Tenetowl LogoTenetowl
Supreme Court of IndiaSupreme Court · 2011Single JudgeApplications dismissed.

Cauvery Coffee Traders, Mangalore v. Hornor Resources (International) Co. Ltd.

Case / Petition Number:
Arbitration Petition Nos. 7 & 8 of 2009
Neutral Citation:[2011] 12 S.C.R. 473

Case Synopsis & Summary

This is a Supreme Court judgment on Arbitration Petition Nos. 7 and 8 of 2009 under the Arbitration and Conciliation Act, 1996, concerning the appointment of an arbitrator in an international commercial dispute arising from a purchase of Calibrated Lumpy Ore Fines. On 24 June 2008, Cauvery Coffee Traders (seller) and Hornor Resources (International) Co. Ltd. (buyer) entered into a purchase agreement for about 40,000 Wet Metric Tons of iron ore, with a guaranteed Fe content not less than 63%. When the ore was shipped and later tested, the Fe content was found to be 62.74%, prompting negotiations and proposals for price adjustment. The buyer proposed a final settlement of US$1.5 million in full and final settlement, which the seller’s bank accepted, though the seller later claimed the bank message was erroneous. The parties issued a legal notice seeking arbitration under Clause 18, which prescribes arbitration in a third country if amicable negotiations fail. The applicant sought appointment of an arbitrator under Section 11(5) & (9) of the Act, while the respondent argued that Part I of the Act applies to international arbitrations outside India and that the dispute had already been resolved by accord and satisfaction. The Court held that Part I is applicable to international arbitrations unless expressly excluded, but ultimately dismissed the applications, finding no arbitrable dispute remained due to the amicable settlement and the decisive acceptance of the final settlement. The decision underscores the sanctity of settlement and estoppel considerations in arbitrability.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • Dr. B.S. Chauhan
Judgment Date
2011-09-13
Court Decision / Holding
Applications dismissed.
Final Disposition
Applications dismissed.

Parties to the Case

Appellants / Petitioners

  • Cauvery Coffee Traders, Mangalore

Respondents

  • Hornor Resources (International) Co. Ltd.

Legal Representation & Advocates

Counsels for Petitioners

  • • V.A. Mohta
  • • P. Vijay Kumar
  • • C.S.N. Mohan Rao

Counsels for Respondents

  • • S.K. Kulkarni
  • • Ankur S. Kulkarni
  • • M. Gireesh Kumar
  • • Anirudha Anand

Provisions of Law Cited

Arbitration and Conciliation Act, 1996 – Section 11(5) & 11(9); Section 2(2)

Legal Doctrines & Maxims

  • Doctrine of estoppel
  • Estoppel by election
  • Accord and satisfaction

Submissions & Arguments

Contentions of Appellants / Petitioners

The applicants contended maintainability under Section 11(5) & (9) of the Arbitration and Conciliation Act, 1996, seeking appointment of an arbitrator in a third country under Clause 18. They argued that Part I of the Act applies to international arbitrations outside India unless expressly excluded, and that there was no misrepresentation, fraud, or coercion by the respondent. They emphasized that the arbitration clause contemplated amicable negotiations in a third country and that any erroneous bank message should not extinguish the applicant’s right to arbitration. They asserted that the final settlement may have been negotiated, but the question remained whether an arbitrable dispute persisted for referral, and whether accord and satisfaction could bar arbitration notwithstanding lack of misrepresentation.

Contentions of Respondents

The respondents argued that the applications were not maintainable as the Purchase Agreement, including Clause 18, contemplated arbitration in a third country only after amicable negotiations; they contended that the parties had reached a complete settlement by way of a price adjustment and final settlement, thereby extinguishing any arbitrable dispute. They asserted that the disputes had been resolved by accord and satisfaction and that no reference to arbitration could be entertained since the contract had been discharged by mutual agreement, with the final settlement accepted by Cauvery with eyes open.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (19)

Case NameCitationTreatmentExplanation
Bhatia International v. Bulk Trading S.A2002 (2) SCR 411PositiveFollowed; the Court applied Bhatia International to hold that Part I applies to international arbitrations outside India unless excluded by agreement.
Indtel Technical Services Private Limited v. W S. Atkins Rail Limited2008 (12) SCR 673PositiveRelied on; supported the view that Part I applies to international arbitrations outside India.
Citation Infowares Limited v. Equinox Corporation2009 (6) SCR 737PositiveRelied on; used to reinforce applicability of Part I in the international context.
Venture Global Engg. Case v. Satyam Computer Services Ltd.2008 (1) SCR 501PositiveRelied on; supports the broad application of Part I to international arbitrations.
Shreejee Traco (I) Pvt. Ltd. v. Paperline International Inc.2003 (9) SCC 79OverruledReferred to but held not binding in light of Bhatia International and Venture Global Engg.; the approach of Shreejee Traco was not followed.
Nathani Steels Ltd. v. Associated Constructions1995 Supp (3) SCC 324PositiveRelied on; supported accord and satisfaction/settlement principles in the arbitration context.
State of Maharashtra v. Nav Bharat Builders1994 Supp (3) SCC 83PositiveRelied on; cited for accord and satisfaction principles.
Mis. P.K. Ramaiah & Company v. Chairman & Managing Director, NTPC1994 Supp. 3 SCC 126PositiveRelied on; accord and satisfaction principles in arbitration displace arbitral reference.
National Insurance Company Limited v. Boghara Polyfab Private LimitedAIR 2009 SC 170PositiveRelied on; discusses discharge of contract and effect on arbitral reference.
R.L. Kalathia v. State of Gujarat(2011) 2 SCC 400PositiveRelied on; part of the convergence of law on accord and settlement affecting arbitrability.
R.N. Gosain v. Yashpal DhirAIR 1993 SC 352PositiveRelied on; estoppel/election doctrine discussion.
Nagubai Ammalai v. B. Shama Rao & Ors.AIR 1956 SC 593PositiveRelied on; estoppel/election doctrine lineage.
C.I.T. v. MR. P. Firm MaurAIR 1965 SC 1216PositiveRelied on; statutory and equitable considerations in discharge/settlements.
Maharashtra State Road Transport Corporation v. Balwant Regular Motor ServiceAIR 1969 SC 329PositiveRelied on; case law on disputes and settlement.
P.R. Deshpande v. Maruti Balaram HaibattiAIR 1998 SC 2979PositiveRelied on; arbitration/settlement principles.
Babu Ram v. Indrapal SinghAIR 1998 SC 3021PositiveRelied on; arbitration/settlement principles.
Chairman and MD, NTPC Ltd. v. Reshmi Constructions, Builders & ContractorsAIR 2004 SC 1330PositiveRelied on; arbitration/settlement principles.
Ramesh Chandra Sankla v. Vikram Cement & Ors.AIR 2009 SC 713PositiveRelied on; arbitration/settlement principles.
Pradeep Oil Corporation v. Municipal Corporation of Delhi & Anr.(2011) 5 SCC 270PositiveRelied on; arbitration/settlement principles.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•7,198 words•~33 min read

In The Court Record

Cauvery Coffee Traders, Mangalore v. Hornor Resources (International) Co. Ltd.

[2011) 12 S.C.R. 473 MIS. CAUVERY COFFEE TRADERS, MANGALORE _v._ A MIS. HORNOR RESOURCES (INTERN.) CO. LTD. Arbitration Petition Nos. 7 & 8 of 2009 SEPTEMBER 13, 2011 B **IDR. B.S. CHAUHAN, J.]** ## _Arbitration and Conciliation Act, 1996:_ _s. 11_ - _Appointment of arbitrator_ - _Purchase Agreement_ c _>etween applicant-seller and respondent-buyer providing that -he quality of iron ore supplied must contain 63% Fe content_ ~lse _the respondent would have right to reject the cargo_ - _'Jonsignment received by respondent contained 62. 74%_ - _=?.espondent informed the applicant that USO 1.5 million would_ D Je _released for the shipment in place of USO 1.8 million in ul/ and final settlement and in case the applicant was willing_ 'o _accept the same, it should ·send instructions through its 'Janker :..__.Applicant received USO' 1.5 million and demanded 'he balance amount on the ground that an erroneous_ E _nessage was forwarded by its bankers to the respondent that 'he applicant had agreed to receive the less payment towards 'ull and final payment_ - _Respondent did not give response_ - _4.pplication for appointment of arbit(ator_ - _Maintainability of_ - _Held: The applicant did not plead that there was any kind 'Jf misrepresentation or fraud or coercion on the part of the_ F _respondent_ - _Nor it was its case that payment_ was _sent by the respondent without any settlement/agreement with the_ F G 473 **H** (2011) 12 S.C.R. 474 SUPREME COURT REPORTS - A _transaction stood concluded between the parties, not on account of any unintentional error, but after extensive and exhaustive bilateral deliberations with a clear intention to_ - - _bring about a quietus to the dispute These negotiations were self-explanatory steps of the intent and conduct of the parties_ - B _to end the dispute and not to carry it further- Since no dispute survived between the parties, application seeking appointment of arbitrator liable to be dismissed._ - _Part I Applicability of, to international commercial_ - _arbitrations held outside India Held: The provisions of Part_ C _I of the Act would be equally applicable to international commercial arbitrations held outside India, unless any of the said provisions are excluded by agreement between the parties expressly or by implication._ **D** _**DOCTRINES/PRINCIPLES:** Doctrine of estoppel_ - - _Approbation and reprobation Held: A party cannot be permitted to "blow hot and cold''. "fast and loose" or "approbate_ - _and reprobate" Where one knowingly accepts the benefits of a contract or conveyance or an order, is estopped to deny_ E _the validity or binding effect on him of such contract or conveyance or order_ - _This rule is applied to do equity, however, it must not be applied in a manner as to violate the_ - _principles of right and good conscience The doctrine of_ - _election is based on the rule of estoppel the principle that_ F _one cannot approbate and reprobate inheres in it_ - _The doctrine of estoppel by election is one of the species of estoppels in pais (or equitable estoppel), which is a rule in equity- By that law,_ a _person may be precluded by his actions or conduct or silence when it is his duty to speak, from_ G _asserting a right which he otherwise would have had._ - _**WORDS AND PHRASES:** Word 'error' Meaning of._ **On 24.6.2008, a Purchase Contract was entered into between the applicant and the respondent wherein the H. applicant agreed to sell to the respondent Calibrated** CAWERY COFFEE TRADERS, MANGALORE _v._ HORNOR 4 75 RESOURCES (INTERN.) CO. LTD. Lumpy Ore Fines of the approximate quantity of 40,000/A Wet Metric (10% more or less at buyers' option) at the price and on the terms and conditions stipulated in the said agreement. The agreement provided for the chemical specification/composition of the Ore and for guaranteed level of Fe i.e. iron content in the contracted goods which B could not be less than 63% and in case the iron content was less than 63%, the buyer would have a right to reject the cargo. C Pursuant to the purchase contract, the applicant on C 6.8.2008 shipped the total consignment. The applicant raised a provisional invoice for a sum of US$ 32,13,529.11 and sent a Certificate of Origin and the Bill of Lading dated 6.8.2008 as issued by the carriers in respect of the carriage of the goods from· Mangalore Port, India to Rizhao Port, China. The said goods reached at China D Port. The delivery of the same was taken by the respondent and on chemical analysis, according to the respondent, the iron contents Fe, were found to be 62.74%. The respondent by email dated 19.9.2008 informed the applicant that a provisional payment would E be released for the shipment in question based on revised rates and, in case, the applicant was willing to accept the revised rates stipulated therein, the respondent would request their end buyers' confirmation to release the payment, and for that purpose, applicant F was asked to send necessary instructions through their banker. The respondent by email dated 7 .10.2008 informed the applicant that US$ 1.5 million could be the amount for the final settlement in respect of the shipment in question, in spite of the fact that the agreed amount G was US$ 18,91,204.00. An amount of US$ 1.5 million was received by the applicant. Subsequent thereto, the applicant repeatedly sent reminders to the respondent to make good the balance payment under the said purchase contract, but no payment was made. The applicant sent H H [2011] 12 S.C.R. 476 SUPREME COURT REPORTS A a legal notice calling upon the respondent to pay the balance amount under the purchase contract or else in view of the arbitration clause 18 contained in the purchase agreement, friendly negotiations should be carried out to settle the dispute accrued between them. B As per the terms of the purchase agreement, arbitration could be held only in a third country. The applicant suggested to have the arbitration proceedings either in Singapore or in Australia. In spite of receiving the said notice and a reminder thereafter, neither the payment of c the balance amount was made, nor the respondent came forward for friendly negotiations. The applicant filed the instant arbitration applications. The main ground raised in the applications was that inspite of the fact that the applicant specifically informed their bankers that an · 0[amount ][of ][USO ][1.5 ][million was to ][be ][received in lieu ][of ] the provisional payment, an erroneous message was forwarded by the applicant's bankers to the respondent that the applicant had agreed to receive an amount of USO 1.s· million towards full and final payment. ## E Dismissing the applications, the Court HELD: 1.1. Notwithstanding the provisions of Section 2(2) of the Arbitration and Conciliation Act, 1996, indicating that Part I of the said Act would apply where F the place of arbitration is in India, even in respect of international commercial agreements, which are to be governed by the laws of another country, the parties would be entitled to invoke the provisions of Part I of the said Act and consequently the application made under G Section 11 thereof would be maintainable. It clearly lays down that the provisions of Part I of the Arbitration and Conciliation Act, 1996, would be equally applicable to international commercial arbitrations held outside India, unless any of the said provisions are excluded by H agreement between the parties expressly or by CAUVERY COFFEE TRADERS, MANGALORE _v._ HORNOR 4 77 RESOURCES (INTERN.) CO. LTD. implication, which is not so in the instant case. [Para 9) A [485-C-F] _Bhatia International v. Bulk Trading S.A_ (2002) 4 SCC 105: 2002 ( 2 ) SCR 411 - followed. _lndtel Technical Services Private Limited v. W S. Atkins Rail Limited_ (2008) 10 SCC 308: 2008 (12) SCR 673; _Citation lnfowares Limited v. Equinox Corporation_ (2009) 7 SCC 220: 2009 (6) SCR 737; _Venture Global Engg. Case v. Satyam Computer Services Ltd._ (2008) 4 SCC 190: 2008 (1) SCR 501- relied on. B C _Shreejee Traco (I) Plit. Ltd. v. Paperline International Inc._ - (2003) 9 sec 79 referred to. 1.2. From the agreement, it is evident that the ore supplied must contain Fe contents not less than 63%. In cas~ the Fe contents are less than the specified percentage, the buyer would have a right to reject the cargo. The Purchase Agr.eement also contained a clause providing for price adjustment in case the supplied ore did not meet the requirement of specification provided for iron ore. In case of any dispute between the parties, the agreement provided for arbitration in any third country. Stand of the respondent throughout was that under Clause 5 of the Purchase Contract, the buyer had a right to reject the whole consignment in case the iron contents were less than 63%. However, goods had already reach~d the port of discharge in China, the buyer accepted the delivery thereof and made a proposal for adjustment of price. Negotiations started as is evident from the email messages dated 8.9.2008, 25.9.2008 and 7.10.2008 and it was in pursuance of these negotiations that the applicant had instructed its banker to accept the proposal made by the respondent and it was in pursuance of their instructions, the banker by email dated 8.10.2009 accepted the proposal and agreed to receive a D E F G H 478 SUPREME COURT REPORTS [2011] 12 S.C.R. A sum of US$ 1.5 million as full and final settlement for the consignment in issue. The payment made was accepted by the applicant and it was after 3 months thereafter that it served a legal notice for making a reference to the Arbitrator. The applicant did not dispute the negotiations B or giving instructions to its banker or in respect of the email by their banker to the respondent or receiving the money in lieu thereof. Error means - a mistake in judgment/assessment in a process or proceedings; some wrong decision taken inadvertently; unintentional c mistakes; something incorrectly done through ignorance or inadvertence; mistake occurred from an accidental slip; deviation from standard or course of right or accuracy - unintentionally; to be wrong about; to think or understand wrongly; an omission made not by design, 0[but ][by mischance. In case, final settlement has been ] reached amicably between the parties even by making certain adjustments and without <:ny misrepresentation or fraud or coercion, then, acceptance of money as full . and final settlement/issuance of receipt or vouchers etc. would conclude the controversy and it is not open to E either of the parties to lay any claim/demand against the other party. [Paras 12, 13, 17, 18, 23) [487-F-G; 489-D-H; 490-A, E-F; 493-F-H] _Nathani Steels Ltd. v. Associated Constructions_ 1995 F Supp (3) SCC 324; _State of Maharashtra v. Nav harat Builders_ 1994 Supp (3) SCC 83; _Mis. P.K. Ramaiah_ & _Company v. Chairman_ & _Managing Director, NTPC_ (1.994) Supp. 3 SCC 126; _National Insurance Company Limited v. Mis. Boghara Po/yfab Private Limited_ AIR 2009 SC 170: 2008 G (13) SCR 638; _R.L. Kalathia v. State of Gujarat_ (2011) 2 SCC - 400: 2011 (1) SCR 391 relied on. H 1.3. The applicant had not pleaded that there was any kind of misrepresentation or fraud or coercion on the part of the respondent. Nor it was its case that payment was CAUVERY COFFEE TRADERS, MANGALORE _v._ HORNOR 4 79 RESOURCES (INTERN.) CO. LTD. sent by the respondent without any settlement/ A agreement with the applicant, and was a unilateral act on its part. The applicant reached the final settlement with eyes open and instructed its banker to accept the money as proposed by the respondent. Proposal itself was on the basis of clause 5 of the Purchase Contract which B provided for Price Adjustment. For a period of three months after acceptance of the money under the full and final settlement, applicant did not raise any dispute in respect of the agreement of price adjustment. In sue~ a fact-situation, the plea that instructions were given by t~e c applicant to the banker erroneously, being, afterthought is not worth acceptance. The transaction stood concluded between the parties, not on account of any unintentional error, but after extensive and exhaustive bilateral deliberations with a clear intention to bring about a 0 quietus to the dispute. These negotiations, therefore, were self-explanatory steps of the intent and conduct of the parties to end the dispute and not to carry it further. [Para 24) [494-A-E] _R.N. Gosain v. Yashpa/ Dhir_ AIR 1993 SC 352: 1992 (2) Suppl. SCR 257- relied on. E 2. A party cannot be permitted to "blow hot and cold", "fast and loose" or "approbate and reprobate". Where one knowingly accepts the benefits of a contract F or conveyance or an order, is estopped to deny the validity or binding effect on him of such contract or conveyance or order. This rule is applied to do equity, however, it must not be applied in a manner as to violate the principles of right and good conscience. Thus, it is G evident that the doctrine of election is based on the rule of estoppel- the principle that one cannot approbate and reprobate inheres in it. The doctrine of estoppel by election is one of the species of estoppels in pais (or equitable estoppel), which is a rule in equity. By that law, H ## 480 SUPREME COURT REPORTS (2011] 12 S.C.R. A a person may be precluded by his actions or conduct or silence when it is his duty to speak, from asserting a right which he otherwise would have had. In the facts and circumstances of the case, as the respondent resorted to clause 5 of the Purchase Agreement dated 28/6/2008, B regarding price adjustment and the offer so made by the respondent has been accepted by the applicant and agreed to receive a particular sum offered by the respondent as a full and final settlement, the dispute comes to an end. The applicant cannot take a complete c somersault and agitate the issue that the offer made by the respondent had erroneously been accepted. In view of that as no dispute survives, the applications are dismissed. [Paras 26-28) [494-G-H; 495-A-H] _Nagubai Ammal_ & _Ors. v. B._ Shama _Rao_ & _Ors._ AIR D 1956 SC 593: 1956 SCR 451; C./. _T. v. MR. P. Firm Maur_ AIR 1965 SC 1216: 1965 SCR 815; _Maharashtra State Road Transport Corporation v. Ba/want Regular Motor Service, Amravati_ & _Ors.,_ AIR 1969 SC 329: 1969, SCR 808; _P.R. Deshpande v. Maruti Ba/aram Haibatti_ AIR 1998 SC 2979: E 1998 (3) SCR 1079; _Babu Ram v. lndrapal Singh_ AIR 1998 SC 3021: 1998 (3) SCR 1145; _Chairman and MD, NTPC Ltd. v. Reshmi Constructions, Builders_ & _Contractors_ AIR 2004 SC 1330: 2004 (1) SCR 62; _Ramesh Chandra Sank/a_ & _Ors. v. Vikram Cement_ & _Ors._ AIR 2009 SC 713: 2008 (10) SCR F 243; _Pradeep Oil Corporation v. Municipal Corporation of Delhi_ & _Anr._ 2011 5 sec 270 - relied on. ## Case Law Reference: G 2002 (2) SCR 411 2008 (12) SCR 673 2009 (6) sc·R 737 2008 (1) SCR 501 followed Para 9, 11 relied on Para 9 relied on Para 9 relied on Para 9 H CAUVERY COFFEE TRADERS, MANGALORE _v._ HORNOR 481 RESOURCES (INTERN.) CO. LTD. |(2003) 9sec79|referredto|Para 10|A| |---|---|---|---| |1995supp(3)sec324 relied|324 reliedon|Para11|| |1994supp(3)sec83|reliedon|Para 19|| |(1994)Supp.3sec126 relied|126 reliedon|Para 20|B| |2008 (13)SCR638|reliedon|Para21|| |2011 (1) SCR391|reliedon|Para 22|| |1992 (2)Suppl.SCR 257 relied|SCR 257 reliedon|Para 25|| ||||c| |1956SCR451|reliedon|Para 26|| |1965SCR815|reliedon|Para 26|| |1969SCR808|reliedon|Para 26|| |1998 (3)SCR1079|reliedon|Para 26|D| |1998 (3)SCR1145|reliedon||| |||Para 26|| |-·|||-·| |2004 (1) SCR 62|reliedon|Para 26|| ||||E| |2008 (10)SCR243|reliedon.|Para 26|| |2011 5sec_210_|reliedon|Para 26|| CIVIL ORIGINAL JURISDICTION : Arbitration Petition No. 7 & 8 of 2009. F Under Section 11 (5) & 11 (9) of the Arbitration and Conciliation Act, 1996. V.A. Mohta, P. Vijay Kumar, C.S.N. Mohan Rao for the Petitioner. G S.K. Kulkarni, Ankur S. Kulkarni, M. Gireesh Kumar, Anirudha Anand for the Respondent. The Judgment of the Court was delivered by H [2011] 12 S.C.R. ## 482 SUPREME COURT REPORTS A **DR.** B.S. **CHAUHAN, J.** 1. The arbitration applications under Section 11 (5) & (9) of the Arbitration and Conciliation Act, 1996, hereinafter called the "Act 1996" have been filed for appointment of Arbitrator in an international arbitration dispute to adjudicate the disputes/differences which have arisen B between the parties. ## A 2. The applicants are a partnership concern incorporated under the Indian Partnership Act, 1932 and have filed two applications as the dispute raised herein relate to two consignments. However, for convenience, facts and issues C related to Petition No.7/2009 are being considered. 3. On 24.6.2008, a Purchase Contract bearing No. CCT/ SST/027/ 240608 was entered and executed by and between the applicants and the respondents wherein the applicants D agreed to sell and the respondents agreed to purchase Calibrated Lumpy Ore Fines of the approximate quantity of 40,000/- Wet Metric Tones (hereinafter called as 'WMT') (10% more or less at buy~rs' option) at the price and on the terms and conditions stipulated in the said agreement. The-· E agreement provided for the chemical specification/composition of the Ore and for. guaranteed level of Fe i.e. iron content in the contracted goods which could not be less than 63%. In case the iron content was less than 63%, the buyer would have a right to reject the cargo. F 4. A large quantity of Ore had been supplied to the respondents which had been accepted and payments had been made. Pursuant to the purchase contract, the applicants on 6.8.2008 shipped a total consignment of 24,500 D!Y MT of Calibrated Lumpy Ore from New Mangalore Port, India to the G port of discharge viz. Rizhao Port, China by vessel named "MV. FUJIN". The applicants raised a provisional invoice for a sum of US$ 32, 13,529.11 and sent a Certificate of Origin and the Bill of Lading dated 6.8.2008 as issued by the carriers in respect of the carriage of the goods from Mangalore Port, India H CAUVERY COFFEE TRADERS, MANGALORE _v._ HORNOR 483 RESOURCES (INTERN.) CO. LTD. [DR. S.S. CHAUHAN, J.] to Rizhao Port, China. The material so supplied had been sent A after proper analysis and it had been certified by the analyst in India that the goods supplied contained more than 63% Fe contents. The said goods reached at China Port. The delivery of the same was taken by the respondents and on chemical analysis, according to them, the iron contents Fe, were found B to be 62.74%. The goods reached the Port of Discharge, and were accepted by the respondents-buyers who promised that payment would be made without any delay. B 5. The respondents vide email dated 19.,9.?008 informed the applicants that a provisional payment would be released for the shipment in question based on revised rates and, in case, the applicants were willing to accept the revised rates stipulated therein, the respondents would request their end buyers' confirmation to release the payment, and for that purpose, applicants were asked to send necessary instructions through their banker. The respondents vide email dated 7.10.2008 informed the applicants that US$ 1.5 million could be the amount for the final settlement in (espect of the shipment in question, in spite of the fact that the agreed amount had been US$ 18,91,204.00. By the said email, applicants were asked by the respondents to inform through their banker in case of their acceptance to the said proposal. Under these peculiar facts and circumstances, as the goods had already reached China and applicants were in dire need of money, they informed through their banker that they agreed to receive payment under the Letter of Credit in a sum of total claim of US$ 18,91,204.00. By email dated 7 .10.2008 the respondents stated that the applicants should accept US$ 1.5 million in full and final settlement. Accordingly, an amount of US$ 1.5 million had been received by them. Subsequent thereto, the applicants had repeatedly been sending reminders to the respondents to make good the balance payment under the said purchase contract, but no payment had been made. As the respondents failed to make the payment of the balance amount, the applicants sent a legal notice dated 14.11.2008 to call upon the respondents C D E F G H [2011) 12 S.C.R. 484 SUPREME COURT REPORTS - A to pay the balance amount under the purchase contract and further provided that, in view of the arbitration clause 18 contained in the purchase agreement, they should carry on friendly negotiations to settle the dispute accrued between the parties. As per the terms of the purchase agreement, arbitration - B can be held only in a third country. The applicants suggested to have the arbitration proceedings either in Singapore or in Australia. In spite of receiving the said notice, neither the payment of the balance amount was made, nor the respondents came forward for friendly negotiations. Therefore, a further - c reminder was sent by the applicants to the respondents calling upon them to indicate the place of arbitration. As neither the payment had been made, nor the respondents have agreed for arbitration proceedings, they have approached this Court by filing these applications. D 6. Shri V.A. Mohta, learned senior counsel appearing for the applicants, has submitted that in spite of the fact that the supply of iron ore has been made strictly in terms of the purchase contract and the outstanding_ payments have not been made even after several reminders, the applicants served a E notice on the respondents for appointment of Arbitrator in the third country in terms of Clause 18 of the Purchase Agreement but the respondents did not make any effort either to come for friendly negotiations or to refer the matter for arbitration, therefore, this Court must refer the matter to the Arbitrator in a F third country preferably Singapore or Australia. 7. On the contrary, Shri Ashok K. Srivastava, learned senior counsel appearing for the respondents, has vehemently opposed the applications contending that the applications G themselves are not maintainable as the purchase agreement can be dealt with Part-II and certainly not under Part-I of the Act 1996. Therefore, the applications under Section 11 (5) & (9) of Act 1996 are not maintainable, even otherwise, there has been a complete settlement between the parties and the applicants H have accepted the full and final settlement as suggested by the CAUVERY COFFEE TRADERS, MANGALORE _v._ HORNOR 485 RESOURCES (INTERN.) CO. LTD. [DR B.S. CHAUHAN, J.] respondents in view of the fact that Fe contents were not as A · per the specifications ~nd certain terms had been offered to the applicants for settlement, which had been agreed by them. The question of making the reference to arbitration proceedings does not arise. B 8. I have considered the rival submissions made. by learned counsel for the parties and perused the record. 9. So far as the issue relating to maintainability of the application itself is concerned, is no more _res integra._ This court in _Bhatia_lntemational v. Bulk Trading_ S.A, (2002) 4 SCC 105, held as under: C " ..... notwithstanding the provisions of Section 2(2) of the Arbitration and Conciliation Act, 1996, indicating that Part I of the said Act would apply where the place of arbitration 0 is in India, even in respect of international commercial • agreements, which are to be governed by the. laws of another country, the parties would be entitled to invoke the provisions of Part I of the aforesaid Act and consequently the application made under Section 11 thereof would be E maintainable. It clearly lays down that the provisions of Part I of the Arbitration and Conciliation Act; 19961 would be equally applicable to international commercial arbitrations held outside India, unless any of the said provisions are excluded by agreement between the parties expressly or by implication, which is not so in the instant case." F E F (See also: _lndtel Technical Services Private Limited v. W_ S. _Atkins Rail Limited,_ (2008) 10 SCC 308; and _Citation lnfowares Limited v. Equinox Corporation,_ (2009) 7 SCC 220). G > 10. In _Venture Global Engg._ Case _v. Satyam Computer Services Ltd._ (2008) 4 SCC 190, this Court considered the similar issue and after considering various earlier judgments, came to the conclusion that implied exclusion of provision of Part-I cannot be inferred and therefore the principles regarding \ H [2011) 12 S.C.R. ## 486 SUPREME COURT REPORTS A the arbitral reference laid down in _Bhatia International_ (supra) are applicable. 11. Hon'ble Mr. R.C. Lahoti, J. (as His Lordship then was) however, has taken a contrary view as in _Shreejee Traco (I)_ B _Pvt. Ltd. v. Paperline International Inc.,_ (2003) 9 SCC 79; it was held: _"8._ So _far_ as _the language employed by Parliament in drafting sub-section (2) of Section 2 of the Act is concerned, suffice it to_ say _that the language is clear and_ c _unambiguous. Saying that this Part would apply where the place of arbitration is in India tantamounts to saying that it will not apply where the place of arbitration is not in India."_ D However, considering the fact that _Bhatia International_ (supra) is a three-Judge Bench judgment and has consistently been followed, the judgment of the learned Single Judge in _Shreejee Traco (I) Pvt. Ltd._ (supra) does not have binding effect. As a consequence, the application is held to be maintainable. E 12. The Relevant part of the Purchase Agreement dated 28.6.2008 reads as under: ## "Clause 5: Price Adjustment ## F For Fe content: In respect of iron ore which does not meet the Fe specifications set forth in Clause 3 the base price referred to in Clause 4 shall be adjusted in accordance with Fe content as determined pursuant to the provisions of Clause G 8 as follows: The base price shall be increased by single prorate (USD2.2) per dry metric tonne for each 1 % Fe below 63.5% upto 63.0 fraction prorate. H CAUVERY COFFEE TRADERS, MANGALORE _v._ HORNOR 487 RESOURCES (INTERN.) CO. LTD. [DR. B.S. CHAUHAN, J.] The Buyer has the right to reject the cargo if Fe content is A below 63.0% . ## Clause 15: Title and Risk The title with respect to each shipment shall pass from Seller to the Buyers when Seller receives reimbursement B of the proceeds from the opening bank through the negotiating bank against the relative shipping documents as set forth in clause 6 after completion of loading on board the vessel at loading port, with effect retrospective to the time of delivery of ore. C ## Clause 18: Arbitration All disputes in connection with this contract or the execution thereof shall be settled amicably by friendly negotiations 0 between the two parties. If no settlement can be reached, the case in dispute shall then be submitted for arbitration to a third country, which shall be agreed upon by both parties. The arbitration award shall be final and binding on both the parties and may be enforced in any court having jurisdiction over the party against which enforcement is E sought. The cost of arbitration shall be borne by the losing party." Thus, from the Purchase Agreement it is evident that the ore supplied must contain Fe contents not less than 63%. In F case the Fe contents are less than the specified percentage, the buyers would have a right to reject the cargo. The Purchase Agreement also contains a clause providing for price adjustment in case the supplied ore does not meet the requirement of specification provided for iron ore. In case of G any dispute between the parties, the agreement provides for arbitration in any third country. 13. The documents on record reveal that parties had been negotiating for the goods supplied and also in respect of payment for the same (vide emails dated 25.6.2008 and H . [2011] 12 S.C.R. 488 SUPREME COURT REPORTS A 8.9.2008). Relevant part of the email dated 25.9.2008 reads as under: " ...... Both cargos were rejected by end buyers due to the quality failure. B c In such case, we regret to say that the maximum CFR price we can work here is $110 for Zhongqiang II AND $120 FOR Fujin. Pis note current market price for cargo below 63 is only $100 and market is still on the down trend. However in consideration of the long term good cooperation between the two companies, we are offering to bear at least a $10-20 loss on our side and with the huge risks of further slide of market, which actually is foreseeable . D ... ... Our above offer is valid till this Friday (26th September, 2008) only ... " 14. The email dated 7.10.2008 sent by the applicants to the respondents reads as under: E "Further to telecom just now, pis note as per latest mutual agreement between seller and buyer, the said USD1 .50 million shall be final settlement for subj.shipment, so please request your bank to revise the swift msg as follows: F G _"beneficiary agrees to receive USD1,500,000.00 for full and final payment for this set of documents and under this letter of credit, after release of this amount, the letter of credit shall be considered expired and cancelled."_ (Emphasis added) 15. Subsequently, the applicants sent an email to the respondents dated 14.11.2008 which provided _inter-alia,_ as under. H _"Clause 8 of the Purchase_ Contract _provided for the_ CAUVERY COFFEE TRADERS, MANGALORE _v._ HORNOR 489 RESOURCES (INTERN.) CO. LTD. [DR. 8.S. CHAUHAN, J.] _remedies available in the event of tbere being_ a A _difference in percentage of the Fe content as compared to the specifications mentioned in the Contract. The said Contract also provided that all disputes would be settled amicably and that if no settlement could be reached, the disputes would be submitted to arbitration to_ a _third_ B _country to be agreed upon by both the parties ._ . . . . . . . Since the Arbitration clause provides for the dispute being submitted for arbitration to a third country, our clients would suggest conduct of the arbitration either in C Singapore under the auspices of the Singapore International Arbitration Centre and/or Australia under the Rules of the Institute of Arbitrators and Mediators, Australia." 16. The applicants again asked the respondents for reference to Arbitrator vide email dated 21.11.2008, but in vein. > 17. Stand of the respondents throughout had been that under Clause 5 of the Purchase Contract dated 24.6.2008 in respect of the iron ore, the buyers had a right to reject the whole E consignment in case the iron contents were less than 63%, as has been in the instant case. However, considering other factors that goods had already reached the port of discharge in China, the buyers accepted the delivery thereof and therefore, the buyers made a proposal for adjustment of price. Negotiations started as is evident from the email messages dated 8.9.2008, F 25.9.2008 and 7.10.2008 as referred to hereinabove, and it was > in pursuance of these negotiations that the applicants had instructed their banker to accept the proposal made by the respondents and it was in pursuance of their instructions, the banker vide email dated 8.10.2009 accepted the proposal and G > agreed to receive a sum of US$500,000.00 as full and final settlement for the consignment in issue. The payment made was accepted by the applicants and it was after 3 months thereafter that they served a legal notice dated 14.11.2008 for making a reference to the Arbitrator. The applicants in the H [2011) 12 S.C.R. 490 SUPREME COURT REPORTS - A present application do not dispute the negotiations or giving instructions to their banker or in respect of the email by their banker to the respondents or receiving the money in lieu thereof. Therefore, the question does arise as to whether the banker's acceptance of instructions given by the applicants can be - B treated as full and final settlement of the dispute. The main ground in this regard had been taken in this application in Paragraph (P) as under: - "In spite of the fact that the Applicants had specifically informed their Bankers that an amount of US$ 1.5 million - c was to be received in lieu of provisional payment, an _erroneous_ message was forwarded by the Applicants' Bankers to the Respondents that the beneficiary being the Applicants herein had agreed to receive an amount of US$ 1.5 million towards full and final payment and that the - D Letters of Credit would be considered expired and cancelled on receipt of the said payment." (Emphasis added) - 1 S. **Error** means - a mistake in judgment/a;sessment in - E a process or proceedings; some wrong decision taken inadvertently; unintentional mistakes; something incorrectly done through ignorance or inadvertence; mistake occurred from an accidental slip; deviation from standard or course of right or accuracy - unintentionally; to be wrong about; to think or - F understand wrongly; an omission made not by design, but by mischance. 19. In _Nathani Steels Ltd. v. Associated Constructions,_ 1995 Supp (3) SCC 324, while dealing with a similar issue, this Court held: G - " ...... once the parties have arrived at a settlement in respect of any dispute or difference arising under a contract and that dispute or the difference is amicably settled by way of a final settlement by and between the - H parties, unless that settlement is set aside in proper CAUVERY COFFEE TRADERS, MANGALORE _v._ HORNOR 491 RESOURCES (INTERN.) CO. LTD. [DR. B.S. CHAUHAN, J.] proceedings, it cannot lie in the mouth of one of the parties A · to the settlement to spurn it on the ground that it was a mistake and proceed to invoke the Arbitration clause. If this is permitted the sanctity of contract, the settlement also being a contract, would be wholly lost and it would be open to one party to take the benefit under the settlement and B then to question the same on the ground of mistake without having the settlement set aside. In the circumstances, we think that in the instant case since the dispute or difference was finally settled and payments were made as per the settlement, it was not open to the respondent unilaterally c to treat the settlement as non est and proceed to invoke the Arbitration clause .... " A similar view has been re-iterated in _State of Maharashtra v. Nav Bharat Builders,_ 1994 Supp (3) SCC 83. 20. This Court in _Mis. P.K. Ramaiah_ & _Company v. Chairman_ & _Managing Director, NTPC,_ (1994) Supp. 3 SCC 126 considered the ambit of accord and satisfaction by the parties voluntarily entered into and dispute raised thereunder. This Court after considering the entire controversy held that: D E "Admittedly the full and final satisfaction was acknowledged by a receipt in writing and the amount was received unconditionally. Thus there is accord and satisfaction by final settlement of the claims. The subsequent allegation of _coercion is an afterthought and a devise to get over the settlement of the dispute, acceptance of the payment and receipt voluntarily given .... Having acknowledged the settlement and_ also accepted measurements and having received the amount in full and final settlement of the claim, there is accord and satisfaction. There is no existing arbitrable dispute for reference to the arbitration." (Emphasis added) F G 21. In _National Insurance Company Limited v. Mis._ H [2011) 12 S.C.R. 492 SUPREME COURT REPORTS A _Boghara Polyfab Private Limited,_ AIR 2009 SC 170, this Court held: B c D "26. When we refer to a discharge of contract by an agreement signed by both the parties or by execution of a full and final discharge voucher/receipt by one of the parties, we refer to an agreement or discharge voucher which is validly and voluntarily executed. If the party which has executed the discharge agreement or discharge voucher, alleges that the execution of such discharge agreement or voucher was on account of _fraud/coercion! undue influence_ practised by the other party and is able to establish the same, then obviously the discharge of the contract by such agreement/voucher is _rendered void and cannot be acted upon._ Consequently, any dispute raised by such party would be arbitrable." (Emphasis added). ## xx xx xx E 29. It is thus clear that the arbitration agreement contained in a contract cannot be invoked to seek reference of any dispute to arbitration, in the following circumstances, when the contract is discharged on account of performance, or _accord and satisfaction,_ or _mutual agreement,_ and the same is reduced to writing (and signed by both the parties or by the party seeking arbitration): F (a) where the obligations und.er a contract are fully performed and discharge of the contract by performance is acknowledged by a full and final discharge voucher/ receipt, nothing survives in regard to such discharged contract; G H (b) where the parties to the contract, by mutual agreement, accept performance of altered, modified and substituted obligations and confirm in writing the discharge of contract by performance of the altered, modified or substituted obligations; CAUVERY COFFEE TRADERS, MANGALORE _v._ HORNOR 493 RESOURCES (INTERN.) CO. LTD. [DR. B.S. CHAUHAN, J.] (c) where the parties to a contract. by mutual agreement, A absolve each other from performance of their respective obligations (either on account of frustration or otherwise) and consequently cancel the agreement and confirm that there are no outstanding claims or disputes." ## (Emphasis added) B 22. In _R.L. Katathia v. State of Gujarat,_ (2011) 2 SCC 400, this court considered a similar issue and held: "(i) Merely because the contractor has issued "no-dues certificate", if there is an acceptable claim, the court cannot reject the same on the ground of issuance of "no-dues certificate". C (ii) Inasmuch as it is common that unless a discharge certificate is given in advance by the contractor, payment 0 of bills are generally delayed, hence such a clause in the contract would not be an absolute bar to a contractor raising claims which are genuine at a later date even after ·· submission of such "no-claim certificat~·. (iii) Even after execution of full and final discharge voucher/ receipt by one of the parties, if the said party is able to establish that he is entitled to further amount for which he is having adequate materials, he is not barred from claiming such amount merely because of acceptance of the final bill by mentioning ''without prejudice" or by issuing "no-dues certificate". E F ·23. In view of the above, law on the issue stands crystallised to the effect that, in case, final settlement has been reached amicably between the parties even by making certain adjustments and without any misrepresentation or fraud or coercion, then, acceptance of money as full and final settlement/ issuance of receipt or vouchers etc. would conclude the controversy and it is not open to either of the parties to lay any claim/demand against the other party. G H [~011] 12 S.C.R. 494 SUPREME COURT REPORTS A 24. The applicants have not pleaded that there has been any kind of misrepresentation or fraud or coercion on the part of the respondents. Nor it is their case that payment was sent by the respondents without any settlement/agreement with the applicants, and was a unilateral act on their part. The applicants B reached the final settlement with their eyes open and instructed their banker to accept the money as proposed by the respondents. Proposal itself was on the basis of clause 5 of the Purchase Contract which provided for _Price Adjustment._ For a period of three· months after acceptance of the money c under the full and final settlement, applicants did not raise any dispute in respect of the agreement of price adjustment In such a fact-situation, the plea that instructions were given by the applicants to the banker _en"Oneous/y,_ being, afterthought is not worth acceptance. D The transaction stood concluded between the parties, not on account of any unintentional error, but after extensive and exhaustive bilateral deliberations with a clear intention to bring ""about a quietus to the dispute. These negotiations, therefore, are self-explanatory steps of the intent and conduct of the E parties to end the dispute and not to carry it further. 25. In _R.N. Gosain v. Yashpa/ Dhir,_ AIR 1993 SC 352, this Court has observed as under:- "Law does not permit a person to both approbate and F reprobate. This principle is based on the doctrine of election which postulates that no party can accept and reject the same instrument and that "a person cannot say at one time that a transaction is valid and thereby obtain some advantage, to which he could only be entitled on the footing that it is valid, and then turn round and say it is void G for the purpose of securing some other advantage." 26. A party cannot be permitted to "blow hot and cold", "fast and loose" or "approbate and reprobate". Where one knowingly accepts the benefits of a contract or conveyance or an order, H is estopped to deny the validity or binding effect on him of such CAUYERY COFFEE TRADERS, MANGALORE _v._ HORNOR 495 RESOURCES (INTERN.) CO. LTD. [DR. B.S. CHAUHAN, J.] contract or conveyance or order. This rule is applied to do A equity, however, it must not be applied in a manner as to violate the principles of right and good conscience. (Vide: _Nagubai_ Amma/ & _Ors. v. B._ Shama _Rao_ & _Ors.,_ AIR 1956 SC 593; _C.I. T._ Vs. _MR. P. Firm Maur,_ AIR 1965 SC 1216; _Maharashtra State Road Transport Corporation v. Ba/want Regular Motor_ B _Service, Amravati_ & _Ors.,_ AIR 1969 SC 329; _P.R. Deshpande v. Maruti Ba/aram Haibatti,_ AIR 1998 SC 2979; _Babu Ram v. lndrapa/ Singh,_ AIR 1998 SC 3021; _Chairman and MD, NTPC Ltd. v. Reshmi Constructions, Builders_ & _Contractors,_ AIR 2004 SC 1330; _Ramesh Chandra Sank/a_ & _Ors. v. Vikram_ c _Cement_ & _Ors.,·_ AIR 2009 SC 713; and _Pradeep Oil Corporation v. Municipal Corporation of Delhi_ & _Anr.,_ (2011) 5 sec 210). A B 27. Thus, it is evident that the doctrine of election is based on the rule of estoppel- the principle that one cannot approbate D and reprobate inheres in it. The doctrine of estoppel by election is one of the species of estoppels in pais (or equitable : estoppel), which.!§ a rule in equity. By that law, a person mi;iy be precluded by his actions or conduct or silence when it is his duty to speak, from asserting a right which he otherwise would E have had. D 28. In the facts and circumstances of the case, as the respondents resorted to clause 5 of the Purchase Agreement dated 28/6/2008, regarding price adjustment and the offer so made by the respondents has been accepted by the applicants and agreed to receive a particular sum offered by the respondents as a full and final settlement, the dispute com :s to an end. F The applicants cannot take a complete somersault and agitate the issue that the offer made by the respondents had G erroneously been accepted. In view of the above, as no dispute survives, the applications are dismissed. D.G. Applications dismissed. H
End of Judgment Record
Browse All Supreme Court of India (2011) Decisions
2011-10-13

GRASIM INDUSTRIES LTD. v. UNION OF INDIA

Grasim Industries Ltd. v. Union of India deals with whether metal scrap or waste generated during repair of worn-out machinery used in a cement manufacturing plant constitutes manufacture and thus obligations to pay Central excise duty. The core dispute arose after Grasim repaired plant components and generated scrap, which was cleared without duty; the Tribunal later held that such scrap did not arise from any manufacturing activity and was not excisable. The Rajasthan High Court initially upheld the duty demand and penalties, while the Tribunal had dropped them. The Supreme Court reversed the High Court, restoring the Tribunal’s order and allowing the appeal. The Court held that although repair work produces metal scrap, this scrap does not participate in the manufacture of cement and cannot be treated as a by-product of the final product. It emphasized that excise duty is on manufacture of goods, requiring that the goods be produced or manufactured in India, and the charging Section 3 applies only when the goods are excisable under Section 2(d) and are manufactured under Section 2(f). Section 2(f) defines manufacture as including any process incidental or ancillary to the completion of the manufactured product, involving transformation of raw material into a new or distinct excisable product. The process of repair, using non-raw materials, does not satisfy this test. The Court also cautioned against deeming provisions in tariff notes as creating manufacture unless expressly stated, relying on various precedents such as Shyam Oil Cake, Ujagar Prints, Hindustan Polymers, and Union of India v. Delhi Cloth and General Mills, among others, to delineate the law of manufacture.

2011-03-02

Bharat Petroleum Corporation Ltd. v. Chembur Service Station

This Supreme Court appeal concerns BPCL’s licence-based relationship with a dealer at a Retail Petroleum Outlet (RPO) in Chembur, Mumbai. BPCL (then Burmah Shell) leased the land and services premises to operate the RPO; in 1972 a DPSL (Dispensing Pump and Selling Licence) granted the respondent the right to sell BPCL’s petroleum products from the outlet. A 1995 renewal extended the arrangement. In 2007, a show-cause notice alleged tampering with dispensing equipment, prompting BPCL to terminate the dealership. The respondent filed suits in the Court of Small Causes claiming tenancy or deemed tenancy under rent-control laws and sought an injunction to continue supply, while BPCL argued the arrangement was a revocable licence, not a tenancy, and the remedy lay in due process and contract law, not eviction under rent-control statutes. The lower courts issued status-quo orders preserving possession and continuing supplies, with various challenges under Public Premises Act and rent-control regimes. The Supreme Court clarified that the DPSL licence creates a limited, revocable right to enter and use the premises to sell BPCL’s products, not a tenancy; the licence terminates with revocation and the licensee has no independent right to possession. The Court ultimately referred the matter to a larger Bench due to divergent views and, in the order, dismissed the appeal with directions to proceed under due process of law.

2011-07-04

Sudam @ Rahul Kaniram Jadhav v. State of Maharashtra

Sudam alias Rahul Kaniram Jadhav challenged a conviction for the murder of a woman with whom he lived as husband and wife and her four children. The victims were found in a village pond in August 2007. The trial court convicted the appellant under IPC Sections 302 and 201 and sentenced him to death; the Bombay High Court affirmed. The State relied on circumstantial evidence: the victims were last seen alive with the appellant; he had posed as single, later marrying another woman (PW-6); the deceased had agreed to pay Rs. 15,000 to PW-6 to settle the dispute; extra-judicial confessions were made by the appellant to PW-6 and PW-9; he absconded and could not explain the deaths. The defense argued that the circumstantial chain was not complete and could admit alternate explanations; there were no direct eyewitnesses. The Supreme Court reiterated the standard for circumstantial evidence: the evidence must be cogently and firmly established, form a complete chain, point to guilt beyond reasonable probability, and be inconsistent with innocence. It concluded all five deaths were homicidal and, applying the rarest-of-the-rare doctrine, upheld the conviction and the death sentence, while dismissing the appeals.

2011-04-18

J.S. Yadav v. State of U.P. & ANR.

This case concerns a challenge to a May 28, 2008 notification declaring the appellant, a member of the Uttar Pradesh State Human Rights Commission, ceased to hold office after amendments to the Protection of Human Rights Act, 1993 were introduced by the Protection of Human Rights (Amendment) Act, 2006. The appellant joined the Commission on 29 June 2006 for a five-year tenure and argued that the amendment, which requires seven years of experience as a District Judge for eligibility, could not curtail an incumbent’s tenure and could not be applied retrospectively. He also contended that Section 26 of the Act guarantees that terms and conditions of service shall not be varied to his disadvantage after appointment, and that the proposed reconstitution would deprive accrued rights. The State argued that fresh appointments to the Commission had to be made, that the amendment could alter service conditions, and that public funds cannot pay two persons for one post; non-joinder of relatives and the lack of a suitable remedy rendered the petition academic. The Supreme Court held that tenure posts must be allowed to endure to the end of the fixed term and that accrued rights cannot be taken away by a repealing or amended statute without express or necessary implication. It held the 2006 Amendment prospective and the impugned notification illegal, allowed the appeal to the extent discussed, and awarded Rs. 1 lakh as costs to the appellant.