Supreme Court of IndiaSupreme Court · 1995Single JudgeAppeal dismissed

B.N. AGARWALLA v. STATE OF ORISSA

Case / Petition Number:
Civil Appeal No. 9413 of 1995

Case Synopsis & Summary

This Civil Appellate jurisdiction matter centers on the interpretation of Section 41-A(7) of the Arbitration (Orissa Amendment) Act, 1982 and its impact on pending arbitration proceedings when the Act commenced on 26 March 1983. The respondent State challenged an award of Rs. 95,003 passed by an arbitrator on 26 March 1983, contending that since the Act amended the Arbitration Act in its application to Orissa, any award in a pending proceeding on the date of commencement would be rendered without jurisdiction and would automatically transfer to the Arbitration Tribunal. The appellant contends that the award made on the date of commencement cannot be treated as having been made before commencement; more crucially, the phrase “by the said date” must be read in harmony with the first part of sub-section (7). The High Court had ruled that the arbitrator had no jurisdiction on 26 March 1983 and that the award was a rule of the Court. The Supreme Court held that “by” in the phrase “by the said date” in sub-section (7) means “before” the date of commencement, not “on” that date. The midnight between 25 and 26 March 1983 marks the cut-off. As a result, the award on 26 March 1983 was made in a pending proceeding and stood transferred to the Arbitration Tribunal. The appeal is therefore dismissed, upholding the High Court’s conclusion and the order that the award be transferred.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • J.S. VERMA
  • K. VENKATASWAMI
Judgment Date
1995-10-16
Court Decision / Holding
Appeal dismissed. The High Court’s conclusion that the arbitrator had no jurisdiction to make the award on 26.3.1983 is affirmed; the award, made on the date of commencement, was in a pending arbitration and therefore transferred to the Arbitration Tribunal. The Court harmonizes the two expressions in sub-section (7) by interpreting 'by the said date' as 'before the date of commencement' for purposes of transfer.
Final Disposition
Appeal dismissed

Parties to the Case

Appellants / Petitioners

  • B.N. Agarwalla

Respondents

  • State of Orissa

Legal Representation & Advocates

Counsels for Petitioners

  • • Vinoo Bhagat

Counsels for Respondents

  • • Jayant Das
  • • P.N. Mishra
  • • A.K. Panda

Provisions of Law Cited

Arbitration (Orissa Amendment) Act, 1982 – Section 41-A(7)Arbitration Act, 1940 (as amended)General Clauses Act, 1897 – Section 5(3)

Legal Doctrines & Maxims

  • ex abundante cautela
  • harmonious construction

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellant contends that the arbitration proceeding in the present case was not pending before the arbitrator on 26.3.1983, the date of commencement of the Arbitration (Orissa Amendment) Act, since the award was made on that very day. Therefore, the proceedings were not automatically transferred under sub-section (7). The crucial phrase “by the said date” should be read harmoniously with the first part, meaning the date is the date of commencement (26.3.1983) and the relevant period ends at midnight preceding that date. The object is to prevent the arbitrator from acting in a proceeding that is already transferred to the Tribunal. The appellant argues for reading ‘by’ as including the date only where context allows; in this context, it must mean “before.”

Contentions of Respondents

The respondent State argued that the Act came into force on 26.3.1983, and an award passed on that date in a pending arbitration would be without jurisdiction as the proceeding stood automatically transferred to the Arbitration Tribunal. The aim of the amendment was to curb mischief by ensuring state-related disputes are decided by the Tribunal. The construction urged would promote the Act’s object, and the delay implied would undermine the statutory framework.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (5)

Case NameCitationTreatmentExplanation
R.C. Muthu Chettiar v. Narayanan Chettiar & Ors.AIR (1928) Mad. 528DistinguishedCited to illustrate contexts where 'by' has meant 'on' in certain circumstances; found inapplicable to the present Act’s context.
Sheikh Nuroo v. Seth Meghraj Ramkaran MarwadiAIR (1937) Nagpur 139DistinguishedCited as another pre‑Orissa Amendment context where the wording differed; not controlling here.
T.A. Janakuara Nainar v. Periaswamy Goundan and Ors.AIR (1949) Madras 376DistinguishedCited for historical interpretation of ‘by’; deemed not applicable to this amendment scenario.
Dharamraj Mahadeo v. Additional Deputy Commissioner Ako/a and Ors.AIR (1957) Bombay 154DistinguishedCited to illustrate broader reading of ‘by’; not applicable to the Orissa Amendment facts.
Eastaugh and Ors. v. Macpherson(1954) 3 All ER 214PositiveRelied upon to support the interpretation of ‘by’ as capable of meaning ‘before’ or ‘on or before’ depending on context; used to harmonize provision.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•3,132 words•~15 min read

In The Court Record

B.N. AGARWALLA v. STATE OF ORISSA

A ## B.N. AGARWALLA _v._ ## STATE OF ORISSA ## OCTOBER 16, 1995 ## B [J.S. VERMA AND K. VENKATASWAMI, JJ.] _Arbitration (01issa Amendment) Act, 1982: Section 41-A(7}-Scope and Applicability of_ C D _Arbitraiion--T1ibunal-Transfer to-Proceeding pending before Arbitrator-'On the date of conu11encen1ent of An1end111ent Act' and in which 'no award has been 111ade by the said date'-Held, these two expressions niust be construed hannoniously-So constnted it 111eans 'in which no award has been made before the said date' i.e. before commencement of the Act-Award made on the date of commencement of Act by Arbitrato,.._..Held without jun·sdiction._ _General Clauses Act, 1897: Section 5(3}-Applicability of_ _Words & Phrases : 'By' in the expression 'by the said date'--Section_ E _41-A(7) of the Arbitration (Orissa Amendment) Act, 1982--Meaning of_ By the Arbitration (Orissa Amendment) Act, 1982 the Arbitration Act, 1940 was amended in its applicability to the State of Orissa. The Amendment Act came into force with effect from 26.3.1983. Section 41-A(7) of the said Act provides that "all arbitrartion proceedings relating to a F dispute of the nature specified in sub-section (1) which are pending before any arbitrator on the date of commencement of the arbitration (Orissa Amendment) Act, 1982 and in which no award has been made by the said date, shall stand transferred to and disposed of by Arbitration Tribunal'. An award for a sum of Rs. 95,003 was made by an Arbitrator in favour of G the appellant on 263.1983 i.e. the date on which Amendment Act came into force . The respondent-State challenged the award on the ground that the Amendment Act having come into force on 26.3.1983, an award made on that day was without jurisdiction in a pending arbitration proceeding which stood transferred to the Arbitration Tribunal by virtue of sub-section (7) of section 41-A. The Subordinate Judge, Bhubaneswar made the H award rule of the Court. The respondent-state preferred appeal before the 390 391 B.N. AGAR WALLA _v._ STATE _I_ B High Court which held that the Arbitrator had no jurisdiction on 26.3.1983 A to pass the impugned award. Against the decision of the High Court, an appeal was preferred before this Court. Dismis.sing the appeal, this Court HELD : 1. The High Court's conclusion that the arbitrator in the present case had no jurisdiction on 26.3.1983 to make the award does not suffer from any infirmity. The award made on 26.3.1983 cannot be said to be an award made before 26.3.1983. The award in the present case having been made on. 26.3.1983 and not before 26.3.1983, the date of commencement of the Arbitration (Orissa Amendment) Act, 1982, the arbitrator had no jurisdiction to make the award as it was a pending arbitration proceeding which automatically stood transferred to the Arbitration Tribunal. [377-E, 396-F] c 2. Sub-section (7) of section 41-A of the Act provides for automatic D transfer to the Arbitration Tribunal of all Arbitration proceedings of the kind specified in sub-section (i) which were "pending before any arbitrator on the date of commencement" of the said Act and "in which no award had been made by the said date". Obviously, the expression "by the said date" here means by the date of commencement of the Arbitration (Orissa E Amendment) act, 1982. The First expression clearly means an arbitration proceeding pending before any arbitrator on the date of commencement of the Act, namely 26.3.1983. The meaning of the second expression should be consistent with that of the first expression since the two could not be used to create a conDict. [394-F-G] F **3. The second expression, namely, "in which no award had been made** by the said date" was further used in sub-section (7) _ex abundate cautela_ to clarify the meaning of pending proceedings by indicating that only those **arbitration proceedings in which the award also had been made "by the** said date" were excluded from the operation of sub-section (7) and that G every other arbitration proceeding including those in which the award alone remained to be made "by the said date" stood transferred to the Arbitration Tribunal. In other words, if the arbitration proceedings had been closed but the arbitrator had not made the award till the midnight between 25th and 26th March, 1983 when the Act came into force, it was a pending arbitration proceeding governed by sub-section (7). [395-E-F] H SUPREME COURT REPORTS [1995) SUPP. 4S.C.R. 392 A 4. The meaning of the word 'by' is both 'before' as well as 'on or before' and therefore, the context in which it has been used becomes decisive. Where the context does not exclnde the date specified and permits its inclusion the word 'by' can be construed to mean 'on' and not 'before' and in that situation, specification of the limit of time by saying "by that date" wonld require including the specified date upto the expiry of that B date for computation of the permitted period. In the· context of the provision made in snh-section (7) of section 41-A meaning of the word 'by' must be 'before' and not 'on' in order to harmonise with the meaning of the earlier part of sub-section (7) and to promote the object ·of its enactment. So construed, the second expression would read as "in which no C award has been made before the said date" i.e. in which no award has been made before the date of commencement of the Act namely, 26.3.1983. This wonld be the harmonions construction of the two expressions in the provision. [396-H, 397-A-D, 396-E] B _R.C. Muthu Chettiar_ v. _Narayanan Chettiar_ & _Ors.,_ AIR (1928) Mad. D 528; _Sheikh Nuroo_ v. _Seth Meghraj Ramkaran Marwadi,_ AIR (1937) Nagpur 139; _TA. Janakuara Nainar_ v. _Periaswamy Goundan and Ors.,_ AIR (1949) Mad. 376 and _Dharamraj Mahadeo_ v. _Additional Deputy Commissioner Ako/a and Ors._ AIR (1957) Born. 154, held inapplicable. E _Eastagh and Ors._ v. _Macpherson,_ (1954) 3 All ER 214, referred to. CIVIL APPELLATE JURISDICTION : Civil Appeal No. 9413 of 1995. From the Judgment aod Order dated 25.11.89 of the Orissa High F Court in Misc. A. No. 305 of 1984. Vinoo Bhagat for the Appellant. Jayant Das, P.N. Mishra aod A.K. Panda for the Respondent. G The Judgment of the Court was delivered by ## J.S. VERMA, J. Leave granted. By the impugned judgment the High Court allowed the appeal against the judgment of the Subordioate Judge, Bhubaoeshwar making ao H award dated.26.3.1983 the rule of the Court, by which a sum of Rs. 95,003 393 B.N. AGAR WALLA _v._ STATE [J.S. VERMA,J.] was directed to be paid to the appellant by 24.6.1983 failing which it was A to carry interest at the rate of 12 per cent per annum from 27.3.1983 till the date of payment. On behalf of the respondent, the award was challenged on the ground that the arbitrator was incompetent to make the award in view of section 4JA(7) of the Arbitration (Orissa Amendment) Act, 1982 (Orissa Act 3 of 1983) which came into force w.e.f. 26.3.1983 B and had the effect of amending the Indian Arbitration Act, 1940. Since the date of the award and the date of the enforcement of the amending Act are the same, the question is of the applicability of the said amendment. This is the only question involved for decision in this appeal by special leave. B c The Arbitration (Orissa Amendment) Act. 1982 was an Act to amend the Arbitration Act, 1940 in its application to the State of Orissa. It received the assent of the President of India on 21.3.1983 and came.into force on publication in the Orissa Gazette, Extraordinary, No.358 dated 26.3.1983. A new section 41-A was inserted in the principal Act relating to D constitution of and references to the Arbitration Tribunal. Sub-section (1) of section 41-A provided that notwithstanding anything contained in the Act or any contract or any other instrument, in all cases where the State Government, a local or other authority controlled by the State Govern- **ment, statutory corporation or a Government company is a party to the** dispute, all references to arbitration shall be made to the Arbitration Tribunal. Sub-section (2) provided for constitution of an Arbitration Tribunal by the State Government in the manner provided therein. Subsections (3), (4), (5) and (6) relate to ancillary matters pertaining to constitution of the Arbitration Tribunal. Sub-section (7) relates to pending **proceedings and it is the construction of this provision which is involved in** F this appeal. Sub-section (7) is as under : E F "All arbitration proceedings relating to a dispute of the nature specified in sub-section (1) which are pending before any arbitrator on the date of commencement of the Arbitration ( Orissa Amendment) Act, 1982 and in which no award has been made by the said date, shall stand transferred to and disposed of by Arbitration **Tribunal. 11** The only question in the present case is: Whether the arbitration **proceeding in the present case was such a pending proceeding before the H** • 394 SUPREME COURT REPORTS [1995] SUPP. 4 S.C.R. B c D E G A arbitrator to be governed by sub-section (7) of section 41-A? The controversy really relates to the meaning of the expression "by the said **<late 11 occurring in** sub~scction **(7).** The contention of learned counsel for the appellant is that the arbitration proceeding in the present case was not pending before the arbitrator on 26.3.1983 which is the date of commencement of the Act as the award had been made on that day. He submits that the date of commencement of the Act is to be included in the expression "by the said date" and, therefore, the arbitrator was not divested of jurisdiction to make the award on 26.3.1983. On the other hand, learned counsel for the respondent contends that the Act having come into force on 26.3.1983, an award made on that day was without jurisdiction in a pending arbitration proceeding which stood transferred to the Arbitration Tribunal by virtue of sub-section (7) of section 41-A. Learned counsel for the respondent further submitted that the object of the enactment was to prevent the mischief for which the provision was enacted and, therefore, the contemplated legislation being widely publicised with the assent of the Presi-· dent being given on 21.3.1983, the construction which he suggests would promote the object of the legislation. It is well known that this amendment was made in the Arbitration Act because of the realisation on account of **strong observations by the courts in several arbitration cases from Orissa** suggesting the desirability of an Arbitration Tribunal to decide the arbitra- **tion disputes in wh.ich the State Government, its instrumentalities or other** public bodies were parties. F **H** Sub-section (7) of section 41-A provides for automatic transfer to the Arbitration Tribunal of all arbitration proceedings of the kind specified in sub-section (1) which were "pending before any arbitrator on the date of commencement" of the said Act and "in which no award had been made _by the said date"._ Obviously, the expression "by the said date" here means by the date of commencement of the Arbitration (Orissa Amendment) Act, 1982. The first expression clearly means an arbitration proceeding pending **before any arbitrator on the date of commencement of the Act, nan1ely 1** 26.3.1983. The meaning of the second expression should be consistent with that of t.he first expression since the two could not be used to create a conflict. The purpose of sub-section (7) is to divest the arbitrator of authority to make the award in all such arbitration proceedings which were pending before the arbitrator on the date of commencement of the said B.N. AGAR WALLA _v._ STATE [J.S. VERMA,J.] 395 Act and to provide for their automatic transfer to the Arbitration Tribunal. A The General Clause Act, 1897 provides that unless the contrary is ex- **pressed) an Act shall be construed as coming into operation in11ne<liately** on the expiration of the day preceding its commencement. There being no contrary indication in the Act, it must be held that the said Act came into force on the midnight on the expiration of the day preceding its commenB **ccn1ent1 i.e., the. n1idnight between 25th and 26th March, 1983. There c·an** be no doubt that if the second expression "in which no award has been made by the said <late" was not also present in sub-section (7), then the undoubted result of the first expression would be that an arbitration proceeding in which no award had been made upto the midnight between 25th and 26th March, 1983 would be a pending arbitration proceeding which automatically stood transferred to the Arbitration Tribunal. The question, therefore, is whether the further words used in the second expression in sub-section (7) must lead to a different conclusion. The **construction of the first expression being unambiguous, the second expres-** sion must be construed harmoniously unless that is not a permissible D **construction of the expression 11by the said date".** B c **It does appear to us .that the secOnd expression, nan1ely, ' 1 in which** no award has been made by the said date" was further used in sub-section (7) _ex abundante cautela_ to clarify the meaning of pending proceedings by indicating that only those arbitration proceedings in which the award also E had been made "by the said date" were excluded from the operation of sub-section (7) and that every other arbitration proceeding including those in which the award alone remained to be made "by the said date" stood transferred to the Arbitration Tribunal. In other words, if the arbitration proceedings had been closed but the arbitrator had not made the award till the midnight between 25th and 26th March, 1983 when the Act came F **into force 1 it \Vas a pending arbitration proceeding governed by sub-section** (7). Acceptance of the appellant's contention would amount to holding that **even though the Act had come into force on the midnight bet \VCcn 25 and** 26th March, 1983, an award made thereafter, on 26th March, 1983 was not a pending arbitration proceeding on the date of commencement of the Act. G **Unless meaning of the expression 11 by the said date" used in sub-section** (7) be only that suggested by learned counsel for the appellant, the construc- **tion \vhich would harmonise with the meaning of the earlier expression, must be given to the provision.** **We may no\v consider the n1eaning of the word 'by' for ascertaining H** 396 SUPREME COURT REPORTS [1995] SUPP. 4 S.C.R. A the meaning of the expression "by the said date". Meaning of the word 'by' **in some of the dictionaries is** : ## _Black's Law Dictionmy (Sixth Edition)_ B **"Before a certain tiinc** ; ......... **not later then a certain tin1e; on or** 11 **hefore a certain time;** ........ ## _The New Shmter Oxford English Dictionmy_ 11 n **................... On or before, not later than** ........ c D E No doubt the word 'by' means 'before a certain time' as well as 'on or before a certain time'. The question is : whether, the word 'by' in the **expression 11by the said date 11 would mean in other words 'before' or 'on'** 26.3.1983 in the present context? We have already indicated the meaning of the first expression "pending before any arbitrator on the date of commencement" to mean clearly and unambiguously pending upto the midnight between 25th and 26th March, 1983, i.e., before commencement of the date 26.3.1983 or at the time of expiry of preceding day i.e. 25.3.1983. The other expression must, therefore, be construed in this context and since the word 'by' means 'before' also, in this context it must be held to mean 'before' and not 'on' the date of commencement of the Act. So construed, the second expression would read as "in which no award has been made before the date" i.e. in which no award have been made before the date of commencement of the Act, namely, 26.3.1983. This would be the harmonious construction of the two expression in the provisions. Obviously, an award made on 26.3.1983 cannot be said to be an F award made before 26.3.1983 and, therefore, the award in the present case having been made on 26.3.1983 and not before 26.3.1983, the date of commencement of the Act, the arbitrator had no jurisdiction to make the award as it was a pending arbitration proceeding which automatically stood transferred to the Arbitration Tribunal. G Learned counsel for the appellant has referred to some decisions where in the word 'by' has been construed to mean that it includes the end or the expiry of the date or period indicated. As we have indicated, the meaning of the word 'by' is both 'before' as well as 'on or before' and, therefore, the context in which it ha.s been used becomes decisive. Where H the context does not exclude the date specified and permits its inclusion, B.N. AGAR WALLA _v._ STATE[J.S. VERMA,J.J 397 A **the word 'byi can be construed to mean 'on' an<l not 'before'; and in that** A situation, specification of the limit of time by saying "by that date" would require including the specified date upto the expiry of that date for computation of the permitted period. P.C. Muthu Chcttiar v. _Narayanan Chettiar and Othm·,_ AIR (1928) Madras 528; _Sheikh Nnroo_ v. _Seth Meghraj Ramkaran Mmwadi,_ AIR (1937) Nagpur 139; _T.A. Janakuara Nainar_ v. B _Pe1iaswamy Goundan and Others,_ AIR 1949 Madras 376; and _Dharamraj Mahadeo_ v. _Additioal deputy Commissioner Ako/a and Others,_ AIR (1957) Bombay 154 are all decisions in which the context required the word 'by' to be read as 'on' and not 'before' to permit inclusion of the period upto the expiry of the date specified. We have already indicated that the context in the present case excludes the date specified and, therefore, excludes the c **meaning 'on' and requires the word 'by' to be read as 'before'.** _Eastaugh and Othm·_ v. _Macpherson,_ (1954) 3 All E.R. 214 supports the view we have taken that the meaning of the word 'by' in the phrase 'by the date' can mean 'on or before the date' or 'before the date' depending on the context in which the word 'by' has been used and the meaning to D be preferred should be that which it has in the given context. We have indicated that in the context of the provision made in sub-section (7) of section 41-A meaning of the word 'by' must be 'before' and not 'on' in order to harmonise with the meaning of the earlier part of sub-section (7) and to promote the object of its enactment. The High Court's conclusion E that the arbitrator in tbe present case had no jurisdiction on 26.3.1983 to **111ake the award does not suffer fron1 any infirmity.** Consequently, the appeal fails and is dismissed. T.N.A. Appeal dismissed.
End of Judgment Record
Browse All Supreme Court of India (1995) Decisions
1995-02-23

Inder Singh v. State of Punjab

Inder Singh, convicted under Section 302 IPC for the murder of Amar Singh, questions the High Court’s affirmation of his life-term sentence. The prosecution’s version is that Amar Singh, who had gone to see off a tractor driver, did not return home; on the night of 31 March/1 April 1984, the appellant, armed with a barchha, lay in wait behind a heap of manure and suddenly sprang upon Amar Singh, while PW4 (the deceased’s father) and PW5 (the mother) were trying to intervene. Amar Singh died instantaneously from a fatal neck wound, with the post‑mortem revealing injuries that pointed to a lethal strike. The Trial Court convicted the appellant under Section 302 IPC, while acquitting two co‑accused. In the appeal before the Supreme Court, the defence argued that the appellant’s motive was merely to thrash Amar Singh for suspected theft of cauliflowers, and that lying in wait with a weapon did not necessarily prove an intention to kill. The Court rejects this: the manner of the assault, the weapon used, the location and extent of the injuries, and the fact that PW4 was also injured while trying to save Amar Singh indicate a determined intention to cause fatal injury. The Court also notes the prompt FIR, the medical evidence, and the recovery of the weapon as corroboration, sustaining the conviction. The appeal is dismissed.

1995-03-27

SUBORDINATE SERVICES SELECTION BOARD v. BIR SINGH AND ANR./RAM NIWAS AND ORS.

This Supreme Court decision concerns the interpretation of reservation in Ex-Servicemen posts and the eligibility of dependents of ex-servicemen for clerical posts in A-class offices. The case arose from a dispute over whether dependents of ex-servicemen, who possess Matriculation but do not have First Division in Matriculation or Second Division in Intermediate, could be considered for appointment to A-class clerical posts when ex-servicemen are unavailable and vacancies exist in the reserved quota. The government had reserved A-class posts for ex-servicemen and prescribed stratified qualifications for A-class and B-class offices; in 1979, to avoid lapsing of reserved posts, it was decided that dependent sons and daughters of ex-servicemen who fulfilled all prescribed conditions should be considered on merit for posts reserved for ex-servicemen to the extent of non-availability of suitable ex-servicemen. The respondents, dependents of ex-servicemen, argued that the 7.9.1991 advertisement did not distinguish between A- and B-class posts and that their Matriculation alone made them eligible for A-class posts on par with ex-servicemen. The High Court held them eligible, but the Court reversed, holding that such dependents are not entitled unless they meet the prescribed qualifications (Matric with First Division or Intermediate with Second Division) or are ex-servicemen. The appeals were allowed.

1995-11-01

Yadu Nandan Garg v. State of Rajasthan and Ors.

This appeal concerns a preliminary notification under Section 4(1) of the Rajasthan Land Acquisition Act, 1953 for the 'planned development of Jaipur city' and a declaration under Section 6 issued after the improvement scheme had been finalised. The appellant, Yadu Nandan Garg, had purchased part of the land in 1970 and built a residence there, while Anand Nursery nearby obtained an exemption. The challenge focused on: (i) alleged unexplained delay between the preliminary notification and the declaration, (ii) discriminatory treatment in granting exemption to Anand Nursery but not to the appellant, and (iii) misdescriptions of survey numbers in the Section 9 notice, namely 265 vs 265/1. The Rajasthan High Court had dismissed the challenge, and the Supreme Court, in its division bench, upheld the validity of the acquisition. The Court held that a purchaser cannot acquire title against the State by clinging to an encumbrance after the notification and finalisation of the scheme; under Section 16 the State is entitled to possession with absolute title free from encumbrances. It rejected the contention of inordinate delay, noting the usual administrative time involved in finalising the scheme. It also held that wrong exemptions or mis-stated survey numbers do not invalidate the notification under Section 4(1), provided the main survey number is mentioned, and that discrimination claims fail given lack of a universal benefit. Consequently, the appeal was dismissed without costs.

1995-09-19

Controller of Examination, Utkal University and Anr. v. Paurnamasi Das and Anr.

These two Civil Appeals arise from challenges to the awarding of BA honours by Utkal University under its Regulations for pre-degree and final degree examinations, and the operation of the 1990 Hard Case Rule. Regulation 12 prescribes separate classification in pre-degree and final degree exams, to be shown on the diploma, with specific percentage thresholds for Second Class and First Class honours in both stages. Regulation 16(b) makes the final degree honours list depend solely on marks obtained in the final examination, subject to retaining honours in the pre-degree stage. The Hard Case Rule provides grace marks (up to 0.5%) to enable a candidate to retain honours or attain a higher class, but must be applied per part of the examination. The respondents, in two appeals, were short by 4 marks in their final degree honours papers, seeking to add 4 grace marks (0.5% of 800) by aggregating marks across pre-degree and final degree, an approach the High Court accepted but the University challenged. The Court held that the Hard Case Rule applies separately to each examination part, and that only up to 2 grace marks could be added in the final degree examination (not across parts). The High Court’s view was thus incorrect, and the appeals were allowed with writ petitions dismissed."