Supreme Court of IndiaSupreme Court · 2024Division BenchAppeal allowed.

Chief Conservator of Forest & Ors. v. Virendra Kumar & Ors.

Case / Petition Number:
Civil Appeal No. 7414 of 2024
Neutral Citation:[2024] 7 S.C.R. 2427 : 2024 INSC 514

Case Synopsis & Summary

Chief Conservator of Forest & Ors. v. Virendra Kumar & Ors. is a Supreme Court appeal arising from a 1998 forest auction in Gorakhpur, Uttar Pradesh, where Respondents were declared successful bidders but failed to deposit the bid amount and complete the work within the time prescribed. After repeated notices, the Divisional Forest Officer forfeited their security deposits and proceeded to re-auction the lots. The Respondents challenged the forfeiture in the Allahabad High Court on the ground that the forest department’s approval of the auction was not granted within the time limit, and therefore they should be allowed to withdraw from the bid. The High Court relied on two Conditions of Sale Manuals (1980-81 and 1987-88) and found overwriting without signatures, concluding that the 1980-81 terms should govern the auction. The Supreme Court examined the Manuals and held that no post-1987-88 manual existed, so the 1987-88 edition should govern. It explained that Clause 10(viii) of the 1987-88 manual imposes a duty on bidders to enquire about acceptance within 35 days and provides for deemed approval if no information is received within the period, while Clause 2-D of the March 27, 1998 agreement authorizes forfeiture for non‑completion. On facts, the respondents’ non‑compliance and lackadaisical approach justified forfeiture. The appeal is allowed; the High Court’s order is set aside and the notice forfeiting the security amount is upheld as valid.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • Vikram Nath
  • Satish Chandra Sharma
Judgment Date
2024-07-10
Court Decision / Holding
Appeal allowed. The impugned order dated 11.01.2011 is set aside and the notice dated 17.01.2000 forfeiting the security amount is upheld as valid. The security deposit of the Respondents is rightly forfeited; the auction terms under the 1987-88 Conditions of Sale govern, and the Respondents’ non-compliance warrants forfeiture.
Final Disposition
Appeal allowed.

Parties to the Case

Appellants / Petitioners

  • Chief Conservator of Forest & Ors.

Respondents

  • Virendra Kumar & Ors.

Legal Representation & Advocates

Counsels for Petitioners

  • • Ms. Garima Prashad, Sr. A.A.G.
  • • Sudeep Kumar, Advocate
  • • Ms. Manisha, Advocate

Counsels for Respondents

  • • Amit Sharma, Advocate
  • • R.C. Kohli, Advocate

Provisions of Law Cited

Clause 10(viii), 1987-88 Conditions of SaleClause 10(viii), 1980-81 Terms & Conditions of Sale and Auction of Jungle WoodClause 2-D, Agreement dated 27.03.1998

Submissions & Arguments

Contentions of Appellants / Petitioners

Appellants contend that the relevant conditions of sale for the 1998 auction are those in the 1987-88 Manual, the latest edition in force since no post‑1987‑88 edition was published. They argue that Clause 10(viii) of the 1987-88 manual introduced a 35-day requirement to communicate acceptance and provided for deemed approval if no information is received; thus bidders must enquire within 35 days and cannot claim withdrawal for non‑communication. They rely on Clause 2‑D of the March 27, 1998 agreement, which provides for forfeiture of security deposits for non‑deposit or non‑performance. The respondents’ repeated reminders notwithstanding, the agreement makes forfeiture valid. They highlight that overwriting of the 1980‑81 manual to 1997‑98 is illegitimate and the High Court erred in elevating it. They emphasize that the respondents did not deposit the amounts and failed to complete the work within deadlines, showing non‑diligence. The appellants urge that the security deposit was rightly forfeited and equity requires upholding the contract terms.

Contentions of Respondents

Respondents argued that because no post-1987-88 manual existed, the 1987-88 edition governs, including the deemed approval within 35 days; they claimed they were not informed within the period and thus could withdraw from the bid, so forfeiture was improper. They relied on the 1987-88 manual’s amendments (35-day rule) and argued the overwriting of older manuals was invalid due to lack of signatures. They asserted that the repeated notices did not justify forfeiture and that the contract terms should be construed in light of lawful approvals and timely information; consequently, the security deposit should not be forfeited and the matter should be resolved in favour of withdrawal from the auction."},

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,333 words•~11 min read

In The Court Record

Chief Conservator of Forest & Ors. v. Virendra Kumar & Ors.

[2024] 7 S.C.R. 2427 : 2024 INSC 514 ## **Chief Conservator of Forest & Ors.** **v.** ## **Virendra Kumar & Ors.** (Civil Appeal No. 7414 of 2024) 10 July 2024 ## **[Vikram Nath* and Satish Chandra Sharma, JJ.]** ## **Issue for Consideration** Validity of forfeiture by forest department of the security deposit made by successful auction bidder due to failure to comply with work mandate, considered. ## **Headnotes[†]** **Auction – Conditions of sale – Forfeiture of security deposit – Respondent emerged as successful bidder in auction conducted by forest department, Gorakhpur (U.P.) in 1998 for certain forest produce – Parties executed an Agreement in terms of relevant Conditions of Sale – However despite being informed about last date to deposit the bid amount and complete the work, followed by two subsequent reminder letters/notices, Respondent failed to comply with the said mandate – Resulting in forfeiture of Respondent’s security deposit and re-auctioning – Forfeiture challenged in High court on the ground that department’s approval was not given within stipulated time, and hence Respondent applied for withdrawing its bid – In its support, Respondent relied on Condition of Sale Manual applicable in 1980-81 overwritten as “1997-98” since auction took place in 1998 and argued that concerned provision mandated communicating approval/ disapproval within 40 days from auction – High Court allowed the writ petition – Decision challenged in this SLP:** **Held:** 1. High Court erred while relying on Manual applicable in 1980-81 because the year in this manual was overwritten as “1997-98” without bearing any signature – A fact noted by High Court but not given due weightage. [Para 14] 2. Court accepted Appellant’s argument that no manual was published after 1987-88 and hence it will prevail over previous * Author [2024] 7 S.C.R. 2428 ## **Digital Supreme Court Reports** edition of 1980-81 that Respondent sought to reply on – As 1987-88 edition did not contain provision regarding above-noted 40 days’ time period, and required the successful bidder to enquire about the status of acceptance of contract if no formal communication is received by him within 35 days, and provided for deemed approval in absence for formal approval within stipulated time-period of 35 days, the Respondent could not escape the consequences of withdrawing from auction. [Para 15-16] 3. On facts, Respondent did not comply with the initial letter and subsequent reminders which reflected its non-diligent and lackadaisical approach that couldn’t be overlooked and thus the forfeiture of security deposit of Respondents was valid. [Para 17-18] ## **List of Acts** Conditions of Sale Manuals. ## **List of Keywords** Forest Department; Auction; Security amount; Forfeiture; Lackadaisical approach; Re-auction. ## **Case Arising From** CIVIL APPELLATE JURISDICTION: Civil Appeal No. 7414 of 2024 From the Judgment and Order dated 11.01.2011 of the High Court of Judicature at Allahabad in WC NO. 55072 of 2000 ## **Appearances for Parties** Ms. Garima Prashad, Sr. A.A.G., Sudeep Kumar, Ms. Manisha, Advs. for the Appellants. Amit Sharma, R.C. Kohli, Advs. for the Respondents. ## **Judgment / Order of the Supreme Court** ## **Judgment** ## **Vikram Nath, J.** 1. Leave granted. 2. This appeal by special leave is against the judgment and order dated 11.01.2011 passed by the High Court of Judicature at Allahabad in Writ Petition (C) No. 55072 of 2000. The said Writ Petition in the [2024] 7 S.C.R.  2429 ## **Chief Conservator of Forest & Ors. v. Virendra Kumar & Ors.** High Court was filed by the Respondents herein challenging the notice dated 17.01.2000 passed by the Divisional Forest Officer, Gorakhpur forfeiting the security amount of the Respondents. For the sake of convenience, we will refer to the parties as per their instant status before this Court. 3. Brief facts of the matter are that the Forest Department had issued a public notice dated 05.03.1998 inviting registered contractors for participation in a sale auction. In pursuance of the said notice, sale auction was completed on 27.03.1998 as per prescribed procedure and the Respondents offered the highest bids in respect of the various lots. On being declared as the successful bidders, an agreement was executed between the Appellant and the Respondent on the same date with respect to the lot No. 195 (38-H Nasirabad, Bankee Range). On the following day itself, a proposal was sent to the Conservator of Forests and Regional Director, Eastern Circle, Gorakhpur, U.P. by the Divisional Forest Officer for approval of the auction proceedings. The said approval was granted by the Regional Director on 14.05.1998. 4. Post approval of the auction proceedings, the Divisional Forest Officer addressed a letter to the Respondent on 15.09.1998 calling upon him to deposit the bid amount of Rs. 2,92,000/- against the respective lots latest by 25.09.1998, obtain their work orders and conclude the work latest by 08.10.1998. It was further stated that in case, the work is not completed within the stipulated time as aforesaid, the security amount deposited with reference to the said auction shall be forfeited and auction proceedings shall be quashed. Even after the issuance of the aforesaid letter, the Respondents did not complete their work and accordingly, a public Notice dated 26.10.1998 was issued by the Forest Department directing the Respondent once again to deposit the bid money and conclude the work. Another notice dated 23.04.1999 was issued to the Respondent stating that the entire work should be completed latest by 15.05.1999, failing which, the amount of security deposited shall be forfeited and the lots in question shall be put to fresh auction. Respondent failed to take action and accordingly on 17.01.2000, the Divisional Forest Officer issued a letter to the Respondent communicating that for non-compliance of the directions given to them, the security amount deposited by them is being forfeited and the lot is being put to re-auction. [2024] 7 S.C.R. 2430 ## **Digital Supreme Court Reports** 5. As mentioned at the outset earlier, the Respondents, being aggrieved by the communication dated 17.01.2000, filed the Writ Petition before the High Court praying for directions to the Appellants to refund the security amount deposited by the Respondent. Before the High Court, the Respondents argued that since the approval to the auction was not granted within the stipulated period, they had applied to withdraw from the auction and were not bound by the said offer made in the auction and accordingly, security amount could not have been forfeited. 6. The agreements between the parties were executed in terms of conditions of sale of the various forest produce. There were two Conditions of Sale Manuals produced before the High Court. The first manual was published in the year 1980-81 and the second manual was published in the year 1987-88. The High Court, in its judgment, observed that there is cutting over the dates of both the manuals relating to application of the order mentioned therein. In the first manual, in place of year 1980-81, it has been cut and made enforced for 1997-98 and in the second manual, in place of 198788, it has been cut and made enforced for 1989-90. High Court also noted that the cuttings do not bear any signatures. 7. The Respondents, for their argument of non-forfeiture of security amount, relied heavily on sub-clause (viii) of Clause 10 of 1980-81 Terms & Conditions of Sale and Auction of Jungle Wood wherein it was provided that if the acceptance or rejection of sale of lots is not informed to the contractor after 40 days, then the contractor will not be bound to take the contract on the accepted bid. Whereas, the Appellants relied on the conditions contained in sub-clause (viii) of Clause 10 of 1987-88 Conditions of Sale, wherein it has been provided that if the approval of the concerned officer is not received within the stipulated period and if the competent authority approves the bid of the lot, then it will be deemed that the lot has been approved. 8. The High Court observed that the Respondents were relying on the conditions made applicable in 1997-98 while the Appellants were relying on the conditions made applicable in 1989-90 and since the auction was held in the year 1998, the conditions applicable in the year 1997-98 will govern the sale by auction pursuant to which agreements have been executed. Accordingly, since the Respondents/ contractors were not communicated about the approval or disapproval [2024] 7 S.C.R.  2431 ## **Chief Conservator of Forest & Ors. v. Virendra Kumar & Ors.** of sale of lots within 40 days, they were not bound by the said offer made in the said auction and could withdraw themselves. Thereby, it was held that the recovery sought to be made from the Respondents was illegal as being contrary to the Conditions of Sale contained in sub-clause (viii) of Clause 10 of the Terms & Conditions of Sale applicable in the year 1997-98. The Writ Petition was allowed by the High Court, setting aside the Appellant’s order dated 17.01.2000 and directing the Appellants to refund the forfeited amount. 9. Aggrieved by the impugned order, the Appellants are before us. An interim stay of the impugned order of the High Court was granted by this Court vide order dated 08.08.2011. 10. The case of the Appellants, largely, is that the relevant Manual operative in the Financial Year 1997-98 is that on which the Financial Year 1987-88 is printed. As per this Manual, the Clause 10 (viii) was amended and the condition of communicating the approval of the auction within 40 days was deleted. It was provided that if no communication regarding approval of the auction is received within the prescribed period, it shall be deemed that the approval of the lots had been accorded by the competent authority. In the absence of any Manual published after the year 1987-88, the said Manual with printed year 1987-88, being the latest Edition, shall prevail over the earlier Edition of the Manual with printed year as 1980-81. 11. Further, it was argued that the Respondents are bound by the terms and conditions as per Agreement dated 27.03.1998 executed by it with the Appellants immediately after the conclusion of the auction proceedings. In this regard, it was also highlighted that Condition No. 2-D of the said agreement clearly provides that if any purchaser fails to deposit the installments as agreed upon, the Forest Officer is entitled to cancel the auction and forfeit the amount of security deposited, amongst other things. 12. Learned Addl. Advocate General appearing for the Appellants has also drawn the Court’s attention to sub-clause (vii) of Clause 10 of 1987-88 Conditions of Sale wherein it is provided that if the buyer does not receive any information regarding acceptance of the contract within 35 days from the date of auction, then he should contact the Deputy Conservator of Forests/Conservator of Forests and get information in this regard. The Forest Department will not bear any responsibility for not receiving timely information. [2024] 7 S.C.R. 2432 ## **Digital Supreme Court Reports** 13. We have heard learned Counsel for the parties and perused the relevant documents on record. 14. We are unable to bring ourselves to agree with the observations made by the High Court. The High Court specifically noted that the cutting over the dates of both the manuals of Conditions of Sale do not bear any signature and yet, went ahead with considering the over-writing as valid and weighed the applicability of respective Manuals based on such over-writing. In the absence of signatures according any sanction to such over-writing, we believe that the High Court has seriously erred by making a finding that the Manual for Year 1980-81 will supersede the Manual for Year 1987-88 and will be applicable for an auction held in the year 1998. 15. Since these are the only two Conditions of Sale Manuals produced before us as well as the High Court, we find force with the Appellants’ argument that in the absence of any Manual published after the year 1987-88, the said Manual with printed year 1987-88, being the latest Edition, shall prevail over the earlier Edition of the Manual and be applicable to the instant auction. 16. The Manual of 1987-88 seems to have brought in amendments in the form of sub-clauses (vii) and (viii) of Clause 10, as mentioned above, which impose the responsibility on the contractor to enquire about the acceptance of the contract if no information is received within 35 days and also grants a deemed approval in cases where the approval is not received within the stipulated period. Once, it has been determined that the Manual of 1987-88 will be relevant for the instant case, it follows that the liability rested on the shoulders of the Respondents to enquire about the status of approval, and they could not have withdrawn from the auction after executing the agreement without bearing its consequences. The said consequences were clearly stated in Clause 2-D of the agreement dated 27.03.1998 and include forfeiture of security amount. 17. There is yet another relevant consideration that we have taken into account while reaching the final decision. It is the fact that in spite of repeated notices by the Appellants calling upon the Respondents to complete the work within a stipulated period, the Respondents failed to come forward and do the needful. Respondents came forward by filing a Writ Petition, only after the communication dated 17.01.2000 forfeiting the security amount. It reflects on the non-diligent and [2024] 7 S.C.R.  2433 **Chief Conservator of Forest & Ors. v. Virendra Kumar & Ors.** lackadaisical approach adopted by the Respondents which cannot be overlooked by this Court. 18. We thus hold that the security amount deposited by the Respondents rightly deserves to be forfeited by the Appellants. 19. Accordingly, the appeal is allowed. The impugned order dated 11.01.2011 is, hereby, set aside and the notice issued by the Appellants dated 17.01.2000 is upheld as valid. 20. Pending application(s), if any, is/are disposed of. ## _Result of the case:_ Appeal allowed. - _†Headnotes prepared by: _ Niti Richhariya, Hony. Associate Editor ( _Verified by:_ Abhinav Mukerji, Sr. Adv.)
End of Judgment Record
Browse All Supreme Court of India (2024) Decisions
2024-04-09

Kizhakke Vattakandiyil Madhavan (Dead) Thr. Lrs. v. Thiyyurkunnath Meethal Janaki and Ors

This appeal concerns partition of a family property in Eravattur, Kozhikode, governed by pre-1956 Mitakshara succession. Madhavan died before 1910; his widow Chiruthey remarried Neelakandan, triggering Section 2 of the Hindu Widow’s Remarriage Act, 1856, which extinguishes a widow’s rights in her deceased husband’s property on remarriage. Chiruthey’s second marriage, and a sequence of instruments dated 1910–1925—back-to-back deeds creating a lease in favour of Cheriyamma and her son (Exhibits A-20 and A-1) and an assignment (Exhibit A-2)—formed the basis for Chandu (the plaintiff) and Sankaran’s successors-in-interest to seek partition in OS 157/1985. The Trial Court granted partition to the plaintiff; the First Appellate Court dismissed; the Kerala High Court restored the Trial Court’s decree. The Supreme Court, however, allowed the appeal. It held that on remarriage the widow’s title over Madhavan’s property stood lapsed under Section 2; yet the back-to-back deeds involved Nangeli (Madhavan’s mother) and Sankaran, who retained an interest. Exhibit A-20 was treated as a valid conveyance, but Chiruthey’s own title did not survive; the lease purportedly created by A-1 could not extend beyond its 12-year term. Consequently, the plaintiff’s claim for partition could not be sustained, and the appeal was allowed with the trial/decree of the lower courts set aside.

2024-10-04

Banshidhar Construction Pvt. Ltd. v. Bharat Coking Coal Limited & Others

Banshidhar Construction Private Limited (the appellant) challenged Bharat Coking Coal Limited’s tender for a mega project to salvage, develop, and operate a coal mine under a revenue-sharing arrangement for 25 years. The tender NIT dated 16.08.2023 imposed stringent eligibility criteria, including Clause 10 requiring financial capacity documentation and a Power of Attorney for signing bids. The appellant contended that its Power of Attorney (dated 07.11.2023 and notarised 14.11.2023) was valid, and its bid documents were uploaded before the last submission date (01.12.2023). Technical bids opened on 04.12.2023, yet the appellant was declared technically disqualified on 06.05.2024 on grounds that it did not meet Clause 10. Meanwhile, Respondent No.8 was declared technically qualified and later found to be the successful bidder after financial bids were opened on 07.05.2024, despite non-compliance with the “mandatory” Clause 10 documents, including delayed Audited Balance Sheets. The High Court dismissed the writ petition. The Supreme Court, while acknowledging limited review in mega-project tenders, held that public authorities must act with fairness, transparency, and without arbitrariness or malafides. It held that the Power of Attorney requirement was satisfied and that accepting the non-compliant Respondent No.8 while rejecting the appellant was arbitrary. The Court set aside the impugned decision and permitted a fresh tender process in accordance with law, reaffirming that Article 14 requires equal treatment and non-arbitrariness in public procurement.

2024-03-21

Union of India v. M/s Indian Oil Corporation Ltd.

This Supreme Court judgment concerns an appeal by the Union of India challenging a batch of Allahabad High Court orders that directed refunds to IOCL for a difference of approx. 110 km in freight charges on the Baad–Hisar route. IOCL had been charged on the basis of a distance of 444 km under the old Local Distance Table; following Railway Ministry circulars in 2004 and 2005 rationalizing the rounding-off of chargeable distance, the distance was reduced to 333.18–334 km in practice. IOCL issued notices under Section 106 of the Railways Act, 1989 (formerly Section 78-B of the Railways Act, 1890) seeking refunds of the alleged overcharge, and 122 consignments were paid at the old distance before the authorities corrected the distance. The Railway Claims Tribunal dismissed most claims as time-barred, while the Allahabad High Court allowed IOCL’s appeals, holding that the original 444 km charge was an “illegal charge” rather than an overcharge, and thus protected by equity. The Union of India challenged this, arguing that Section 106(3) only covers refunds of overcharges and not illegal charges; that the change in distance stemmed from policy rationalization and circulars, not an erroneous charge. The Court distinguishes Hindustan Petroleum, clarifies the overcharge/illegal charge distinction, and ultimately holds that the 444 km distance was illegal. As a result, the Union’s appeals are dismissed, and IOCL’s refunds for the difference would be payable to IOCL. The matter underscores the nuanced interplay between statutory time limits, chargeable distance, and the nature of the charge in refund claims.

2024-07-23

Gene Campaign & Anr. v. Union of India & Ors.

This is a batch of writ petitions initiated in 2004–2005 addressing the environmental and regulatory treatment of GM crops, specifically the environmental release of transgenic mustard DMH-11 (Dhara Mustard Hybrid-11). The Supreme Court examined whether GEAC’s 18.10.2022 conditional approval and the 25.10.2022 decision were legally sound, whether they violated Article 21 (right to a safe environment) and whether the precautionary principle was properly applied. The court undertook a comprehensive review of the regulatory framework under the Environment Protection Act, 1986 and the 1989 Rules, as well as the Technical Expert Committee (TEC) reports and Parliamentary Standing Committee recommendations. A key feature is the dual opinions: Justice Nagarathna (with Justice Karol concurring but delivering a separate opinion) upheld a robust judicial review of executive policy in GM regulation and found serious irregularities in the decision-making process, quashing the impugned approvals and directing a national policy on GM crops, greater public transparency, and safe-guarded field testing. Justice Karol, in a separate opinion, while endorsing the need for precaution, cautioned against an outright ban on HT crops and emphasized policy matters be left to the legislature. The judgment thus emphasizes environmental rule of law, public trust, intergenerational equity, and a precautionary approach, while mandating further regulatory reform and public participation.