High Court of KeralaSingle JudgeWP(C) Nos.1780/2021 and 1790/2021, and connecte...

CENTRAL BOARD OF TRUSTEES, EPF v KERALA ELECTRICAL AND ALLIED ENGINEERING CO. LTD.; KERALA ELECTRICAL AND ALLIED ENGINEERING CO. LTD. v REGIONAL PROVIDENT FUND COMMISSIONER; WP(C) Nos.1780 of 2021, 1790 of 2021, 24681 of 2020, 24720 of 2020 (connected)

Case / Petition Number:WP(C) Nos.1780/2021, 1790/2021, 24681/2020, 24720/2020 (connected cases)

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • Gopinath P.
Judgment Date
2024-01-31
Court Decision / Holding
The High Court disposed of the writ petitions by setting aside the CGIT/Tribunal orders in those appeals and restoring Appeal Nos.447 and 233 of 2018 to the Tribunal. The Tribunal is directed to reconsider the matters in light of Horticulture Experiment Station Gonikoppal, Coorg (Supra) and Central Board of Trustees (Supra), and determine the reasonable amount of damages under Section 14-B of the EPF Act; hearing to be afforded to both sides and to conclude in the shortest possible time.
Final Disposition
WP(C) Nos.1780/2021 and 1790/2021, and connected Nos.24681/2020 and 24720/2020 disposed of; Tribunal orders set aside and appeals restored for reconsideration; Tribunal to determine reasonable damages after hearing both sides within a short time.

Parties to the Case

Appellants / Petitioners

  • CENTRAL BOARD OF TRUSTEES, EPF
  • KERALA ELECTRICAL AND ALLIED ENGINEERING CO LTD

Respondents

  • KERALA ELECTRICAL AND ALLIED ENGINEERING CO LTD
  • REGIONAL PROVIDENT FUND COMMISSIONER, EMPLOYEES PROVIDENT FUND ORGANIZATION, SUB REGIONAL OFFICE, PONNAMMA CHAMBERS-1, PARAMESWARA NAGAR, OPP. ARCHANA-ARADHARA THEATRE, KOLLAM-691001
  • CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL CUM LABOUR COURT, ERNAKULAM
  • CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL CUM LABOUR COURT, COCHIN
  • ASSISTANT PROVIDENT FUND COMMISSIONER

Legal Representation & Advocates

Counsels for Petitioners

  • • SHRI.PIRAPPANCODE V.S.SUDHIR
  • • SHRI.AKASH S.
  • • SMT.A.MEGHA

Counsels for Respondents

  • • P.BENNY THOMAS
  • • D.PREM KAMATH
  • • TOM THOMAS (KAKKUZHIYIL)
  • • ABEL TOM BENNY
  • • AARON ZACHARIAS BENNY
  • • BHARATH NAIR
  • • AMRUTHA SELVAM
  • • S.MANU (DSGI)

Case Synopsis & Summary

This batch of writ petitions before the High Court of Kerala, consolidated as WP(C) Nos.1780/2021, 1790/2021 and connected matters (Nos.24681/2020 and 24720/2020), concerns damages leviable under Section 14-B of the Employees’ Provident Funds and Miscellaneous Provisions Act, 1952 (EPF Act). The Central Board of Trustees, EPF (CBD-EPF) challenges the Central Government Industrial Tribunal cum Labour Court (CGIT) Ernakulam’s reduction of damages from 100% to 70% in appeals filed by the Kerala Electrical and Allied Engineering Co. Ltd. (KEEEC), arguing that after the Supreme Court’s ruling in Horticulture Experiment Station Gonikoppal, Coorg v. Provident Fund Organization (2022) 4 SCC 516, mens rea is no longer required to impose damages under Section 14-B, and thus 100% damages cannot be faulted. Conversely, the KEEEC (and certain EPF advocates) contend that although mens rea is not required, Section 14-B does not mandate 100% damages in all cases, and quantum should be determined case-by-case, citing Bake ’N’ Joy Hot Bakery (2024) (1) KLT 391) and related authorities. The High Court ultimately disposes of the writ petitions, directing restoration of the appeals to the Tribunal for reconsideration in light of the stated law, after hearing both sides, and to determine a reasonable damages quantum under Section 14-B. The judgment emphasizes that mens rea is not a prerequisite while clarifying that 100% damages need not be automatic.

Provisions of Law Cited

Section 14-B of the Employees’ Provident Funds and Miscellaneous Provisions Act, 1952The Employees’ Provident Funds and Miscellaneous Provisions Act, 1952Section 14-B

Legal Doctrines & Maxims

  • Mens rea (or actus reus) not essential for imposing penalty or damages for breach of civil obligations
  • Principle that penalty provisions can be imposed irrespective of guilty intent, unless statute requires mens rea (as discussed in SEBI v. Shriram Mutual Fund and related rulings)
  • Distinction between civil penalties and criminal penalties (as discussed in the cited authorities)

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioners submitted that under Horticulture Experiment Station Gonikoppal, Coorg v. Provident Fund Organization (2022) 4 SCC 516, mens rea is no longer a prerequisite for imposing damages under Section 14-B of the EPF Act. Consequently, 100% damages cannot be faulted and the Tribunal’s reduction to 70% is unsustainable. They relied on the Supreme Court and this Court’s own decision in Central Board of Trustees v. Bake ‘N’ Joy Hot Bakery (2024 (1) KLT 391) to argue that the quantum of damages must be determined by considering the facts and circumstances of each case, and that 100% penalties need not be automatic.

Contentions of Respondents

The respondents contended that even with mens rea not required, the quantum of damages under Section 14-B is not rigidly fixed at 100%; it should be determined with regard to the facts of each case. They cited Bake ’N’ Joy Hot Bakery (2024 (1) KLT 391) to support the proposition that a reasonable amount of damages may be imposed after considering the circumstances, and that the Tribunal’s decision to reduce to 70% may be permissible depending on facts.

Cited Precedents (7)

Case NameCitationTreatmentExplanation
Horticulture Experiment Station, Gonikoppal, Coorg v. Provident Fund Organization(2022) 4 SCC 516PositiveSupreme Court decision establishing that mens rea is not a necessary element for imposing damages under Section 14-B.
Bake ‘N’ Joy Hot Bakery2024 (1) KLT 391PositiveKerala High Court decision cited to support that 100% damages are not mandatory and that a reasoned quantum can be determined.
HMT (supra)unknownMentioned OnlyReferenced among authorities discussing the general principle but not centrally relied upon for the central holding.
McLeod Russell (India) Ltd. (supra)unknownMentioned OnlyCited among authorities; not central to the final holding here.
Provident Fund Commissioner v. RSL Textiles (India) (P) Ltd.(2017) 3 SCC 110PositiveUsed to illustrate the broader principle that mens rea is not essential in such penalties.
SEBI v. Shriram Mutual Fund(2006) 5 SCC 361Mentioned OnlyCited in context of penalties without requirement of mens rea but not controlling the 100% rule.
Union of India v. Dharamendra Textile Processors(2008) 13 SCC 369Mentioned OnlyCited as part of the background on penalties and mens rea; not controlling on 100% rule here.

Diagnostic Tool

Beta

Does this judgment govern your specific facts?

Don't risk relying on a distinguishable precedent. Enter your facts or proposition below. We will test it against CENTRAL BOARD OF TRUSTEES, EPF v KERALA ELECTRICAL AND ALLIED ENGINEERING CO. LTD.; KERALA ELECTRICAL AND ALLIED ENGINEERING CO. LTD. v REGIONAL PROVIDENT FUND COMMISSIONER; WP(C) Nos.1780 of 2021, 1790 of 2021, 24681 of 2020, 24720 of 2020 (connected) and instantly map out authorities that support, challenge, or govern your position.

Extracted Judgment Text

Exact text extracted from official judgment records.

# **`IN THE HIGH COURT OF KERALA AT ERNAKULAM PRESENT`** # **`THE HONOURABLE MR. JUSTICE GOPINATH P. WEDNESDAY, THE 31[ST] DAY OF JANUARY 2024 / 11TH MAGHA, 1945`** # **`WP(C) NO. 1780 OF 2021`** ## **`PETITIONER:`** ``` CENTRAL BOARD OF TRUSTIES, EPF THROUGH THE ASSISTANT PROVIDENT FUND COMMISSIONER, EMPLOYEES PROVIDENT FUND ORGANISATION, REGIONAL OFFICE, PARAMESWAR NAGAR, PONNAMMA CHAMBERS, KOLLAM-691 001. ``` ``` BY ADVS. SHRI.PIRAPPANCODE V.S.SUDHIR SHRI. AKASH S. SMT.A.MEGHA ``` ## **`RESPONDENT:`** ``` KERALA ELECTRICAL AND ALLIED ENGINEERING COM LTD. POST BOX NO.8, KUNDARA-691 501, KOLLAM, REPRESENTED BY ITS ASST. MANAGER (F AND A). BY ADVS. P.BENNY THOMAS D.PREM KAMATH(K/1285/1998) TOM THOMAS (KAKKUZHIYIL)(K/000821/2008) ABEL TOM BENNY(K/1381/2018) AARON ZACHARIAS BENNY(K/001533/2023) BHARATH NAIR(K/002569/2022) AMRUTHA SELVAM(K/001249/2023) ``` ``` THIS WRIT PETITION (CIVIL) HAVING COME UP FOR ADMISSION ON 31.01.2024, ALONG WITH WP(C).1790/2021, 24720/2020 AND CONNECTED CASES, THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING: ``` W.P.(C) Nos.1780 of 2021 and Conn.Cases **-:2:-** # **`IN THE HIGH COURT OF KERALA AT ERNAKULAM`** # **`PRESENT`** ``` THE HONOURABLE MR. JUSTICE GOPINATH P. ``` ``` WEDNESDAY, THE 31[ST] DAY OF JANUARY 2024 / 11TH MAGHA, 1945 WP(C) NO. 1790 OF 2021 ``` ## **`PETITIONER:`** ``` CENTRAL BOARD OF TRUSTIES EPF THROUGH THE REGIONAL PROVIDENT FUND COMMISSIONER, EMPLOYEES PROVIDENT FUND ORGANISATION, REGIONAL OFFICE, PARAMESWAR NAGAR, PONNAMMA CHAMBERS, KOLLAM-691 001. ``` ``` BY ADVS. SHRI.PIRAPPANCODE V.S.SUDHIR SHRI. AKASH S. SMT.A.MEGHA ``` ## **`RESPONDENT:`** ``` KERALA ELECTRICAL AND ALLIED ENGINEERING COMPANY LTD., KUNDARA, KOLLAM 691 501, REPRESENTED BY ITS MANAGER (F AND A). BY ADVS. P.BENNY THOMAS D.PREM KAMATH(K/1285/1998) TOM THOMAS (KAKKUZHIYIL)(K/000821/2008) ABEL TOM BENNY(K/1381/2018) AARON ZACHARIAS BENNY(K/001533/2023) BHARATH NAIR(K/002569/2022) AMRUTHA SELVAM(K/001249/2023) ``` ``` THIS WRIT PETITION (CIVIL) HAVING COME UP FOR ADMISSION ON 31.01.2024, ALONG WITH WP(C).1780/2021 AND CONNECTED CASES, THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING: ``` W.P.(C) Nos.1780 of 2021 and Conn.Cases **-:3:-** ## **`IN THE HIGH COURT OF KERALA AT ERNAKULAM`** # **`PRESENT`** ``` THE HONOURABLE MR. JUSTICE GOPINATH P. WEDNESDAY, THE 31[ST] DAY OF JANUARY 2024 / 11TH MAGHA, 1945 WP(C) NO. 24681 OF 2020 ``` ## **`PETITIONER:`** ``` THE KERALA ELECTRICAL AND ALLIED ENGINEERING CO.LTD., POST BOX NO.8, KUNDARA, KOLLAM-691501, REPRESENTED BY ITS MANAGER (F AND A), MR.SUBRAMANIAN R.R. ``` ``` BY ADVS. SRI.P.BENNY THOMAS SRI.D.PREM KAMATH SRI.TOM THOMAS (KAKKUZHIYIL) SHRI.ABEL TOM BENNY SHRI.JYOTHISH KRISHNA SMT.MEENAKSHY S DEV SHRI.AHAMMAD SACHIN K. SHRI.KURIAN OOMMEN THERAKATH ``` ## **`RESPONDENTS:`** ``` 1REGIONAL PROVIDENT FUND COMMISSIONER EMPLOYEES PROVIDENT FUND ORGANIZATION, SUB REGIONAL OFFICE, PONNAMMA CHAMBERS-1, PARAMESWARA NAGAR, OPP. ARCHANA-ARADHARA THEATRE, KOLLAM-691 001. ``` ``` 2CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL CUM LABOUR COURT, 38/377 A-2, KARITHALA LANE, KARSHAKA ROAD, COCHIN-682016.THIRUVANANTHAPURAM, PIN-695 501. BY ADVS. SRI.PIRAPPANCODE V.S.SUDHIR (FOR R1) SHRI. AKASH S. SMT.A.MEGHA SRI. S.MANU (DSGI) ``` ``` THIS WRIT PETITION (CIVIL) HAVING COME UP FOR ADMISSION ON 31.01.2024, ALONG WITH WP(C).1780/2021 AND CONNECTED CASES, THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING: ``` W.P.(C) Nos.1780 of 2021 and Conn.Cases **-:4:-** ## **`IN THE HIGH COURT OF KERALA AT ERNAKULAM`** # **`PRESENT`** ``` THE HONOURABLE MR. JUSTICE GOPINATH P. WEDNESDAY, THE 31[ST] DAY OF JANUARY 2024 / 11TH MAGHA, 1945 WP(C) NO. 24720 OF 2020 ``` ## **`PETITIONER:`** ``` THE KERALA ELECTRICAL AND ALLIED ENGINEERING CO.LTD., POST BOX NO.8, KUNDARA, KOLLAM-691 501, REPRESENTED BY ITS MANAGER (F AND A), MR. SUBRAMANIAN R R. BY ADVS. SRI.P.BENNY THOMAS SRI.D.PREM KAMATH SRI.TOM THOMAS (KAKKUZHIYIL) SHRI.ABEL TOM BENNY SHRI.JYOTHISH KRISHNA SMT.MEENAKSHY S DEV SHRI.AHAMMAD SACHIN K. SHRI.KURIAN OOMMEN THERAKATH ``` ## **`RESPONDENTS:`** ``` 1ASSISTANT PROVIDENT FUND COMMISSIONER EMPLOYEES PROVIDENT FUND ORGANIZATION, SUB REGIONAL OFFICE, PONNAMMA CHAMBERS-1, PARAMESWARA NAGAR, OPP. ARCHANA-ARADHANA THEATRE, KOLLAM-691 001. 2CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL CUM LABOUR COURT, 38/377, A-2, KARITHALA LANE, KARSHAKA ROAD, COCHIN-682 016. BY ADVS. SRI.PIRAPPANCODE V.S.SUDHIR SMT.M.S.KIRAN, CGC SHRI. AKASH S. SMT.A.MEGHA SRI.S.MANU (DSGI) ``` ``` THIS WRIT PETITION (CIVIL) HAVING COME UP FOR ADMISSION ON 31.01.2024, ALONG WITH WP(C).1780/2021 AND CONNECTED CASES, THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING: ``` W.P.(C) Nos.1780 of 2021 and Conn.Cases **-:5:-** ## **J U D G M E N T** ## **`[WP(C) Nos.1780 & 1790 of 2021 and WP(C) Nos. 24681 & 24720 2020]`** WP(C)Nos.24681 and 24720 of 2020 have been filed by the Kerala Electrical & Allied Engineering Co.Ltd. (a Government of Kerala Company) challenging the orders on Appeal Nos.233 and 447 of 2018 on the file of the Central Government Industrial Tribunal cum Labour Court, Ernakulam, through which, the appeal filed by the said company against orders imposing damages under Section 14 B of the The Employees’ Provident Funds and Miscellaneous Provisions Act, 1952 (hereinafter referred to as “the EPF Act, 1952”) has been reduced only to 70%. It is the case of the company that, considering the facts and circumstances under which there was delay in remitting the Provident Fund contributions, the Tribunal ought to have completely waived damages under Section 14 B of the EPF Act, 1952 or should have at least restricted the amount of damages to a nominal amount. The orders in Appeal Nos.447 and 233 of 2018 have also been challenged by the Central Board ## W.P.(C) Nos.1780 of 2021 and Conn.Cases ## **-:6:-** of Trustees of the Employees’ Provident Fund Organization by filing WP(C)Nos.1780 and 1790 of 2021. It is the case of the Provident Fund Organization that the Tribunal ought not to have interfered with the levy of damages at 100% and the reduction of damages to 70% on the appeals filed by the company is unsustainable. 2. When these matters were taken up for consideration today, it is the submission of Sri. Pirappancode V. S. Sudhir, the learned counsel appearing for the petitioner in W.P(C)Nos.1780 and 1790 of 2021, that, it is now clear from the judgment of the Supreme Court in **Horticulture Experiment Station Gonikoppal, Coorg v. Provident Fund Organization;** (2022) 4 SCC 516, that mens rea is no longer required to be established for the purposes of imposing damages under Section 14 B of the EPF Act, 1952. It is submitted that in such circumstances, the levy of damages at 100% under Section 14 B of the EPF Act, 1952, cannot be faulted and the order of the Tribunal to the extent it reduces the penalty from 100% to 70% is unsustainable in law. 3. Sri. P. Benny Thomas, the learned counsel appearing for the petitioner in W.P(C)Nos.24681 and 24720 of 2020 would ## W.P.(C) Nos.1780 of 2021 and Conn.Cases ## **-:7:-** submit that, even when the requirement of mens rea has been taken away on account of the law laid down by the Supreme Court in **Horticulture Experiment Station Gonikoppal,** **Coorg (Supra),** the provisions of Section 14 B of the EPF Act, 1952 indicate that 100% damages need not be imposed invariably in every case and the amount of damages to be imposed has to be determined by the authority having regard to the facts and circumstances of each case. He refers to the judgment of this Court in **Central Board of Trustees v. Bake ‘N’ Joy Hot Bakery** ; 2024 (1) KLT 391 to contend that this Court after referring to **Horticulture Experiment Station Gonikoppal, Coorg (Supra)** held as follows: “4. Having heard the learned counsel appearing for the petitioner and the learned counsel appearing for the 1[st] respondent, I am of the view that there is considerable merit in the contention taken by the learned counsel appearing for the 1[st] respondent. The facts which compelled the Tribunal to take a view that this was not a case where the damages had to be levied at 100% is spelt out in the order itself. These reasons have already been noticed by this Court while considering the submissions of the learned counsel appearing for the 1[st] respondent. Indeed, the requirement of mens rea and/or actus reus is no longer a necessary ingredient to be proved to impose damages. In **Horticulture Experiment Station v.** W.P.(C) Nos.1780 of 2021 and Conn.Cases ## **-:8:-** **Provident Fund Organization** , (2022) 4 SCC 516 after referring to **HMT (supra)** , **McLeod Russel (India) Ltd. (supra), Provident Fund Commr. v. RSL Textiles (India) (P) Ltd.;** (2017) 3 SCC 110, **SEBI v. Shriram Mutual Fund** , (2006) 5 SCC 361 & **Union of India v. Dharamendra Textile Processors;** (2008) 13 SCC 369 it was held:- “15. Taking note of the exposition of law on the subject, it is well settled that mens rea or actus reus is not an essential element for imposing penalty or damages for breach of civil obligations and liabilities.” It is no doubt true that in **Horticulture Experiment Station (supra)** , while dealing with the question of damages under the EPF Act, the Supreme Court followed the view in **SEBI v. Shriram Mutual Fund** (which was decided in the background of penalty provisions in the SEBI Act) that “a breach of civil obligation which attracts penalty in the nature of fine under the provisions of the Act and the Regulations would immediately attract the levy of penalty irrespective of the fact whether contravention must be made by the defaulter with guilty intention or not. We also further held that unless the language of the statute indicates the need to establish the presence of mens rea, it is wholly unnecessary to ascertain whether such a violation was intentional or not.” The above view in respect of penalty provisions in the SEBI Act, in **Shriram Mutual Fund (supra)** was followed by a three-judge bench of the Supreme Court in **Union of India v. Dharamendra Textile** W.P.(C) Nos.1780 of 2021 and Conn.Cases ## **-:9:-** **Processors (supra)** (which was decided in the background of penalty provisions in the Income Tax Act). However, the said decision of the Supreme Court does not hold that 100% damages must be invariably imposed. The decision is also not authority for the proposition that the circumstances that led to the default cannot be considered while deciding the quantum of damages to be imposed. In the facts of the present case, the Tribunal has not set aside the damages under Section 14-B of the EPF Act. It has only reduced the quantum of penalty to 50%. This, in my view is permissible even when the requirement of mens rea and/or actus reus is no longer a necessary ingredient for levy of damages under Section 14-B of the EPF Act. It is to be noted that the provisions of Section 14-B of the EPF Act do not prescribe that a penalty at 100% is to be mandatorily imposed”. 4. Having heard learned counsel as above, I am of the view that the orders in Appeal Nos.447 and 233 of 2018 on the file of the Central Government Industrial Tribunal cum Labour Court, Ernakulam, can be set aside and those appeals can be restored to the file of the Tribunal, and the Tribunal can be directed to reconsider the appeals having regard to the law laid down in **Horticulture Experiment Station Gonikoppal, Coorg (Supra)** as also the judgment of this Court in **Central Board of Trustees (Supra).** The Tribunal shall, having regard to the facts and circumstances of the case, consider as to the W.P.(C) Nos.1780 of 2021 and Conn.Cases ## **-:10:-** reasonable amount of damages that can be imposed under Section 14 B of the EPF Act, 1952. Accordingly, these writ petitions will stand disposed of setting aside the orders of the Central Government Industrial Tribunal cum Labour Court in Appeal Nos.447 and 233 of 2018 and restoring Appeal Nos.447 and 233 of 2018 to the file of the Tribunal. The Tribunal shall reconsider the matter as directed above within the shortest possible time, after affording an opportunity of hearing to both sides. **Sd/GOPINATH P. JUDGE** ats W.P.(C) Nos.1780 of 2021 and Conn.Cases ## **-:11:-** ## **`APPENDIX OF WP(C) 1780/2021`** ``` PETITIONER’S EXHIBITS ``` ``` EXHIBIT P1TRUE COPY OF THE MEMORANDUM OF APPEAL NO.447/2018 FILED BY THE RESPONDENT BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL CUM LABOUR COURT, ERNAKULAM. ``` ``` EXHIBIT P2TRUE COPY OF THE COUNTER AFFIDAVIT FILED BY THE PETITIONER BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL IN APPEAL NO.447/2018. ``` ``` EXHIBIT P3TRUE COPY OF THE ORDER DATED 5.10.2020 IN APPEAL NO.447/2018 OF THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL CUM LABOUR COURT, ERNAKULAM. ``` W.P.(C) Nos.1780 of 2021 and Conn.Cases ## **-:12:-** ## **`APPENDIX OF WP(C) 1790/2021`** ``` PETITIONER’S EXHIBITS ``` ``` EXHIBIT P1TRUE COPY OF THE MEMORANDUM OF APPEAL NO.233/2018 FILED BY THE RESPONDENT BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL CUM LABOUR COURT, ERNAKULAM. ``` ``` EXHIBIT P2TRUE COPY OF THE COUNTER AFFIDAVIT FILED BY THE PETITIONER BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL IN APPEAL NO.233/2018. ``` ``` EXHIBIT P3TRUE COPY OF THE ORDER DATED 5.10.2020 IN APPEAL NO.233/2018 OF THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL CUM LABOUR COURT, ERNAKULAM. ``` W.P.(C) Nos.1780 of 2021 and Conn.Cases ## **-:13:-** ## **`APPENDIX OF WP(C) 24681/2020`** ``` PETITIONER’S EXHIBITS ``` - `EXHIBIT P1 TRUE COPY OF THE PROFIT & LOSS ACCOUNT ALONG WITH BALANCE SHEET OF THE PETITIONER COMPANY FOR THE PERIOD FROM 2008-2009.` - `EXHIBIT P2 TRUE COPY OF THE PROFIT & LOSS ACCOUNT ALONG WITH BALANCE SHEET OF THE PETITIONER COMPANY FOR THE PERIOD FROM 2009-2010.` - `EXHIBIT P3 TRUE COPY OF THE PROFIT & LOSS ACCOUNT ALONG WITH BALANCE SHEET OF THE PETITIONER COMPANY FOR THE PERIOD FROM 2010-2011.` - `EXHIBIT P4 TRUE COPY OF THE PROFIT & LOSS ACCOUNT ALONG WITH BALANCE SHEET OF THE PETITIONER COMPANY FOR THE PERIOD FROM 2011-2012.` - `EXHIBIT P5 TRUE COPY OF THE PROFIT & LOSS ACCOUNT ALONG WITH BALANCE SHEET OF THE PETITIONER COMPANY FOR THE PERIOD FROM 2012-2013.` - `EXHIBIT P6 TRUE COPY OF THE PROFIT & LOSS ACCOUNT ALONG WITH BALANCE SHEET OF THE PETITIONER COMPANY FOR THE PERIOD FROM 2013-2014.` - `EXHIBIT P7 TRUE COPY OF THE PROFIT & LOSS ACCOUNT ALONG WITH BALANCE SHEET OF THE PETITIONER COMPANY FOR THE PERIOD FROM 2014-2015.` - `EXHIBIT P8 TRUE COPY OF THE PROFIT & LOSS ACCOUNT ALONG WITH BALANCE SHEET OF THE PETITIONER COMPANY FOR THE PERIOD FROM 2015-2016.` - `EXHIBIT P9 TRUE COPY OF THE PROFIT & LOSS ACCOUNT ALONG WITH BALANCE SHEET OF THE PETITIONER COMPANY FOR THE PERIOD FROM 2016-2017.` - `EXHIBIT P10 TRUE COPY OF THE PROFIT & LOSS ACCOUNT ALONG WITH BALANCE SHEET OF THE PETITIONER COMPANY FOR THE PERIOD FROM 2017-2018.` - `EXHIBIT P11 TRUE COPY OF THE PROFIT & LOSS ACCOUNT ALONG WITH BALANCE SHEET OF THE PETITIONER COMPANY FOR THE PERIOD FROM 2018-2019.` W.P.(C) Nos.1780 of 2021 and Conn.Cases **-:14:-** ``` EXHIBIT P12TRUE COPY OF THE ORDER DATED 3.1.2017 ISSUED BY THE 1ST RESPONDENT. EXHIBIT P13TRUE COPY OF THE COMMON ORDER DATED 5.10.2020 IN APPEAL NO.447/2018 WITH APPEAL NO.233/2018. EXHIBIT P14TRUE COPY OF THE INTERIM ORDER DATED 22.10.2020 IN W.P.(C)NO.22267/2020 BY THIS HON'BLE COURT. ``` W.P.(C) Nos.1780 of 2021 and Conn.Cases ## **-:15:-** ## **`APPENDIX OF WP(C) 24720/2020`** ``` PETITIONER’S EXHIBITS ``` - `EXHIBIT P1 TRUE COPY OF THE PROFIT AND LOSS ACCOUNT ALONG WITH BALANCE SHEET OF THE PETITIONER COMPANY FOR THE PERIOD FROM 2008-2009.` - `EXHIBIT P2 TRUE COPY OF THE PROFIT AND LOSS ACCOUNT ALONG WITH SHEET OF THE PETITIONER COMPANY FOR THE PERIOD FROM 2009-2010.` - `EXHIBIT P3 TRUE COPY OF THE PROFIT AND LOSS ACCOUNT ALONG WITH BALANCE SHEET OF THE PETITIONER COMPANY FOR THE PERIOD FROM 2010-2011.` - `EXHIBIT P4 TRUE COPY OF THE PROFIT AND LOSS ACCOUNT ALONG WITH BALANCE SHEET OF THE PETITIONER COMPANY FOR THE PERIOD FROM 2011-2012.` - `EXHIBIT P5 TRUE COPY OF THE PROFIT AND LOSS ACCOUNT ALONG WITH BALANCE SHEET OF THE PETITIONER COMPANY FOR THE PERIOD FROM 2012-2013.` - `EXHIBIT P6 TRUE COPY OF THE PROFIT AND LOSS ACCOUNT ALONG WITH BALANCE SHEET OF THE PETITIONER COMPANY FOR 2013-2014.` - `EXHIBIT P7 TRUE COPY OF THE PROFIT AND LOSS ACCOUNT ALONG WITH BALANCE SHEET OF THE PETITIONER COMPANY FOR THE PERIOD FROM 2014-2015.` - `EXHIBIT P8 TRUE COPY OF THE PROFIT AND LOSS ACCOUNT ALONG WITH BALANCE SHEET OF THE PETITIONER COMPANY FOR THE PERIOD FROM 2015-2016.` - `EXHIBIT P9 TRUE COPY OF THE PROFIT AND LOSS ACCOUNT ALONG WITH BALANCE SHEET OF THE PETITIONER COMPANY FOR THE PERIOD FROM 2016-2017.` ## W.P.(C) Nos.1780 of 2021 and Conn.Cases ## **-:16:-** ``` EXHIBIT P10 ``` ``` TRUE COPY OF THE PROFIT AND LOSS ACCOUNT ALONG WITH BALANCE SHEET OF THE PETITIONER COMPANY FOR THE PERIOD FROM 2017-2018. ``` ``` EXHIBIT P11TRUE COPY OF THE PROFIT AND LOSS ACCOUNT ALONG WITH BALANCE SHEET OF THE PETITIONER COMPANY FOR THE PERIOD FROM 2018-2019. ``` - `EXHIBIT P12 TRUE COPY OF THE ORDER DATED 13/07/2011 ISSUED BY THE 1ST RESPONDENT.` ``` EXHIBIT P13TRUE COPY OF THE COMMON ORDER DATED 05.10.2020 IN APPEAL NO.447/2018 WITH APPEAL NO.233/2018. ``` ``` EXHIBIT P14TRUE COPY OF THE INTERIM ORDER DATED 22.10.2020 IN WP (C) NO.22267/2020 BY THIS HON'BLE COURT. ```