Chandra Bansi Singh and Ors. v. State of Bihar and Ors.

Case / Petition Number:
Civil Appeal Nos. 9973-9977 of 1983; Special Leave Petition (Civil) No. 3098 of 1983; Special Leave Petition (Civil) No. 4428 of 1983.
Neutral Citation:1985 SCR 580

Case Synopsis & Summary

This Supreme Court decision arises from Land Acquisition proceedings in Bihar, where the State issued a notification under Section 4 of the Land Acquisition Act, 1894 to acquire 1,034.94 acres in Village Digha for housing by the Bihar Housing Board, with compensation to be paid by the Housing Board rather than the State. In 1980, a 4.03-acre fragment belonging to a politically influential family (the Pandey family) was released from acquisition, an action challenged by writ petitions. The petitions raised Article 14 challenges to the release and argued that the entire Section 4 notification was vitiated as a result of this separate release. The Supreme Court held the release under Section 48 to be non est for violating Article 14, noting the release was a pure act of favouritism without legal justification. However, it rejected the argument that the entire notification should be struck down; the Court said the released land would be restored to the acquisition as it stood on 19.8.74, and the release could not invalidate the whole notification. The Court also recognized equitable relief for delay in actual possession, directing an additional equitable compensation in the form of interest at 7.5% per annum for two years on the land’s value. The appeals and petitions were disposed of partly in the appellants’ favour, with the matter framed as a balance between legitimate public purpose and discriminatory action.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • S. Murtaza Fazal Ali
  • A. Varadarajan
  • Sabyasachi Mukharji
Judgment Date
1984-08-22
Court Decision / Holding
Appeals and Petitions partly allowed. The release under Section 48 was held non est for violating Article 14; the Section 4 notification would be deemed valid for all lands acquired, including the Pandey lands; the released portion would be treated as part of the acquisition. The Court awarded equitable compensation in the form of interest at 7.5% per annum for two years on the land value. No costs order was made.
Final Disposition
Partly allowed

Parties to the Case

Appellants / Petitioners

  • Chandra Bansi Singh and Ors.

Respondents

  • State of Bihar and Ors.

Legal Representation & Advocates

Counsels for Petitioners

  • • R. P. Bhatt
  • • A. K. Srivastava
  • • A. K. Sen
  • • M. P. Jha
  • • D. P. Singh
  • • B. B. Singh
  • • Y. S. Chitale
  • • L. R. Singh
  • • Gopal Singh
  • • S. S. Jauhar
  • • S. N. Misra

Counsels for Respondents

  • • F. S. Nariman
  • • Ram Balak Mahto
  • • Advocate General
  • • B. P. Singh
  • • Ranjit Kumar
  • • L. N. Singh
  • • K. P. Verma
  • • Jaya E Narayan
  • • R. P. Singh

Provisions of Law Cited

Article 14 of the ConstitutionLand Acquisition Act, 1894 – Section 4Land Acquisition Act, 1894 – Section 6Land Acquisition Act, 1894 – Section 7Land Acquisition Act, 1894 – Section 9Land Acquisition Act, 1894 – Section 48Urban Land Ceiling ActArticle 32 of the Constitution

Legal Doctrines & Maxims

  • Non est
  • Court of equity

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellants contended that the release under Section 48 of the Land Acquisition Act, 1894 was violative of Article 14 and rendered the entire Section 4 notification void; the release was a pure favouritism with no legal justification, and the entire notification should be struck down while seeking equitable relief for delay in possession.

Contentions of Respondents

The respondents argued that the Pandey lands’ release served practical public purposes and that a blanket invalidation of the notification would be excessive; delays in possession were due to stays by the Government and courts, and compensation should reflect the law and equity considerations, including possible enhanced relief for delay.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (2)

Case NameCitationTreatmentExplanation
Lila Ram etc. v. Union of India and Ors.[1976] I SCR 941DistinguishedThe present case is distinguished on the facts; the release was a separate action and does not invalidate the entire notification, unlike the broader publicPurpose in Lila Ram.
Lila Ram etc. v. Union of India and Ors.[1976] SCR 341Mentioned OnlyReferenced within the discussion to contextualize the public purpose principle but not controlling for the present case.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•3,781 words•~18 min read

In The Court Record

Chandra Bansi Singh and Ors. v. State of Bihar and Ors.

•. [S. MURTAZA FAZAL ALI, A. VARADARAJAN AND SABYASACHI MUKHARJi, JJ.] _Constitution_ _of India,_ _1950-Article_ _14-Proceedings_ _under_ _Section 4_ _of the_ _Land Acquisition Act, 1894 taken._ _On_ _19.8.74 seeking_ _to_ _acquire land_ _for_ _Housing_ _Board but_ _on_ _24.5.80 a small portion_ _of_ _land_ _of a particular_ _influential family_ wa~ _exempted_ _from_ _the_ _acqulsttton-Whether the release_ _of the said land is in_ _violation_ _of_ _Artfcle_ _14 of_ _th1_ _Constitution_ _arzd_ _whether the_ _entire_ _acquisition_ _Proceedi'ngs_ _would be_ _vitiated by_ _the_ _said Act of release-_ _Compensatlon payable should be based, whether at the prevailing market value_ _on_ _the data_ _of Sectiotr 4 Notification or_ _on_ _the date_ _of actual_ _take_ _over_ _of_ _possession-Supreme Court being a Court_ _of equity_ _as_ _well._ _it can award_ _compensation for t'ie delay_ _in_ _actual turnover._ Respondent State issued a Notification under Section 4 of the Land Acquisition Act. 1894 seeking to acquire 1034.94 acres of land in Village Digha for the purpose of construction of houses by the Bihar State Hou'iing Board and the price or compensation for the acquired land was to be paid. by the Hou~iog Board and not by the State from its own funds. In July 1977, the State Ministry of Revenue and Industry, after issuinJ Notifications under Sections 6, 7 and 9 and after considering tbe claims and objections confiirmed the acquisition. On 24.5.1980 a portion of the land comprising 4.03 acres belonging to some influentiJ.I persons (Pandey families) was released without there being any legal or constitutional justifiCation for the same. This release was challenged by way of Writ Petitions in the Bihar High Court, out of which the Present Civil Appeals. and Special Leave Petitions have arisen and by filling fresh Writ Petitions in the Court. Allowing the appeals aod the petitions in part, the Court HELD : 1. The order of release passed by the Goveroment under Section 48 of the Land Acquisition Act, 1894 was _non est,_ as being violative of Article 14 of the Constitution. The release of laod in favour of Pandey families was a pure and simple act of favouritism without there being any legal or constitutional justification for the same. [583G-H, 584G] 2. The entire Notification issued under Section 4 on 19th August, 1974 would be deemed to be valid and Ibo land released to the Pandey _Si19_ CHANDRA BANS! SINGH AND ORS. ETC . _v._ STATE OF BIHAR AND ORS. ETC. ' _August_ _22,_ _1984_ " B c n D E F G H _580_ SUPREME COURT REPORT [1985) l s.c.R. A families would form part of tho acquisition as it did on 19.8.74. The release being separate and subsequent act of the Collector could not invalidate the entire Notification but would only invalidate the portion released. _Lila_ _Ram_ _etc._ v. _Union_ _of India_ _and_ Ors.[1976] I SCR 941 distinguished. [SSSC·D, E-F) B (J D E F G ## " 3 : 1 The contention that compensation should be paid according to the value of land prevailing on the date of actual take over of possessi9n, since the price of land bad appreciated substantiallyJ is not correct under the law for two reasons, namely; (i) thrrt it is not the fault of the Collector ,for causing the delay in taking over the pos'lession because the matter was pursued both in the Courts and before the Government and the proceedings bad to be stayed, as a result of which Collector was pr'Cvented from taking possession or giving his award, although all proceedings had taken place; and (ii) The landowners being in continuous possession of the land bad enjoyed the usufruct of the same, particularly the lands happened to be mostly mango orchards and they must have derived large benefits by selling them in the market. [S86G-H, S87A-B) 3 : 2 However, the appellants have undoubtedly a case for pay .. ment of some additional compensation in equity which relief cannot be denied by the Supreme court which is not only a Court of law but a Court of equity as well. Apart from the compensation which may be awarded by the Collector or enhanced by tho Judge or a High Court the appellants should get an equitable compensation in the form of interest calculated at the rate of seven and a half percent per annum for two years on the value of land owned by each land owner. Thus equitable compensation bas been awarded in the special facts of the case appeal, if any, under the Act on tho amount of compensation payable. [587C-E] CivIL APPELLATE JURISDICTION : Civil Appeal Nos. 9973 to 9977 of 1983 Appeals by Special leave from the Judgment and Order dated the 31st January, 1983 of the Patna High Court in C.W.J.C. Nos. 2170, 3435, 3879, 3436 and 3561 of 1982. WITH Special Leave Petition (Civil) No. 3098 of 1983 From the Judgment and Order dated the 3 !st January, 1983 of the Patna High Court in C.W.J.C. No. 3556 of 1982. AND Special Leave Petition (Civil) No. 4428 of 1983 From the Judgment and Order dated the 31st January, 1983 of the Patna High Court in C. W.J.C. No. 2104 of 1982. AND .. ###### ' Al .. , #### . c. B. SINGH _v._ BIHAR _(Fazal All,_ _J.)_ 581 Writ Petition (Civil) Nos. 13306-21, 13346 of 1983 and 13229 A of 1934 and 1324-42 of 1984. Under article 32 of the Constitution of India . _K._ _P._ _Verma,_ Advocate General and _R._ _p: Singh_ in SLP. No. 4288 of 1983. The Judgment of the Court was delivered by FAZAL ALI, J. Sometimes while taking a pragmatic and progres· sive action under a statute in the general public interest, which is doubtless a step in the right direction, the Government succumbs to internal or external pressures by a citizen or group of citizens so as to show special favour to them which destroys the laudable object of the nature of the action. Such a course is adopted to help a few chosen friends at the cost of the people in general and furstrates the very object of the meaningful State action. Furthermore, the State action brings it into direct collision with Art, 14 of the Col\stitution of India. ADVOCATES FOR THE APPELLANTS: _R._ _p._ _Bhatt_ and _A. K_ _Srivastava_ in CA. 9973/83 . _A.K._ _Sen_ and _M._ _P._ _Jha_ in CA. No. 9974/83. _D._ _P._ _Singh_ and _B._ _B._ _Singh_ in CA. No .. 9975/83. _Y._ _S. Chitale,_ _L._ _R. Singh_ and _Gopal Singh_ for the Appellants . ADVOCATE FOR THI?. PETITIONER IN SLP NO. 4428 OF 1983. _S. S. Jauhar_ and _S._ _N._ _Misra_ ADVOCATES FOR RESPONDENTS: _F._ _S. Narlman, Ram Balak Mahto,_ Advocate General, _B._ _P;_ _Singh_ and _Ranjit Kuinar'.in_ CA. 9973/83. B c D _L._ _N._ _Singh, K._ _P._ _Verma,_ Advocate General and _Jaya_ E _Narayan_ _R._ P: _Singh_ (In WP. Nos. 13306·21 and 13346) F G A B c D E F G fl _582_ SUPREME COURT REPORTS (1985] 1 S.C.R. 'Fhe present case seems to us to be a concrete illustration of the State action taken under the land Acquisition Act, J 894 (for short, to be referred to as the 'Act'). What happened here is that while the Government of Bihar acquired a. vast tract of laud for construe· tion of houses and allotment to the people belonging to the low and middle income groups but chose to exsmpt certain persons from the statutory action on purely unreasonable and illusory grounds. Fortunately, the chosen class comprised a very small number of persons whose lands consisted of a small proportion of the total acquired land. This now brings us to the consideration of the important facts of the case. A notification under s. 4 of the Act was issued by the Government of Bihar on 19.8.14 seeking to acquire 1034.94 acres of land in village Digha for the purpose of con•truction of houses by the Bihar State Hoasing Board wherein it was mentioned that the price or compensation for the acquired land was to be paid by the Housing Board and not by the State from its own funds. By virtue of the said notification objections were called and on 12.2.76 all the objeGtions were disposed of. A declaration under s. _6_ of the Act was issued which was published on 21J.~.7ti. On 25.3.76 the publica· tion was received by the Department and notices were issued under s. 7 of the Act for filing claims. On 14.4.76 notification under s. 9 of the Act was issued. On 19.5.76 as mamy as 500 objections were filed. So far so good. Unfortunately, thereafter on 8.11. 76 a representation was made by Mr. Ram Avtar Shastri, Member of Parliament for withdrawing the acquisition proceedings, which was disposed of ' and dismissed in December,1976. After this, rate report was prepared which was accepted by the Collector who gave his final estimate and sent the same to the . Government in January, 1977. According to the estimate, a sum of Rs. 8.30 crores was to be disbursed to the various owners whose lands were sought to be acquired. While the matter was nearing completion preparations for the 1977 general elections were made as a result of wlllich the entire matter was deferred and put into cold· storage. On 24.5.80, which is a crucial date as it appears to b• the subject matter of the present appeals and writ petitions, a portion of land comprising 4.03 acres belonging to some influential persons, viz., Badri Sahu, R.S. Pandey and his relations (hereinafter referred to as 'Pandey families') was released. It is not clear what were the considerations which led the Government to single out Pandey ######, ... ... A B c D E F G H c. B. SiNGH _v._ BiHAR _(Fazal Ali,_ J.) 583 families for favourable treatment. Sometime in July, 1977 the State Ministry of Revenue and Industry confirmed the acquisition. Ultimately, on 12.12.77 in order to smoothen the way for the acquisition of the lands in question, the Central Government exempted purely agricultural lands from acquisition under the Urban Land Ceiling Act. In the year 1978, a representation was made by Mr. Thakur Prasad who took over as the new Minister of Industries after the general elections, about the acquisition to the Chief Minister who stayed further proceedings in the matter. In the mean-time, a writ petition was filed in the High Court which was ultimately withdrawn by the petitioners and the stay was vacated by the Government sometime in·carly 1980. In May, 1981 another writ petition was filed in the High Court mainly challenging the release of lands on 24.5.80 in favour of Pandey families on the ground that the said release was violative of Art. 14 and therefore the entire notification was bad and without jurisdiction. In January, 1982, the amount of com.oensation was deposited by the State Housing Board with the Treasury which was followed by an Award given in respect of the acquired lands on I. 2 .83. The totality of the facts and the dates stated above clearly show that the delay in finalising the compensation by the Collector w_as due to unforseen circumstances and the appellants, therefore, cannot be beard to complain of the same because, as already indicated, this was due to stay orders passed by the Government and the courts on several representations. It is rather unfortunate that while the acquisition of land for a sound purpose was taken and necessary steps complied with, the acquisition fell into a rough weather raising serious controversies between the parties in dispute, putting forward various claims and objections, as a result of which the said housing scheme was delayed by more than 5-6 years. Indeed, if the Government would have been wiser and more alert by the time possession was taken. the object of building houses by the Housing Board of the State could have been accomplished long before. The sheet anchor oftbe arguments of the appellants in civil appeal No. 9973 of 1983, wbich is by special leave, was that the entire acquisition proce7dings and the orders passed by the Collector acquiring the land became _non est_ as they were violative of Art. I 4 of the Constitution, It was conteqded tqat there was no justifiQation for t]je A B c D , .. ### . G ' ### . ff 584 SUPREME COURT REPORTS [1985) l s.c.R. Government to have released a portion of the land, viz., 4.03 acres. However small fraction of the 'main land, it was merely to favour a particular set of individuals, viz., Pandey families, who are alleged to have exercised very great influence on the Government of the time and that was done only to help one single body of persons without any reasonable classification or nexus to the object of the Notification. The release of land belonging to Pandey families was supported by the Government on the ground that as they had put up large buildings with boundary walls in the entire area covered by 4.03 acres, it would have boen rather difficult for the Government to demolish the said constructions thereon. In order to repel this argument, unimpeachable materials were produced before us to show that the plea of huge buildings or houses situated on the land of Pandey families was a complete hoax or a false pretext in order to enable the Collector to withdraw the acquisition of this particular land. On examining the materials, which have not been denied by the Pandey families, we find that the contentions of the appellants are sound and must prevail. We have been shown photographs of the lands of Pandey families, which appear at page 120 of the Paperbook, which shows that there are no huge buildings or houses but only small hutments, perhaps used for keeping a tubewell to water the fields. The plot in question is No. 3114 which belongs to Pandey families. On page 121 there is another photograph which shows small hut-in the plot owned by the Pandey families. On the other hand, amongst the lands acquired and not withdrawn from acquisition is a plot owned by one Deo Narain Singh, on which stands a two-storeyed structure which also is meant for the purpose of keeping cattle or watchman to look after the field. Even so, if the plea of Pandey families was to be accepted then there was a much superior claim of Deo Narain Singh for release of his land also. Neither the photographs referred to above nor the fact that no structure except the one shown in the photogroph which had been built by ihe Pandey families, has been disputed before us. It was, therefore, rightly argued by counsel for the appellants in Civil Appeal No. 9973/83 that the release of land in favour of the Pandey families was a pure and simple act of favouritism without there being any legal or constitutional justification for the same. The State also was not in a position either to rebut or support the release of the lands in question. We might also mention that although notice had been iss!led and served on the Pandey families yet they did not appear in this Coi>rt to support thoir claim. Hence, there does not appear to l:>e any serioqs dispute between the parties that the order of release c. B. SINGH _v._ BillAR _(Fazal Ali,_ **J.)** **SSS** passed by the Government under s. 48 of the Act was _non_ _est_ as **A** be;ng violative of Art. 14 of the Constitution. **B** c **D** E **F** G H The matter does not rest here but the counsel for the appellants further submitted before this Court to declare the entire acquisition of lands as unconstitutional even though a very small fraction of it was hit by the mischief of Art. 14. It was submitted that the entire tract of lands was acquired by one notification and once it is found that even an infinitesimal part of it was unconstitutional, the entire notification would have to be struck down. In case at the time of acquisition the lands belonging to the Pandey families were left out on some special grounds in public interest, then doubtless the appellants' argument would be unanswerable. This, however, does not appear to have. happened in this case, as indicated above. Whereas section 4 notification was issued on 19.8.74, the release came on 24.5.80, that is to say about six years after. Hence, all that would happen is that the release is here by declared to be bad and _non est_ as a result of which the entire notification issued under s. 4 on 19.8.74 would be deemed to be ~alid and. the land released to the Pandey families would form part of the acquisition as it did on 19.8.74. Perhaps, the appellants wanted to persuade this Court to strike down the entire notification so that when a fresh notification is issued they may be able to get a higher comprnsation in view of the sudden spurt and rise in the;price of land and other commodities in between the period when the acquisition was made and when the actual possession was taken. For the reasons that we have given above we are unable to uphold this process of reasoning. The release being a separate and subsequent act of the Collector, could not invalidate the entire notification but would only invalidate the portion released, with the result that the original notificatiod wonld be restored to its position as it stood on 19.8.74 . Reliance was placed by the counsel for the State on a decision of this Court in the case of _Lila Ram etc._ v. _Union_ _of India_ _&_ Ors.,( [1] ) _etc._ This case is clearly distinguishable from the present one because the argument in that case proceeded on the footing that as huge areas of land had been freezed there was no public purpose in acquiring the land and hence the acquisition was bad. While rejecting the contention Khanna, J., speaking for the Court observed thus ; ( ll [1976) 1 SCR 341. -,, •• ##### • A 8 c D E F G u _586_ SUPREME COURT REPORTS (1985] I S.C.R, "It is significant that the land covered by the notification is not a· small plot but a huge area covering thousands of acres. In such cases it is difficult to insist upon greater precision for specifying the public purpose because it is quite possible that various plots covered by the notification may have to be utilised for different purposes set out in the Interim General Plan. No objection was also taken by the appellant before the authorities concerned that the public purpose mentioned in the notification was not specific enough and as such he was not able to file effective objections against the proposed acqui>ition." The case cited above has no application to the facts of the present case because it was never argued before the High Court that the acquisition was without any public purpose. It is, however, contended by both the parties that if at the time when the section 4 notification was issned an invidious distinction without any reasonable classification would have been made between the land acquired and the land of Pandey families so as to form an integral part of the entire acquisition, the entire notification would have been struck down. Here, we find that the release of land in favour of Pandey families came after three years of the initial notification and therefore it cannot invalidate the section 4 notification in its entirety. All that would happen is that the released portion would be deemed to be _non est_ and in the eye of law the section 4 notification would be deemed to be a notification for the entire lands acquired, including the lands of Pandey families. In view of our decision on the aforesaid points, it is not necessary for us to dilate further on this question . The other question' raised by the counsel for the appellants was that there was sufficient delay between the date of the section 4 notification and taking over possession of the lands during which period the price of land had appreciated substantially and, therefore, the compensation should be paid according to the value of the land prevailing on the date of actual taking over of possession. This argument also is without substance for the following reasons : (I) that it is not the fault of the Collector for causing the delay in taking over the po.session because the matter was pursued both in the courts and before the Government and the proceedings had to be stayed, as a result ' ... -· _>_ / # . (2) The landowners being in contin~ous possession of the land had enjoyed the usufruct of the same, particularly the lands happened to be mostly mango orchards and they must have derived large benefits by selling them in the market. On an analysis of the various steps taken by the parties and others in the taking of possession, there is undoubtedly a delay of about ll; years and for the purpose of calculation, and convenience when rounded off, the delay may be taken to be of two years. So far as this delay is concerned, the appellant; have undoubtedly a case for payment of some additional compensation in equity though not under law and as this Court is not only a court of law but a court of equity as well, it will be impossible for us to deny this relief to the appellants. After taking into consideration the various shades and aspects of the case we are clearly of the opinion that apart from the compensation which may be awarded by the Collector or enhanced by the Judge or a higher Court, the appellants should get an equitable compensation in the form of interest calculated at the rate of 7t per cent per annum for two years on the value of land owned by each landowner. This equitable compensation has been awarded in the special facts of this case and will not be the subject matter of appeal, if any, under the Act on the amount of compensation. As the points involved in these appeals and writ petitions are the same we decided to dispose them of by one common judgment. For the reasons given above, the appeals the special leave and the writ petitions are disposed of accordingly but without any order as to costs. S.R. _Appeals and Petitions partly allowed._ c. ii. SiNGH _v._ BIHAR _(Fazaf Ab,_ j,) SS'7 of which Collector was prevented from taking posses- A sion or giving his award, although all other proceedings had taken place . B c D E F
End of Judgment Record
Browse All Supreme Court of India (1985) Decisions
1984-09-28

Gurpal Tuli and Ors. v. State of Punjab and Ors.

This Supreme Court decision concerns pay scales for teachers in the Punjab government schools in light of circulars issued in 1967, 1979, and 1957. The appellants—Masters and Mistresses holding M.A., M.Sc., B.T. or B.Ed. degrees—petitioned for the higher Lecturer’s grades set out in paragraph 2 of the Government Circular Letter dated July 29, 1967 (Rs. 300-25-450/25-600 for those with first and second division Master’s degrees; Rs. 250-25-400/25-550 for those with third-class Master’s degrees). They argued that they perform the same work as Lecturers and, under the principle of equal pay for equal work, are entitled to those higher grades; reliance was placed on Randhir Singh v. Union of India. The Punjab and Haryana High Court dismissed the writ petitions, and the Division Bench affirmed. The Court held that paragraph 2 of the July 29, 1967 circular creates a Lecturer’s Grade, and the number of Lecturer posts is limited; entitlement to those grades is contingent on holding Lecturer posts, not merely possessing postgraduate qualifications. The decision distinguishes Randhir Singh and notes that the July 29, 1967 circular operates on a different plane from the 1957 circular. Kirpal Singh Bhatia’s case is deemed of no assistance. Consequently, the appeals are dismissed, preserving the distinction between Lecturer posts and other teaching posts while acknowledging earlier clarifications remain applicable to the relevant posts.

1984-12-11

Goa Sampling Employees' Association v. General Superintendence Co. of India Pvt. Ltd. & Ors.

These appeals address whether the Central Government is the "appropriate Government" to refer five industrial disputes under Section 10(1)(d) of the Industrial Disputes Act, 1947, in the Union Territory of Goa, Daman and Diu. The Goa Sampling Employees' Association contended that iron ore samplers employed at Mormugao Port fall within the Dock Workers (Regulation of Employment) Act, 1948 as "dock workers" and, being in a major port within a Union Territory, the Central Government is the appropriate authority to refer the disputes. They also argued that in a Union Territory there is no State Government and thus the Central Government should perform functions of the State Government for the UT. The Central Government’s references were initially upheld by the Tribunal, but the Bombay High Court quashed them, holding the Central Government not to be the appropriate Government, since Goa, Daman and Diu is administered by an Administrator under Article 239, with the Administrator treated as the State Government for purposes of the Act. The Supreme Court reversed, holding that the General Clauses Act definitions and Constitutional provisions treat the Union Territory administration separately from a State Government; the Central Government is the appropriate Government for UTs in relation to industrial disputes. The Court directed expeditious disposal of the merits and awarded costs against the respondents.

1985-04-23

V. J. THOMAS AND ORS. v. UNION OF INDIA AND ORS.

This is a Supreme Court appeal by Junior Engineers challenging the constitutionality of the Note appended to clause (4) of Appendix I to the Telegraphic Engineering Service (Group B Posts) Recruitment Rules, 1981. The dispute traces to earlier rules: the 1966 Telegraphic Engineering Service (Class II) Recruitment Rules required promotion to Assistant Engineer entirely by promotion through a qualifying departmental examination, with a list prepared by a Departmental Promotion Committee. Sub-clause (4) allowed those recruited and absorbed in that grade against vacancies in a given year (five years prior to the year of announcement) to be eligible for the department exam. The 1981 Rules superseded the 1966 Rules and introduced a qualifying-cum-competitive examination, with a Note stating that the first two examinations would be competitive only for officers who had already qualified in the qualifying examination held before the 1981 Rules. Appellants, recruited in 1973, argued that this Note discriminates against 1973 and later batches by denying them a fair opportunity to contest promotions, despite five years’ service. The Kerala High Court found the Note ultra vires, but the Division Bench disagreed. The Supreme Court ultimately held that the appeal is infructuous due to time and that the Note is not ultra vires, while directing future scheduling of qualifying and competitive examinations, and promotions in light of vacancies. The appeal is disposed of with no costs.

1985-03-27

T. Venkata Reddy v. State of Andhra Pradesh

These writ petitions challenge the constitutional validity of the Andhra Pradesh Abolition of Posts of Part-time Village Officers Ordinance, 1984 (Ordinance No. 1 of 1984), which abolishes part-time village posts and creates Village Assistants. The Governor promulgated the Ordinance under Article 213, arguing administrative reform and expediency in a divided Andhra Pradesh (Andhra Area and Telangana Area) with a long history of hereditary and semi-hereditary village offices governed by pre-constitutional and colonial statutes. The petitions raised three main contentions: (i) lack of mind by the Governor in promulgating the Ordinance, (ii) the Ordinance lapsed due to absence of a replacement Act and thus the abolished posts should be revived, and (iii) the abolition infringed Article 21. The petitioners relied on earlier judgments upholding gubernatorial ordinances and the proposition that an Ordinance should have the same force as an Act, yet require constitutional limits. The Court reviews the constitutional framework (Articles 123 and 213) and explains that Ordinance power is a plenary legislative function exercisable to meet emergencies when the legislature is not in session, with the Ordinance having the force of an Act but subject to six-week or six-month disallowance provisions. It also clarifies that abolition and the creation of Village Assistants are two independent, sequential actions and that disapproval cannot revive completed, already-implemented changes. The Court ultimately dismisses the petitions, noting that the State may create new posts under Article 162 as long as not pre-empted by a statute or rule.