Supreme Court of IndiaSupreme Court · 2011Division BenchAppeal allowed; judgments and decree set aside;...

BIHAR STATE ELECTRICITY BOARD & ANR. v. RAM DEO PRASAD SINGH & ORS.

Case / Petition Number:
Civil Appeal No. 7754 of 2011
Neutral Citation:[2011] 11 S.C.R. 249

Case Synopsis & Summary

This Supreme Court judgment concerns the dismissal of security guards employed at Patratu Thermal Power Station, Hazaribagh, in 1975 and the plaintiffs’ subsequent civil suit challenging their termination as bad, unconstitutional and inoperative. The trial court allowed the suit in 1981, but the appellate court and the Patna High Court both rejected the challenge, upholding the decrees against the Board. After the bifurcation of Bihar on 15 November 2000, the Bihar Reorganisation Act, 2000 created Jharkhand, with Section 89 providing transfer of pending proceedings relating to the territory that became Jharkhand. The appellants argued that the suit and the appellate proceedings were already pending at the appointed date and must stand transferred to Jharkhand, rendering the Patna ADJ and Patna High Court without jurisdiction; the suit’s decree was therefore non-executable in Bihar. The respondents urged transfer to Jharkhand but the court, relying on Section 89 and Section 62 of the Reorganisation Act, held that the proceedings had to be transferred by operation of law, that Jharkhand State Electricity Board had to be the proper defendant, and that the judgment in Bihar could not be enforced there. The court concluded that the judgments of the lower courts were untenable. The appeal is allowed and the suit is dismissed; the judgments are set aside.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • Aftab Alam
  • R.M. Lodha
Judgment Date
2011-09-08
Court Decision / Holding
The judgments and decree of the first appellate court and the Patna High Court are set aside; the suit is dismissed. The transfer of pending proceedings occurred by operation of law under Section 89 of the Bihar Reorganisation Act, 2000, and Jharkhand State Electricity Board is the appropriate defendant; the lower courts’ judgments were untenable and non-executable in Bihar.
Final Disposition
Appeal allowed; judgments and decree set aside; suit dismissed.

Parties to the Case

Appellants / Petitioners

  • Bihar State Electricity Board
  • ANR

Respondents

  • Ram Deo Prasad Singh
  • 8 others

Legal Representation & Advocates

Counsels for Petitioners

  • • Navin Prakash

Counsels for Respondents

  • • S.B. Sanyal
  • • Subhro Sanyal
  • • Gopal Prasad
  • • Rajiv Shankar Dvivedi
  • • Praveen Kr. Singh

Provisions of Law Cited

Bihar Reorganisation Act, 2000 - Section 89 - Transfer of pending proceedingsBihar Reorganisation Act, 2000 - Section 62 - Provisions as to Bihar State Electricity Board, State Warehousing Corporation and State Road Transport CorporationIndustrial Disputes Act, 1947Industrial Establishment (Standing Orders) Act, 1946Code of Civil Procedure, Order 9 Rule 4Electricity Supply Act, 1948Warehousing Corporations Act, 1962Road Transport Act, 1950

Legal Doctrines & Maxims

  • If the dispute is not an industrial dispute, the remedy lies in the civil court.
  • If the industrial dispute arises out of a right or liability under general or common law and not under the Act, the civil court has alternate jurisdiction.
  • If the industrial dispute relates to enforcement of a right or an obligation created under the Act, the only remedy is under the Act.
  • If the right sought to be enforced is a right created under the Act such as Chapter V-A, the remedy is either under Section 33-C or the raising of an industrial dispute.

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellants contend that, upon bifurcation of the State of Bihar with effect from 15 November 2000, Patratu Thermal Power Station, Hazaribagh, fell within the new State of Jharkhand. Section 89 of the Bihar Reorganisation Act, 2000 provides for transfer of pending proceedings relating to the territory that becomes Jharkhand, such that the proceeding would stand transferred to the corresponding court of Jharkhand by operation of law. The Additional District Judge and Patna High Court lost jurisdiction to hear and decide the matter once the appointed day arrived. The decree of the trial court becomes non-executable in Bihar with Jharkhand taking over; the Bihar Board cannot reinstate the respondents there, and the related suits must be dismissed. The respondents’ maintainability under the Industrial Disputes Act also supports dismissal of the civil suit rather than reinstatement.

Contentions of Respondents

The respondents urge transfer to a Jharkhand forum, pointing to Section 89; they seek impleadment of the Jharkhand State Electricity Board as a defendant and argue that Patratu is situated in Jharkhand, thus making Jharkhand the proper forum. They contend that the suit might still be maintainable and that, at the least, the matter should be heard in Jharkhand so that a proper forum governs the dispute. They rely on the law relating to transfer of pending proceedings and the jurisdiction of civil courts in industrial disputes as interpreted in Premier Automobiles Ltd. v. Kamlekar Shantaram Wadke.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (1)

Case NameCitationTreatmentExplanation
Premier Automobiles Ltd. v. Kamlekar Shantaram Wadke of Bombay and Ors.1976 (1) SCR 427PositiveCited and applied to articulate the four principles governing Civil Court jurisdiction in industrial disputes, which the Court used to hold that the suit was not maintainable and that jurisdiction lay elsewhere.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•4,454 words•~21 min read

In The Court Record

BIHAR STATE ELECTRICITY BOARD & ANR. v. RAM DEO PRASAD SINGH & ORS.

A ## [2011) 11 S.C.R. 249 ## BIHAR STATE ELECTRICITY BOARD & ANR. _v._ RAM DEO PRASAD SINGH & ORS. (Civil Appeal No. 7754 of 2011) SEPTEMBER 08, 2011 B **[AFTAB ALAM AND R.M. LODHA, JJ.]** _Bihar Reorganisation Act, 2000_ - _s. 89_ - _Transfer of_ - _pending proceedings Respondent working at Thermal Power Station, Hazaribagh dismissed from service_ - _Suit filed_ C _by respondent after four years before Munsif, Patna seeking_ - _declaration that dismissal was bad and inoperative in law_ - _Suit allowed by the trial court First appellate court by judgment dated 18. 1. 2006 upheld the said order- Patna High Court also upheld the order_ - _On appeal, held: Suit filed by_ D - _the respondent was not maintainable On bifurcation of State of Bihar with effect from 15. 11. 2000, the appointed date under the Reorganisation Act, Thermal Power Station Hazaribagh which was earlier part of State of Bihar, forms part of the newly created State of Jharkhand_ - _Transfer of proceedings in terms_ E - _of s. 89 was to take place by operation of law First appellate court as also the Patna High Court had no jurisdiction to hear_ - _and decide the matters Patna High Court lost sight of fact that it was affirming_ a _decree that was no longer executable in the State of Bihar- Jharkhand State Electricity Board came_ F - - _into existence on April 1, 2001 Thereafter, Bihar State Electricity Board could not reinstate the respondents as security guards at Thermal Power Station, Hazaribagh where they were working at the time of dismissal- Respondent working as sec·urity guard at the Thermal Power Station,_ G _Hazaribagh were workmen under the Industrial Disputes Act_ - _They could raise industrial disputes concerning their_ - _dismissal from service Thus, the judgment passed by first appellate court as also Patna High Court was illegal and_ - _without jurisdiction Judgment and decree under challenge_ 249 H E 250 SUPREME COURT REPORTS [2011] 11 S.C.R. - A _are set aside and suit is dismissed_ - _Industrial Disputes Act, 1947._ In the year 1975, respondents working as ·~ecurity guards at Patratu Thermal Power Station, Hazaribagh, 8[were dismissed from service, on charges ][of ][misconduct. ] After four years, the respondents filed a suit in the court of Munsiff, Patna, seeking declarations that their dismissal was bad, unconstitutional and inoperative in law and they would be legally deemed to have continued C in service. The trial court allowed. the suit. The appellants filed an appeal and the Additional District Judge dismissed the same by or~er dated 18.01.2006. The High Court also dismissed the second appeal. Therefore, the appellants filed the instant appeal. ## D Allowing the appeal, the Court HELD: 1.1 The district of Hazaribagh, where Patratu Thermal Power Station is situated, was earlier part of the State of Bihar but on bifurcation of the State with effect E from November 15, 2000, the appointed date under the Reorganisation Act it forms part of the newly created State-Jharkhand. From a bare reading of Section 89 of the Bihar Reorganisation Act, 2000, it is evident that on the appointed date the appeal preferred against the judgment F and decree passed by the Munsiff stood transferred to a corresponding court in the State of Jharkhand. The transfer of the appeal took place by operation of law and the Additional District Judge, Patna was denuded of all authority and jurisdiction to proceed with the matter or to hear and decide the appeal. It follows equally that the G Patna High Court had no jurisdiction to hear and decide the second appeal arising from the suit. Thus, in view of section 89 of the judgments of th.e High Court and the first appellate court appear to be manifestly illegal and without jurisdiction. [Para 4) [254-A-B; 255-C-E] H • BIHAR STATE ELECTRICITY BOARD & ANR. _v._ RAM 251 DEO PRASAD SINGH & ORS. ' 1.2 The judgment passed by the first appellate court A was illegal and without jurisdiction and the judgment and order passed by the Patna High Court is equally without jurisdiction. It is quite strange the High Court lost sight of the fact that it was affirming a decree that was no longer executable or enforceable in the State of Bihar. B Section 62 of the Re-organisation Act contains provisions relating to Bihar State Electricity Board besides two other Corporations. In terms of sub-section 3 of section 62, Jharkhand State Electricity Board came into existence on April 1, 2001. After that date it is no c longer possible for the Bihar State Electricity Board to reinstate the respondents as security guards at Patratu Thermal Power Station where they were working at the time of dismissal from service. Thus, the judgments passed by the first appellate court and the High Court are 0 untenable in law and the decree passed by the trial court, in the absence of Jharkhand State Electricity Board having been impleaded as a defendant, is rendered nonexecutable in the State of Bihar. [Paras 9, 10 and 11) [257G-H; 258-H; 260-A-B] E 1.3 The submission that the case may be transferred to an appropriate court in the State of Jharkhand from the stage of the first appeal against the judgment and decree passed by the Munsiff, Patna, and before that court the respondents might take steps for impleadment of the Jharkhand State Electricity Board as one of the defendants cannot be accepted. [Para 12] [260-C-D] F 1.4 The respondents were dismissed from service on November 11, 1975. They filed the suit four years later at G Patna and tried to overcome the bar of limitation by pleading that they first came to know about their dismissal from service when they went to collect their wages in October, 1976. The Munslff strangely accepted the plea. [Para 14] [260-E-F] H 252 SUPREME COURT REPORTS [2011] 11 S.C.R. A 1.5 Before filing the suit at Patna, the respondents had filed suits being title suit Nos. 65, 66, 67 and 72 of · 1975 before the Munsiff, Hazaribagh. Those suits were dismissed for default. Before the Patna court an objection was raised on behalf of the defendants-appellants B regarding the maintainability of the suit in terms of Order 9 Rule 4 of the Code of Civil Procedure. The plaints of the suits filed at Hazaribagh were produced before the Patna court but the objection was overruled on the ground that the Board omitted to get the plaintiffs' signatures on the c plaints and vakalatnamas filed before the Hazaribagh court formally proved. [Para 15) [260-G-H; 261-A] 1.6 The suit filed by the plaintiffs was itself not maintainable. The respondents worked as security guards at the Thermal Power Station, they were, D therefore, workmen within the meaning of the Industrial Disputes Act, 1947 and their service conditions were governed by the standing orders framed under the Industrial Establishment (Standing Orders) Act, 1946 and the relevant rules framed by the Board. Therefore, it was E open to the respondents to raise an industrial dispute concerning their dismissal from service. [Para 16) [261B-C] _The Premier Automobiles Ltd. v. Kamlekar Shantaram_ F _Wadke ofBombay and Ors._ (1976) 1 SCC 496: 1976 (1) SCR 427 - referred to. 1.7 The respondents' suitwas itself not maintainable. The judgments and decree coming under challenge are set aside and ·the suit filed by the respondents is G dismissed. [Paras 17 and 18) [262-E-F] ## Case Law Reference: 1976 (1) SCR 427 Referred to Para 16 CIVIL APPELLATE JURISDICJJON : Civil Appeal ' . No. -- H 7754 of 2011'. # BIHAR STATE ELECTRICITY BOARD & ANR. _v._ RAM 253 DEO PRASAD SINGH & ORS. From the Judgment and Order dated 22.09.2008 of the High Court of Patna in SA No. 97 of 2006. A Navin Prakash for the Appellants. S.B. Sanyal, Subhro Sanyal, Gopal Prasad, Rajiv Shankar Dvivedi and Praveen Kr. Singh for the Respondents. The Judgment of the Court of was delivered by **AFTAB ALAM,** J. 1. Leave granted. 2. The appellants, Bihar State Electricity Board and its Chairman were the defendants in a suit filed by respondents 1 to 8, the plaintiffs. The respondents were the workmen of the Board and at the material time, i.e., in the year 1974 they were working as security guards at Patratu Thermal Power Station, Hazaribagh. They were proceeded against on certain charges of misconduct. In the domestic enquiry the charges were established and on the basis of the findings of the domestic enquiry, they were dismissed from service .on November 11, 1975. After 4 years of dismissal from service they filed a suit (T.S. No. 95/1979) in the court of Munsiff V, Patna, seeking declarations that their dismissal was bad, unconstitutional and inoperative in law and they would be legally deemed to have continued in service. 3. The trial court allowed the suit by judgment and decree dated August 29, 1981. The appeal preferred by the appellants against the judgment and decree passed by the trial court (Title Appeal No. 147 of 1981/62/2004) was dismissed by the Additional District Judge, fast track court No. 2, Patna, by judgment dated January 18, 2006. The appellants, then, brought the matter before the __High Court in second appeal (SA No. 97 of 2006) but this too was dismissed by judgment and order dated September 22, 2008. The appellants are now before this Court assailing the judgments and decree passed against them. C D E F G H ## 254 SUPREME COURT REPORTS [2011] 11 S.C.R. - A 4. In view of section 89 of the Bihar Reorganisation Act, 2000 the judgments of the High Court and the first appellate court appear to be manifestly illegal and without jurisdiction. It may be noted that the district of Hazaribagh, where Patratu Thermal Power Station is situated, was earlier part of the State - B of Bihar but on bifurcation of the State with effect from November 15, 2000, the appointed date under the Reorganisation Act it forms part of the newly created StateJharkhand. Section 89 of the Reorganisation Act dealing with transfer of pending proceedings provides as follows - - c "89."Transfer of pending proceedings - - (1) Every proceeding pending immediately before the appointed day before the court (other than the High Court), tribunal, authority or officer in any area which - D on that day falls within the State of Bihar shall, if it is a proceeding relating exclusively to the territory, which as from that day is the territory of Jharkhand State, stand transferred to the corresponding court, tribunal, authority or officer of that State. E - (2) If any question arises as to whether any proceeding should stand transferred under sub-section (1 ), it shall be referred to the High Court at Patna and the decision of that High Court shall be final. F - (3) In this section, - - (a) "proceeding" includes any suit, case or - . appeal; and G (b) "corresponding court, tribunal authority or officer" in the State of Jharkhand means, - H (i) the court, tribunal, authority or officer in which, or before whom, the proceeding would have laid if it had been instituted after the appointed day; or BIHAR STATE ELECTRICITY BOARD & ANR. _v._ RAM 255 DEO PRASAD SINGH & ORS. [AFTAB ALAM, J.] (ii) in case of doubt, such court, tribunal, A authority, or officer in that State, as may be determined after the appointed day by the Government of that State or the Central Government, as the case may be, or before the appointed day by the Government of the s existing State of Bihar to be the corresponding court, tribunal, authority or officer." (emphasis added) c From a bare reading of section 89 of the Act, it is evident that on the appointed date the appeal preferred against the judgment and decree passed by the Munsiff stood transferred to a corresponding court in the State of Jharkhand. The transfer of the appeal took place by operation of law and the D Additional District Judge, Patna was denuded of all authority and jurisdiction to proceed with the matter or to hear and decide the appeal. It follows equally that the Patna High Court had no jurisdiction to hear and decide the second appeal arising from the suit. E E 5. From the judgment of the Patna High Court it appears that one of the three substantial questions of law arising in the second appeal related to the question of jurisdiction of the first appellate court to hear the appeal and the question was framed as follows: - F "3. Whether the lower appellate court had the jurisdiction to hear the title appeal after coming into force of the Bihar Re-organisation Act, 2000? G 6. The High Court answered the question in the negative, but in doing so it sought to side-step section 89 of the Reorganisation Act in curious ways. In paragraphs 9 and 10 of the judgment it held and observed as follows: - "9. It is not in dispute that when the title suit was filed the H ## 256 SUPREME COURT REPORTS [2011] 11 S.C.R. - A said Act had not come into force and even when the title appeal was filed in the year 1981 the said Act was not in force and the said Act came into force in the year 2000 and it was made effective from 15.11.2000 much after the title appeal had been admitted and was pending for - B · hearing. Furthermore, there was an issue before the trial court with respect to the jurisdiction of the court to try the suit as objection was raised by the defendants that the suit should have been filed at Hazaribagh and the said issue was framed as issue no. (iv) but the same was not pressed - c by the defendants before the trial court and hence it appears to have been conceded by them that the court at Patna had jurisdiction to try the suit. 10. Section 89 of the Act specifically provides that a suit or an appeal pending in the territory of reorganised State D of Bihar would stand transferred to the State of Jharkhand if the subject matter of the suit falls within the State of Jharkhand. But it is also provided that if any question arises as to whether it shall be referred to Patna High Court and decision of that High Court shall be final. E However, in the instant case it is quite apparent that the title appeal remained pending for about four years after coming into force of the aforesaid Act but the defendants who were the appellants in that Court never raised any such question with regard to the jurisdiction of the Court nor any F such matter was ever referred to the High Court at Patna as per the said provisions of Law. Hence, in these circumstances the learned court of appeal below was quite justified in hearing the said title appeal and deciding it on merits." - G H 7. The High Court is wrong on all scores. The fact that the appeal against the judgment and decree passed by the Munsiff was filed before the bifurcation of the State and on the appointed date (November 15, 2000) the appeal was already pending before the Additional District Judge has no bearing BIHAR STATE ELECTRICITY BOARD & ANR. _v._ RAM 257 DEO PRASAD SINGH & ORS. [AFTAB ALAM. J.] · on the issue. Section 89 relates to proceedings pending on the A appointed date and not to proceeding that might be filed after that date. Secondly, the objection in regard to the territorial jurisdiction, raised before the trial court was in an altogether different context. The objection before the trial court was based on the ground that the plaintiffs-workmen were working at B Patratu Thermal Power Station and their dismissal had taken place there. The cause of action having arisen at Patratu, the suit ought to have been filed before a court under whose territorial jurisdiction Patratu Thermal Power Station is situate. The objection was not pressed before the trial court presumably c because the head office of the Board being at Patna it was believed that the plaintiffs could file the suit at Patna as well. But the objection taken before the Munsiff, whether pressed or given up, could have no bearing on the- transfer of the proceedings on the bifurcation of the State in terms of section D 89 of the Reorganisation Act. 8. The third ground given by the High Court that the defendants who were the appellants before the Additional District Judge never raised the question with regard to the jurisdiction of the court nor any such question was referred to tbe Patna High Court for its decision, is equally misconceived and untenable. As noted above, the transfer of the proceedings in terms of section 89 of the Act is to take place by operation of law and is not dependant upon any objection raised by any of the two sides. E F 9. In light of the above, it must be held that the judgment passed by the first appellate court was illegal and without jurisdiction and equally without jurisdiction is the judgment and order passed by the Patna High Court. G 10. Further, quite strangely the High Court lost sight of the fact that it was affirming a decree that was no longer executable or enforceable in the State of Bihar. Section 62 of the Reorganisation Act contains provisions relating to Bihar State Electricity Board besides two other Corporations and in so far H 258 SUPREME COURT REPORTS (2011] 11 S.C.R. - A as relevant for the present provides as under: - "62. Provisions as to Bihar State Electricity Board, State Warehousing Corporation and State Road Transport Corporation.- - B - (1) The following bodies corporate constituted for the existing State of Bihar, namely:- - (a) the State Electricity Board constituted under the Electricity Supply Act, 1948 (54 of 1948); - c - (b) the State Warehousing Corporation established under the Warehousing Corporations Act, 1962 (58 of 1962); - '(c) the State Road Transport Corporation - D established under the Road Transport Act, 1950 (64 of 1950), shall, on and from the appointed day, continue to function in those areas in respect of which they were functioning E immediately before that day, subject to the provisions this section and to such directions as may, from time to time, be issued by the Central Government. · - (2) Any directions issued by the Central Government under sub-section ( 1) in respect of the Board or the - F Corporation shall include a direction that the Act under which the Board or the Corporation was constituted shall, in its application to that Board or Corporation, have effect subject to such exceptions and modifications as the Central Government thinks - G fit. - G - (3) The Board or the Corporation referred to in subsection (1) shall cease to function as from, and shall be deemed to be dissolved on such date as the - H Central Government may, by order, appoint; and BIHAR STATE ELECTRICITY BOARD & ANR. _v._ RAM 259 DEO PRASAD SINGH & ORS. [AFTAB ALAM, J.] upon such dissolution, its assets, rights and A liabilities shall tie apportioned between the successor States of Bihar and Jharkhand in such manner as may be agreed upon between them within one year of the dissolution of the Board or the Corporation, as the case may be, or if no B agreement is reached, in such manner as the Central Government may; by order, determine: Provided that any liabilities of the said Board relating to the unpaid dues of the coal supplied to the Board by any public sector coal company shall be provisionally apportioned between the State Electricity Boards constituted respectively in the successor States of the existing State of Bihar or after the date appointed for the dissolution of the Board under this sub-section in such manner as may be agreed upon between the Governments of the successor States within one month of such dissolution or if no agreement is reached, in such manner as the Central Government may, by order, determine subject to reconciliation and finalisation of the liabilities which shall be completed within three months from the date of such dissolution by the mutual agreement between the successor States or failing such agreement by the direction of the Central Government: C D E Provided further that an interest at the rate of two per cent higher than the Cash Credit interest shall be paid on outstanding unpaid dues of the coal supplied to the Board by the public sector coal company till the liquidation of such dues by the concerned State Electricity Board constituted in the successor States on or after the date appointed for the dissolution of the Board under this sub-section. F G " In terms of sub-section 3 of section 62, Jharkhand State Electricity Board came into existence on April 1, 2001. After H 260 SUPREME COURT REPORTS [2011] 11 S.C.R. A that date it is no longer possible for the Bihar State Electricity Board to reinstate the respondents as security guards at Patratu Thermal Power Station where they were working at the time of dismissal from service. B 11. Thus, looked at from any angle, the judgments passed by the first appellate court and the High Court are untenable in law and the decree passed by the trial court, in the absence of Jharkhand State Electricity Board having been impleaded as a defendant, is rendered non-executable in the State of Bihar. C ·12, Mr. S.B. Sanyal, learned senior advocate, appearing for the plaintiffs-respondents, submitted that the case may be transferred to an appropriate court in the State of Jharkhand from the stage of the first appeal against the judgment and decree passed by the Munsiff, Patna. And before that court the D plaintiffs-respo!)Pents might take steps for impleadment of the Jharkhand State Electricity Board as one of the defendants. 13. We are completely disinclined to take that course for the following reasons. ## E E 14. It may be recalled that the respondents were dismissed from service on November 11, 1975. They filed the suit four years later at Patna and tried to overcome the bar of limitation by pleading that they first came to know about their dismissal from service when they went to collect their wages in October, F 1976. The Munsiff strangely accepted the plea. 15. Secondly, before filing the suit at Patna, they had filed suits being title suit Nos. 65, 66, 67 and 72of1975 before the Munsiff, Hazaribagh. Those suits were dismissed for default. G Before the Patna court an objection was raised on behalf of the defendants-appellants regarding the maintainability of the suit in terms of Order 9 Rule '4 of the Code of Civil Procedure. The plaints of the suits filed at Hazaribagh were produced before the Patna court but the objection was overruled on the H ground that the Board omitted to get the plaintiffs' signatures I BIHAR STATE ELECTRICITY BOARD & ANR. _v._ RAM 261 DEO PRASAD SINGH & ORS. [AFTAB ALAM, J.] on the plaints and vakalatnamas filed before the Hazaribagh court formally proved. 16. Thirdly and most importantly the suit filed by the plaintiffs was itself not maintainable. It may be recalled that plaintiffs worked as security guards at the Thermal Power Station, they were, therefore, without doubt workmen within the meaning of the Industrial Disputes Act, 1947 and their service conditions were governed by the standing orders framed under the Industrial Establishment (Standing Orders) Act, 1946 and the relevant rules framed by the Board. It was, therefore, open to the respondents to raise an industrial dispute concerning their dismissal from service. A suit seeking reinstatement was therefore clearly barred and not maintainable. The issue stands settled by the decision of this Court in _The Premier Automobiles Ltd. v. Kamlekar Shantaram Wadke of Bombay and Others,_ (1976) 1 SCC 496. In paragraphs 23 and 24 of the judgment this Court held as follows: :-- "23. To sum up, the principles applicable to the jurisdiction of the Civil Court in relation to an industrial dispute may be stated thus: A B C D E (i) If the dispute is not an industrial dispute, nor does it relate to enforcement of any other right under the Act the remedy lies only in the civil court. > (ii) If the dispute is an industrial dispute arising out of a right or liability under the general or common law and not under the Act, the jurisdiction of the civil court is alternative, leaving it to the election of the suitor concerned to choose his remedy for the relief which is competent to be granted in a particular remedy. (iii) If the industrial dispute relates to the enforcement of a right or an obligation created under the Act, then the only remedy available to the suitor is to get an adjudication under the Act. F G H 262 SUPREME cduRT REPORTS (2011] 11 S.C.R. - A (iv) If the right which is sought to be enforced is a right created under the Act such as Chapter V-A then the remedy for its enforcement is either Section 33-C or the raising of an industrial dispute, as the case may be. - B 24. We may, however, in relation to principle No. 2 stated above hasten to add that there will hardly be a dispute which will be an industrial dispute within the meaning of Section 2(k) of the Act and yet will be one arising out of a right or liability under the general or common law only and not under the Act. Such a contingency, for example, may - c arise in regard to the dismissal of an unsponsored workman which in view of the provision of law contained in Section 2A of the Act will be an industrial dispute even though it may otherwise be an individual dispute. Civil Courts, therefore, will have hardly an occasion to deal with - D the type of cases falling under principle No. 2. Cases of industrial disputes by and large, almost invariably, are bound to be covered by principle No. 3 stated above." 17. We, thus, come to the inescapable conclusion that the E plaintiffs-respondents' suit was itself not maintainable and was liable to be dismissed. 18. For the reasons discussed above the appeal is allowed. The judgments and decree coming under challenge F are set aside and the suit filed by the plaintiffs-respondents is dismissed. 19. In the facts of the case there will be no order as to costs. G N.J. Appeal allowed.
End of Judgment Record
Browse All Supreme Court of India (2011) Decisions
2011-10-13

GRASIM INDUSTRIES LTD. v. UNION OF INDIA

Grasim Industries Ltd. v. Union of India deals with whether metal scrap or waste generated during repair of worn-out machinery used in a cement manufacturing plant constitutes manufacture and thus obligations to pay Central excise duty. The core dispute arose after Grasim repaired plant components and generated scrap, which was cleared without duty; the Tribunal later held that such scrap did not arise from any manufacturing activity and was not excisable. The Rajasthan High Court initially upheld the duty demand and penalties, while the Tribunal had dropped them. The Supreme Court reversed the High Court, restoring the Tribunal’s order and allowing the appeal. The Court held that although repair work produces metal scrap, this scrap does not participate in the manufacture of cement and cannot be treated as a by-product of the final product. It emphasized that excise duty is on manufacture of goods, requiring that the goods be produced or manufactured in India, and the charging Section 3 applies only when the goods are excisable under Section 2(d) and are manufactured under Section 2(f). Section 2(f) defines manufacture as including any process incidental or ancillary to the completion of the manufactured product, involving transformation of raw material into a new or distinct excisable product. The process of repair, using non-raw materials, does not satisfy this test. The Court also cautioned against deeming provisions in tariff notes as creating manufacture unless expressly stated, relying on various precedents such as Shyam Oil Cake, Ujagar Prints, Hindustan Polymers, and Union of India v. Delhi Cloth and General Mills, among others, to delineate the law of manufacture.

2011-03-02

Bharat Petroleum Corporation Ltd. v. Chembur Service Station

This Supreme Court appeal concerns BPCL’s licence-based relationship with a dealer at a Retail Petroleum Outlet (RPO) in Chembur, Mumbai. BPCL (then Burmah Shell) leased the land and services premises to operate the RPO; in 1972 a DPSL (Dispensing Pump and Selling Licence) granted the respondent the right to sell BPCL’s petroleum products from the outlet. A 1995 renewal extended the arrangement. In 2007, a show-cause notice alleged tampering with dispensing equipment, prompting BPCL to terminate the dealership. The respondent filed suits in the Court of Small Causes claiming tenancy or deemed tenancy under rent-control laws and sought an injunction to continue supply, while BPCL argued the arrangement was a revocable licence, not a tenancy, and the remedy lay in due process and contract law, not eviction under rent-control statutes. The lower courts issued status-quo orders preserving possession and continuing supplies, with various challenges under Public Premises Act and rent-control regimes. The Supreme Court clarified that the DPSL licence creates a limited, revocable right to enter and use the premises to sell BPCL’s products, not a tenancy; the licence terminates with revocation and the licensee has no independent right to possession. The Court ultimately referred the matter to a larger Bench due to divergent views and, in the order, dismissed the appeal with directions to proceed under due process of law.

2011-07-04

Sudam @ Rahul Kaniram Jadhav v. State of Maharashtra

Sudam alias Rahul Kaniram Jadhav challenged a conviction for the murder of a woman with whom he lived as husband and wife and her four children. The victims were found in a village pond in August 2007. The trial court convicted the appellant under IPC Sections 302 and 201 and sentenced him to death; the Bombay High Court affirmed. The State relied on circumstantial evidence: the victims were last seen alive with the appellant; he had posed as single, later marrying another woman (PW-6); the deceased had agreed to pay Rs. 15,000 to PW-6 to settle the dispute; extra-judicial confessions were made by the appellant to PW-6 and PW-9; he absconded and could not explain the deaths. The defense argued that the circumstantial chain was not complete and could admit alternate explanations; there were no direct eyewitnesses. The Supreme Court reiterated the standard for circumstantial evidence: the evidence must be cogently and firmly established, form a complete chain, point to guilt beyond reasonable probability, and be inconsistent with innocence. It concluded all five deaths were homicidal and, applying the rarest-of-the-rare doctrine, upheld the conviction and the death sentence, while dismissing the appeals.

2011-04-18

J.S. Yadav v. State of U.P. & ANR.

This case concerns a challenge to a May 28, 2008 notification declaring the appellant, a member of the Uttar Pradesh State Human Rights Commission, ceased to hold office after amendments to the Protection of Human Rights Act, 1993 were introduced by the Protection of Human Rights (Amendment) Act, 2006. The appellant joined the Commission on 29 June 2006 for a five-year tenure and argued that the amendment, which requires seven years of experience as a District Judge for eligibility, could not curtail an incumbent’s tenure and could not be applied retrospectively. He also contended that Section 26 of the Act guarantees that terms and conditions of service shall not be varied to his disadvantage after appointment, and that the proposed reconstitution would deprive accrued rights. The State argued that fresh appointments to the Commission had to be made, that the amendment could alter service conditions, and that public funds cannot pay two persons for one post; non-joinder of relatives and the lack of a suitable remedy rendered the petition academic. The Supreme Court held that tenure posts must be allowed to endure to the end of the fixed term and that accrued rights cannot be taken away by a repealing or amended statute without express or necessary implication. It held the 2006 Amendment prospective and the impugned notification illegal, allowed the appeal to the extent discussed, and awarded Rs. 1 lakh as costs to the appellant.