Case Synopsis & Summary

This batch of IA applications arises from the Central Empowered Committee’s report of 16 October 2014 regarding alleged illegalities in the mining lease of Sarda Mines Private Limited (SMPL) and the environmental clearance granted for its Thakurani iron ore mine, Block‑B, Keonjhar, Odisha. The writ petition (C) No. 114 of 2014, led by Common Cause, seeks scrutiny of seven core issues identified by the CEC: renewal of the mining lease; validity of the environmental clearance; sale of iron ore as ROM; diversion of additional land; production beyond clearance; Rule 37 violations under MCR 1960; and questions surrounding ownership of the lease. The Supreme Court, in a two-judge bench, focuses on the environmental clearance and related production since 2001, reviewing the intents of the 1999 permission and the 2004 clearance. The Court concludes that the environmental clearance does not operate retrospectively; it treats the 1999 permission as the authority for mineral ore (ROM) extraction, while the clearance covers iron ore (lump) expansion and must be interpreted in light of this distinction. The Court holds that excess production from 2001–2004 was illegal to the extent beyond the clearance and directs the Central Empowered Committee to quantify penalties, while preserving the validity of the mining activity up to 22 September 2004 to the extent legally permissible. The substantive applications are disposed of with these directions and a six-week timeframe for penalty computation is allotted. The decision analyzes ROM vs lump distinctions (citing National Mineral Development Corporation Ltd. v. State of M.P. and Tata Steel Ltd. v. Union of India) and reaffirms non-retroactivity of environmental clearances.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Landmark Cases
Hon'ble Judges
  • Madan B. Lokur
  • Deepak Gupta
Judgment Date
2018-11-12
Court Decision / Holding
Substantive applications disposed of to the above extent and in terms of the directions: environmental clearance not retrospective; SMPL’s production between 2001–2004 to the extent of 1.4 LTPA legal; excess mining to be penalised as per CEC’s recalculation; CEC given 6 weeks to rework penalties; no further relief on retrospective expansion; the matter to be re‑quantified on the basis of the environmental clearance terms and ROM/lump interpretation.
Final Disposition
Substantive applications disposed of with directions to CEC to quantify penalty for illegal/excess mining from 22 September 2004, and with the finding that environmental clearance is not retrospective; records to be made available for penalty computation; the first year of production is deemed 2004‑2005 for calculation purposes; the CEC to complete the work within six weeks.

Parties to the Case

Appellants / Petitioners

  • Common Cause

Respondents

  • Union of India
  • State of Odisha (Orissa)
  • Ors

Provisions of Law Cited

Mines and Minerals (Development and Regulation) Act, 1957 (MMDR Act)Environmental Impact Assessment Notification, 1994 (as amended)Forest (Conservation) Act, 1980Mineral Concession Rules, 1960 (MCR, 1960)Rule 37, MCR, 1960

Legal Doctrines & Maxims

  • Environmental clearance does not have retrospective effect; operational from the date of grant.
  • Realistic interpretation of environmental clearance to reflect contemporaneous permissions (ROM vs iron ore lumps).
  • Two mining permissions cannot operate coextensively in a way that nullifies statutory limits.
  • ROM is the product from which lumps and other by‑products are derived; lumps are by‑products of ROM.

Submissions & Arguments

Contentions of Appellants / Petitioners

Common Cause advocates strict scrutiny of SMPL’s mining activities and seeks enforcement of environmental laws, with emphasis on the non‑retrospective nature of environmental clearances and the need to penalize illegal mining as per the CEC report. It relies on the MMDR Act and EIA/National environmental standards to ensure compliance, calling for a robust accounting of excess mining and a corrective remedy via penalties quantified by the CEC.

Contentions of Respondents

The respondents (including Union of India and SMPL’s affiliates) argued for interpreting the environmental clearance in light of the pre‑existing permissions, contending that retrospective effect should be considered for the mining lease's renewal period; they claim the 2004 clearance covered expansion and must be read in harmony with the 1999 permission, contending that the dual permissions could be reconciled to permit production up to the cleared quantum.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (3)

Case NameCitationTreatmentExplanation
Common Cause v. State of Odisha1 (2017) 9 SCC 499PositiveCourt relies on this decision for the proposition that environmental clearances do not have retrospective effect, as stated in paragraphs discussed in the judgment.
National Mineral Development Corporation Ltd. v. State of M.P.2004 (6) SCC 281PositiveUsed to define ROM and lumps as by‑products in open‑cast mining; supports the interpretation of ROM vs lumps in the context of the mining expansion described.
Tata Steel Limited v. Union of India2015 (6) SCC 193PositiveCited to reinforce the process of mining where iron ore is ROM and subsequently separated into lumps, fines, and waste; informs the ROM–lump delineation in this case.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•3,729 words•~17 min read

In The Court Record

Common Cause v Union of India & Ors.

**REPORTABLE** IN THE SUPREME COURT OF INDIA CIVIL ORIGINAL JURISDICITON ## **I.A. No. 40 of 2015, I.A.No.42 of 2015,** ## **IA No.61 of 2015 in IA No.40 of 2015 and IA No.111989 of 2018** ## **IN** ## **WRIT PETITON (C) NO. 114 OF 2014** Common Cause …Petitioner versus Union of India & Ors. **(IN RE: SARDA MINES PVT. LTD.)** …. Respondents ## **J U D G M E N T** ## **Madan B. Lokur, J.** 1. In this batch of substantive applications, we are concerned with what is described as “Illegalities involved in the mining lease of Sarda Mines Private Limited” by the Central Empowered Committee in its report of 16[th] October, 2014. 2. It is not necessary to repeat all the facts leading up to these applications since the background has already been detailed by us in _**Common Cause v. State**_ > Signature Not Verified _**of Orissa**_ .[1] Digitally signed by SANJAY KUMAR Date: 2018.11.12 12:35:52 IST Reason: 1 (2017) 9 SCC 499 IA Nos.40 of 2015 etc. in W.P. (C) No.114 of 2014 Page 1 of 14 3. While dealing with the mining lease of Sarda Mines Private Limited, the Central Empowered Committee or the CEC concerned itself with seven issues. They are: 1. Regarding renewal of the mining lease. 2. Regarding validity of the Environmental Clearance. 3. Regarding sale of iron ore in the form of ROM by Sarda Mines Private Limited. 4. Regarding diversion of additional land for mining and allied activities 5. Regarding production of iron ore without/in excess of the Environmental clearance. 6. Regarding enquiry done by the State Government for alleged violation of Rule 37, MCR, 1960 [Mineral Concession Rules of 1960]. 7. Regarding alleged ownership of the mining lease actually being with Jindal Steel and Power Ltd. 4. For the present, we are concerned only with the validity of the environmental clearance granted to Sarda Mines Private Limited or SMPL and the production of iron ore without/in excess of the environmental clearance. The concern relates to a mining lease granted to SMPL over 947.046 hectares of land for 20 years from 14[th] August, 2001 to 13[th] August, 2021. The mining lease is of Thakurani Mines, Block B, Village Soyabali, District Keonjhar in Odisha. We are not concerned with the validity or otherwise of the grant or renewal of the mining lease to SMPL. IA Nos.40 of 2015 etc. in W.P. (C) No.114 of 2014 Page 2 of 14 ## **Grant of permission to mine** 5. It has been pointed out to us and this is not disputed, that SMPL was granted permission on 13[th] July, 1999 to extract 1,40,000 MT of iron ore per annum. The permission granted clearly indicates that it is in the context of reopening (to the extent of broken up area of 94.024 acres) the existing mine where the highest production was 1,39,802.00 MT during 1966 as certified by the Deputy Director (Mines). The said extraction or production was of iron ore and the permission granted in 1999 was also for extraction or production of iron ore. This was in accord with the provisions of the Mines and Minerals (Development and Regulation) Act, 1957 (MMDR Act) that permits mining of the mineral iron ore. The permission granted on 13[th] July, 1999 reads as follows: - “Subject: Reopening of iron ore mines in Block-B in village Soyabali of Thakurani iron ore mines in District Keonjhar, Orissa - clarifications reg. Sir, This has reference to letter of 10[th] June, 1999 jointly from you and Shri M.L. Sarda seeking clarification on applicability of the provisions of the EIA Notification of 1994. We have noted the following: - (i) The Department of Steel and Mines, Government of Orissa has agreed to renew mining lease in respect of Block-B covering an area of 2340.20 acres in village Soyabali of the Thakurani iron ore mines in favour of Shri S.L. Sarda and Shri M.L. Sarda. - (ii) The entire lease area is in reserve forest for which de-reservation proposal has been forwarded by the DFO, Keonjhar to the PCCF, Bhubaneswar. - (iii) Already broken up area is 94.024 acres. IA Nos.40 of 2015 etc. in W.P. (C) No.114 of 2014 Page 3 of 14 - (iv) Highest production from Block-B mines was 1,39,802.00 MT during 1966 as certified by Dy. Director (Mines), Joda, Keonjhar in his letter No. 7892 dated 26.5.99. - (v) Applications have been submitted to Orissa State Pollution Control Board for obtaining “consent to operate” and IBM for approval of mining plan. Further, it has been noted that you are planning to reopen the mine sometimes by the end of 1999 without change in broken up area and production level. Also there is no plan to modernise the mine. It has also been noted that wet drilling will be adopted on working phases. Besides management of surface run off, mine water discharge and plantation of OB dumps, water spraying on haul roads, transfer points and crushing plant will be done regularly. The provisions of EIA Notification of 1994 are not applicable to the renewal of mining lease proposals that do not involve expansion or modernisation. However, you should confine excavation only to already broken up area of 94.024 acres as per mining plan approved and limit production to 1,40,000 MTPA [TPA?]. You are also advised to obtain other statutory approvals from the concerned authorities including the forestry clearance under the Forest (Conservation) Act, 1980 and ensure compliance with the general environmental conditions as indicated in Annexure-I. In case, you plan any expansion or modernisation then prior approval under the provisions of the EIA Notification of 1994 as amended subsequently should be obtained from the Ministry.” 6. Again, the admitted position is that SMPL did not act upon the permission granted on 13[th] July, 1999 till 13/14 August, 2001. The apparent reason is that the mining lease in favour of SMPL was renewed only on 13/14 August, 2001. It is only after the mining lease was renewed that SMPL started mining or extracting iron ore on the basis of the permission granted on 13[th] July, 1999. ## **Grant of environmental clearance** 7. The next important date that we are concerned with is 22[nd] September, 2004 that is the date on which SMPL was granted environmental clearance for the extraction of iron ore. The environmental clearance granted to SMPL was for IA Nos.40 of 2015 etc. in W.P. (C) No.114 of 2014 Page 4 of 14 expansion of production of iron ore (lump) from 1.5 lakh tonnes per annum (LTPA) to 4.0 million tonnes per annum (MTPA). There was a progressive gradation in the production capacity inasmuch as during the first year the increase in production was permitted from 1.5 LTPA to 0.5 MTPA; 3.0 MTPA by the third year and 3.750 MTPA from the fifth year to achieve the rated capacity in production of 4.0 MTPA during the 17[th] year. 8. However, what is strange about the environmental clearance granted to SMPL on 22[nd] September, 2004 is that it referred to the “proposal for expansion of production of iron ore (lump)” from 1.5 LTPA to 4.0 MTPA. In fact, the permission granted on 13[th] July, 1999 was for production of iron ore and not for iron ore (lump). It is not even the case of SMPL that it was granted the permission on 13[th] July, 1999 for the extraction or production of iron ore (lump), Moreover, the MMDR Act refers to the mineral iron ore and not to iron ore (lump). The concept of extraction or production of iron ore (lump) introduced in the environmental clearance was alien to the permission granted on 13[th] July, 1999 and the MMDR Act. Therefore, the environmental clearance granted on 22[nd] September, 2004 must be understood in the context of the permission granted on 13[th] July, 1999 and the MMDR Act. If so appreciated, then it is clear that environmental clearance was granted to SMPL only related to the expansion of production of iron ore from 1.5 LTPA to 4.0 MTPA. As mentioned above, it is not even the case of SMPL that it was granted permission to extract iron ore (lump) to the extent of 1.4 LTPA in terms of the permission granted on 13[th] July, IA Nos.40 of 2015 etc. in W.P. (C) No.114 of 2014 Page 5 of 14 1999. Our understanding of the environmental clearance in this context and in this regard keeping these factors in mind is of considerable importance insofar as the decision in the applications is concerned, as will be apparent a little later. ## **Retrospective effect of the environmental clearance** 9. Learned counsel for SMPL did not contest or dispute that an environmental clearance does not have any retrospective effect. It is operational from the date it is granted. In any event, this issue is no longer _res integra_ having been settled in the decision rendered in _**Common Cause**_ in paragraph 87 of the Report. The submission made, however, was that the benefit of retrospectivity of the environmental clearance should be given to SMPL from the date on which the mining lease was renewed, that is, with effect from 13/14 August, 2001. The reason for claiming this benefit is that the expanded permissible production would then commence from August 2001 and SMPL would be entitled to extract a larger quantity of iron ore with the progressive gradation given in the environmental clearance with the result that the 3[rd] year of production would be 2004 and the 5[th] year of production would be 2006 and not 2009. Similarly, the 17[th] year of production would be 2018 and not 2021. 10. We simply cannot accept this submission since it is plainly contrary to the decision of this Court in _**Common Cause**_ . Moreover and additionally, accepting the submission would mean that for the period from 13/14 August, 2001 till 22[nd] September, 2004 SMPL would have the benefit of the permission granted on 13[th] IA Nos.40 of 2015 etc. in W.P. (C) No.114 of 2014 Page 6 of 14 July, 1999 as well as the retrospective benefit of the environmental clearance dated 22[nd] September, 2004 meaning thereby that SMPL would have two mining permissions, which is obviously not possible _**.**_ However, we cannot deny to SMPL the benefit of the permission granted on 13[th] July, 1999 on the basis of which SMPL carried out mining activities from the date of renewal of the mining lease that is 13/14 August, 2001 till 22[nd] September, 2004. Even learned _Amicus_ does not have any objection to granting the benefit of the permission to SMPL for this period, to the extent that SMPL extracted or produced 1.4 LTPA of iron ore during this period. Therefore, the mining activity carried out by SMPL from 13/14 August, 2001 till the date of the environmental clearance, that is, 22[nd] September, 2004 is legal to the extent of 1.4 LTPA and SMPL cannot be penalised for this mining activity during this period. 11. It was submitted by learned counsel for SMPL that if the environmental clearance is not given retrospective effect then it would mean that its validity would not be co-extensive with the term of the mining lease. Resultantly, the operation of the environmental clearance though granted for the life of the mining lease would necessarily be curtailed to the detriment of SMPL. This submission is noted only to be rejected. The submission made can hardly be a ground for giving retrospective effect to the environmental clearance. If the life of the environmental clearance is curtailed due to operation of the law, then so be it. 12. Learned counsel for SMPL has shown us a Summary of the Project, IA Nos.40 of 2015 etc. in W.P. (C) No.114 of 2014 Page 7 of 14 Environmental Impact Assessment and Environmental Management Plan relating to the proposed expansion of the Thakurani iron ore mine, Block-B, District Keonjhar, Orissa. This document is of February 2002 and is to be found on page 25 of volume 168 of the paper book. He has drawn our attention to page 28 thereof which relates to the mining proposed by open-cast method using drilling and blasting. The production build-up is given in the form of a chart but it takes 20012002 as the first year of production. This is obviously on the assumption that the environmental clearance relates back to the date of renewal of the mining lease in 2001. However, since we have held that the environmental clearance does not and cannot have any retrospective effect, the first year of production should in fact be 2004-2005 (pro rata) based on the environmental clearance. On the basis of the chart pointed out by learned counsel for SMPL, it is quite clear that there has been excess mining of iron ore from the first year of production itself. This excess mining is clearly illegal and must be penalised in terms of our judgement in _**Common Cause**_ . 13. We leave it to the Central Empowered Committee (CEC) to quantify the penalty to be imposed on SMPL from 22[nd] September, 2004 and based on the terms of the environmental clearance. The calculation should also take into consideration our conclusion that the environmental clearance is not retrospective and the first year of production, in view of the environmental clearance granted to SMPL would be 2004-2005. Any mining in excess of the environmental clearance by SMPL would be and is illegal. IA Nos.40 of 2015 etc. in W.P. (C) No.114 of 2014 Page 8 of 14 ## **Extraction of iron ore (lump)** 14. The main rub of the controversy before us lies in the terminology employed in the environmental clearance granted to SMPL - whether it was entitled to extract iron ore (lump) or mineral iron ore, within the limits laid down in the environmental clearance. 15. Before resolving this controversy, it must be clearly understood that extraction of the mineral iron ore is the extraction of iron ore Run of Mine or ROM. Lumps of iron ore are, in a sense, a by-product of ROM as are topsoil, mineral rejects, sub-grade ore and fines and the distinctions made are for the purposes of payment of royalty. The submission of learned counsel for SMPL is to the effect that SMPL was entitled to extract iron ore (lump) in terms of the environmental clearance. If this submission is to be taken literally, then SMPL was entitled to extract only iron ore (lump) without extracting iron ore ROM. This would be much like the argument put forth by Portia enabling Shylock to extract his pound of flesh without spilling a drop of blood. However, we need not take a decision in this regard merely on semantics. 16. That lumps are a by-product of the extraction of iron ore ROM is clear from the decision of this Court rendered in _**National Mineral Development Corporation Ltd. v. State of M.P**_ .[2] wherein this Court noted the process of winning the mineral as described by the appellant therein in the following words: > 2 (2004) 6 SCC 281 > IA Nos.40 of 2015 etc. in W.P. (C) No.114 of 2014 Page 9 of 14 “Iron ore deposits occur mostly in the hill ranges and iron ore is found on the top of the hill i.e. on the surface. The process by which the mineral is won has been described by the appellant as under: - “The ore is extracted by opencast method of mining for which mining benches are prepared. Firstly, holes are drilled on the benches covering the entire height of the bench at regular distance depending on ore types. After charging of the holes with explosives this portion of the bench is blasted. **The blasted material known as ROM (run-of-mines) consists of large boulders, fragments and fines along with other contaminants. ROM is transported to crushing plant by dumpers and crushed to below 150 mm sizes. This crushed ROM contains lump, fines and also contaminants such as alumina and silica** . The crushed ore is transported to screening plant through conveyor belts and is washed with water and screened in vibrating screens. Vibrating screens segregate ore into different sizes such as lump, calibrated ore and fines……” (Emphasis supplied by us). 17. Similarly, in _**Tata Steel Limited v. Union of India**_[3] it was observed that in the process of mining, iron ore is extracted (that is ROM) and separated into ore lumps, fines and waste material which is commonly known as slime. 18. Looked at in this light, the context in which permission was granted to SMPL on 13[th] July, 1999 is important. Permission was granted to SMPL to extract the mineral iron ore. This had no reference at all to the sub-category or by-product called iron ore (lump) but must be understood as permission to extract mineral iron ore ROM. It was this permission that was sought to be proposed for expansion of production and if it is looked at in this contemporaneous or historical (whichever) background, then it is quite obvious that the environmental clearance > 3 (2015) 6 SCC 193 > IA Nos.40 of 2015 etc. in W.P. (C) No.114 of 2014 Page 10 of 14 granted on 22[nd] September, 2004 was only with reference to iron ore ROM. This must also be read in the context of the MMDR Act which refers to the mineral iron ore and does not refer to iron ore (lump). A combination of these two factors convinces us that the environmental clearance granted to SMPL was only with reference to iron ore ROM and not iron ore (lump), notwithstanding the terminology employed in the environmental clearance. 19. Taking the view as canvassed by learned counsel for SMPL would lead to a rather anomalous situation wherein, for the purposes of extracting iron ore (lump) of a permissible quantity, SMPL could extract as much iron ore ROM as it desired. In other words, for the purposes of extracting iron ore (lump) of 4.0 MTPA could it be said that SMPL was entitled to extract iron ore ROM to the extent of 6.0 MTPA or even 8.0 MTPA? The answer to this is certainly in the negative otherwise the environmental clearance granted to SMPL would be devoid of any rational meaning whatsoever. Also taking this into consideration, it does appear to us that though the environmental clearance granted to SMPL was unhappily worded, it must be given a realistic meaning so that it is not rendered ineffective on the ground of vagueness and to the detriment of the environment as also to the detriment of SMPL. 20. In this context, it is necessary to refer to the Summary of the Project, Environmental Impact Assessment and Environmental Management Plan of February 2002 placed on record by SMPL in volume 168 of the paper book. The IA Nos.40 of 2015 etc. in W.P. (C) No.114 of 2014 Page 11 of 14 table or chart on page 28 thereof and which forms a part of the document indicates that for the production ore extraction of iron ore (lump) the total excavation of iron ore ROM proposed is almost double the quantity. The chart is as follows: |**Years**|**Lump Ore**<br>**(+5- 180m**<br>**and 30 +**<br>**18m) (MT)**|**Total**<br>**Excavation**<br>**(MT)**|**ROM**<br>**(MT)**|**Top**<br>**Soil**<br>**(MT)**|**Mineral**<br>**rejects**<br>**(MT)**|**Subgrade**<br>**Ore (MT)**|**Fines,**<br>**-5 mm**<br>**(MT)**| |---|---|---|---|---|---|---|---| |1styear<br>2001-2002|0.500|1.151|0.770|0.000|0.349|0.032|0.270| |2ndyear<br>2002-2003|1.196|2.159|1.840|0.000|0.267|0.052|0.644| |3rdyear<br>2003-2004|1.976|3.499|3.040|0.000|0.121|0.338|1.064| |4thyear<br>2004-2005|2.990|4.829|4.600|0.000|0.183|0.046|1.610| |5thyear<br>2005-2006|3.750|6.058|5.770|0.000|0.231|0.057|2.020| |**Sub Total**|**10.412**|**17.696**|**16.020**|**0.000**|**1.151**|**0.525**|**5.606**| |2007-2011|18.750|33.571|28.850|0.024|1.342|3.355|10.100| |2012-2016|18.750|33.547|28.850|0.000|1.342|3.355|10.100| |2017-2021|20.00|35.779|30.770|0.000|1.431|3.578|10.770| |**Grand Total**|**67.912**|**120.593**|**104.90**|**0.024**|**5.266**|**10.813**|**36.576**| 21. It is quite clear to us even from the above chart that the interpretation sought to be given by learned counsel for SMPL to the environmental clearance was never intended and if it was, then the unfortunate consequence would be that the environmental clearance must be held to be invalid and quashed, resulting in greater damage to the interests of SMPL than envisaged. On a realistic interpretation to the environmental clearance, for the purposes of calculating excess or illegal production of iron ore, the entire extraction of iron ore ROM is IA Nos.40 of 2015 etc. in W.P. (C) No.114 of 2014 Page 12 of 14 required to be taken into consideration. 22. We may note in this context that it has come on record that the entire iron ore ROM extracted by SMPL is actually sold to Jindal Steel and Power Ltd. or JSPL and it is not only iron ore (lump) that is sold to JSPL. In this factual background, the issue of the relationship between SMPL and JSPL arises but we are not concerned with this for the present. However, what is more important is that it is the sale of iron ore ROM that is made by SMPL to JSPL and not the sale of iron ore (lump). In other words, SMPL is desirous of taking full advantage of its extraction and production of iron ore ROM but at the same time shying away from the legal consequences that follow. 23. It was submitted by learned counsel for SMPL that the CEC has confused itself between extraction or production of iron ore ROM and extraction or production of iron ore (lump) and as a consequence, it has arrived at an incorrect figure of excess or illegal mining by SMPL. In fact, the contention is that SMPL has neither been involved in any excess or illegal mining and the conclusions arrived at by the CEC are totally incorrect. We cannot accept this submission in view of the discussion above, including the conduct and activities of SMPL, the provisions of the MMDR Act and the context in which the permission and environmental clearance was granted to SMPL. Under the circumstances, we find no merit in the objections raised by SMPL to the report of the CEC with regard to the validity of the environmental clearance or the excess or illegal mining of IA Nos.40 of 2015 etc. in W.P. (C) No.114 of 2014 Page 13 of 14 iron ore by SMPL. 24. However, in view of our conclusion, the CEC might have to rework the quantum of excessive or illegal mining carried out by SMPL and the consequent penalty. For this, we grant 6 weeks’ time to the CEC to do the needful. All records relevant for arriving at a decision should be made available by SMPL and the concerned authorities to the CEC. 25. The substantive applications are disposed of to the above extent and in terms of the above directions. **...……………………J (Madan B. Lokur)** **...…………………....J** **New Delhi; November 12, 2018** **(Deepak Gupta)** IA Nos.40 of 2015 etc. in W.P. (C) No.114 of 2014 Page 14 of 14
End of Judgment Record
Browse All Landmark Cases Judgments
2019-01-22

State of Himachal Pradesh & Anr. v. Pinju Ram & Others; State of Himachal Pradesh & Ors. v. Ganesh Dutt & Anr.

This batch of appeals concerns regularisation and monetary benefits of part‑time employees in Himachal Pradesh who were converted to daily‑wage status. The State had issued a policy on 27 February 2004: part‑time Class‑IV employees who had completed ten years of continuous service as on 31 December 2003 would be made daily wagers with prospective effect, and posts vacated by such employees would stand abolished; Education and Ayurveda were excluded from the policy. Revenue Chowkidars, engaged by Panchayats, were not covered by that policy and received separate treatment. Following writ petitions and an order of the Himachal Pradesh High Court and in light of later developments, the State drew‑up directions in 2011 (22 September) to give seniority to Revenue Chowkidars on the basis of ten years of service, but with wages from the date of actual appointment and without back‑dated monetary benefits; 7 July 2012 further instructions reiterated this stance for remaining part‑time employees, with monetary benefits not guaranteed in the interregnum. The respondents pressed for back wages dating from 1 January 2007 and broader coverage. The Supreme Court held that the 2007 back‑pay direction was unsustainable, clarified that seniority would count from ten years without past benefits, and that the 2011 policy and Moti Singh principle should guide the approach. The appeals are allowed; no costs. The related writ petitions are to be disposed of consistent with these directions.

2018-08-14

Union Bank of India and Others v. C.G. Ajay Babu and Anr.

This is a Supreme Court of India appeal concerning the forfeiture of gratuity under the Payment of Gratuity Act, 1972. The respondent was a branch manager of the appellant bank and was dismissed on 3 June 2004 after disciplinary proceedings. A show-cause notice sought to forfeit gratuity due to misconduct involving moral turpitude, which was ordered on 20 April 2004. The High Court upheld the dismissal but held that gratuity could be paid since there was no financial loss to the bank, and that a bipartite settlement between the bank and employees permitted forfeiture only where misconduct caused financial loss. The Division Bench, however, held that forfeiture under Section 4(6) must be read together with Section 4(5) and that no loss was proven, thus entitling the employee to gratuity in accordance with the bipartite settlement. The Supreme Court agreed with the High Court that forfeiture is not automatic; it is controlled by Sections 4(5) and 4(6) of the Act and by the bipartite settlement, which requires loss to justify forfeiture. The Court emphasized that an act must constitute an offence involving moral turpitude and that conviction is generally required for forfeiture under 4(6)(b)(ii). The appeal is dismissed with no costs.

2018-09-25

Reema Salkan v. Sumer Singh Salkan

This is a Supreme Court of India criminal appeal under the Criminal Appellate Jurisdiction arising from a maintenance dispute under Section 125 Cr.P.C. The parties, married in 2002, had a protracted litigation history. The Family Court granted maintenance to the wife from 17 July 2003 to 8 December 2010, and held no maintenance thereafter. The High Court, in revision, partly allowed the application, directing Rs.9,000 per month from 9 December 2010 onward, while upholding the earlier period’s Rs.10,000 per month. This Court had earlier granted interim maintenance of Rs.20,000 per month in 2014 (Criminal Appeal Nos. 2347-2349 of 2014). The appellant contends there has been no change in circumstances since the interim order and that the respondent’s substantial assets, education, and overseas earnings establish the capacity to pay higher maintenance. The respondent defends the High Court’s reasoning, arguing that the Family Court’s assessment, demeanor observations, and the principle that maintenance should not be perpetual require careful scrutiny, and that the notional minimum wage approach used by the High Court is flawed. The overarching issue is the quantum of monthly maintenance payable to the appellant and whether the interim amount should be augmented beyond the period up to 2010.”

2019-12-03

M/s Embassy Property Developments Pvt. Ltd. v State of Karnataka & Ors.

This judgment concerns three Civil Appeals filed by a Resolution Applicant, the Corporate Debtor (through its Resolution Professional) and the Committee of Creditors, challenging an Interim Order of the Karnataka High Court staying an NCLT order in proceedings under the Insolvency and Bankruptcy Code, 2016. The NCLT Chennai had admitted an application under Section 7 of the IBC against M/s Tiffins Barytes Asbestos & Paints Ltd. and directed a moratorium under Section 14. The Interim Resolution Professional then sought a deemed extension of a mining lease under MMDR Act, 1957 and the Government of Karnataka rejected it. The NCLT, by an order dated 11.12.2018, set aside the Government’s order and directed execution of Supplement Lease Deeds for the period up to 31.03.2020. The Government of Karnataka challenged this in a High Court writ petition, which stayed the impugned NCLT order. The core issues were: (i) whether the High Court may interfere under Article 226/227 with an NCLT order in IBC when an appeal lies to the NCLAT, and (ii) whether fraud can be inquired into by NCLT/NCLAT in CIRP. The Court reiterates that IBC is a complete, umbrella code with a three‑tier mechanism (NCLT, NCLAT, Supreme Court) and that public‑law disputes arising from MMDR Act obligations lie outside IBC. It ultimately holds that while NCLT/NCLAT may inquire into fraud, they cannot adjudicate MMDR‑related public legal disputes; and the High Court’s writ jurisdiction in public‑law contexts remains permissible. The appeals are dismissed.