Supreme Court of IndiaSupreme Court · 1988Division BenchAppeals allowed; no order as to costs.

Chief Engineer and Secretary, Engineering Department, for and on behalf of Chandigarh Administration, Chandigarh, v. K.S. Brar & Anr.

Case / Petition Number:
Civil Appeal Nos. 3099 B and 3100 of 1988
Neutral Citation:1988 Supp. 2 SCR 797

Case Synopsis & Summary

This appeal arises from a dispute over seniority in the Punjab Public Works Department and the Chandigarh Administration. Respondent No. 4 (Puranjit Singh) had been absorbed into the Chandigarh Administration from the Punjab PWD under a transfer, while another officer, K.S. Brar, challenged the seniority fixation. The Central Administrative Tribunal had held that Respondent No. 4 should be placed at the bottom of the gradation list and seniority fixed from his absorption date, deeming the absorption invalid for not specifying special circumstances. The appellant Chandigarh Administration, and Petitioner Puranjit Singh, contended that the question of regularity of absorption bears on seniority but that Rule 12(5) governs seniority fixation for officers transferred, allowing seniority to be fixed earlier than the absorption date in the public interest and with due credit for prior service. The Supreme Court, while noting that Rule 10 governs transfer, held that the relevant provision for seniority is Rule 12(5) and its proviso, and that the notification of 14.1.1980 fixing seniority from 7.10.1972 complied with the proviso. It concluded the Tribunal erred by not applying Rule 12(5). The appeals are allowed; the order fixing seniority is upheld, and no costs are awarded.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • Murari Mohan Dutt
  • M. H. Kania
Judgment Date
1988-09-01
Court Decision / Holding
Appeals allowed; the judgment and order of the Tribunal are set aside; the order dated 14 January 1980 fixing seniority is upheld.
Final Disposition
Appeals allowed; no order as to costs.

Parties to the Case

Appellants / Petitioners

  • Chandigarh Administration
  • Puranjit Singh

Respondents

  • K.S. Brar
  • Anr.

Legal Representation & Advocates

Counsels for Petitioners

  • • Kapil Sibal
  • • G.L. Sanghi
  • • Ms. Kamini Jaiswal
  • • P.N. Puri
  • • R.K. Chopra
  • • Ravinder Chopra

Counsels for Respondents

  • • V.C. Mahajan
  • • S.C. Patel

Provisions of Law Cited

Punjab Service of Engineers Class II, P.W.D. (Buildings & Roads Branch) Rules, 1965 (Rule 10)Punjab Service of Engineers Class II, P.W.D. (Buildings & Roads Branch) Rules, 1965 (Rule 12(5))Proviso to Rule 12(5)

Legal Doctrines & Maxims

  • in the interest of the public service
  • ex facie

Submissions & Arguments

Contentions of Appellants / Petitioners

The Chandigarh Administration and Puranjit Singh contended that while the absorption of Respondent No. 4 was not challenged, the tribunal's fixation of seniority from the date of absorption and the claim that the absorption order was invalid for lack of special circumstances were improper. They argued that Rule 12(5) authorises fixation of seniority from an earlier date in the public interest, allowing credit for prior service, provided seniority is not more favorable than the credit already earned. They urged that the order dated 14 January 1980 fixing seniority on 7 October 1972 complied with the proviso and was within the limits of the Rule, and that the tribunal failed to consider Rule 12(5) as the controlling provision for seniority in transfer cases.

Contentions of Respondents

The respondents argued that the question of irregularity of the absorption was immaterial to seniority and that Rule 12(5) permits assigning seniority from an earlier date in the public interest, after considering the circumstances and representations. They pressed that the 14 January 1980 notification fixing seniority from 7 October 1972 was valid and that the tribunal erred in not applying Rule 12(5) and in treating the absorption as a flaw.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•3,259 words•~15 min read

In The Court Record

Chief Engineer and Secretary, Engineering Department, for and on behalf of Chandigarh Administration, Chandigarh, v. K.S. Brar & Anr.

CHIEF ENGINEER AND SECRETARY, ENGINEERING A DEPARTMENT,"FOR AND ON BEHALF OF CHANDIGARH ADMINISTRATION, CHANDIGARH ETC.· _y_ _v._ K.S. BRAR & ANR. ETC. SEPTEMBER 1, 1988 B [MURARI MOHON DUTT AND M.H. KANIA, JJ.) _Punjab Service of Engineers Class II P. W.D. (Buildings_ & _Road-_ _ways Branch) Rules,_ _1965,_ _Rules_ _JO_ _and 12-Appointment of officer by_ ### transfer-Assignment assigned from the date of of seniority deputation which is prior in public interest-Whether to the date can be of c _abSlfrption._ / # ' Rule 10 of the Punjab Service of Engineers Class. II, P.W.D. / Rule 10 of the Punjab Service of Engineers Class. II, P.W.D. (Buildings and Roadways Branch) Rules, 1965 provides that the government may, in special circumstances, with the approval of the D Commission, appoint an orpcer to the service by transfer. Sub-rule (5) of Rule 12 of the rules lays down that any person appointed to a post in the service as an Assistant Engineer by transfer can be assigned senionty as of a date earlier than the date of absorption provided this is done in the interest of the public service and the seniority thus fixed shall in no case be more favourable than the seniority determined .after allowing E him credit fOr the period of service rendered by him in previous appointment as Assistant Engineer. ##### _, The appellant, in Civil Appeal No. 3100 of 1988 (hereinafter ;eferred to as respondent No. 4 as In the Tribunal) was an Assistant Engineer in the Punjab Public Works Department. He was deputed to F work with the Engineering Department of Chandigarh Administration on October 7, 1972 and was absorbed in the said Department on June 17, 1978, at his request, However, he was granted seniority w .e.f. October 7, 1972 being the date of his joining as an Assistant Engineer on _:r_ deputation in the Chandigarh Administration. G One K.S. Brar (hereinafter referred to as petitioner as in the Tribunal) joined the Chandigarh Administration as an Assistant Engineer on June 24, 1976. He challenged before the Tribunal the seniority of respondent No. 4 on the ground that the order of absorption of respondent No. 4 in the Chandigarh Administration and the order ###### fixing his seniority were not in public interest or in the interest of the H it 797 A B ### c D 798 SUPREME COURT REPORTS [1988] Supp. 2 S.C.R. service. The Tribunal allowed the petition holding that respondent No. 4 should be placed at the bottom of the gradation list of officers of his category and granted seniority from the date he was absorbed in the cadre. Hence these appeals by special leave by respondent No. 4 and the ·Chandigarh Administration respectively. It was contended on behalf of respondent No. 4(a) that the question of .regularity or validity of the order of absorption was irrelevant to the question of fixation of seniority; and (b) that the Chandigarh Administration was entitled to assign a seniority to respondent No. 4 from a date prior to the date of his absorption as per the provisions of sub.rule (5) of Rule 12 of the Rules. It was, on the other hand, argued on behalf of the respondent (petitioner before the Tribunal) that, as the transfer of respondent No. 4 and his appointment as an Assistant Engineer in the Chandigarh Administration was at his own request, he should be placed at the bottom of the seniority list as on the date of absorption. Allowing the appeals, HELD: (1) For the question of determining seniority, what one has to see is not Rule 10 but Rule 12(5) of the said'Rules. The Tribunal completely failed to notice Rule 12(5) and, probably, it was because of this that it fell into the error of coming to the conclusion that it did. This ,E appears clear from the fact that there is no reference to Rule 12(5) at all in the judgment of the Tribunal. [803C-D, 804B-C] 2(i) The Notification dated 14.1.1980 relating to the fixation of seniority of Respondent No. 4· expressly sets out that the order assigning a higher seniority to him has been passed by the Chandigarh AdminisF !ration taking into account all the circumstances of the case and keeping **in view public interest and after considering the representations made** **in connection** **with** **the tentative seniority list which was circulated** earlier. By the said order seniority is assigned to Respondent No. 4 with effect from 7.10.1972 which is clearly within the limits laid down in the proviso to Rule 12(5) of the said Rules. [803D-E, F-G] G 2(ii) Respondent No. 4 was first appointed as an Assistant Engineer through the Public Service Commission in July 1968 whereas the petitioner was appointed to a similar post as late as on June 24, 1976. Respondent No. 4 was thus holding the post of an Assistant Engineer prior to the petitioner. As far as the qualifications go, it H appears _prima_ _facie_ that the qualifications of Respondent No. 4 are ### • ,. CHIEF ENGINEER _v .._ K.S. BRAR [KANIA, J.J 799 better than those of the petitioner and certainly, not lower than those of A the petitioner. No oblique motive for granting a higher seniority to Respondent No. 4 is shown. In these circumstances, it is not possible to say that the order assigning seniority to Respondent No. 4 as aforesaid _>t_ .has been passed merely under the guise of Public interest. [803-804H, A-Bl CIVIL APPELLATE JURISDICTION: Civil Appeal Nos. 3099 B and 3100 of 1988. From the Judgment dated 17.9.87 passed by the Central Administrative Tribunal, Chandigarh Bench, Chandigarh in 0 .A. No. T-5/CH of 1987. #### c .Kapil Sibbal, G.L. Sanghi, Ms. Kamini Jaiswal, P.N. Puri, R.K. Chopra and Ravinder Chopra for the Petitioners. V.C. Mahajan and S.C. Patel for the Respondents. The Judgment of the Court was delivered by KANIA, J. Special Leave granted in both the petitions. The Registry is directed to register and number these petitions as Civil Appeals. D I _{_ These Appeals are both directed against a judgment of the Cent- E ral Administrative Tribunal, Chandigarh Bench, dated September 17, 1987. The Appeal arising out of Special Leave Petition No. 15073 of 1987 has been preferred by the Chandigarh Administration, Chandigarh and the Appeal arising out of Special Leave Petition No. 11877 of 1987 has been preferred at the instance of Puranjit Singh. Writ Petition No. 3287 of 1978 filed in the. Punjab & Haryana High Court F was transferred to the said Tribunal and treated as T.A. No. T-5/CH of 1987 and it is the judgment of the Tribunal in this petition which is impugned before us. The said writ petition was filed by K.S. Brar who is Respondent No. 1 in Special Leave Petition No. 15073 of 1987 and Respondent No. 4 in Special Leave Petition N9. 11877 of 1987. Puranjit Singh, the petitioner in Special Leave Petiiion No. 11877 of 1987 G was Respondent No. 4 in the said writ petition' and Chandiga.rh Administration and its officers were Respondents Nos. 1 to 3. We ~propose to refer to the parties by their description in the said wr/t ~petition. Respondent No. 4 was appointed as an Assistant Engineer in the H 800 SUPREME COURT REPORTS [1988] Supp. 2 S.C.R. A Punjab Public Works Department (Irrigation Wing) on July 15, 1968 on selection ihrough the Punjab Public Service Commission. On October 7, 1972 Respondent No. 4 was deputed to work with the Chandigarh Administration in its. Engineering Department as an Assistant Engineer. On June 24, 1976 the petitioner joined the Chandigarh Administration as an Assistant Engineer as a direct recruit B by his selection through the Union Public Service Commission. Respondent No. 4 made an application, while on deputation with the Administration of the Union Territory of Chandigarh, for absorbing him in the cadre of Sub-Divisional Engineers in the Engineering Department at Chandigarh. His request was acceded to by the Administration and by an order passed by the Home Secretary on June 17, 1978 he was absorbed in the Engineering Department as a Sub###### C Divisional Engineer (B & R) in the Chandigarh AdminiStration, working on deputation in the Housing Board, Chandigarh. The order absorbing him as a Sub-Divisional Engineer was incorporated in a Notification dated March 1, 1979, which was duly Gazetted. The said Notification sets out that _the Chief Commissioner, Union Territory, D Chandigarh, in consulation with the Union Public Service Commis sion, New Delhi, is pleased to appoint Puranjit Singh as Assistant Engineer (Civil); Class II, in the Engineering Department of Chandigarh Administration on buildings and roads side, by transfer from Punjab, P.W.D. Buildings and Roads Branch, and that his appointment will be subject to further provisions of P.W.D. Class II E Rules, 1965 as applicable to the Engineering Department of the Chandigarh Administration. There is no mention of public interest or interest of the service in this order. The consent of the State of Punjab as well as the approval of the Union Public Service commission with regard to this appointment of Respondent No. 4 was duly taken. On consideration, a tentative seniority list was circulated on November F 19, 1979 inviting objections and after hearing the objections Respondent No. 4 was granted seniority with effect from October 7, 1972, being the date of his joining as an Assistant Engineer on deputation in the P. W .D. Buildings and Roads Branch of the Chandigarh Administration. The Notification dated 14.1.1980 granting him final seniority sets out _inter a/ia_ as follows: G "AND· WHEREAS the Chandigarh Administration considered all the circumstances of the case and keeping the public interest in view, fixed the tentative seniority of Shri Puranjit Singh w.e.f. 7.10.1972, the date of his joining as Assistant Engineer in P. W .D. Buildings & Roads Branch CHIEF ENGINEER _v._ KS. BRAR !KANIA, J) 801 Now, therefore, in pursuance of rule 12.5 of Punjab A Service of Engineers, Class II, P.W.D. (Buildings and Roads Branch) Rules, 1965, the Chief Commissioner, Chandigarh Administration is pleased.to order the fixation of. seniority of Shri Puranjit Singh as Assistant Engineer w.e.f. 7.10.1972 ..... " B #### c D E F G '· From this it is clear that Respondent Ne. 4 was granted seniority with effect from 7.10.1972 when he was appointed on deputation as Assistant Engineer in P. W .D. (Duildings and .Roads Branch) as stated earlier. The petitioner in the w~i! petition challenged both the order of · absorption of Respondent No. 4 in the Chandigarh Administration and the order fixing his seniority on the ground that these orders were not in public interest or in the interest of the service. However, at the hearing before the Tribunal, at the very outset, learned Counsel for the petitioner made it clear that he was not challenging the absorption of Respondent No. 4 but only the placement of the petitioner in the seniority list and the assigning of seniority to Respondent No. 4 from the date he was taken on deputation, namely, 7.10.1972. The contention of the petitioner was that, since Respondent No. 4 was appointed by transfer to the Chandigarh Administration at ~is own request, he ought to have been placed at the bottom of the seniority list in the year of absorption and below the petitioner. Curiously, although the challenge to the order absorbing Respondent No. 4 in the service of the Chandigarh Administration was given up by the petitioner, the Tribunal came to the conclusion, on the basis of Rule 10 of the Punjab Service of Engineers, Class II, P.W.D. (Buildings and Roads Branch) Rules (referred to hereinafter as "the said Rules"), that the order of absorption was not valid as no special circumstances had been set out or shown justifying the same and hence, there was a lacuna in the order. The Tribunal held that, as a result of this Respondent No. 4 should be placed at the bottom of the gradation list of officers of his category and granted seniority from the date he was absorbed in the cadre, namely, February 9, 1979. It is against this decision that both, the Chandigarh Administration and Respondent No. 4, have come by way of these Appeals. It was urged by learned Counsel for the Chandigarh Administration as well as learned Counsel for Respondent No. 4 that the question of regularity or validity of the order of absorption was irrelevant to the question of fixation of seniority. It was submitted by .them that, in view 1 of the challenge t-0 the-an:ler of absorption of Respondent No. 4 having been specifically given up by learned Counsel for the petitioner before H A B ## c D 802 SUPREME COURT REPORTS [1988] Supp. 2 S.C.R. the Tribunal, it was not open to the Tribunal to consider the question of validity of the absorption at all, and that as per the provisions of sub-rule (5) of Rule 12 of the said Rules the Chandigarh Administration was entitled to assign a seniority to Respondent No. 4 from a date prior to the date of his absorption in the interest of the public service - ~and after taking into account all the circumstances of the case provided that Respondent No. 4 could not be granted seniority more favourably than the seniority determined after allowing him credit for the period of service rendered by him in his previous appointment as Assistant Engineer. It was, on the other hand, contended by learned Counsel for the petitioner that, as the transfer of Respondent No. 4 and his appointment as an Assistant Engineer in the Chandigarh Administration was at his own request, he should be placed at the bottom of the seniority list as on the date of absorption. In order to appreciate these respective contentions, it is neces-, sary to set out the relevant provisions. Rule 10 of the said Rules provides for the appointment in Class II service by transfer and reads as under: "The Government may in special circumstances with the approval of the Commission, appoint an Officer to the service by transfer." ##### E Sub-Rule (5) of Rule 12 of the said Rules reads thus: ###### F "12(5) in the case of an officer appointed by transfer as an Assistant Engineer, while normally he would be placed junior to all the officers appointed directly or by promotion as Assistant Engineers in a particular year, the Government may in the interest of the public service and takin,g into consideration all the circumstances of the case, fiX his seniority on ad hoc basis. Provided that the seniority thus fued shall in no case, be more favourable than the seniority determined after allowing him credit for the period of service rendered by him in previous appointment as Assistant Engineer or on a post the duties of which in the opinion of the Government are of equivalent or greater responsib!lity. The decision of Government on this point shall be finaL" H As far as the appointment of Respondent No. 4 as Assistant CHIEF ENGINEER _v._ K.S. BRAR [K~NIA, J.] 803 Engineer in the Chandigarh Administration is concerned, we must proceed on the footing that it was made at his own request. Rule 10 of the said Rules clearly provided that such an appointment can be made only in special circumstances. In our view, where the request made by the officer concerned is based on circumstances showing the request A for transfer is justified, this might be looked up as a special circumstance. It was, however, pointed out by learned Counsel for the B petitioner that the order of appointment by transfer does not refer to any special circumstance and hence, the appointment of Respondent No. 4 in the Chandigarh Administration by transfer is itself not regular. However, we do not wish to go into the question as to whether such an appointment could be said to be invalid or irregular merely because no special circumstances has been recited in the order because the challenge to the order appointing Respondent N.o. 4 by transfer C has been specifically given up by the petitioner in the Tribunal. In our view, for the question of determining seniority, what one has to see ·is not Rule 10 but Rule 12(5) of the said Rules which, in terms, provides that any person appointed to a post in the service in question by transfer can be assigned seniority as of a date earlier than the date of D absorption provided this is done in the interest of the public service. The Notification dated 14.1.1980 relating to the fixation of seniority of Responaent No. 4 expressly sets out that the order assigning a higher seniority to him has been passed by the Chandigarh Administration taking into account all the circumstances of the case and keeping in view public interest and after considering the representations made in E connection with the tentative seniority list which was circulated earlier. The· said Notification, in its earlier portion, recites that Respondent No. 4 was appointed on July 15, 1968 as an Assistant Engineer (Civil) in the Punjab P .W.D. (Irrigation Branch) and that he was appointed as an Assistant Engineer (Civil) in the Buildings and Roads .. Branch of Punjab P:W.D. on October 7, 1972 through the F Public Service Commission and joined on deputation in the Engineering Department of the Chandigarh Administration. By the said order seniority is assigned to Respondent No. 4 with effect from 7 .10.1972 which is clearly within the limits laid down in the proviso t,o Rule 12(5) of the said Rules. In view of this, the order granting him seniority as aforesaid appears _ex facie_ to be in order .. It was urged by learned G Counsel for the petitioner that, although public interest has been referred to in the said Notification, it is clear that this consideration was not in the mind of the Chandigarh Administration at all but the appointment was made to favour Respondent No. 4. We are afraid that there is no basis ·on which such a submission can be founded. Respondent No. 4 was first appointed as an Assistant Engineer H E F G H A B ### c D ###### 804 SUPREME COURT REPORTS I l988] Supp. 2 S.C.R. through the Public Service Commission in July 1968 whereas the petitioner was appointed to a similar post as late as on June 24, 1976. Respondent No. 4 was thus holding the post of an Assistant Engineer prior to the petitioner. As far as the qualifications go, it appears _prima_ _facie_ that the qualifications of Respondent No. 4 are better than those of the petitioner and certainly, not lower than those of the petitioner. No oblique motive for granting a higher seniority to Respondent No. 4 is shown to us. In these circumstances, it is not possible to say that the order assigning seniority to Respondent No. 4 as aforesaid has been passed merely under the guise of public interest. In our view, the Tribunal completely failed to notice Rule 12(5) of the said Rules and, probably, it was because of this that it fell into the error of coming to the conclusion that it did. This appears clear from the fact that there is nd reference to Rule 12(5) at all in the judgment of the Tribunal. In the result, the appeals are allowed, the judgment and order passed by the Tribunal are set aside and validity of the order dated 14 .. I. 1980 fixing seniority of Respondent No. 4 is upheld. Looking to the circumstances of the case, there will be no order as to costs. M.L.A. Appeals allowed.
End of Judgment Record
Browse All Supreme Court of India (1988) Decisions
1988-10-05

GIRJA SHANKAR TIWARI AND ANR. v. HIRDAY RANJAN CHAKRABORTY AND ANR.

This case concerns a dispute over occupancy and vacancy of a shop premises at Rae Bareli under the U.P. Urban Buildings (Regulation of Letting, Rent and Eviction) Act, 1972. The landlord’s successors claimed the premises had fallen vacant and sought allotment under Section 12, which deems vacancy if a landlord ceases to occupy the building or allows non-family occupancy. The premises had been rented originally to M/s Dhacca Swastic Aushadhalaya in 1946/1947. After its dissolution, an employee of the Aushadhalaya, Hirday Ranjan Chakraborty, continued occupying the premises and paid rent in the name of the Aushadhalaya, not in his own name. The Rent Controller found vacancy, and a Rent Control appeal upheld the controller’s view. The Allahabad High Court reversed, treating the Aushadhalaya as the tenant and the rent paid in its name as rent on behalf of Chakraborty, effectively denying deemed vacancy. The Supreme Court reversed the High Court, holding that Chakraborty’s occupation was by someone other than the tenant and that the deemed vacancy under Section 12 had occurred even though the building was not physically vacant. The Rent Controller’s order was restored, and the High Court’s decision set aside, with the appeal allowed.

1988-09-09

U.P. Bhoodan Yagna Samiti v. Braj Kishore

This appeal concerns land grants under the Uttar Pradesh Bhoodan Yagna Act, 1952 (Sections 14 and 15) made in 1968 to respondents described as traders living in Kanpur. The Additional Collector cancelled these pattas in 1976 on grounds that the respondents did not reside in the village where the plots were located, did not belong to the category of landless persons, and that the grants lacked government approval. The Allahabad High Court, in Misc. Writ Petitions, quashed the cancellation order and upheld the grants, holding that the respondents fell within the definition of “landless persons,” notwithstanding their urban residence and business. The UP Bhoodan Yagna Samiti challenged this in a Civil Appeal before the Supreme Court. The Court emphasizes interpreting the statute against its background and the philosophy of the Bhoodan movement, noting reliance on Vinoba Bhave and Jaya Prakash Narayan, and discusses the 1975 Amendment substituting “landless agricultural labourers” for “landless persons” in Section 14. It concludes that grants were to be made in accordance with the Bhoodan Scheme and to landless agricultural labourers resident in the village whose livelihood is agriculture; hence the basis for the amendment and its thrust to correct interpretation. Consequently, the appeals are allowed, the High Court’s judgment is set aside, the Additional Collector’s orders are restored, and costs are awarded to the appellants.

1988-08-16

A.S. GOKHALE v. R.T. OFFICER

Achyut Shivram Gokhale challenged the Bombay Regional Transport Authority’s refusal to issue a five‑day special permit under section 63(6) of the Motor Vehicles Act for the route Bombay–Shirdi, on grounds that the Maharashtra government had issued a scheme (under section 68‑D(3)) conferring exclusive contract carriage rights on the Maharashtra State Road Transport Corporation (MSRTC). The scheme listed seven saved categories and operated to exclude others from contract carriage on those routes, but the appellant argued that such a scheme does not bar special permits under section 63(6). The Regional Transport Authority had demanded a No Objection Certificate from MSRTC, and the Maharashtra State Transport Appellate Tribunal had held that a special permit is not a contract carriage permit and the scheme does not prevent issuing such permits. The Bombay High Court, however, set aside the Tribunal’s view. The Supreme Court clarified the law: a contract carriage permit under section 51 and a special permit under section 63(6) are distinct, though a special permit may share some features with a contract carriage permit. It held that the scheme’s exclusivity pertains to contract carriages under section 51 and does not bar special permits under section 63(6). It also distinguished Andhra Pradesh and Karnataka authorities, and found Adarsh Travels Bus Service distinguishable. The result is that a special permit can be issued notwithstanding the exclusive scheme, and the No Objection Certificate requirement was unwarranted.

1988-05-11

Bharat Petroleum Staff v. Bharat Petroleum Corporation Ltd.

This Supreme Court judgment concerns the pension rights of erstwhile Burmah Shell management staff following nationalisation under the Burmah Shell (Acquisition of Undertakings in India) Act, 1976, and their subsequent transfer to Bharat Petroleum Corporation Limited (the government company). The petitioners, i.e., the Burmah Shell management staff pensioners, sought two reliefs: (i) restoration of the commuted pension after 15 years as laid down in the Supreme Court’s Common Cause decision (AIR 1987 SC 210); and (ii) adequate escalation in pension to protect purchasing power given the rupee’s depreciation and rising living costs. The respondents argued that Burmah Shell’s pension scheme was funded, that the Common Cause decision could not be automatically extended to a public sector undertaking, and that any escalation would require funds beyond the existing pension fund, possibly necessitating government support. The Court held that the petitioners were entitled to a pension hike at the same rate as Hindustan Petroleum Corporation, directing the respondent to implement the increase from May 1, 1988 and to disburse the additional pension by July 31, 1988. It, however, reserved adjudication on restoration of commuted pensions, noting that issue was not to be decided in this petition. The judgment underscores the state’s welfare liability and judicial notice of the rupee’s devaluation, while ensuring a timely remedy for the petitioners.