High Court of KeralaSingle JudgeCivil revision petitions dismissed; enhanced co...

CRP Nos. 368/21 & 70/22: Thomas K.V. vs Power Grid Corporation of India Ltd. and Power Grid Corporation of India Ltd. vs Thomas K.V.

Case / Petition Number:CRP 368/2021; CRP 70/2022

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • V.G. Arun
Judgment Date
2024-02-21
Court Decision / Holding
Civil revision petitions dismissed. The Corporation shall pay the enhanced compensation fixed by the court below within three months of receipt of a copy of this order. If any portion of the enhanced compensation is deposited, that shall be disbursed to the claimant on appropriate application.
Final Disposition
Civil revision petitions dismissed; enhanced compensation to be paid by the Corporation within three months.

Parties to the Case

Appellants / Petitioners

  • Thomas K.V.
  • P.T. Jose
  • S. Ashitha

Respondents

  • Power Grid Corporation of India Ltd.
  • The Special Tahsildar (LA), Power Grid Corporation of India Ltd.

Legal Representation & Advocates

Counsels for Petitioners

  • • P.T. Jose
  • • S. Ashitha

Counsels for Respondents

  • • Millu Dandapani

Case Synopsis & Summary

These Civil Revision Petitions challenge an order awarding compensation for damage caused by the drawing of 400 kV transmission lines across a landowner’s property and for diminution in land value. The claimant, Thomas K.V., alleged that the 400 kV lines not only felled trees but also reduced the land’s usable value, yet the court below granted only partial relief, with trees’ compensation disallowed for lack of supportive evidence and diminution in land value computed by relying on Ext. A4 and the Commission’s Exts. C2 and C2(b). The court deducted 10% from the value in Ext. A4 and fixed 40% of the central corridor and 20% for outer corridors, with 20% for the remaining unusable portion, ultimately awarding Rs. 15,71,455/-. The petitioner argued that the Advocate Commissioner’s findings should have been relied upon and that the deductions were unreasonably harsh. The Power Grid Corporation contended that the enhancement was excessive and the reliance on Ext. A4 was misplaced. The Kerala High Court, applying the KSEB v. Livisha doctrine on factors affecting land value, reviewed the evidence and upheld the lower court’s approach, dismissing the revisions. The court ordered the Corporation to pay the enhanced compensation within three months from the copy of the order, with any deposited sums to be disbursed on proper application.

Provisions of Law Cited

Section 115 of the Code of Civil Procedure

Legal Doctrines & Maxims

  • KSEB v. Livisha doctrine on fixation of land value and diminution in land value due to public works (e.g., transmission lines) and the relevant factors—situs, distance, extent of the line, middle vs. edge, nature and use of land, commercial importance

Submissions & Arguments

Contentions of Appellants / Petitioners

The claimant contends that the court below erred by not granting enhanced compensation for the loss due to trees cut and for diminution in land value. The Advocate Commissioner’s findings on tree loss were not fully relied upon, and the 10% deduction from Ext. A4, along with the 40%/20% allocations for the central and outer corridors, respectively, and 20% for the remaining unusable portion, are argued to be inadequate given the extent of damage and the value diminution.

Contentions of Respondents

The Power Grid Corporation argues that the enhancement is excessive and that reliance on Ext. A4 is inappropriate. It challenges the quantum for land value diminution and the percentage allocations, and contends that interest at 9% on the enhanced amount is unjustified and that the Commission report should not override contemporaneous government guidelines.

Cited Precedents (1)

Case NameCitationTreatmentExplanation
KSEB v. Livisha[(2007) 6 SCC 792]PositiveThe court relies on the factors articulated in KSEB v. Livisha to determine the diminution in land value due to the land being affected by transmission lines, guiding the computation of compensation.

Diagnostic Tool

Beta

Does this judgment govern your specific facts?

Don't risk relying on a distinguishable precedent. Enter your facts or proposition below. We will test it against CRP Nos. 368/21 & 70/22: Thomas K.V. vs Power Grid Corporation of India Ltd. and Power Grid Corporation of India Ltd. vs Thomas K.V. and instantly map out authorities that support, challenge, or govern your position.

Extracted Judgment Text

Exact text extracted from official judgment records.

## **IN THE HIGH COURT OF KERALA AT ERNAKULAM** ## **PRESENT** **THE HONOURABLE MR.JUSTICE V.G.ARUN WEDNESDAY, THE 21[ST] DAY OF FEBRUARY 2024 / 2ND PHALGUNA, 1945** ## **CRP NO. 368 OF 2021** **AGAINST THE ORDER/JUDGMENT OPELE 120/2013 OF VI ADDITIONAL DISTRICT COURT, ERNAKULAM** ## **REVISION PETITIONER/S:** THOMAS. K.V. AGED 58 YEARS KOLATTUKUDY HOUSE, MURINGEDATHPARA, CHULLY, MANJAPRA P.O., ALUVA TALUK. BY ADVS. P.T.JOSE S.ASHITHA ## **RESPONDENT/S:** 1 POWER GRID CORPORATION OF INDIA LTD., CONSTRUCTION AREA OFFICE, KAKKANAD, NOW IN PAO/400, 220KV SUBSTATION, KUMARAPURAM P.O., PALLIKARA, KOCHI-682303, REP. BY DEPUTY MANAGER. 2 THE SPECIAL TAHSILDAR (L.A.), POWERGRID CORPORATION OF INDIA LTD., CHEVARAMBALAM, KOZHIKODE, NOW IN KAKKANAD P.O., 682030. ## **OTHER PRESENT:** SRI.A.ARUN KUMAR-SC ,KSEB THIS CIVIL REVISION PETITION HAVING BEEN FINALLY HEARD ON 15.01.2024, ALONG WITH CRP.70/2022, THE COURT ON 21.02.2024 DELIVERED THE FOLLOWING: CRP Nos.368/21 & 70/22 -2- ## **IN THE HIGH COURT OF KERALA AT ERNAKULAM** ## **PRESENT** **THE HONOURABLE MR.JUSTICE V.G.ARUN WEDNESDAY, THE 21[ST] DAY OF FEBRUARY 2024 / 2ND PHALGUNA,** ## **1945** ## **CRP NO. 70 OF 2022** **AGAINST THE ORDER/JUDGMENT OPELE 120/2013 OF VI** **ADDITIONAL DISTRICT COURT, ERNAKULAM** ## **REVISION PETITIONER/S:** POWER GRID CORPORATION OF INDIA CONSTRUCTION AREA OFFICE, MAVELIPURAM COLONY, KAKKANAD, COCHIN - 682 030, PRESENTLY AT CONSTRUCTION AREA OFFICE, 400/220, KV SUB STATION, KUMARAPURAM P.O., PALLIKKARA, ERNAKULAM - 683 565, REPRESENTED BY ITS SENIOR GENERAL MANAGER. BY ADV MILLU DANDAPANI ## **RESPONDENT/S:** 1 THOMAS K.V. KOLATTUKUDY HOUSE, MURINGRADATHPARA, CHULLY, MANJAPRA (PO), ALUVA TALUK, ERNAKULAM - 683 581. 2 THE SPECIAL TAHSILDAR (LA) POWER GRID CORPORATION OF INDIA LTD., CHEVARAMBALAM P.O., KOZHIKODE - 673 017. BY ADV P.T.JOSE **THIS CIVIL REVISION PETITION HAVING BEEN FINALLY HEARD ON** **15.01.2024, ALONG WITH CRP.368/21, THE COURT ON 21.02.2024 DELIVERED THE FOLLOWING:** CRP Nos.368/21 & 70/22 -3- ## **ORDER** Dated this the 21[st] day of February, 2024 These revision petitions are filed challenging the order passed by the Additional District Judge-VI, Ernakulam in O.P.(Electricity) No.120 of 2013. The original petition was filed by the revision petitioner in CRP No.368 of 2021 (hereinafter called 'the claimant'), being dissatisfied with the compensation awarded towards the damage and loss sustained due to the drawing of 400 KV lines across his property by the Power Grid Corporation of India Ltd (hereinafter called 'the Corporation'). The essential facts are as under; The claimant is in ownership and possession of landed property having an extent of 10.49 Ares comprised in Re-Sy.No.181/6/2 in Block No.20 of Manjapra Village in Aluva Taluk. The land was cultivated with various yielding and non-yielding CRP Nos.368/21 & 70/22 -4- trees. According to the claimant, to facilitate drawing of the lines and smooth transmission of power, large number of trees were cut from his property. The drawing of high tension lines rendered the land underneath and adjacent to the lines useless, resulting in diminution of the value of the property. In spite of the huge loss suffered by the claimant, only an amount of Rs.1,23,093/- was paid as compensation towards the value of yielding and non-yielding trees cut. Surprisingly, no compensation was granted for diminution in land value. Hence, the original petition was filed, seeking enhanced compensation towards the value of trees cut and diminution in land value. 2. The court below rejected the claim for enhanced compensation for the value of trees cut since no evidence in support of the claim was produced. As far as the claim for enhanced compensation towards diminution in land value is concerned, the court below relied on Ext.A4 CRP Nos.368/21 & 70/22 -5- document as well as Exts.C2 and C2(b) commission report and sketch. The court below noticed that while Ext.A4 property having public roads on two sides, access to the claimant's property is through a pathway on the eastern side. Based on these factors, the court below fixed the land value of the claimant's property by deducting 10% of the value shown in Ext.A4 property. Relying on Ext.C2(b) sketch, the court below found that the electric lines were drawn over the centre of the claimant's property. The extent of central corridor was held to be 12.873 cents and that of the outer corridors, 12.079 cents (5.559+6.52). For the central corridor, 40% of the land value was granted as compensation and for the outer corridors, 20% of the land value. The court below also noted that the remaining property admeasuring 0.963 cents cannot be used for any useful purpose and granted 20% of the land value as compensation. Accordingly, the claimant was found entitled to compensation of Rs.15,71,455/-. CRP Nos.368/21 & 70/22 -6- Dissatisfied with the quantum of enhancement, the claimant has filed CRP No.368 of 2021, whereas the Corporation has filed CRP No.70 of 2022 contending that the enhancement ordered is far in excess of the actual damage sustained. 3. Heard Adv.P.T.Jose for the claimant and Adv.Millu Dandapani for the Corporation. 4. Learned Counsel for the claimant contended that the court below committed gross illegality in refusing to grant enhanced compensation for the loss sustained due to the cutting of valuable trees, in spite of the Advocate Commissioner assessing and reporting the loss. The findings in the Commissioner's report were not relied on by the court below for the reason that the property was inspected much after the trees were cut. The said reasoning is flawed since the trees were cut much after issuance of notification by the Corporation and the cause of action for filing the original petition arose only on payment of the initial compensation, even CRP Nos.368/21 & 70/22 **==> picture [19 x 7] intentionally omitted <==** later. It is further contended that 10% deduction made from the value of property involved in Ext.A4 document is unreasonable. 5. It is submitted that the court below grossly erred in granting only 40% of the land value fixed for the central corridor and 20% for the outer corridors. It is further submitted that the court below is not justified in granting only 20% of the land value for the property which rendered useless due to the drawing of electric lines. Considering the extent of damage sustained and the diminution in land value consequent to the drawing of lines, the court below ought to have granted compensation as claimed. 6. Learned Counsel for the Corporation contended that, compensation towards diminution in land value granted is exorbitant and there is no rationale in granting 9% interest on that amount. The court below also erred in relying on Ext.A4 for fixing the land value of the claimant's property. As the drawing of electric CRP Nos.368/21 & 70/22 -8- lines does not prohibit the landowner from conducting agricultural activities and putting up small structures, 40% of the land value granted for the central corridor and 20% for the outer corridors are exorbitant. The court below grossly erred in granting 20% of the land value for the portion of the property, which was unaffected by drawing of the lines. 7. A careful scrutiny of the impugned order reveals that the claim for enhancement of compensation towards the value of trees cut was rightly rejected since no supporting material, other than the findings in the Advocate Commissioner's report, was made available. As found by the court below, apart from the interested testimony of a witness, who is the claimant in a connected case and that of a person who claimed to have purchased agricultural products from the landowners for the last ten years, no other witnesses were examined. The court below rightly refused to accept their CRP Nos.368/21 & 70/22 -9- testimony since it was at variance with the claim in the petition and the assessment made by the Commissioner. For the same reason, the findings in the Commission report were also not accepted. On the other hand, the court below found the Corporation to have assessed the yield on the basis of the guidelines issued by the Government. It was therefore held that the evidence let in by the claimant was not sufficient to discard the contemporaneous valuation statement prepared by the Corporation. 8. As far as the diminution in land value is concerned, the factors to be taken into consideration, as laid down in _**KSEB v. Livisha**_ ## _**[(2007) 6 SCC 792]**_ are as under; “ _10. The situs of the land, the distance between the high voltage electricity line laid thereover, the extent of the line thereon as also the fact as to whether the high voltage line passes over a small tract of land or through the middle of the land and other similar relevant factors in our opinion_ CRP Nos.368/21 & 70/22 -10- _would be determinative. The value of the land would also be a relevant factor. The owner of the land furthermore, in a given situation may lose his substantive right to use the property for the purpose for which the same was meant to be used.”_ On careful scrutiny of the impugned order, it is seen that the compensation was enhanced after taking all the above factors into consideration. The nature of the land, the cultivation therein, the commercial importance of the area and the manner in which the land was affected by drawing of the lines are all seen considered for fixing the land value as well as the percentage of diminution. The court below has deducted only 10% of the land value in Ext.A4 document, which according to me, is a reasonable deduction. Similarly, valid reasons are stated for granting 40% of the land value as compensation for the central corridor and 20% for the outer corridor. The 20% compensation granted for the remaining property is also justified, since the finding is CRP Nos.368/21 & 70/22 -11- that the property could not be put to any useful purpose and not that the property is rendered completely useless. As such, there is no illegality or material irregularity in the impugned order, warranting intervention by this Court in exercise of the revisional power under Section 115 of the Code of Civil Procedure. For the aforementioned reasons, the civil revision petitions filed by the claimant as well as the Corporation are dismissed. The Corporation shall pay the enhanced compensation fixed by the court below within three months of receipt of a copy of this order. If any portion of the enhanced compensation is deposited by the Corporation, that shall forthwith be disbursed to the claimant on appropriate application being filed. Sd/- **V.G.ARUN JUDGE** Scl/