British Machinery Supplies Company v. Union of India and Others

Case / Petition Number:
Civil Appeal No. 5421 of 1983
Neutral Citation:1992 SCR Supp. 3

Case Synopsis & Summary

This is a Civil Appeal challenging the pricing and supply regime for canalised imports of GP sheets/coils under the Government of India policy administered through SAIL (Steel Authority of India Limited). The appellant, an actual user, sought 600 MT of GP sheets/coils, but SAIL registered only 300 MT and later offered smaller lots. From April 1981 to November 1981, the appellant observed that other purchasers received materials while it did not. A Pricing Committee met in December 1981 to decide an increase in price by Rs. 800 per MT, which was formally ordered in early 1982. The government orders reached SAIL on 2–8 February 1982 and were implemented the same day. The appellant challenged the increase as arbitrary, discriminatory, and contrary to the registration/LC timelines, arguing it should not bear the higher price since registration and LC occurred before the price rise and that others were treated differently. SAIL argued that pricing is dictated by the Pricing Committee and government policy; it could not unilaterally fix prices and had to follow the policy. A force majeure event preventing supplier delivery (fire) caused 62 MT to be unavailable. The Delhi High Court rejected the contentions; the Supreme Court upheld the Government policy-based pricing. The appeal was dismissed with costs.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • Kuldip Singh
  • P. B. Sawant
Judgment Date
1992-12-17
Court Decision / Holding
Appeal dismissed (with costs).
Final Disposition
Appeal dismissed with costs

Parties to the Case

Appellants / Petitioners

  • British Machinery Supplies Company

Respondents

  • Union of India
  • Steel Authority of India Limited (SAIL)

Legal Representation & Advocates

Counsels for Petitioners

  • • Bishambar Lal
  • • Ms. Geetanjali Mohan

Counsels for Respondents

  • • Joseph Vallapally
  • • Barish Salve
  • • G. Venkatesh Rao
  • • C. V. Subba Rao
  • • M. P. Sharma
  • • D. N. Mishra

Provisions of Law Cited

Paragraph 65, Import Policy for the year 1980-81Paragraph 66, Import Policy for the year 1980-81Paragraph 72, Handbook of Import-Export Procedures, 1980-81Paragraph 73, Handbook of Import-Export Procedures, 1980-81Paragraph 151, Handbook on Import Policy, 1980-81Paragraph 152, Handbook on Import Policy, 1980-81

Legal Doctrines & Maxims

  • Force majeure
  • Judicial restraint: pricing determined by Government policy and Pricing Committee; canalising agency to abide by Committee decisions, not fix prices

Submissions & Arguments

Contentions of Appellants / Petitioners

Appellant contended that (1) registration of demand and opening of LC before 8.2.1982 shielded it from the price increase; (2) SAIL discriminated by charging higher price to the appellant while supplying others at lower rates; (3) the increase in price was arbitrary, with reasons not germane or justified. An additional claim argued that if material had been supplied to the appellant earlier (April 1981–Nov 1981) as to others, the impact of the price rise would have been less.

Contentions of Respondents

Respondents argued that price increases were decided by the Pricing Committee under the Import Policy and formal orders issued on 30.1.1982 and 2–8 February 1982; pricing is part of government policy and cannot be adjudicated by the court; force majeure prevented supply of 62 MT, and those increases were applicable to all actual users; SAIL acted as a canalising agency bound to implement pricing decisions and not to fix prices.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•3,627 words•~17 min read

In The Court Record

British Machinery Supplies Company v. Union of India and Others

A # BRITISH MACHINARY SUPPLIES COMPANY _v._ ## tJNlON OF INbIA AND ORS. ## DECEMBER 17, 1992 ## B ## (KULDIP SINGH AND P.B. SAWANT, JJ.] _Handbook of Import-Eiport Procedures, 1980-81-Paragraphs 72, 151 and 152-G.P. Sheets/Colls-linport of-Through canalised agency Steel Authority of India (SA1L}-f'ricing Committee increasing the price-Supply_ C _·of materials at increased price p;evalent on date of ;elease-Not on date of registratio"n with SAIL ..... Validity of..:.....Price increase-Whether arbitrary and discriminatory-Non-supply of Materials by SAIL due to foreign supplier invoking force'majeur_ . ,, •. _clause in the_ . _contract-Effect_ . . . _of._ The appellant applied to the Steel Authority of India Limited D (SAIL) for supply of 600 Metric tonnes of G~P. Sheets/Coils of 0.45 m.m. gauge. SAIL registered the demand of the appellant for 300 metric tonnes only. Thereafter S,,.IL sent a telegram offering the appellant 62 metric tonnes. The appellant accepted the offer and complied with the formalities. The supplies were to be made latest by 31.3.1981. But it was E not m·ade as Scheduled. On 16.12.1981, a meeting of the Pricing Committee resolved to increase the price of the imported G.P. Sheets/coils by about Rs~800 per metric ton and this was communicated to SAIL on 8.2.1982. . Meanwhile on 12.1.1982 SAIL further offered 59 metric tonnes of F G.P. Sheets/Coils. On 1.2.1982 the appellant accepted the offer and complied With the other formalities. On 16.3.1982 SAIL wrote to the appellant that the Government of India has decided to increase the release price of G.P. Sheets/Coils imported, by Rs. 800 per metric ton. G On 19.4.1982 SAIL olTered another 211 metric tonnes of G.P. SheefS/Coils at increased price. The appellant accepted the offer but protested against the increase in price @Rs. 800 metric ton. Later SAIL informed the appellant that the foreign suppliers had invoked _force majeur_ clause in the contract due to fire and had not H supplied 62 metric tonnes of G.P. sheets/coils and therefore the said 690 691 BRITISH MACHINARY CO. _v._ U.0.1. supply could not be made. As regards the imcrease in price, SAIL A informed the appellant that it was binding both on SAIL as also actual users like the appellant. The appellant pointed out that certain concerns were supplied the material even after 8.2.1982 and were not charged the increase in price of Rs. 800 per metric ton, and the appellant should also be supplied material without being charged the increase in price. B Since SAIL refused to do so, the appellant filed Writ Petition before the High Court and contended that the appellant having registered the demand and opened its letter of credit prior to 8.2.82, it was not liable to pay the increased price; that SAIL was treating the appellant discriminately and that the increase in price itself was arbitrary. The High Court rejected all the three contentions and dismissed the. Writ Petition. C Aggrieved by the High Court's judgment, the appellant preferred the present appeal. In addition to the contentions raised before the High Court, it was contended before this Court that had the material been supplied D to the appellant in time by SAIL when it was · supplied to others, the increase in price would not have affected it. ## Dismissing the appeal, this Court HELD: 1. SAIL being only a canalising agency has to abide by the E decisions on pricing taken from time to time by the Pricing Committee. SAIL has no authority to fix the price. In fact, if it releases items at prices other than the price fixed by the Pricing Committee, it would be committing a breach of the Government Policy. Hence at the time of the release of an item SAIL has to release it at the price fixed by the F Pricing Committee. The application made by the appellant for registering itself for the imported G.P. sheets/coils makes it clear that the appellant is bound by the said policy. Admittedly, the release of the material in favour of the appellant is after 8.2.1981. [696-D,F] 2.1. The Pricing Committee met on 8.12.1981 for the first time to G consider the increase in the price wherein a tentative decision to increase the price by Rs. 800 per metric ton was taken. It again met on 16.12.1981 to finally approve the said decision and it was resolved formally that the price would be increased by Rs. 800 per metric ton. The minutes of the meeting were circulated by the Ministry of'Steel and Mines on H SUPREME COURT REPORTS [1992) SUPP. 3 S.~.R. 692 A B 2.1.1982 and formal orders were i.ssued in that behalf by the Chief Controller of Imports and Exports on 30.1.1982. The said orders were· received by SAIL on 2.2.1982 at its Head Office in New Delhi, and on 8.2.1982 by its office at Calcutta and were implemented on the same day. SAIL could not increase the price unless formal written orders of the Government were received by it which it did on 8.2.1982. [697-D-F] C > 2.2. Between 16.12.1981 and 8.2.1982, certain parties were supplied the material at the old rate. However, even in respect of the said parties, supplementary invoices were raised in order to recover the increase in price of Rs. 800 per metric toli for the supplies made to them during that period. (697-G,H] D • 3. The foreign suppliers of G.P. Sheets could not supply the material since there was a fire and the supplier had invoked the _force majeur_ clause of the contract. It is in these circumstances that the supply of 62 Metric Tonnes of G.P. sheets could not be made to the appellant. Hence the appellant cannot make a grievance. in that behalf. (696-G,H] E F 4. Pricing is a part of the package of the import and export policy. It is not for the Court to decide whether the prices of particular items should be increased or lowered or fixed at particular rates. The Government of India and its Pricing Committees appointed to determine the prices for the commodities, have to take several factors into. considerations including the indigenous market conditions of the material concerned and the effect of the prices on the production, availability and prices of the goods which are produced with the help of such imported material, and the price of the very same material or substituted material or its substitutes in the indgenous as well as international markets. However, it is evident from records that there was a need to increase the price of G.P. Sheets/coils."' (698-C-El CIVIL APPELLATE JURISDICTION: Civil Appeal No. 5421 of G 1983. From· the Judgment and Order dated 18.11.82 of the Delhi High Court in C.W.P. No. 1685of1982. · H Bishambar Lal and Ms. Geetanjali Mohan for the Appellant. 693 BRITISH MACHINARYCO. _v._ U.0.1. [SAWANT, J.] Joseph Vallapally, Barish Salve, G. Venkatesh Rao, C.V. Subba Rao, M.P. Sharma and D.N. Mishra for JBD & Co. for the Respc>ndents. The Judgment of the Court was delivered by SAWANT, J. The appellant is an actual user of various items of st~el as well of G.P. sheets/coils. The import of G.P. sheets/coils under the policy B of the Government of India is canalised through the Steel AGthority of India Limited [SAIL]. On 1.4.1.1981, the appellant applied to the SAIL for the supply of 600 metric tonnes of G.P. sheets/coils of 0.45 mm gauge. On 17.3.1981, the SAIL registered the damand of the appellant for only 300 metric tonnes of G.P. sheets/coils. On 13.11.1981; the SAIL sent ,a telegram C offering the appellant 62 metirc tonnes of G.P. Sheets/coils of 0.45 mm thickness subject to the appellant's acceptance reaching it before 19.11.1981, and also required the appellant to open an irrevocable letter of credit. By its telegram of 16.11.1981 the appellant conveyed its acceptance and. on 26.11.1981 opend an irrevocable letter of credit in fav0ur of the SAIL for a sum of Rs. 64,000. This demand of the appellant for the year D 1980-81 was to be supplied latest by 31.3.1981. 2. According to the appellant, during the period from April 1981 to November 1981, ignoring the claim of the appellant, the SAIL supplied imported G.P. sheets/coils to some parties but did not supply any quantum E of G.P. sheets/coils to the appellant. 3. On 16.12.1981, a meeting of the Pricing Committee resolved to increase the price of the imported G.P. sheets/coils by about Rs.800 per metric ton. This decision of the Pricing Committee was communicated to the SAIL on 8.2.1982. F 4. In the meanwhile, on 12.1.1982, the SAIL offered to the appellant, 59 metric tonnes of G.P. sheets/coils of 0.5 mm thickness subject to the appellant's acceptance reaching the SAIL latest by 25.1.1982. The SAIL also required the appellant to establish an irrevocable letter of credit, G although the requirement of the appellant was for G.P. sheets/coils of 0.45 mm thickness. On 24.1.1982, the appellant accepted the said offer and on 1.2.1982, opend an irrevocable letter of credit in favour of the SAIL for a sum of Rs. 3,10,000. 5. By its letter of 16.3.1982, the SAIL wrote to the appellant that the H SUPREMF COURT REPORTS (1992) SUPP. 3 S.C.R. 694 A Gover~ent of India had· decided to increase the release price of. G .P. sheets/coils imported/to be imported by Rs. 800 per metric ton. 6. By its letter of 19.4.1982, the SAIL offered another 211 metric tonnes of G.P. sheets/coils and required the appellant to confirm the acceptance by 30.4.1982 and also to establish a fresh letter of credit B covering 106.5 per cent of C&F value plus Rs. 800 per metric ton (towards increase-in rele~e price of imported _G.P:_ sheets/coils). On 2.5.1982, the appellant accepted the offer of 211 metric tonnes of G.P. sheets/coils but protested against the increase in price of Rs. 800 per metric ton and requested for allowing the opening of irrevocable letter of credit at the C actual price. 7 .. Itappears that by its letter of 8.5.1982, the SAIL informed the appellani-conipany that the foreign suppliers had invoked the _force majeur_ clause in tlie contract due to fire and had not supplied 62 metirc tonnes of D G.P. sheets/coils of0.45 mm thickness, and therefore, the said supply could not be made. As regards the increase in price by Rs. 800 p~r metric ton, the SAIL wrote to the appellant that the release price of imported G .P. sheets/coils had been increased by the Pricing Committee constituted under the Import Trade Control Policy for the year 1981-82 and as such the increase was binding both on the SAIL as well as the actual users like E the appellant. The SAIL, therefore, asked the appellant to fake necessary action to enhance the value of the letters of credit established by them to enable the respondent-SAIL to release material to the appellant when it arrived in India. F F 8. According to the appellant, the SAIL had supplied to certain concerns, viz., Irshad Enterprises, Best Trunk House and Steel House, G.P. sheets/coils on 20.2.1982, 22.2.1982 and 28.2.1982 respectively without · ch~ging ·the increased price of Rs. 800 per metric ton. Since. the SAIL refused to supply the material except at the increased price, the appellant approached the Delhi High Court by way of a writ petition raising. three G contentions. The first. contention was that the appellant lia-ring registered its demand and opened its letter of credit prior to 8.2.1982, it was not liable to pay the increased price of Rs. 800 per metric ton. The second contention was that the SAIL was treating the appellant discriminately inasmuch as thc;:y had supplied others G.P. sheets/coils at the non-enhanced price. The H last content.ion was that_ the increase in ;>rice itself was arbitrary and the 695 BRITISH MACHINARY CO. _v._ U.0.1. (SAWANT, J.] reasons given for the increase were neither germane nor justified. The High Court rejected all the three contentions and dismissed the petition. Hence this appeal. 9. In addition to the contentions raised before the High Court, the appellant has raised one more contention before us, viz., that although the appellant's demand was registered, during the relevant period, it was B ignored by the SAIL an~ others were supplied the material during the period from April 1981 to November 1981. Had the material been supplied to the appellant during the said period, the increase in price would not have affected it, assuming that the increase was justified. c 10. We find no substance in any of the contentions. In the first instance, as paragraph 65 of the Import Policy for the year 1980- 81 shows, in the case of the items listed in Appendix 8 of the Handbook of ImportExport Procedures - 1980-81 [which include the present material], the eligible actual users had to register their 12 months' requirements with the canalised agency - which is the SAIL in the present case - together _with_ D _earnest money_ calculated _at 2 per cent_ of the sale value of the quantity registered _or Rs.50,000 whichever is less._ Paragraph 66 states that the canalising agency would take _financial cover_ as it considered necessary before arranging the imports. Paragraph 72 states that there would be a Pricing Committee under the chairmanship of the Chief Controller of E Imports and Exports for determining/prescribing the selling price of canalised items from time to time .. Paragraph 73 states that imports, distribution and pricing of the items would be governed by the concerned policy of the Government. It may be added here that on the Pricing Committee, representative of the SAIL was only an invitee member. F 11. Paragraph 151 of the Handbook on Import Policy - 1980-81 states that under "the Import Policy - 1980-81, a canalising agency is expected to take into <l;Ccount the availability of indigenously produced material before imports are arranged. It further stated that no person registering his requirement with the canalising agency will have the right to ask for a G particular brand or make. Paragraph 152 then states as follows: "152. An Actual User, while registering his requirements for allotment of a canalised item, should indicate to the canalising agency the phased programme of delivery on a quarterly basis - or monthly if so laid down by the . H SUPREME COURT REPORTS (1992] Sl.JPP. 3 S.C.R. 696. A **B** canalising agency. The canalising agency will scrutinise such registration and indicate within a period of 90 days, the arrangements it would be able to make for ~ffecting supplies. ln case, the canalising agency does not (a) give any such indication for a period of delivery at least three months ahead from the date of registration or (b) effect deliveries as regist~red with it and for which it bas or could have taken financial' s;o~er as laid in the Import Po~cy, 1980-81, the Actual US,er may approach the CCI&E {Monitoring _Committee), New Delhi; for appropriate relief by way of direct imports." c 12. **_It** is clear from paragraph 72 of the Import Policy that the Government of ln~a had constituted a Pricing Committee for determining/prescribing th_e selling price of the canalised items from time to time. There are various considerations which go into revising the price of the **D** canalised items, from time to time. The Pricing Committee is independent of t~e SAIL whose· .representative. is only an invitee member to the Committee's meetings, and the SAIL being o1;11y a canalising agency has to abide by the decision~ on pricing taken from time to time by the Pricing Committee. The SAIL has no authority to fix the price. In fact, if it releases items at prices other than fixed. by the Pricing Committee, it would be E committing a breach of the Goven;unent Policy. Hence at the time of the release of an item the SAIL has to release it at the price fixed by the Pricing Committee. It is no_t disputed tltat the appell~t was bound by the Import Policy. In fact, the applicatiQn made. by the appellant (pr registering itself for the imported G.P. sheetsf.coµs makes it clear thatthe appellant is bound F by the said policy. Hence, the appellant eannot make any grievance that· they had ·to pay the price -of the material as was prevalent at the time of the release of the m.aterfal. Admittedly, the release of the material in favour of the appellant_is after 8.2.1981. E F 13. As regards the contention that the appellant was not supplied 62 G metric.tonnes of G.P~ sheets, :as has been explained in the cour1ter-affidavit filed on behalf of the SAIL, the foreign suppliers of the said material could not supply the same since there. was a fire and the supplier had invoked the _force majeur_ clause of the contract. It is in these circumstances that no supply of the material could be made to the appellant. Hence the appellant **H** cannot make . a grievance in that behalf. The contention that during the 697 BRffiSH MACHINARY CO. _v._ U.0.1. [SAWANT, J.] B period from April i981 to November 1981, others were supplied whereas A the appellant was ignored the same is untenable. As has been pointed out on behalf of the SAIL in its counter-affidavit, all the said suppliers had registered their demands prior to 8.2.1982. They have also given the dates on which the said concerns had registered their demands which bear out the truth of their statement made in the counter-affidavit. 14. The contention that three enterprises, viz., M/s. lrshad Enterprises, Best Trunk House and Steel House were supplied the , material at non-enhanced price, the respondent-SAIL in its counter-affidavit has pointed out that in respect of M/s. lrshad Enterprises, a sum of Rs.20,000 had not been charged through inadvertent mistake in calculation. C It had no relevance whatsoever to the increased price of Rs. 800 per metric ton. As soon as the the said mistake was discovered, .a debit note was raised against the said party to recover the amount. It has also been pointed out that the increased price of Rs. 800 per metric ton had been charged from all the said three parties and the allegation in that behalf is baseless and D incorrect. As regards the contention that the appellant had registered its demands prior to 8.2.1982, as has been stated above, the Pricing Committee met on 8.12.1981 for the first time to consider the increl;lse in the price wherein a tentative decision to increase the price of Rs.800 per metric ton was takeli. It again met on 16.12.1981 to finally approve the said decision E and it was resolved formally that the price would be increased by Rs.800 per metric ton. The minutes of the meeting were circulated by the Ministry of Steel and Mines on 2.1.1982 and formal orders were issued in that behalf by the Chief Controller of Imports and Exports on 30.1.1982. The said ord~rs were received by the SAIL on 2.2.1982 by its head office in New Delhi, and on 8.2.1982 by its office at Calcutta and were implemented on F the same day. The SAIL could not increase the price unless formal written orders of the Government were received by it which it did on 8.2.1982. 15. As regards the contention that between 16.12.1981 and 8.2.1982, certain parties were supplied the material at the old rate, it is pointed out G on behalf of the respondent that till 8.2.1982 they could not charge the price at the enhanced rate. However, even in respect of the said parties, supplementary invoices were raised in order to release and recover the ~nhanced price of Rs. 800 per metric ton for the supplies made _to_ them -durip.g that period. In fact, as against the amount of Rs. 2,36,895 [approx:] H SUPREME COURT REPORTS (1992) SUPP. 3 S.C.R. 698 A B being the total value at the rate of Rs.800 per metric ton, an amount of .Rs.80,868 has already been recovered from the said five parties to clear 101.085 metric tonnes of G.P. sheets/coils sold during the said period. From the remaining 8 parties, an amount of Rs.1,56,027/- is due on account of the said increase; the quantity involved being 195.034 metric tonnes. One of the reasons why the said amount has yet to be recovered is that the concerned eight parties are not regular customers of the SAIL and have not come forward for furt1l,ir imports through it. However, the counter-affidavit states that the SAIL is taking all necessary steps available to it in law to realise the aforesaid amount from the said eight parties as well. C C 16. Coming to the last contention, viz., that there is no justification for increase in the price; suffice it to say that it is not for the Court to decide whether the prices of particular items should be increased or lowered or fixed at particular rates. The Government of India and its Pricing Committees appointed to determine the prices for the commodities, have to take several factors into considerations including the D indigenous market conditions of the material concerned and the effect of the prices on the production, availability and prices of the goods which are produced with the help ~such hnported material, and the price of the very same material or substituted material or its substitutes in the indigenous as well as international markets. Pricing is a part of the package E of the import and export polic_:y. It does appear, as has been stated in the counter-affidavit filed on behalf of the respondent-SAIL that at the relevant time there was a need to increase the price of G.P. sheets/coils. In the circumstances, we are of the view that the justification or the relevance of the increase in the price cannot be attacked by the appellant. F 17. In the result, the appeal fails and is dismissed with costs. G.N. Appeal dismissed.
End of Judgment Record
Browse All Supreme Court of India (1992) Decisions
1992-01-07

Jaiswal v. Debi Mukherjee

Dr. P. K. Jaiswal challenged a UPSC process for the post of Assistant Director General (Prevention of Food Adulteration). The Union Government had initially asked UPSC to fill the post by direct recruitment but, before advertisements, informed it to withhold the process while examining possible promotion from Assistant Secretary and amending recruitment rules to create higher tiers. Despite this, the UPSC advertised the post and the appellant was interviewed. Debi Mukherjee, then Assistant Secretary and seeking promotion upon the rule-amendment, obtained an interim stay from the Central Administrative Tribunal and later a direction to provide promotional avenues. In the meantime, two higher-pay tiers were created, without separate designations, under an amendment directed by the Court in a related matter. The appellant argued that once the selection process begins, the Government and Tribunal cannot freeze it and that the Commission should complete the selection; and that overlooking the two new layers amended later was erroneous. The respondents contended on points of vested rights and the proper policy- and rule-based framework for promotions versus direct recruitment. The Supreme Court held that the Government can withdraw the requisition before the advertisement if it intends to amend rules to permit promotion, that the Government’s pre-advertisement decision is permissible, and that a right to be considered for selection crystallizes only after advertisement and interview. The appeal was dismissed.

1992-09-24

S.B. Dogra v. State of Himachal Pradesh and Ors.

This Civil Appeal concerns the seniority of S.B. Dogra in the Himachal Pradesh Police Service in the wake of the demobilised armed forces concession. After HP State was formed, Rule 5(1) of the Demobilised Armed Forces Personnel (Reservation of Vacancies in the HP State Non-Technical Services) Rules, 1972, provided that the seniority of officers appointed against reserved vacancies shall be determined on the assumption that they joined the service at the first opportunity after their military service or training prior to commission. Dogra, who had military service and later joined the HP Police Service against a reserved vacancy for Demobilised Armed Forces Personnel, was placed with a notional entry year (1964) and thus ahead of some officers, including Durga Shanker Amist. The dispute escalated through High Court proceedings and a Central Administrative Tribunal decision relying on earlier cases. The Supreme Court, comparing Rule 5(1) with Punjab/Haryana rules and distinguishing the applicable statutory framework, held that the Tribunal erred in confining the seniority to the period of actual military service during the emergency. It noted that the rules are not pari materia with Haryana’s rules and that the language of Rule 5(1) permits a broader interpretation for notional entry. The Court distinguished certain earlier rulings (A.S. Parmar; Narendra Nath Pandey) as inapplicable here, while applying the State of Madhya Pradesh v. Rameshwar Prasad approach to preserve fair seniority. Ultimately, the appeal was allowed, the Tribunal’s seniority order was set aside, and the prior position was restored with directions for implementation of the judgment.

1992-12-11

State of Maharashtra v. Rattanlal

This is a Supreme Court decision interpreting the revisional powers of the State Government under the Maharashtra Agricultural Land (Ceiling and Holdings) Act, 1961. The respondent-declarant had a declaration under Sec. 12; the Surplus Land Determination Tribunal found surplus land (9 acres 8 guntas). On appeal, the Revenue Tribunal modified the resumption from Survey No. 11 to Survey No. 29, which was upheld. Later, after undisclosed lands came to light, the Additional Commissioner issued a show cause, remitted the matter to the primary Tribunal for redetermination and delimitation, and the High Court held that once an appeal under Sec. 21 is filed and an order is made, the Commissioner or the State Government lacks jurisdiction to determine the ceiling area. The State Government challenged this view. The Court held that under Sec. 45(2) and (3), the Commissioner has revisional powers, either suo motu or on an aggrieved person’s application, to call for records of inquiries under Secs. 17–21 and to pass orders after a hearing, subject to provisos including time limits and restrictions when appeals are pending. The decision also clarifies that suo motu revisional action can correct fraud or suppression of material facts, and that finality does not bar such action in cases of concealed lands. The High Court’s view was set aside and the Commissioner's order restored, with the appeal allowed along with costs.

1992-10-13

State of Madhya Pradesh and Anr. v. Syed Naseem Zahir and Others

State of Madhya Pradesh and Anr. v. Syed Naseem Zahir and Others concerns the legality and timing of the 'sealed cover' procedure used by the Departmental Promotion Committee (DPC) for recommending promotions when disciplinary proceedings were contemplated. Syed Naseem Zahir, who rose to Superintending Engineer, was included in a 1987 panel for promotion to Chief Engineer, but his name was kept in sealed cover due to potential misconduct. A charge-sheet was issued in 1988. The Madhya Pradesh Administrative Tribunal later directed promotion based on the sealed-cover recommendation, prompting the State's special leave appeal. The Supreme Court held that the departmental enquiry had been completed and the charges proved, and while it emphasized that Jankiraman's case governs sealed-cover use, the peculiar facts allowed keeping the sealed cover unopened until the disciplinary proceedings concluded. The Court outlined that if exonerated, the sealed-cover would be opened and the respondent would be notionally promoted from the date a junior was promoted, with consequential benefits, including back wages; if punished, action would be taken in accordance with Jankiraman's guidelines. The Court set aside the Tribunal's order and allowed the State's appeal, directing that no promotion be granted until proceedings end, and that the sealed-cover mechanism be used consistent with the facts.