherwise conforms to the requisite pollution norms, ex post facto approval should be given in accordance with law, in strict conformity with the applicable Rules, Regulations and/or Notifications._ _**Ex post facto approval should not be withheld only as a penal measure.** The deviant industry may be penalised by an imposition of_ D _heavy penalty on the principle of ‘polluter pays’ and the cost of restoration of environment may be recovered from it._ ## _***_ _96. The appeals are allowed. The impugned order is set aside._ E _The_ _**Respondent No. 1 shall take a decision on the application of the Appellant for revised EC in accordance with law, within three months from date. Pending such decision, the operation of the steel plant shall not be interfered with on the ground of want of EC, FC, CTE or CTO.** ”_ F 39. The proposition of law enunciated/re-enunciated by this Court in _**Electrosteel Steels Limited**_ **(supra)** was reiterated in _**Pahwa Plastics Pvt. Ltd. and Anr. v. Dastak NGO and Ors.[6]**_ 40. As held by this Court in _**Electrosteel Steels Limited**_ (supra) _ex post facto_ EC should not ordinarily be granted, and certainly not for G the asking. At the same time _ex post facto_ clearances and/or approvals and/or removal of technical irregularities in terms of a Notification under the EP Act cannot be declined with pedantic rigidity, oblivious of the consequences of stopping the operation of mines, running factories and plants. - H 6 2022 SCC Online SC 362 ## D. SWAMY V. KARNATAKA STATE POLLUTION CONTROL 565 BOARD AND ORS. [INDIRA BANERJEE, J.] 41. The EP Act does not prohibit _ex post facto_ Environmental Clearance. Grant of _ex post facto_ EC in accordance with law, in strict compliance with Rules, Regulations, Notifications and/or applicable orders, in appropriate cases, where the projects are in compliance with, or can be made to comply with environment norms, is in our view not impermissible. The Court cannot be oblivious to the economy or the need to protect the livelihood of hundreds of employees and others employed in the project and others dependent on the project, if such projects comply with environmental norms. A B ## 42. In _**Lafarge Umiam Mining Private Limited v. Union of India[7]**_ , a three-Judge Bench of this Court held:- C _“119. The time has come for us to apply the constitutional “doctrine of proportionality” to the matters concerning environment as a part of the process of judicial review in contradistinction to merit review. It cannot be gainsaid that utilization of the environment and its natural resources has to be in a way that is consistent with principles of sustainable development and intergenerational equity, but balancing of these equities may entail policy choices. In the circumstances, barring exceptions, decisions relating to utilisation of natural resources have to be tested on the anvil of the well-recognized principles of judicial review. Have all the relevant factors been taken into account? Have any extraneous factors influenced the decision? Is the decision strictly in accordance with the legislative policy underlying the law (if any) that governs the field? Is the decision consistent with the principles of sustainable development in the sense that has the decisionmaker taken into account the said principle and, on the basis of relevant considerations, arrived at a balanced decision? Thus, the Court should review the decision-making process to ensure that the decision of MoEF is fair and fully informed, based on the correct principles, and free from any bias or restraint. Once this is ensured, then the doctrine of “margin of appreciation” in favour of the decision-maker would come into play.”_ D E F G > 7 (2011) 7 SCC 338 H 566 SUPREME COURT REPORTS [2022] 15 S.C.R. ## A 43. In _**Alembic Pharmaceuticals Ltd**_ .(supra), this Court observed:- B C D E F G _“27. The concept of an ex post facto EC is in derogation of the fundamental principles of environmental jurisprudence and is an anathema to the EIA notification dated 27 January 1994. It is, as the judgment in Common Cause holds, detrimental to the environment and could lead to irreparable degradation. The reason why a retrospective EC or an ex post facto clearance is alien to environmental jurisprudence is that before the issuance of an EC, the statutory notification warrants a careful application of mind, besides a study into the likely consequences of a proposed activity on the environment. An EC can be issued only after various stages of the decision making process have been completed. Requirements such as conducting a public hearing, screening, scoping and appraisal are components of the decision-making process which ensure that the likely impacts of the industrial activity or the expansion of an existing industrial activity are considered in the decision-making calculus. Allowing for an ex post facto clearance would essentially condone the operation of industrial activities without the grant of an EC. In the absence of an EC, there would be no conditions that would safeguard the environment. Moreover, if the EC was to be ultimately refused, irreparable harm would have been caused to the environment. In either view of the matter, environment law cannot countenance the notion of an ex post facto clearance. This would be contrary to both the precautionary principle as_ well as the need for sustainable development.” 44. Even though this Court deprecated _ex post facto_ clearances, in _**Alembic Pharmaceuticals Ltd**_ . (supra), this Court did not direct closure of the units concerned but explored measures to control the damage caused by the industrial units. This Court held:- _“However, since the expansion has been undertaken and the industry has been functioning, we do not deem it appropriate to order closure of the entire plant as directed by the High Court.”_ H D. SWAMY V. KARNATAKA STATE POLLUTION CONTROL 567 BOARD AND ORS. [INDIRA BANERJEE, J.] 45. The Notification being SO. 804(E) dated 14[th] March 2017 was not in issue in _**Alembic Pharmaceuticals Ltd.**_ (supra). In _**Alembic Pharmaceuticals Ltd.**_ (supra) this Court was examining the propriety and/or legality of a 2002 circular which was inconsistent with the EIA Notification dated 27[th] January 1994, which was statutory. The EIA Notification dated 27[th] January 1994 has, as stated above, been superseded by the Notification dated 14[th] September 2006. 46. There can be no doubt that the need to comply with the requirement to obtain EC is non-negotiable. A unit can be set up or allowed to expand subject to compliance of the requisite environmental norms. EC is granted on condition of the suitability of the site to set up the unit, from the environmental angle, and also existence of necessary infrastructural facilities and equipment for compliance of environmental norms. To protect future generations and to ensure sustainable development, it is imperative that pollution laws be strictly enforced. Under no circumstances can industries, which pollute, be allowed to operate unchecked and degrade the environment. 47. _Ex post facto_ environmental clearance should ordinarily not be granted routinely, but in exceptional circumstances taking into account all relevant environmental factors. Where the adverse consequences of denial of _ex post facto_ approval outweigh the consequences of regularization of operations by grant of _ex post facto_ approval, and the establishment concerned otherwise conforms to the requisite pollution norms, _ex post facto_ approval should be given in accordance with law, in strict conformity with the applicable Rules, Regulations and/or Notifications. In a given case, the deviant industry may be penalised by an imposition of heavy penalty on the principle of ‘polluter pays’ and the cost of restoration of environment may be recovered from it. 48. It is reiterated that the EP Act does not prohibit _ex post facto_ EC. Some relaxations and even grant of _ex post facto_ EC in accordance with law, in strict compliance with Rules, Regulations, Notifications and/ or applicable orders, in appropriate cases, where the projects are in compliance with environment norms, is not impermissible. As observed by this Court in _**Electrosteel Steels Limited**_ (supra), this Court cannot be oblivious to the economy or the need to protect the livelihood of hundreds of employees and others employed in the units and dependent on the units for their survival. A B C D E F G H 568 SUPREME COURT REPORTS [2022] 15 S.C.R. - A 49. _Ex post facto_ EC should not ordinarily be granted, and certainly not for the asking. At the same time _ex post facto_ clearances and/or approvals cannot be declined with pedantic rigidity, regardless of the consequences of stopping the operations. 50. In our considered view, the NGT rightly found that when the B Bio-Medical Waste Treatment facility of the Appellant was being operated with the requisite consent to operate, it could not be closed on the ground of want of prior Environmental Clearance. The issues raised/involved in this appeal are squarely covered by the judgment of this Court in _**Electrosteel Steels Limited**_ (supra)and _**Pahwa Plastics Pvt. Ltd.**_ (supra). This Court cannot lose sight of the fact that the operation of a C Bio-Medical Waste Treatment Facility is in the interest of prevention of environmental pollution. The closure of the facility only on the ground of want of prior Environmental Clearance would be against public interest. There are no grounds to interfere with the judgment and order of the NGT in appeal as rightly argued by KSPCB and the Respondent No.3. D The appeal is barred by delay. In any case, the appeal does not raise any substantial question of law. The appeal is therefore dismissed. Nidhi Jain (Assisted by : Shashwat Jain, LCRA) Appeal dismissed. E F G H
End of Judgment Record
Browse All Supreme Court of India (2022) Decisions
2022-12-09

MOHD. SABEER @ SHABIR HUSSAIN v. RM, U. P. STATE ROAD TRANSPORT CORP.

The appellant, Mohd. Sabeer (also known as Shabir Hussain), a scrap dealer, was a passenger in a UP State Road Transport Corporation bus when the driver rashly and negligently drove the vehicle, causing a collision near Ghaziabad in 2009. He sustained grave injuries including an amputation of the right lower limb and other bodily injuries. The Motor Accident Claims Tribunal (MACT) awarded Rs. 15,76,465 with interest; the High Court of Delhi enhanced the amount to Rs. 16,70,932. The Disability Certificate recorded 70% permanent disability. The High Court had treated the claimant’s functional disability as 35%, relying on post‑accident income reflected in IT returns, and erred in not adequately recognizing the impact on earning capacity of a self‑employed person who cannot drive. The Supreme Court held that the appellant’s functional disability should be treated as 60% for loss of future earning capacity and that permanent disablement warrants consideration of future prospects in addition to future income. It invoked National Insurance Co. v. Pranay Sethi to apply a 40% addition for future prospects, and directed compensation for prosthetic limb purchase and maintenance, as well as enhanced non‑pecuniary damages. The final award was increased to Rs. 38,70,120 with 9% interest from the date of application, and the appeals were allowed, emphasizing liberal, holistic justice to restore the claimant to his pre‑accident position in light of socio‑economic factors.

2022-01-25

Intercontinental Hotels Group (India) Pvt. Ltd. & ANR. v. Waterline Hotels Pvt. Ltd.

Intercontinental Hotels Group (India) Pvt. Ltd. & Anr. v Waterline Hotels Pvt. Ltd. is a Supreme Court decision addressing appointment of a sole arbitrator under Section 11(6) read with Section 11(12)(a) of the Arbitration and Conciliation Act, 1996, in a dispute arising from a Hotel Management Agreement (HMA) for renovating the Holiday Inn & Suites Bengaluru, Whitefield. The petitioners allege breach by Waterline Hotels, including non-payment of incentive management fee and related charges, culminating in Waterline’s email termination of the HMA on 12 October 2018 after rebranding the hotel as Miraya. The petitioners invoked arbitration; Waterline challenged the enforceability of the arbitration clause on the ground that the HMA is an unstamped instrument under the Karnataka Stamp Act. A Karnataka High Court ad‑interim relief was granted in 2018, but the Supreme Court’s judgment focuses on the scope of judicial interference at the pre‑appointment stage. The Court reiterates a pro‑arbitration stance, noting that arbitrability/validity are generally matters for the arbitrators, with a narrow exception to cut deadwood or to refer for authoritative settlement where necessary, invoking Vidya Drolia. It also analyzes stamp duty, observing that stamp duty has been paid (albeit disputed) and that the question of the correct stamp duty may be resolved later, not as a precondition to appointing an arbitrator. Consequently, the Court appoints Justice A. V. Chandrashekara as a sole arbitrator, directs SIAC to proceed under its rules, and allows the petition in terms stated, while leaving stamp duty issues for arbitration to determine later.

2022-02-01

The State of Sikkim v. Jasbir Singh & ANR

This appeal by the State of Sikkim challenges a High Court judgment upholding a Sessions Judge’s order directing a written notice to the Army’s commanding officer to transfer the case to a court-martial. The case concerns concurrent jurisdiction between a court-martial and an ordinary criminal court under the Army Act for an offence allegedly committed by Lance Naik Jasbir Singh during active service in Sikkim, with the FIR under IPC 302 and related charges. The High Court held that the procedure under Sections 125/126 Army Act, the 1978 Rules (Rules 3-5) and CrPC Rule 475 had not been observed and that the Army authorities had exercised their discretion to prefer a court-martial; thus, the court-martial alone would have jurisdiction. The Supreme Court, however, held that the offence falls into a category with concurrent jurisdiction under Sections 69 and 70 of the Army Act, and that where there is concurrent jurisdiction, the first instance discretion to choose the forum lies with the designated officer under Section 125. In the present case there was no decision by the designated officer to institute proceedings before a court-martial, and the sequence of events showed significant cooperation with the CrPC process. Consequently, the Sessions Judge’s competence to proceed in the criminal court was not in error, the High Court’s order is set aside, and the respondent-accused is to be transferred to civil custody to face trial in the criminal court. The appeal is allowed.

2022-07-22

Hemant Kumar Verma & Ors. v. Employees State Insurance Corporation & Ors.

This writ petition concerns whether junior resident doctors in ESIC-run medical colleges should be eligible for the 50% in-service reservation for postgraduate medical courses, a benefit presently available to Insurance Medical Officers Grade-II (IMO-II) recruited through competitive selection. ESIC recruits IMO-II and provides a 50% in-service quota for PG seats; however junior residents, who complete MBBS under bond and serve as part of ESIC's residency scheme, are not deemed in-service doctors. The petitioners argued parity with IMO-II because their qualifications, duties, and work environment are similar, and urged the Court to treat them as in-service to extend the 50% reservation to their batch. ESIC contends that junior residents are contractual, bond-based appointees governed by the ESIC Residency Scheme; IMO-II is a permanent post governed by the ESIC Staff and Condition of Service Regulations 1959; the bond reduction in 2020 and the 2018/2020 memoranda cannot convert junior residents into in-service doctors. The Court relies on precedents establishing institutional preference in PG admissions—Saurabh Chaudri v. Union of India, Yatin Kuma Jasubahi v. State of Gujarat, and Pradeep Jain v. Union of India — to acknowledge the legitimacy of institutional preference, but ultimately holds that junior residents and regular ESIC doctors are distinct categories and the in-service quota cannot be equitably extended to junior residents. The petition is dismissed.