Tenetowl LogoTenetowl
Supreme Court of IndiaSupreme Court · 2021Division BenchDisposal of Special Leave Petitions: The Court ...

COMPACK ENTERPRISES INDIA (P) LTD. v. BEANT SINGH

Case / Petition Number:
Special Leave Petition (Civil) Nos. 2224-2225 of 2021
Neutral Citation:[2021] 1 S.C.R. 866

Case Synopsis & Summary

This Special Leave Petition arises from a Delhi High Court consent decree in a dispute over possession of the ground floor of the property bearing No. B-60, Ground Floor, GT Karnal Road, Industrial Area, Delhi (5,472 sq ft). Beant Singh, the Respondent, owner's claim led to a suit for possession and mesne profits, with Compack Enterprises India (P) Ltd. (the Petitioner) contending that only 2,200 sq ft was licensed to it. The High Court's 2014 order decreed possession of the entire area. In 2019, the High Court passed a consent decree increasing mesne profits to Rs. 1,00,000 per month with a 10% annual increment starting 1.10.2009, and directing possession of the entire 5,472 sq ft. The Petitioner challenged the correctness of the consent decree in a Review, contending the 10% increase was recorded as every 12 months instead of every alternate year, and that possession should be of 2,200 sq ft only. The Supreme Court held that the area of possession had indeed been settled in the 2014 judgment and should be the entire 5,472 sq ft, a view that attained finality. It found an error on the face of record in recording a 10% increase every 12 months and rectified it to 10% every alternate year, overturning the 2019 order to this extent. The Court directed delivery of possession, release of arrears, and costs, while preserving other terms of the consent decree.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • MOHAN M. SHANTANAGOUDAR
  • VINEET SARAN
Judgment Date
2021-02-17
Court Decision / Holding
The Special Leave Petitions are disposed of. The Court recognizes that the 2019 consent decree contained an error—recording a 10% increase in mesne profits every 12 months. It rectifies the decree to reflect a 10% increase every alternate year, from 2009 onward, overturning the 25.07.2019 order to the limited extent of this rectification. It upholds the High Court’s decree directing delivery of possession of the entire suit property (5,472 sq ft) to the Respondent and directs the Petitioner to hand over possession within eight weeks, to release any arrears already deposited, and to pay the arrears as directed in order dated 14.02.2019, with the modified mesne profits provision. Costs of Rs. 1,00,000 are awarded to the Respondent. The decision confirms that possession of the full property must be delivered and that clerical/arithmetical errors in consent decrees can be corrected where appropriate." ,
Final Disposition
Disposal of Special Leave Petitions: The Court disposed of the petitions. It upheld the High Court’s direction for possession of the entire property and rectified the mesne profits clause to reflect 10% increase every alternate year, while awarding Rs. 1,00,000 in costs and directing the Petitioner to hand over possession within eight weeks.

Parties to the Case

Appellants / Petitioners

  • COMPACK ENTERPRISES INDIA (P) LTD.

Respondents

  • Beant Singh

Legal Representation & Advocates

Counsels for Petitioners

  • • Mukul Rohatgi
  • • Basava Prabhu S. Patil
  • • Mahesh Agarwal
  • • Rajesh Banati
  • • Ms. Aanchal Mullick
  • • Ankit Banati
  • • E. C. Agrawala
  • • Harpreet Singh Uppal
  • • Purushottam Sharma Tripathi
  • • Mukesh Kumar Singh
  • • Ms. Arushi Patil

Counsels for Respondents

  • • Mukul Rohatgi
  • • Basava Prabhu S. Patil
  • • Mahesh Agarwal
  • • Rajesh Banati
  • • Ms. Aanchal Mullick
  • • Ankit Banati
  • • E. C. Agrawala
  • • Harpreet Singh Uppal
  • • Purushottam Sharma Tripathi
  • • Mukesh Kumar Singh
  • • Ms. Arushi Patil

Provisions of Law Cited

Code of Civil Procedure, 1908, Order XII, Rule 6Constitution of India, Article 227

Legal Doctrines & Maxims

  • Estoppel by judgment in consent decrees
  • Inherent power of the court to rectify clerical/arithmetic errors in consent decrees to conform with the terms of the compromise
  • Consent decrees should not be interfered with except for exceptional/glaring errors or with revised consent of all parties
  • Fraud, misrepresentation or mistake can vitiate a compromise (exception to estoppel)

Submissions & Arguments

Contentions of Appellants / Petitioners

The petition contends that the consent decree’s recording of a 10% mesne profits increase every 12 months is a typographical error. The compromise evidence and prior judgments indicate the intended increase was every alternate year (10% every 24 months), aligning with license terms that had 10% increases on a longer cycle. The 2006 license agreement covered the entire property (5,472 sq ft), not just 2,200 sq ft, and the High Court’s 12.11.2014 order decreed possession of the entire area, a view that has attained finality. The petitioner handed over possession to Mr. Gosain in 2015, not to the respondent, and is not liable for further mesne profits; however, it seeks rectification to align the decree with the compromise and to avoid the ongoing breach of court orders. The petitioner emphasizes the need to avoid re-agitating settled questions and to correct an apparent error in the decree in light of the intended settlement.

Contentions of Respondents

The respondent argues that the 2006 license and the parties’ conduct show the entire suit property (5,472 sq ft) was licensed and in possession of the petitioner, and the High Court’s 2014 order directing possession of the entire area should stand. The 10% mesne profits increase is consistent with the terms of the consent decree and the related license-terms; the petitioner’s attempts to delay delivery of possession and to re-open the settled range of rights undermine the High Court’s finality. The High Court’s judgment correctly recorded that the petitioner was obligated to vacate the entire premises, and the sequence of orders, including the 2019 consent decree, should be upheld, save for the rectification of the date-based increment to an alternate-year basis as recognized by the Supreme Court."},

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (3)

Case NameCitationTreatmentExplanation
Byram Pestonji Gariwala v. Union Bank of India & ors.(1992) 1 SCC 31PositiveCited for the proposition that a consent decree would not operate as an unconditional estoppel when the compromise is vitiated by fraud, misrepresentation, or mistake; supports the court’s ability to rectify a consent decree in exceptional cases.
Gupta Steel Industries v. Jolly Steel Industries Pvt. Ltd. & anr.(1996) 11 SCC 678PositiveCited to establish the principle that consent decrees should not be unilaterally interfered with and that there can be a revised consent of all parties; recognizes the remedial power to rectify in light of the compromise.
Suvaran Rajaram Bandekar & ors. v. Narayan R. Bandekar & ors.(1996) 10 SCC 255PositiveCited as part of the same doctrinal framework on consent decrees and estoppel, reinforcing the nuanced approach to interference and rectification.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•4,878 words•~23 min read

In The Court Record

COMPACK ENTERPRISES INDIA (P) LTD. v. BEANT SINGH

866 SUPREME COURT REPORTS [2021] 1 S.C.R. 866 [2021] 1 S.C.R. A ## COMPACK ENTERPRISES INDIA (P) LTD. v. ## BEANT SINGH (Special Leave Petition (Civil) Nos. 2224-2225 of 2021) B ## FEBRUARY 17, 2021 ## **[MOHAN M. SHANTANAGOUDAR AND VINEET SARAN, JJ.]** _Decree – Consent decree – Review of – Suit for possession and_ mesne _profits filed by respondent against petitioner – Petitioner_ C _disputed the area in its possession – Trial court held that this issue had been settled by High Court in an earlier litigation between the parties and thus, the same cannot be re-opened –_ Mesne _profits granted – Cross-appeals for reduction/enhancement thereof – High Court passed consent decree – Petitioner filed review contending_ D _that terms of the consent decree were recorded incorrectly – Dismissed – In challenge to the judgment in cross appeals and the review petition, held: Question of area of possession was settled by the High Court in the earlier litigation, decreeing the respondent’s suit for possession for the entire suit property – Petitioner’s challenge to the said judgment before Supreme Court was dismissed – Thus,_ E _this view attained finality – High Court correct in upholding the terms of the consent decree directing petitioner to hand over possession of the entire suit property to the respondent – However, the consent decree erroneously recorded a 10% increase in_ mesne _profits every year, instead of every alternate year – This is an error_ F _apparent on the face of the record – Rectified –_ Mesne _profits to be treated as increasing by 10% every alternate year, from 2009 till the date of handover of possession – Consent decree modified to this extent – Suit – Code of Civil Procedure, 1908 – Or.XII, r.6._ _Decree – Consent decree – Law of – Discussed._ ## G **Disposing of the petitions, the Court** **HELD: 1.1 Consent decrees are intended to create estoppels by judgment against the parties, thereby putting an end to further litigation between the parties. This Court has held that it would be slow to unilaterally interfere in, modify, substitute** H 866 867 COMPACK ENTERPRISES INDIA (P) LTD. v. BEANT SINGH **or modulate the terms of a consent decree, unless it is done with** A **the revised consent of all the parties thereto. However, this formulation is far from absolute and does not apply as a blanket rule in all cases. The first impugned judgment of the High Court dated 14.2.2019 recorded the terms of the compromise that the Petitioner had agreed to; and that the same Court has** B **subsequently upheld the validity of that consent decree in the second impugned judgment dated 25.07.2019. Thus, this Court would be cautious in exercising its inherent power to interfere in this consent decree, except where there is any exceptional or glaring error apparent on the face of the record. [Paras 1820][874-D-H; 875-A-B]** C _Byram Pestonji Gariwala v. Union Bank of India & ors._ **(1992) 1 SCC 31 : [1991] 1 Suppl. SCR 187 – relied on.** _Gupta Steel Industries_ v. _Jolly Steel Industries Pvt. Ltd. & anr._ **(1996) 11 SCC 678 : [1996] 6 Suppl. SCR 669;** _Suvaran Rajaram Bandekar & ors._ v. _Narayan R. Bandekar & ors.,_ **(1996) 10 SCC 255 : [1996] 5 Suppl. SCR 439 – referred to.** D ## **1.2 On the question of area of possession:** E **The 2006 Agreement, which is the relevant agreement for the present purposes, pertains to the entire suit property, and does not delimit the licensed area to a 2,200 sq. ft. portion. Thus, the 2006 Agreement effective from 1.04.2006 to 30.09.2008, licensed the total area of 5,472 sq. ft. to Petitioner. Hence, the material on record discloses that the Petitioner is presently in illegal possession of the entire suit property admeasuring 5,472 sq. ft. Further, this question has already been settled by the High Court judgment dated 12.11.2014 in the earlier litigation between the parties, decreeing the Respondent’s suit for possession for the entire area of 5,472 sq. ft (and not only the 2,200 sq. ft. portion claimed to be possessed by the Petitioner). In that order, the High Court had taken note of an admitted document on the record wherein the Petitioner was stated to be in possession of the entire suit property. The Petitioner’s challenge to this judgment dated 12.11.2014 before the Supreme Court has been dismissed in** F G H 868 SUPREME COURT REPORTS [2021] 1 S.C.R. - A **SLP(C) No. 7531/2015, and R.P.(C) No. 1494/2015 in SLP(C) No. 7531/2015, by orders dated 16.03.2015 and 15.07.2015 respectively. Thus, this view has attained finality, and the Petitioner’s efforts to re-agitate this question in the present proceedings is a waste of this Court’s time and an abuse of the process of law. Thus, the High Court was correct in upholding** - B **the terms of the consent decree directing Petitioner to hand over possession of the entire suit property of 5,472 sq. ft. to the Respondent, and there is see no reason to interfere with this part of the consent decree. [Paras 21, 22 and 24][875-D-G; 876-C-D]** ## C **1.3 On the question of mesne profits:** - **The Single Judge, in noting that** _**“this figure of mesne profits**_ - _**of Rs.1 lakh will be increased by 10% after every 12 months, i.e from 1.10.2009, 1.10.2011 etc etc”**_ **(emphasis supplied), has confused not only himself, but also the parties to the litigation.** - D **There is an inconsistency in so far there is a gap of every alternate year, i.e. from 2009 to 2011, in the example used by the Single Judge even though the decree notes an increase of 10% in mesne profits after every 12 months. The said inconsistency in the underlined extract of the consent decree is an error apparent on** - E **the face of the record. Hence this is a fit case to exercise inherent the jurisdiction to correct the terms of the consent decree, to bring it in conformity with the intended compromise. Even the judgment dated 23.09.2017 and the final decree dated 15.11.2017 passed by the Trial Court also awards a 10% increase only on each alternative year, i.e. 01.04.2011, 01.04.2013, 01.04.2015 and** - F **so on. Further, the original terms of the license agreement between the parties also incorporated a 10% increase in license fee once every 30 months/2.5 years. Thus, the Single Judge’s order dated 14.02.2019 has given rise to a lot of confusion. Given this background, and looking at the preponderance of** - G **probabilities, benefit of doubt is given to the Petitioner. Therefore, it is held that the intention of the compromise between the parties was that there should be a 10% increase in mesne profits every alternate year. The recording of a 10% increase after every 12 months in the consent decree was an inadvertent error, which is** H COMPACK ENTERPRISES INDIA (P) LTD. v. BEANT SINGH 869 **now rectified. To this limited extent, the second impugned** A **judgment dated 25.07.2019 is overturned, and the consent decree recorded by the Single Judge’s judgment dated 14.02.2019 stands modified. [Paras 27-29][876-F-H; 877-A-D]** **1.4 The Petitioner made repeated and persistent efforts to re-agitate the question of delivery of possession to the Respondent, in an attempt to circumvent complying with the view taken by the High Court in the judgment dated 12.11.2014, which has now attained finality. Despite the clear direction in that judgment to vacate possession in favour of the Respondent, pending any adjudication on the separate proceedings for possession and specific enforcement initiated by Mr. ‘G’ (to whom, as per the petitioner’s contention, the respondent had agree to sell the suit property), the Petitioner handed over possession to Mr. ‘G’ in July, 2015. Possession has to this date not been handed over to the Respondent, who has been dragged to the court time and again due to the Petitioner’s conduct. This is an instance of blatant disregard for the Court’s orders, and an abuse of judicial process. Petitioner to take steps for handing over possession of the suit property measuring 5,472 sq. ft. to the Respondent within eight weeks from today, without fail. Further, the Registry is directed to expeditiously release the arrears of mesne profits, if any, already deposited by the Petitioner before this Court to the Respondent. The Petitioner is further directed to pay to the Respondent all arrears as directed in order dated 14.2.2019, with the limited modification that the mesne profits are to be treated as increasing by 10% every alternate year, from 2009 till the date of handover of possession. The Petitioner is additionally directed to pay costs of Rs. 1 lakh to the Respondent as stated in the impugned order dated 25.7.2019. [Paras 30-32][877-E-H; 878-A-B]** B C D E F ## **Case Law Reference** |**[1996]**|**6**|**Suppl. SCR**|**669**|**referred to**|**Para 18**|G| |---|---|---|---|---|---|---| |**[1996]**|**5**|**Suppl. SCR**|**439**|**referred to**|**Para 18**|| |**[1991]**|**1**|**Suppl. SCR**|**187**|**relied on**|**Para 19**|| H 870 SUPREME COURT REPORTS [2021] 1 S.C.R. A CIVIL APPELLATE JURISDICTION : Special Leave Petition (Civil) Nos. 2224-2225 of 2021. From the Judgment and Order dated 14.02.2019 of the High Court of Delhi at New Delhi in RFA No. 253 of 2018 and Order dated 25.07.2019 in RP No. 177 of 2019 in RFA No. 253 of 2018. B Mukul Rohatgi, Basava Prabhu S. Patil, Sr. Advs., Mahesh Agarwal, Rajesh Banati, Ms. Aanchal Mullick, Ankit Banati, E. C. Agrawala, Harpreet Singh Uppal, Purushottam Sharma Tripathi, Mukesh Kumar Singh, Ms. Arushi Patil, Advs. for the appearing parties. The Judgment of the Court was delivered by ## C **MOHAN M. SHANTANAGOUDAR, J.** 1. These petitions arise out of judgments of the High Court of Delhi (hereinafter ‘High Court’) dated 14.02.2019 and 25.07.2019. By the first impugned judgment dated 14.02.2019, the High Court disposed of the regular first appeal RFA No. 253/2018 filed by the Petitioner against judgment and order of the Ld. Additional District Judge, Rohini D (‘Trial Court’) dated 23.09.2017 in Suit No. 58395/2016 filed by the Respondent. Whereas by the second impugned judgment dated 25.7.2019, the High Court disposed of Review Petition No. 177/2019 filed by the Petitioner against the judgment in RFA No. 253/2018. ## **I. Background Facts** E 2. These cases concern a suit for possession and mesne profits filed by the Respondent/plaintiff against the Petitioner/defendant, with respect to the ground floor of the property bearing No. B-60, Ground Floor, G.T. Karnal Road, Industrial Area, Delhi-110033, admeasuring 608 sq. yards (or, 5,472 sq. ft.) (hereinafter ‘suit property’). F 3. The Respondent, Beant Singh, is the owner of the suit property. He, through M/s Channa Auto Agencies (P) Ltd. (of which he is a Director), executed a license agreement dated 1.11.2000 in respect of a portion of the suit property in favour of M/s Compack Enterprises (the Petitioner’s predecessor), for a period of 30 months in consideration for G a monthly license fee of Rs. 28,000/- (hereinafter, ‘2000 Agreement’). On 1.04.2003, Compack Enterprises merged with Compack Enterprises India (P) Ltd. (i.e., the Petitioner herein), and the 2000 Agreement continued with mutual consent of parties. The license arrangement was renewed on 1.07.2003 for another 30 months, with a 10% increase in monthly license fee to Rs.30,800/- (hereinafter, ‘2003 Agreement’). The H 2003 Agreement was renewed for the last time effective from 1.04.2006 ## COMPACK ENTERPRISES INDIA (P) LTD. v. BEANT SINGH 871 [MOHAN M. SHANTANAGOUDAR, J. ] and expiring on 30.09.2008, with a further 10% increase in monthly license A fee to Rs.33,900/- (hereinafter, ‘2006 Agreement’). 4. However, even after the expiry of the 2006 Agreement on 30.9.2008, and non-renewal of the same, the Petitioner continued to occupy the suit property. Consequently, the Respondent brought O.S. No. 58395/2016 against the Petitioner on 13.02.2009 for recovering B possession of the entire suit property and mesne profits thereon from 1.10.2008 till the vacation of the suit property. ## _Petitioner/Defendant’s Arguments in Original Suit No._ 58395 _/_ ## _2016_ **5. On the question of vacating possession** , the Petitioner admitted to having been in possession of only a portion of the suit property measuring 2,200 sq. ft., averring that it was only this portion, not the entire suit property admeasuring 5,427 sq. ft., that was licensed to them by the Respondent. 6. Petitioner further contended that its continued possession of this portion of the suit property was lawful, since the Respondent had concealed the material fact of having entered into an agreement dated 11.6.2008 to sell the suit property to one Mr. Ajay Gosain for a sum of Rs. 4 crores, of which the Respondent had already received a sum of Rs. 65 lakhs. The suit property was agreed to be sold to, and was thus in lawful possession of, Mr. Gosain before the expiry of the 2006 Agreement on 30.09.2008. Mr. Gosain is the husband of one of the Petitioner’s Directors, and also the brother of another Director. **7. On the question of mesne profits,** Petitioner contended that it had been in possession of only 2,200 sq. ft. of the suit property and had been paying license fee for it till July, 2015 as per the interim order passed by the Trial Court; and that they vacated the premises in July, 2015 and handed over possession to Mr. Gosain, to whom the Respondent had allegedly transferred possession of the suit property pursuant to the agreement to sell. Thus, the Petitioner claims that it is not liable to pay any further sum to the Respondent. C D E F G _Trial Court’s Judgment dated 23.09.2017_ **8. On the question of vacating possession,** the Trial Court held that the issue had already been decided by the High Court in C.M.(M) No. 193/2013 by judgment dated 12.11.2014, and could not be re-opened. H 872 SUPREME COURT REPORTS [2021] 1 S.C.R. A 9. The Respondent had earlier filed an application before the Trial Court under Order XII, Rule 6, of the Code of Civil Procedure, 1908 (hereinafter, ‘CPC’), praying for a judgment on admission decreeing the suit for possession in favour of the Respondent. Upon the Trial Court’s dismissal of this application, the Respondent approached the High Court under Article 227 of the Constitution in C.M.(M) No. 193/2013 praying B for the aforesaid relief. Therein, the High Court by its judgment dated 12.11.2014 reversed the Trial Court’s dismissal, and held that the admissions made by the parties justify decreeing the Respondent’s suit for possession. It had thus directed that the possession of the entire suit property measuring 5,472 sq. ft. be handed over to the Respondent by C the Petitioner. A **10. On the question of mesne profits,** the Trial Court noted that it is an admitted fact between the parties that the possession of the suit property has still not been handed over to the Respondent despite the High Court’s order dated 12.11.2014. Instead, the Petitioner claimed D to have handed over possession to Mr. Gosain in July, 2015. The following further observations of the Trial Court are relevant for our purposes: - _a. What is the area of the suit property for which Petitioner is liable?_ The High Court’s order dated 12.11.2014 had settled the dispute E _qua_ the area that was in possession of the Petitioner, decreeing the Respondent’s suit for possession for the entire suit property area of 5,472 sq. ft (and not only the 2,200 sq. ft. portion claimed to be possessed by the Petitioner). The view taken by the aforesaid order has attained finality as far back as on 12.11.2014 and is binding. ## F - _b. What is the quantum of compensation payable?_ For the period between 1.10.2008 to 27.04.2009, the Respondent is entitled to license fee @ Rs. 37,290/- p.m., i.e., the license fee agreed upon in the 2006 Agreement (Rs. 33,900/-) with a hike of 10%. For the period of unlawful possession between 28.04.2009 till vacation of G possession, Petitioner shall pay mesne profits @ Rs.60,000/- p.m. with 10% increase on the 1[st] April of each alternate year, till the suit property is handed over to Respondent. 11. Aggrieved by the decision on mesne profits, both the Petitioner and Respondent filed cross-appeals before the High Court against the H COMPACK ENTERPRISES INDIA (P) LTD. v. BEANT SINGH 873 [MOHAN M. SHANTANAGOUDAR, J. ] judgment of the Trial Court dated 23.09.2017, seeking, respectively, A reduction and enhancement in the quantum of mesne profits. _First Impugned Judgment of the High Court dated 14.02.2019 in the above cross-appeals_ 12. The High Court passed a consent decree, directing that the Petitioner shall pay to the Respondent, by way of mesne profits, an enhanced sum of Rs.1,00,000/- p.m., with a 10% increase “ _after every 12 months, i.e. from 1.10.2009, 1.10.2011 etc etc_ ” w.e.f. 1.10.2008 (i.e., the date on which the 2006 Agreement expired) till the date the Petitioner hands over actual possession of the suit property measuring 5,472 sq. ft. to the Respondent. B C 13. Aggrieved that the terms of the consent decree were recorded incorrectly in the aforesaid order, the Petitioner filed Review Petition No. 177/2019, which was dismissed by the High Court. ## _Second Impugned Judgment of the High Court in the above review petition dated 25.07.2019_ 14. The Petitioner contended in its review petition that the High Court in the first appeal had erred in recording the terms of the consent decree agreed to by the Petitioner. _First,_ the judgment records that the mesne profits be increased by 10% every 12 months, instead of recording a 10% increase every 24 months. _Second,_ the judgment erroneously records that the Petitioner will hand over possession of the entire suit property measuring 5,472 sq. ft., when the documents on record would show that the Petitioner was only ever in possession of 2,200 sq. ft. 15. The High Court, rejecting the Petitioner’s contentions, held that there was no error apparent on the face of the record to justify its review jurisdiction, and that the Petitioner was dishonestly trying to wriggle out of the consent decree by attempting to overreach the Court. The review petition was dismissed with exemplary costs of Rs.1,00,000/payable by the Petitioner to the Respondent. ## **II. Submissions made by the Petitioner in the present SLP** D E F G 16. Shri Mukul Rohatgi, learned senior counsel for the Petitioner, contends that the High Court ought to have, while recording the terms of the consent decree, recorded a 10% increase in mesne profits every 24 months, instead of 12 months. As per him, this typographical error is H 874 SUPREME COURT REPORTS [2021] 1 S.C.R. - A borne out by the fact that a 10% increase every 24 months closely mirrors the terms of the license agreements where the license fee was increased by 10% every 30 months. The reference to a 10% increase “ _after every 12 months, i.e. from 1.10.2009, 1.10.2011 etc etc_ ” in the first impugned judgment of the High Court dated 14.02.2019 (supra) also corroborates this. - B 17. The learned senior counsel for the Petitioner has also contended that the first impugned judgment dated 14.02.2019 erred in recording that the Petitioner has consented to handing over possession of the entire suit property area of 5,472 sq.ft., when the Petitioner has consistently maintained that only 2,200 sq.ft. was licensed to him and in his possession. C Both these submissions are vehemently opposed by Shri Basava Prabhu S. Patil, learned senior counsel for respondent. ## **III. This Court’s Analysis** 18. Before adverting to the specific contentions raised by the D learned senior counsel for the Petitioner, it may be useful to briefly summarise the law governing consent decrees that shall inform our conclusions on the present matter. It is well-settled that consent decrees are intended to create estoppels by judgment against the parties, thereby putting an end to further litigation between the parties. Resultantly, this Court has held that it would be slow to unilaterally interfere in, modify, E substitute or modulate the terms of a consent decree, unless it is done with the revised consent of all the parties thereto. ( _**Gupta Steel Industries**_ **v.** _**Jolly Steel Industries Pvt. Ltd. & anr.** ,_ (1996) 11 SCC 678; _**Suvaran Rajaram Bandekar & ors.**_ **v.** _**Narayan R. Bandekar & ors.** ,_ (1996) 10 SCC 255). F 19. However, this formulation is far from absolute and does not apply as a blanket rule in all cases. This Court, in _**Byram Pestonji Gariwala**_ **v.** _**Union Bank of India & ors** .,_ (1992) 1 SCC 31, has held that a consent decree would not serve as an estoppel, where the compromise was vitiated by fraud, misrepresentation, or mistake. Further, G this Court in the exercise of its inherent powers may also unilaterally rectify a consent decree suffering from clerical or arithmetical errors, so as to make it conform with the terms of the compromise. 20. The present Petitions thus must be answered in light of the above-stated position of law. It is relevant at this juncture to note that the first impugned judgment of the High Court dated 14.2.2019 recorded H COMPACK ENTERPRISES INDIA (P) LTD. v. BEANT SINGH 875 [MOHAN M. SHANTANAGOUDAR, J. ] the terms of the compromise that the Petitioner had agreed to; and that A the same Court has subsequently upheld the validity of that consent decree in the second impugned judgment dated 25.07.2019. Thus, keeping in line with this Court’s jurisprudence, we would be cautious in exercising our inherent power to interfere in this consent decree, except where there is any exceptional or glaring error apparent on the face of the B record. We now refer to and answer the specific contentions raised by the parties. ## _On the question of area of possession:_ 21. Having undertaken a close perusal of the License Agreements executed between the Petitioner and Respondent, we reject learned senior counsel Mr. Rohatgi’s contention that the Petitioner was only in possession of and licensee to a 2,200 sq.ft. portion of the suit property. It is evident that, unlike the 2000 Agreement and 2003 Agreement, the 2006 Agreement, which is the relevant agreement for the present purposes, pertains to the entire suit property, and does not delimit the licensed area to a 2,200 sq. ft. portion. Thus, the 2006 Agreement effective from 1.04.2006 to 30.09.2008, licensed the total area of 5,472 sq. ft. to Petitioner. Hence, the material on record discloses that the Petitioner is presently in illegal possession of the entire suit property admeasuring 5,472 sq. ft. 22. Further, this question has already been settled by the High Court judgment dated 12.11.2014 (supra) in the earlier litigation between the parties, decreeing the Respondent’s suit for possession for the entire area of 5,472 sq. ft (and not only the 2,200 sq. ft. portion claimed to be possessed by the Petitioner). In that order, the High Court had taken note of an admitted document on the record wherein the Petitioner was stated to be in possession of the entire suit property. The Petitioner’s challenge to this judgment dated 12.11.2014 before the Supreme Court has been dismissed in SLP(C) No. 7531/2015, and R.P.(C) No. 1494/ 2015 in SLP(C) No. 7531/2015, by orders dated 16.03.2015 and 15.07.2015 respectively. Thus, this view has attained finality, and the Petitioner’s efforts to re-agitate this question in the present proceedings is a waste of this Court’s time and an abuse of the process of law. In any case, since the Petitioner claims no right or interest in the remaining 3,272 sq. ft. of the suit property, there is no prejudice caused to the Petitioner by the order to vacate the entire suit property since he is not the owner of property to that extent also. C D E F G H 876 SUPREME COURT REPORTS [2021] 1 S.C.R. A 23. It is further an admitted position, as recorded by the Trial Court, that the Petitioner has not handed over possession to the Respondent – having claimed to have handed over possession to Mr. Gosain instead in July, 2015. This is despite the High Court’s judgment dated 12.11.2014 decreeing the suit for possession in favour of the Respondent. Mr. Gosain’s right in the suit property is a question pending B in separate specific performance proceedings filed by him. Thus, at this stage, the Respondent is entitled to get possession of the suit property, pending adjudication of Mr. Gosain’s claims. This view attained finality as far back as on 12.11.2014, and it is high time that the Petitioner stops making efforts to circumvent delivering possession of the suit property C to the Respondent. 24. Thus, the High Court was correct in upholding the terms of the consent decree directing Petitioner to hand over possession of the entire suit property of 5,472 sq. ft. to the Respondent, and we see no reason to interfere with this part of the consent decree. ## D _On the question of mesne profits:_ 25. As referred to supra, Shri Mukul Rohatgi, learned senior counsel for the Petitioner has contended that the High Court ought to have, while recording the terms of the consent decree, recorded a 10% increase in mesne profits every alternate year, instead of every year. E 26. On the contrary, Shri Basava Prabhu S. Patil, learned senior counsel for the Respondent wants us to construe the observations of the late learned Single Judge appearing in para 1 of the first impugned judgment dated 14.02.2019 to mean that the mesne profits payable are to be increased by 10% every year. F F 27. The learned Single Judge, in noting that “ _this figure of mesne profits of Rs.1 lakh will be increased by 10% after every 12 months, i.e from 1.10.2009, 1.10.2011 etc etc_ ” (emphasis supplied), has confused not only himself, but also the parties to the litigation. There is an inconsistency in so far there is a gap of every alternate year, i.e. from 2009 to 2011, in the example used by the learned Single Judge even G though the decree notes an increase of 10% in mesne profits after every 12 months. The aforementioned inconsistency in the underlined extract of the consent decree is an error apparent on the face of the record. Hence we find that this is a fit case to exercise inherent the jurisdiction to correct the terms of the consent decree, to bring it in conformity with H the intended compromise. COMPACK ENTERPRISES INDIA (P) LTD. v. BEANT SINGH 877 [MOHAN M. SHANTANAGOUDAR, J. ] 28. At this stage, it is relevant to note that even the judgment dated 23.09.2017 and the final decree dated 15.11.2017 passed by the Trial Court also awards a 10% increase only on each alternative year, i.e. 01.04.2011, 01.04.2013, 01.04.2015 and so on. Further, the original terms of the license agreement between the parties also incorporated a 10% increase in license fee once every 30 months/2.5 years. Thus, the learned Single Judge’s order dated 14.02.2019 has given rise to a lot of confusion. Given this background, and looking at the preponderance of probabilities, we are inclined to give benefit of doubt to the Petitioner. Therefore, we hold that the intention of the compromise between the parties was that there should be a 10% increase in mesne profits every alternate year. The recording of a 10% increase after every 12 months in the consent decree was an inadvertent error, which we have now rectified. 29. To this limited extent, the second impugned judgment dated 25.07.2019 is overturned, and the consent decree recorded by the learned Single Judge’s judgment dated 14.02.2019 stands modified. A B C D ## **III. Final Conclusions** 30. At this stage, this Bench would like to register its displeasure at the Petitioner’s repeated and persistent efforts to re-agitate the question of delivery of possession to the Respondent, in an attempt to circumvent complying with the view taken by the High Court in the judgment dated 12.11.2014, which has now attained finality. Despite the clear direction in that judgment to vacate possession in favour of the Respondent, pending any adjudication on the separate proceedings for possession and specific enforcement initiated by Mr. Gosain, the Petitioner handed over possession to Mr. Gosain in July, 2015. Possession has to this date not been handed over to the Respondent, who has been dragged to the court time and again due to the Petitioner’s conduct. This is an instance of blatant disregard for the Court’s orders, and an abuse of judicial process. 31. Hence the present petitions are disposed of, with direction to the Petitioner to take steps for handing over possession of the suit property measuring 5,472 sq. ft. to the Respondent within eight weeks from today, without fail. Further, the Registry is directed to expeditiously release the arrears of mesne profits, if any, already deposited by the Petitioner before this Court to the Respondent. The Petitioner is further directed to pay to E F G H 878 SUPREME COURT REPORTS [2021] 1 S.C.R. - A the Respondent all arrears as directed in order dated 14.2.2019, with the limited modification that the mesne profits are to be treated as increasing by 10% every alternate year, from 2009 till the date of handover of possession. 32. The Petitioner is additionally directed to pay costs of B Rs. 1 lakh to the Respondent as stated in the impugned order dated 25.7.2019. 33. The Special Leave Petitions stand disposed of accordingly. - C Divya Pandey Petitions disposed of. D E F G H
End of Judgment Record
Browse All Supreme Court of India (2021) Decisions
2021-01-05

HARI OM @ HERO v. STATE OF U.P.

This is a Supreme Court appeal arising from six accused tried in multiple trials for offences under IPC sections 396 and 412, the SC/ST Act (3(2)(v)) and the Arms Act. The Trial Court convicted Hari Om @ Hero of the 396 IPC offence and awarded death, while other accused received varying outcomes. The High Court confirmed Hari Om’s death sentence and upheld some convictions, while acquitting three co-accused. The Supreme Court, in a Division Bench led by Justice Uday Umesh Lalit, allowed the appeals by Hari Om and others, finding serious infirmities in the prosecution case, especially the testimony of PW5, a five-year-old child witness (Ujjwal). The Court held that corroboration of a child witness is a prudential rule rather than a hard requirement and that, given glaring inconsistencies and lack of reliable corroboration, the evidence could not sustain a conviction under Section 396 IPC against Hari Om. It also highlighted ambiguities in fingerprint evidence—its collection, handling, and interpretation—and noted the absence of robust link evidence connecting the accused to the crime. Consequently, Hari Om, Sanjay @ Sonu and Saurabh @ Sanju were acquitted and ordered to be set at liberty, with the Court emphasizing careful, circumspect evaluation of child-witness testimony and forensic evidence.

2021-01-22

INDIAN BANK AND ANOTHER v. MAHAVEER KHARIWAL

This appeal concerns an Indian Bank employee who sought voluntary retirement under the Indian Bank Employees Pension Regulations, 1995 (Regulation 29), including a request for waiver of the three-month notice. The bank rejected the request on the ground that the employee was not eligible under Regulation 29, and initiated departmental proceedings which culminated in penalties. The employee challenged the rejection in a writ petition; the Single Judge dismissed it to the extent challenged here, but the Division Bench quashed the rejection and directed the bank to release retiral dues under the Pension Regulations. The Supreme Court, upholding the employer’s challenge, held that the voluntary retirement application dated 21.01.2004 was absolutely in consonance with Regulation 29 and that the 20.04.2004 rejection was illegal and contrary to Regulation 29. It held that the employee is entitled to all retiral benefits on the basis of voluntary retirement, and that the subsequent departmental enquiry would be non est since there would be no employer–employee relationship after retirement. The Court analyzed Regulation 29, including the three-month notice, the need for acceptance by the appointing authority, and the curtailment mechanism under Sub-Regulation 3, as well as the proviso to Sub-Regulation (1) relating to deputation. The appeal is dismissed with no costs, and the employee’s retiral benefits are secured while any further proceedings are void.

2021-11-29

Hasmat Ali v. Amina Bibi & ORS.

This is a Civil Appeal under Section 100 of the Code of Civil Procedure, 1908, arising from a suit in which the plaintiff sought a declaration that the defendant was a tenant up to 31.03.2003, eviction of the defendant from the suit shop, and other reliefs. The Trial Court partly decreed the suit directing the defendant to vacant possession; the Appellate Court dismissed the appeal, and the High Court, in Regular Second Appeal No. 403 of 2017, dismissed the appeal in limine without giving reasons. The essential issue is whether the High Court could dismiss a second appeal in limine without recording reasons and whether the appeal should be admitted for consideration of substantial questions of law under Section 100(1)–(5). The Supreme Court examines the interplay between Section 100 and Order XLII, clarifying that a second appeal lies only if the High Court formulates a substantial question of law under Section 100(4) and that the appeal must be heard on that question under Section 100(5). It reinforces that a dismissal in limine requires explicit reasons and that “so far as may be” in Order XLII indicates procedural alignment with Order XLI. Applying these principles, the Court sets aside the High Court’s order for lack of reasons, allows the appeal, and remits the matter to the High Court for fresh disposal in accordance with law, with no costs. The decision underscores the mandatory requirement of reasoned orders in second-appeal dismissals.

2021-02-15

Sudipta Chakrobarty & Anr. v. Ranaghat S.D. Hospital & Ors.

This Civil Appeal concerns the practice of delivering a final operative order without accompanying reasons in proceedings before the National Consumer Disputes Redressal Commission (NCDRC) and the consequences of delaying reasons. The National Commission pronounced the operative order in 2019 but took eight months to issue a reasoned judgment, prompting scrutiny under Article 21 of the Constitution. The Supreme Court recalls established authority that the right of aggrieved parties to challenge an order on its merits is prejudiced when reasons are withheld or delayed, and that due process requires timely, reasoned decisions. Citing State of Punjab & Ors. v. Jagdev Singh Talwandi (1984), Anil Rai v. State of Bihar (2001) and Zahira Habibulla M. Sheikh & Ors. v. State of Gujarat (AIR 2004 SC 3467), among others, the Court reiterates that pronouncing the operative portion without reasons undermines the fruits of litigation and defeats subsequent remedies. In the instant case, there was a hiatus of eight months between the operative order dated 26.04.2019 and the accompanying reasons. The Court orders that the President of the National Commission examine the matter and take steps to discontinue this practice, ensuring that reasoned judgments are delivered together with operative orders. The appeal and pending applications are disposed of.