CENTRAL WAREHOUSING CORPORATION & ANR. v. M/S SIDHARTHA TILES & SANITARY PVT. LTD

Case / Petition Number:
/2024
Neutral Citation:2024 SCC OnLine SC 1754

Case Synopsis & Summary

Central Warehousing Corporation (CWC), a statutory body under the Warehousing Corporations Act, 1962, provided warehousing facilities to Sidhartha Tiles & Sanitary Pvt. Ltd. beginning in 2012 under a lease that envisaged a three-year term expiring in September 2015, with renewal by mutual consent and periodic rate revisions during the subsistence of the agreement. Clause 16 of the lease incorporated an arbitration clause: disputes arising out of or concerning the agreement would be referred to a sole arbitrator appointed by the Managing Director of CWC, with the Arbitration and Conciliation Act, 1996 applying to the proceedings. Prior to expiry, storage charges were revised several times, culminating in disputes over renewal and the legality of the rate increases. Although the respondent vacated the premises in November 2015, eviction proceedings under the Public Premises Act were initiated. The Estate Officer’s order held unauthorised possession for a short period, directing dues under the lease. The respondent invoked Section 11(6) of the Act to refer the disputes to arbitration, and the High Court held the claims fell within the arbitration clause. The Supreme Court rejected the argument that the Public Premises Act overrides the Arbitration Act, noting that the disputes arise from the contract and are within the arbitration clause. Relying on SBI General Insurance Co. Ltd. v. Krish Spinning (supra) and In re: Interplay (supra), the Court directed that the arbitration proceed, while also awarding costs of Rs 50,000 and directing expeditious completion of the award. The appeal is dismissed.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Landmark Cases
Hon'ble Judges
  • PAMIDIGHANTAM SRI NARASIMHA
  • SANDEEP MEHTA
Judgment Date
2024-10-21
Court Decision / Holding
The appeal is dismissed; the Public Premises Act does not override the Arbitration and Conciliation Act; the arbitration clause governs the disputes; the High Court's appointment of arbitrator is upheld; arbitral proceedings to resume and deliver the award as expeditiously as possible; the appellant to pay costs of Rs. 50,000.
Final Disposition
Appeal dismissed; arbitration proceedings to resume; awards to be delivered expeditiously; costs Rs 50,000.

Parties to the Case

Appellants / Petitioners

  • CENTRAL WAREHOUSING CORPORATION & ANR.

Respondents

  • M/S SIDHARTHA TILES & SANITARY PVT. LTD

Provisions of Law Cited

Public Premises Act, 1971Arbitration and Conciliation Act, 1996Section 11 of the Arbitration and Conciliation Act, 1996Section 11(6) of the Arbitration and Conciliation Act, 1996Section 11(6-A) of the Arbitration and Conciliation Act, 1996Warehousing Corporations Act, 1962

Legal Doctrines & Maxims

  • The scope of examination under Section 11(6-A) is confined to the existence of an arbitration agreement
  • Prima facie scrutiny of existence of arbitration agreement
  • Arbitration clause covering all disputes arising out of the agreement
  • Interplay between Public Premises Act and Arbitration Act; not overlapping
  • Following SBI General Insurance Co. Ltd. (supra) and In Re: Interplay (supra) to interpret the remit of referral court

Submissions & Arguments

Contentions of Appellants / Petitioners

The applicants contended that the Public Premises Act, 1971 may override the Arbitration and Conciliation Act, 1996 in the context of disputes arising from the lease and renewal and related charges; they argued for keeping the disputes out of or limited from arbitration by virtue of statutory eviction provisions; however, the court rejected this position, noting that the disputes arise from the contract and fall within the arbitration clause.

Contentions of Respondents

The respondents argued that there is a valid arbitration clause (Clause 16) in the lease agreement, and the disputes relating to renewal and rate revisions fall within its scope; the High Court correctly referred the matter to arbitration; the Public Premises Act does not extinguish or override the arbitration clause; arbitration proceedings should proceed.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (2)

Case NameCitationTreatmentExplanation
SBI General Insurance Co. Ltd. v. Krish Spinning—PositiveCited to articulate the remit of the referral court under Section 11(6) and the scope of examination for existence of an arbitration agreement.
In re: Interplay (supra)—PositiveCited for the proposition that the scope of enquiry at the appointment stage is limited to prima facie existence of the arbitration agreement.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,210 words•~11 min read

In The Court Record

CENTRAL WAREHOUSING CORPORATION & ANR. v. M/S SIDHARTHA TILES & SANITARY PVT. LTD

2024 INSC 805 **==> picture [72 x 72] intentionally omitted <==** ## **REPORTABLE** ## IN THE SUPREME COURT OF INDIA CIVIL APPELLATE JURISDICTION ## **CIVIL APPEAL NO.________/2024 Arising out of SLP (C) No. 4940 of 2022** CENTRAL WAREHOUSING CORPORATION & ANR. ...APPELLANT(S) VERSUS M/S SIDHARTHA TILES & SANITARY PVT. LTD ...RESPONDENT(S) ## **J U D G M E N T** ## **PAMIDIGHANTAM SRI NARASIMHA, J** . **1.** Leave granted. **2.** The questions of law formulated in this appeal is, whether the Public Premises Act, 1971 overrides the Arbitration and Conciliation Act, 1996. If the said question is answered in negative, the only question that survives is, whether the High Court committed any error in appointing the arbitrator while exercising the jurisdiction under Section 11 of the Arbitration and Conciliation Act, 1996 (‘hereinafter referred as the Act’). Having examined the matter in detail, it is clear Signature Not Verified that the said question does not arise in the facts and circumstances of Digitally signed by Indu Marwah Date: 2024.10.21 18:19:16 IST Reason: the case. We are guided by the existence of the Arbitration Clause and the decision of this Court in _SBI General Insurance Co. Ltd._ vs. _Krish_ 1 _Spinning[1]_ which discussed the scope of referral court’s interference when a valid arbitration clause exists. **3.** A brief conspectus of the facts is as follows. The appellant is a statutory body under the Warehousing Corporations Act, 1962, and is under the administrative control of the Ministry of Consumer Affairs, Government of India. As it was providing warehousing facilities, the respondent, a company engaged in the business of trading ceramic tiles and sanitary ware, had approached the appellant for storage of its goods. The appellant agreed and provided a storage space of 1295 sq. mtrs. and possession of this space was handed over to the respondent on 12.09.2012, even before an agreement could be entered between the parties. **4.** Lease agreement on 26.09.2012 governing the contractual relationship provided under Clause 1 that the space will remain with the respondent for a period of 3 years from 12.09.2012. Thus, the contract was due to expire by efflux of time by 11.09.2015. This lease was made subject to a ‘renewal by mutual consent’ as per Clause 2. The rate of storage was fixed at Rs. 131 per square meter per month. What is relevant for us is Clause 16 of the agreement, incorporating the arbitration clause. 1 2024 SCC OnLine SC 1754 2 **5.** Even before the expiry of the lease, the storage charges were said to have been revised on a pan India basis w.e.f. 01.11.2012. The revision of the storage charges was communicated to the respondent and by a letter dated 04.10.2012, a demand for enhanced payment w.e.f. 01.11.2012 was raised. The appellant renewed the said demand on 10.05.2013 and 31.12.2014 and intimated that if the amount is not paid, it will be inferred that the respondent is not interested in retaining the facility. While the matter was pending, the storage charges were further revised w.e.f. 01.04.2015 by a letter dated 05.03.2015 when the respondent was informed that the tariff will be at the rate of Rs.177/per sq. mtr. per month. **6.** In turn, the respondent is said to have intimated the appellant that it is interested in continuing the facility but sought renewal of the agreement dated 26.09.2012 by also committing that any arrears due as per the original agreement would be cleared. **7.** On 16.09.2015, the appellant is supposed to have rejected the request for renewal of the agreement and has in turn raised a demand of Rs. 16,10,004/. In view of the fact that the respondent had not vacated the premises despite the lease’s expiry on 11.09.2015, the appellant invoked the provisions of the Public Premises (Eviction of Unauthorised Occupants) Act, 1971 (hereinafter the Public Premises Act). 3 **8.** It is an admitted fact that even before the order of the Estate Officer under the Public Premises Act could be passed, the respondent is said to have vacated the premises on 13.11.2015. The Estate Officer any way passed his order on 31.12.2015 holding that the respondent was in unauthorised possession only from 11.09.2015 (i.e. when the lease expired) to 13.11.2015 (when premises were vacated) and also directed payment of certain dues as indicated in the demand notice. **9.** It is in the above referred background that the respondent invoked arbitration by filing an application under Section 11(6) of the Act for the appointment of an arbitrator in view of a subsisting arbitration clause in the agreement. The said clause is as under: “ _**16.** All disputes and differences arising out of or in any way touching upon or concerning this agreement whatsoever shall be referred to the sole Arbitration of any person appointed by the Managing Director, Central Warehousing Corporation New Delhi. The Award of such Arbitrator shall be final and binding on the Parties to this agreement. It is a term of this agreement that in the event of such arbitrator to whom the matter is originally referred / being transferred or vacating his office or being unable to act for any reason the Central Warehousing Corporation at that time shall appoint any other person to act as Arbitrator in accordance with the terms of this agreement. Such person shall be entitled to proceed with the reference from the stage at which it was left by his predecessors. The Arbitrator shall give a speaking award._ _The venue of Arbitration shall be at such place as may be fixed by the Arbitrator at his sole discretion._ _The cost of arbitration shall be borne by the parties as per the decision of the Arbitrator._ _The Arbitrator shall give separate award respect of each dispute or difference referred him,_ 4 _In to Subject as aforesaid, the Arbitration & Conciliation Act, 1996 shall apply to the Arbitration proceedings under this clause_ .” **10.** The application under Section 11 specifically speaks about the dispute that has arisen under the agreement dated 26.09.2012. Broadly, they relate to the right of renewal of the contract and also the legality and propriety of the revision of rates during the subsistence of the agreement. **11.** The High Court considered the matter in detail and came to the conclusion that the claims made in the notice followed by the application under Section 11 are clearly covered by the arbitration clause. The relevant portions of the High Court Judgment is as under: “ _**12.** On going through the same, it is seen that as per the said clause all disputes and differences arising out of or in any way touching upon or concerning the agreement have to be referred to the sole arbitration of any person appointed by the Managing Director of the Corporation. Award of such arbitrator shall be final and binding on the parties to the agreement. The arbitrator shall also decide the venue of arbitration and the cost of arbitration shall be borne by the parties as per the decision of the arbitrator. The arbitrator is required to give separate award in respect of each dispute or difference referred to him. Thus, the crucial words in Clause 16 are "all disputes and differences arising out of or in any way touching upon or concerning the agreement. According to the petitioner, the agreement for dedicated warehousing entered into between the parties on 26.09.2012 clearly mentioned the rate of storage charge i.e. Rs. 131-00 per square meter per month. But the Corporation unilaterally enhanced the storage charge rate with effect from 01.11.2012 at the gross area rate of Rs.157-00 per Square meter per month and net area rate of Rs.216-00 per square meter per month._ 5 _**13.** The second area of dispute is with regard to extension of the agreement for dedicated warehousing. As per Clause No 1 the period of dedicated warehousing was for three years with effect from 12.09.2012, but both the parties had the option of renewing the agreement for a further period as mutually agreed upon on expiry of the term of the agreement. It is on these two issues that notice of arbitration was given to the Managing Director of the Corporation by the petitioner on 23.09.2015. As per the postal tracking (page32 of the paper book), the same was delivered on 26.09.2015. In any case respondent has not disputed receipt of the notice. According to the respondent, it is not an arbitral dispute being beyond the agreement._ ” **12.** Questioning the judgment and order passed by the High Court, referring the dispute to arbitration, the appellant filed the present appeal. Though the question relating to whether the Public Premises Act will override the Arbitration Act has been raised and argued before the High Court. This court issued notice in the special leave petition on the basis of the question so formulated. We could have dismissed the special leave petition on this very ground but as notice was issued on this point and the appeal has been pending for some time, we considered it appropriate to hear the appellant on this question and decide the case. We will first answer the issue relating to the applicability of the Public Premises Act. **13.** _Re: Whether the Public Premises Act, 1971 overrides the Arbitration and Conciliation Act, 1996:_ This submission has to fail. The reasons are simple and straight forward. The dispute that is raised in the 6 Section 11 application relate to promises and reciprocal promises arising out of the agreement dated 26.09.2012. The right of renewal as well as the legality and propriety of the enhanced demand arose during the subsistence of the agreement. It will be on the interpretation, construction and the obligations arising out of the agreement that the respondent’s claim rests. On the other hand, The Public Premises Act authorises the ejectment of a tenant in unauthorised occupation of public premises and for consequential directions. The original lease as it were, validly subsisted till 11.09.2015 and the dispute between the parties related to the period commencing from 12.09.2012 to 11.09.2015, when the lease expired. The Public Premises Act would not even cast a shadow on this period. In so far as the dispute relating to this right of renewal is concerned, it depends on the terms of the agreement. The Public Premises Act neither bars nor overlaps with the scope and ambit of proceedings that were initiated under the Arbitration and Conciliation Act. **14.** _Whether the High Court committed any error in appointing the arbitrator while exercising the jurisdiction under Section 11_ : We have already extracted the relevant portion of the order passed by the High Court. The revision of storage charges occurred during the subsistence of the contract. Its legality and propriety will depend on the terms of the agreement dated 26.09.2012. Similarly, the right of renewal will 7 also be based on and a construct of the said agreement. These two disputes will undoubtedly arise out of the agreement between the parties and the resolution of such disputes is clearly covered by the arbitration clause (Cl. 16 of the agreement). After the recent decision of this court in _SBI General Insurance Co._ ( **supra** ) the remit of the referral court to consider an application under Section 11(6) is clear and unambiguous. We need to just examine the existence of an arbitration agreement. The context is clearly delineated in paras 110-111 and 114 of the judgment which are extracted below for ready reference. “ _**110.** The scope of examination under Section 11(6-A) is confined to the existence of an arbitration agreement on the basis of Section 7. The examination of validity of the arbitration agreement is also limited to the requirement of formal validity such as the requirement that the agreement should be in writing._ _**111.** The use of the term ‘examination’ under Section 11(6-A) as distinguished from the use of the term ‘rule’ under Section 16 implies that the scope of enquiry under section 11(6-A) is limited to a prima facie scrutiny of the existence of the arbitration agreement, and does not include a contested or laborious enquiry, which is left for the arbitral tribunal to ‘rule’ under Section 16. The prima facie view on existence of the arbitration agreement taken by the referral court does not bind either the arbitral tribunal or the court enforcing the arbitral award._ […] _**114.** In view of the observations made by this Court in In Re : Interplay (supra), it is clear that the scope of enquiry at the stage of appointment of arbitrator is limited to the scrutiny of prima facie existence of the arbitration agreement, and nothing else_ .[…]” (emphasis supplied) **15.** For the reasons stated above, we have no hesitation in rejecting the petition and we further hold that the appellant must bear the costs for this unnecessary litigation which we quantify at Rs. 50,000/-. 8 **16.** As the arbitration proceedings were stayed due to the pendency of this appeal by the order dated 01.04.2022, while dismissing this appeal we direct that the arbitral tribunal shall resume the proceedings and endeavour to deliver the award as expeditiously as possible. **17.** The appeal is dismissed in terms of the above order. ………………………………....J. [ **PAMIDIGHANTAM SRI NARASIMHA** ] ………………………………....J. [ **SANDEEP MEHTA** ] NEW DELHI; October 21, 2024. 9
End of Judgment Record
Browse All Landmark Cases Judgments
2019-01-22

State of Himachal Pradesh & Anr. v. Pinju Ram & Others; State of Himachal Pradesh & Ors. v. Ganesh Dutt & Anr.

This batch of appeals concerns regularisation and monetary benefits of part‑time employees in Himachal Pradesh who were converted to daily‑wage status. The State had issued a policy on 27 February 2004: part‑time Class‑IV employees who had completed ten years of continuous service as on 31 December 2003 would be made daily wagers with prospective effect, and posts vacated by such employees would stand abolished; Education and Ayurveda were excluded from the policy. Revenue Chowkidars, engaged by Panchayats, were not covered by that policy and received separate treatment. Following writ petitions and an order of the Himachal Pradesh High Court and in light of later developments, the State drew‑up directions in 2011 (22 September) to give seniority to Revenue Chowkidars on the basis of ten years of service, but with wages from the date of actual appointment and without back‑dated monetary benefits; 7 July 2012 further instructions reiterated this stance for remaining part‑time employees, with monetary benefits not guaranteed in the interregnum. The respondents pressed for back wages dating from 1 January 2007 and broader coverage. The Supreme Court held that the 2007 back‑pay direction was unsustainable, clarified that seniority would count from ten years without past benefits, and that the 2011 policy and Moti Singh principle should guide the approach. The appeals are allowed; no costs. The related writ petitions are to be disposed of consistent with these directions.

2018-08-14

Union Bank of India and Others v. C.G. Ajay Babu and Anr.

This is a Supreme Court of India appeal concerning the forfeiture of gratuity under the Payment of Gratuity Act, 1972. The respondent was a branch manager of the appellant bank and was dismissed on 3 June 2004 after disciplinary proceedings. A show-cause notice sought to forfeit gratuity due to misconduct involving moral turpitude, which was ordered on 20 April 2004. The High Court upheld the dismissal but held that gratuity could be paid since there was no financial loss to the bank, and that a bipartite settlement between the bank and employees permitted forfeiture only where misconduct caused financial loss. The Division Bench, however, held that forfeiture under Section 4(6) must be read together with Section 4(5) and that no loss was proven, thus entitling the employee to gratuity in accordance with the bipartite settlement. The Supreme Court agreed with the High Court that forfeiture is not automatic; it is controlled by Sections 4(5) and 4(6) of the Act and by the bipartite settlement, which requires loss to justify forfeiture. The Court emphasized that an act must constitute an offence involving moral turpitude and that conviction is generally required for forfeiture under 4(6)(b)(ii). The appeal is dismissed with no costs.

2018-09-25

Reema Salkan v. Sumer Singh Salkan

This is a Supreme Court of India criminal appeal under the Criminal Appellate Jurisdiction arising from a maintenance dispute under Section 125 Cr.P.C. The parties, married in 2002, had a protracted litigation history. The Family Court granted maintenance to the wife from 17 July 2003 to 8 December 2010, and held no maintenance thereafter. The High Court, in revision, partly allowed the application, directing Rs.9,000 per month from 9 December 2010 onward, while upholding the earlier period’s Rs.10,000 per month. This Court had earlier granted interim maintenance of Rs.20,000 per month in 2014 (Criminal Appeal Nos. 2347-2349 of 2014). The appellant contends there has been no change in circumstances since the interim order and that the respondent’s substantial assets, education, and overseas earnings establish the capacity to pay higher maintenance. The respondent defends the High Court’s reasoning, arguing that the Family Court’s assessment, demeanor observations, and the principle that maintenance should not be perpetual require careful scrutiny, and that the notional minimum wage approach used by the High Court is flawed. The overarching issue is the quantum of monthly maintenance payable to the appellant and whether the interim amount should be augmented beyond the period up to 2010.”

2019-12-03

M/s Embassy Property Developments Pvt. Ltd. v State of Karnataka & Ors.

This judgment concerns three Civil Appeals filed by a Resolution Applicant, the Corporate Debtor (through its Resolution Professional) and the Committee of Creditors, challenging an Interim Order of the Karnataka High Court staying an NCLT order in proceedings under the Insolvency and Bankruptcy Code, 2016. The NCLT Chennai had admitted an application under Section 7 of the IBC against M/s Tiffins Barytes Asbestos & Paints Ltd. and directed a moratorium under Section 14. The Interim Resolution Professional then sought a deemed extension of a mining lease under MMDR Act, 1957 and the Government of Karnataka rejected it. The NCLT, by an order dated 11.12.2018, set aside the Government’s order and directed execution of Supplement Lease Deeds for the period up to 31.03.2020. The Government of Karnataka challenged this in a High Court writ petition, which stayed the impugned NCLT order. The core issues were: (i) whether the High Court may interfere under Article 226/227 with an NCLT order in IBC when an appeal lies to the NCLAT, and (ii) whether fraud can be inquired into by NCLT/NCLAT in CIRP. The Court reiterates that IBC is a complete, umbrella code with a three‑tier mechanism (NCLT, NCLAT, Supreme Court) and that public‑law disputes arising from MMDR Act obligations lie outside IBC. It ultimately holds that while NCLT/NCLAT may inquire into fraud, they cannot adjudicate MMDR‑related public legal disputes; and the High Court’s writ jurisdiction in public‑law contexts remains permissible. The appeals are dismissed.