Supreme Court of IndiaSupreme Court · 1989Single JudgeAppeals allowed.

BIHAR STATE ELECTRICITY BOARD & ANR. v. DHANAWAT RICE AND OIL MILLS

Case / Petition Number:
Civil Appeal Nos. 156-164 of 1989
Neutral Citation:[1989] 1 S.C.R.

Case Synopsis & Summary

The Bihar State Electricity Board (BSEB) and Dhanawat Rice & Oil Mills are parties to an agreement concerning supply of electrical energy. Clause 1 obliges the Board to furnish a constant supply of energy at defined voltage, cycles, and wiring; Clause 4 imposes minimum annual charges even if the consumer does not fully utilise the energy; Clause 13 contemplates a proportionate reduction of the annual minimum guarantee if supply is interrupted for reasons beyond the Board’s control or if the Board is unable to supply energy due to strikes, riots, fires, floods, acts of God, or similar contingencies. For years 1973–74 to 1982–83 the Board billed the minimum guarantee; the mills challenged the charges arguing non-supply due to trippings, load-shedding and power cuts, resulting in substantial losses. The Patna High Court held that “constant supply” meant continuous supply, and that the mills could be liable to pay only if supply occurred as contemplated; it quashed the demands. The Supreme Court allowed the appeals, ruling that “constant supply” does not equate to uninterrupted, 24/7 supply; rather it means supply at the prescribed parameters with standard variations. It reaffirmed that interruptions constitute “circumstances beyond the control” of the consumer, enabling a proportionate reduction under clause 13, to be computed by the Chief Engineer using hours of non-supply. Pending computation, supply should not be disconnected; fresh demand may issue after reduction. Appeals allowed.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • G. L. Oza
  • K. N. Saikia
Judgment Date
1989-01-17
Court Decision / Holding
Appeals allowed. The High Court’s interpretation that 'constant supply' equates to continuous 24x7 supply is rejected. The Court holds that constant supply refers to energy supplied at the contracted parameters; interruptions due to events beyond the Board’s control trigger a proportionate reduction in the annual minimum guarantee under clause 13, to be assessed by the Chief Engineer based on hours of non-supply. Pending such assessment, the Board shall not disconnect supply, and after reduction, fresh demand may be raised following normal procedures.
Final Disposition
Appeals allowed.

Parties to the Case

Appellants / Petitioners

  • BIHAR State Electricity Board and Anr.

Respondents

  • Dhanawat Rice and Oil Mills

Legal Representation & Advocates

Counsels for Petitioners

  • • Dr. Y.S. Chitale
  • • Pramod Swamp

Counsels for Respondents

  • • N.R. Choudhary
  • • L.R. Singh

Provisions of Law Cited

Electricity (Supply) Act, 1948: Sections 18, 26, 28, 29, 49, 54, 60Indian Electricity Rules, 1956 (as context)

Legal Doctrines & Maxims

  • Circumstances beyond the control of a party (contractual doctrine)
  • Proportionate reduction under a contractual clause (clause 13)
  • Interpretation of contract clauses to reflect real obligations rather than literal phrasing
  • Inability to supply energy due to power cuts treated as beyond the consumer's control (as per Northern India Iron & Steel Co.)

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellants/Board contended that 'constant supply' in clause 1 refers to supply of energy in the prescribed electrical parameters, not necessarily a 24x7/continuous service. Clause 4 mandates payment of minimum charges even if consumption does not reach the minimum, and Clause 13 provides a proportionate reduction only when supply is prevented or curtailed due to events beyond the Board's control, or if non-availability of energy occurs as per contract. The Board argued that interruptions due to circumstances beyond its control do not automatically negate liability for minimum charges, and the reduction must be computed by the Chief Engineer in light of actual non-supply hours; the High Court’s interpretation equating 'constant' with 'continuous' was erroneous. The decision in Northern India Iron & Steel Co. is cited to support the view that non-supply under a contract due to power cuts is a circumstance beyond the consumer’s control, warranting proportional relief; pending such assessment, disconnection should be barred and normal recovery procedures to follow after the reduction.

Contentions of Respondents

The respondents argued that clause 1 contemplates constant supply of electrical energy and implies uninterrupted service. They asserted that if the Board fails to supply as contemplated, the Board cannot compel payment of the minimum guarantee; clause 13 permits only a proportionate reduction when supply is curtailed by events beyond the Board’s control or the consumer’s ability to take energy is impaired. They relied on statutory and jurisprudential authorities, including Northern India Iron & Steel Co., to contend that non-supply due to power cuts constitutes a circumstance beyond the consumer’s control, entitling relief through proportionate reduction. They urged the Court to uphold the High Court’s interpretation that the Board’s failure to furnish the agreed level of supply warrants a reduction proportionate to non-supply hours, ensuring fairness and preventing unjust charges for energy not delivered or utilised.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (4)

Case NameCitationTreatmentExplanation
Northern India Iron & Steel Co. v. State of Haryana & Anr.[1976] 2 SCR 677PositiveThe Court follows this decision to treat non-supply due to power cuts as a circumstance beyond the consumer's control, justifying a proportionate reduction as per clause 13.
Amalgamated Electricity Co. Ltd. v. Jalgaon Borough Municipality[1976] 1 SCR 636Mentioned OnlyCited as a precedent but not relied upon as controlling for the present decision.
Mis. Man Industrial Corporation v. Rajasthan State Electricity Board and othersAIR 1986 Rajasthan 137Mentioned OnlyCited for background; not adopted or distinguished in the core reasoning.
Mukand Iron and Steel Works Ltd. v. Maharashtra State Electricity Board and anotherAIR 1982 Bombay 580Mentioned OnlyCited as part of background authorities; not the basis of the holding.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•3,273 words•~15 min read

In The Court Record

BIHAR STATE ELECTRICITY BOARD & ANR. v. DHANAWAT RICE AND OIL MILLS

A B c BIHAR STATE ELECTRICITY BOARD & ANR. _v._ DHANAWAT RICE AND OIL MILLS JANUARY 17, 1989 [G.L. OZA AND K.N. SAIKIA, JJ.] _Electricity (Supply) Act,_ _1948:_ _Sections_ _18,_ _26, 28, 29,_ _49,_ _54_ _&_ _60-Agreement to supply electrical energy-Clauses_ _1,_ _4 and_ _13 of the_ _agreement-Provision for constant supply of electricity-Constant supply_ _whether continuous_ _supply-Minimum_ _annual guarantee_ _payment-_ _Tripping, load-shedding and power cut-Failure to_ _supply continuous_ _electricity-Circumstances beyond control_ _of Electricity Board--Co.n-_ _sequent non-consumption_ _by_ _consumer upto the level_ _of minimum_ _guarantee-Consumer entitled to proportionate reduction._ Clause 1, of the agreement arrived at between the consumer0 respondents and the appellant-Electricity Board, provided for constant supply of electrical energy to the consumers. Clause 4 provided that even if the consumer does not consume electricity above the minimum guarantee then it will be incumbent upon the consumer to pay annual minimum charges. Clause 13 provided for the contingency that if the consumer is prevented from receiving or using the electrical energy due E to strikes, riots, fire, floods, explosions, act of God or any other case reasonably beyond the control of the Board or if the Board is prevented from supplying such electrical energy owing to any of the causes mentioned then the consumer was entitled to a proportionate reduction # of the annual minimum guarantee bill as determined by the Chief Engineer. F The respondents were served with the bills for annual minimum guarantee for the years 1973-74 to 1982-83 by the Electricity Supply Division. The respondents tiled their claims, under clause 13, with the Chief Engineer denying their liability to pay any such charges because the Board did not supply constant supply as provided in clause 1. It was G alleged that during the period in question due to trippings, load-sheding and power-cut the respondents suffered a great loss. The Chief En- ~ gineer negatived the claims of the respondents. A batch of writ petitions was filed in the High Court, challenging the order of the Chief Engineer. Although in these petitions relief H sought was proportionate reduction of the annual minimum guarantee 168 BIHAR STATEELEC. BOARD _v._ DHANAWATRICE& OIL MILLS 169 ~- bills but in view of the interpretation of clauses I, 4 and 13 the High A Conrt quashed the demand made by lhe Electricity Board by holding that under clause I it was incumbent for the Electricity Board to supply constant electricity supply and that the consumers will be liable to pay annual minimum guarantee charges only if the Board supplies the power as provided in the agreement but the consumer does not utilise B , ~ the power. In these appeals by Special Leave, it was contended on behalf of the appellants that the 'constant supply' mentioned in clause 1 cannot mean ~----.; 'continuous supply'. The respondent-consumers could not deny the liability to pay annual minimum guarantee bills if the Electricity Board could not supply power for all the 24 hours due to circumstances beyond [c ] the coutrol of the Electricity Board. In case of shortage of supply due to "I, circumsta11ces beyond the control of the Board the consumers were entitled to a proportionate reduction under clause 13 of the agreement. Allowing the appeals, the Court, D HELD: 1. The High Court was not right in coming to the conclusion that the respondents were not liable at all to pay the annual minimum guarantee charges. [175C] A 1.1. The High Court in its judgment clearly stated the hours E every year in dispute when the power was not supplied and on this basis the respondent-consumers will only be entitled to proportionate reduclion as ordinarily the consumers are expected to have continuous power supply. Clause 13 clearly provides for the proportionate reduction of the annual minimum guara.ntee bills. [ 175D] ## J 2. Clause 1 talks of constant supply of electrical energy providing the annual minimum guara.ntee bills. [ 175D] F 2. Clause 1 talks of constant supply of electrical energy providing for voltage, cycles, phases and wires. It does not talk of either of con**tinuous or non-continuous or intermittent supply. [** **t** **73E]** 3. The Respondent consumers are entitled to a proportionate reduction of the minimum guarantee bill. The inability of the Electricity G Board. to supply electrical energy due to power cut or any other circumstance beyond its control as per the demand of the consumer -4- according to the contract will be reflected in :md considere«J as a circumstance beyond the control of the consumer which prevented it from consuming electricity .as per the contract and to the extent it wanted to consume. [l 73G] H A B 170 SUPREME COURT REPORTS [1989] 1 S.C.R. _Northern India Iron_ _&_ _Steel Co._ _etc._ v. _State of Haryana_ _&_ _Anr.,_ [1976] 2 S.C.R. 677, followed. 4. The Chief Engineer of the Electricity Board shall accordingly assess the proportionate reduction of the annual minimum guarantee bills in respect of disputed years on the basis of non supply as indicated in the High Court Judgment. [175D-E] 4.1. Pending assessment, the power supply of the consumers will not be disconnected on the ground of failure to pay the annual minimum guarantee bills. [175E] C 4.2. The Electricity Board will be entitled to take recourse to the normal procedure if the consumers fail to pay after the proportionate reduction is made and fresh demand is made. [175E-FI _Amalgamated Electricity_ _Co._ _Ltd._ v. _Jalagaon Borough Munici-_ _pality,_ [1976] 1 SCR 636; _Mis. Man Industrial Corporation_ v. D _Rajas than State Electricity Board and others,_ AIR 1986 Rajasthan 137 and _Mukand Iron and Steel Works Ltd._ v. _Maharashtra State Electricity_ _Board and another,_ AIR 1982 Bombay 580, referred to. E F CIVIL APPELLATE JURISDICTION: Civil Appeal Nos. 156164 of1989. From the Judgment and Order dated 24.7.1987 and 7.4.1988 of the Patna High Court in C.W. J.C. Nos. 253, 266, 262, 255, 260 265, 555, 254of1986 and C.W.J.C. No. 17of1988 respectively. Dr. Y.S. Chitale and Pramod Swamp for the Appellants. N.R. Choudhary and L.R. Singh for the Respondents. The Judgment of the Court was delivered by G These special leave petitions have been filed against the judg##### + ment of the High Court of Patna by which several writ petitions were disposed of. All these special leave petitions have been preferred in this Court aggrieved by that judgment. The common question which arises in all these SLPs is that under the agreement arrived at between H the consumers and the Bihar State Electricity Board there is a clause G OZA, J. Leave granted. BIHARSTATEELEC. BOARD _v._ DHANAWATRICE&OILMILLS IOZA,J.) 171 of payment of minimum guarantee which indicates that even if the A 4**consumer does not consume electricity above the minimum guarantee** that it will be incumbent upon the consumer to pay charges for energy which is the annual minimum guarantee provided in the agreement pertaining to Industrial units. The relevant facts are that for the years 1973-74 to 1982-83 the B .~· bills for annual minimum guarantee were served on the appellants by the Electricity Supply Division, Forbesganj and on receipt thereto the appellants filed their claims as provided under clause 13 of the agree_"-_)_ ment on the ground that appellant was not liable to pay any such '· charges because the appellant did not supply constant electricity as provided in the agreement during the period in question and there c were tripping, load shedding, and power-cut which resulted in a great ...,__ loss to the petitioners and as the supply was not in accordance with the agreement liability to pay annual minimum guarantee bills could not be fastened on the consumer. The Chief Engineer who was the authority under the agreement negatived the claim and so they filed writ petitions in the High Court. D The High Court by the impugned judgment came to the conclusion that under clause I of the agreement it was incumbent for the Electricity Board to supply constant electricity and the consumer will #### J be liable to pay annual minimum guarantee charges only if in spite of Electricity Board to supply constant electricity and the consumer will #### . J be liable to pay annual minimum guarantee charges only if in spite of the fact that the Board supplies power as contemplated in the agree- E men! and the consumer does not utilise the power then the liability to pay annual minimum guarantee charges will arise and on this basis the High Court quashed the demands made for these years on the basis of annual minimum guarantee as it found that power was not supplied __ _j_ according to the agreement. F Learned counsel appearing for the Electricity Board contended that cluase 1 of the agreement does not in any manner mean that there should be a continuous supply. The term used in clause 1 of the agreement only talks of constant supply of electrical energy a.t the pressure of volts, cycles, 3 phase, 3 wire etc. but it does not talk of continuous supply without any bteak and it therefore could not be contended that G if there was no supply for a few minutes it will amount to failure on the part of the Electricity Board to provide constant supply. It was con###### -+- tended that the constant supply cannot mean continuous supply. It if there was no supply for a few minutes it will amount to failure on the part of the Electricity Board to provide constant supply. It was contended that the constant supply cannot mean continuous supply. It was also contended that clause 4 of the agreement clearly talks of the payment of annual minimum guarantee charges and therefore it could not be said that because of the power cut or situations beyond the H _>r·_ -+- '. A B c D 172 SUPREME COURT REPORTS [1989] I S.C.R. control of the Electricity Board if the power could not be supplied for all the 24 hours every day the respondent consumer can deny the liability to pay annual minimum guarantee bills. It was also contended that in view of clause 13 of the agreement which provides that if there was shortage of supply and that shortage resulted in short supply then the consumer was entitled to a proportionate reduction of the annual minimum guarantee bill as determined by the Chief Engineer, Biha.r State Electricity Board and consequently the respondent in this case went to the Chief Engineer who ultimately decided on the basis of facts that respondents were not entitled to any proportionate reduction and it was because of this that the petitions were filed before the High Court. It was contended that the learned Judges of the High Court · have failed to appreciate clause 13 of the agreement. Learf'\ed counsel also placed reliance Of'\ the decisions in _Amalgamated Electricity_ _Co._ _Ltd._ v. _Jalgaon Borough Municipality,_ [1976] 1SCR636; _Mis Northern_ _India Iron_ & _Steel_ _Co._ _etc._ v. _State of Haryana_ & _Anr ..,_ [1976] 2 SCR 677; _Mis Man Industrial Corporation_ v. _Rajasthan State Electricity_ _Board and others,_ AIR 1986 Rajasthan 137 and _Mukand Iron and Steel_ _Works Ltd._ v. _Maharashtra State Electricity Board and another,_ AIR 1982 Bombay 580. Learned counsel for the respondents on the other hand contended that clause 1 provides for constant supply of power, the variations permitted have been indicated in this clause itself and it is COf'\E tended that it is only where the electricity Board discharges its duty to supply power as contemplated in clause I and the CO!lS\lmer because of his ·difficulties is not able to utilise power even upto the level of minimum guarantee that the liability to pay annual minimum guarantee bills could be fastened on the consumer but if the Board fails to discharge its responsibilities as contemplated ip clause 1 of the F agreement it could not compel the consumer to pay the annual minimum guarantee. It was frankly conceded that in the petition itself originally relief sought was proportionate reduction of the annual minimum guarantee bills but in view of the interpretation of clauses I, 4 and 13 the High Court came to the conclusion that there is no liability on the consumer to pay annual minimum guarantee bills as the ElecG tricity Board has failed to supply power as contemplated in clause I of the agreement. Learned counsel however contended that the Chief Engineer in his order has misunderstood the whole situation but before the High Court the facts were not disputed and in each case average hours of supply per year during the disputed period have been stated which have not been disputed by the Electricity Board and if at all the -~ H High Court judgment is not maintained the respondents are entitled to ### .. A B c D E F G H , ··- BIHARSTATEELEC. BOARD _v._ DHANAWATRICE&OILMILLS (OZA,J.I 173 proportionate reduction of the annual minimum guarantee bills in the light of the hours of supply per year which have been stated in the High Court judgment and is not disputed. Clause 1 of the agreemnt reads as under: "1. (a) The Board shall furnish to the consumer and the consumer shall accept at the point of supply mentioned in the schedule hereto, on and from the date on which the said premises shall be connected with the supply Distributing mains and during the continuance of the agreement, a constant supply of electrical energy at the pressure of ..... . Volts, 50 cycles, 3 phases, 3 wires, alternating current system subject to standard variations as provided in Indian Electricity Rules, 1956 or any other statutory modification thereof as may be in force from time to time for the purpose and upto ·the maximum specified (hereinafter referred to as the contract demand) and under the conditions laid down in the Schedule." This clause talks of constant supply of electrical energy providing for voltage, cycles, phases and wires. It is clear that it does not talk of continuous supply nor does it talk of non-continuous or intermittent supply. In fact this clause in our opinion is not very material for the decision of the case as the sole controversy pertains to interpretation of clause 13. Clause 4 of the agreement provides for the minimum guarantee and there is no dispute that if the consumer is not able to utilise electricity even upto the level of minimum guarantee; This clause provides for payment of charges of minimum guarantee. "The real controversy pertains to the interpretation of clause 13. In fact in _Northern_ _India Iron_ _&_ _Steel_ _Co._ case. [19761 2 SCR 677 this Court had the occasion to consider a situation of this kind where this Court on this aspect of the matter has observed that where the Electricity Board fails to supply power because of shortage of energy, power cut or any other circumstances as per demand of the consumer according to the con, tract it will be considered as a circumstance beyond the control of the consumer which prevented it from consuming electricity as per the contract. Their Lordships observed as under: A B c D 174 SUPREME COURT REPORTS [1989) 1 S.C.R. "We are, therefore, of the view that the inability of ##### + the Board to supply electric energy due to power cut or any other circumstance beyond its control as per the demand of the consumer according to the contract will be reflected in and considered as a circumstance beyond the control of the consumer which prevented it from consuming electricity as per the contract and to the extent it wanted to _1_ consume. The monthly demand charge for a particular month will have to be assessed in accordance with subclause (b) of clause 4 of the tariff and therefore from a proportionate reduction will have to be made as per sub- ~ clause (f). We hope, in the light of the judgment, there will be no difficulty in working out the figures of the propor. tionate reduction in any of the cases and for any period. In case of any difference or dispute as to the quantum of the _>r_ demand charge or the proportionate reduction, parties will be at liberty to pursue their remedy as may be available to them in accordance with law." It appears that reading clause 13 in the present case clearly provides for the contingency and it provides for the failure on the part of the supplier and also failure on the part of consumer in the circumstances like strike, riot, fire, flood, explosion or act of God or any other -A .. reason beyond the control of either of the parties. Clause 13 of the E agreement reads: ... ###### -t- F G "If at any tirhe the consumer is prevented from receiving or using the electrical energy to be supplied under this agreement either in whole, or in part due to strikes, riots, fire, floods, explosions, act of God or any other case reasonably beyond control or if the Board is prevented from supplying or unable to supply such electrical energy owing to any or all of the causes mentioned above then the demand charge and guaranteed energy charge set out in the schedule shall be reduced in proportion to the ability of the consumer to take or the Board to supply such power and the decision of the Chief Engineer, Bihar State Electricity Board, in this respect shall be final." In view of this language of the clause clearly providing for the proportionate reduction of the annual minimum guarantee bills it could not be doubted that the High Court was not right in coming to the conclu· H sion that the respondents were not liable to pay annual minimum BIHARSTATEELEC. BOARD _v._ DHANAWATRICE&OILMILLS [OZA,J.] 175 guarantee bills at all. The judgment of this Court also clearly indicated A that the respondents consumers are entitled to a proportionate reduction of the minimum guarantee bills. In clause 13 of the agreement this is clearly stated that the authority competent to determine the proportionate reduction is the Chief Engineer and it appears that it was because of this that the respondents consumers approached the Chief B Engineer for consideration. But it appears that the learned Chief Engineer also did not clearly understand the meaning of clause 13. The judgment of the High Court on which reliance is placed have only followed the judgment referred to above. In our opinion, therefore, the High Court was not right in coming to the conclusion that the respondents were not liable at all to pay C annual minimum guarantee charges. In fact they are only entitled to the proportionate reduction. The judgment of the High Court clearly states the hours every year.in dispute when the power was not supplied and on this basis the respondents consumers will be entitled to proportionate reduction as ordinarily the consumers are expected to liave D continuous power supply. It is therefore directed that the Chief Engineer of the Electricity Board on the basis of hours of non supply as indicated in the High Court judgment and not disputed in the High Court will assess the proportionate reduction of the annual minimum guarantee bills in respect of disputed years indicated above and it is also directed that until this is not done the power supply will not be E disconnected on the basis of failure to pay the annual minimum guarantee bills for the periods stl!ted above. However, after the proportionate reduction is made and fresh demand is made, Electricity Board will be entitled to take recourse to the normal procedure if the consumers fail to pay . . ### . F In the circumstances no order as to costs. T.N.A. Appeals allowed.
End of Judgment Record
Browse All Supreme Court of India (1989) Decisions
1989-12-22

LAXMI NARAYAN NAYAK v. RAMRATAN CHATURVEDI AND ORS.

This appeal concerns an election petition challenging the Madhya Pradesh Vidhan Sabha election from Niwadi constituency (No. 34) held in early 1985. The appellant, Laxmi Narayan Nayak, alleged that the first respondent, Ramratan Chaturvedi, engaged in corrupt practices under Sections 123(2), 123(3) and 123(3A) of the Representation of the People Act, 1951. The Madhya Pradesh High Court dismissed the petition for lack of substantiation, and Nayak challenged that decision in this Supreme Court appeal. The Court concentrates on three issues: (i) whether the nomination paper of Pratap Singh (11th respondent) was improperly rejected; (ii) whether the respondent held a meeting on 28 February 1985 at Niwadi and promised a silver shield to electors, constituting corrupt practice under Section 123(1); and (iii) whether government servants and a police officer accompanied the respondent to persuade electors and whether money was distributed. The Court reiterates that election petitions are quasi-criminal and require strict proof, including a clear element of bargaining in bribery, with reliability and corroboration of oral evidence. It critically analyzes the evidence: the nomination issue is resolved in the petitioner's favour by the High Court’s reasoning, while the alleged bribery and use of government officers fail due to inconsistencies and lack of corroboration. Ultimately, the Supreme Court upholds the High Court’s decision and dismisses the appeal with costs.

1989-09-19

Aphali Pharmaceuticals Ltd. v. State of Maharashtra & Ors.

Aphali Pharmaceuticals Ltd., an Ayurvedic medicine manufacturer, challenged excise-duty liability on the product Ashvagandharist, which contains self-generated alcohol but is not a beverage. Initially treated as exempt under item 2(i) of the 1955 Act’s Schedule (renumbered as item 3(i) after the 1961 Amendment) because it was an Ayurvedic preparation containing self-generated alcohol not capable of being consumed as an ordinary alcoholic beverage. The 1962 Finance Act introduced Explanation I to the Schedule, defining “patent and proprietary” medicines by reference to the Drugs Act, 1940, with retrospective effect. A Maharashtra circular (31 May 1962) directed treating such preparations as falling under item 1 (patent or proprietary medicines) rather than item 3, and excise duties were subsequently levied and paid under protest. The appellant filed suit; the Civil Judge decreed in its favor, the High Court reversed, and this Court allowed the appeal. The Court held that Explanation I did not amend or override the Schedule’s categories, and the circular could not override the enactment; the Schedule and the Act, read with the Rules (Rules 64-66) and the Drugs Act, determine taxability. The Supreme Court restored the Civil Judge’s decree, holding the appellant was not liable under the amended schedule as interpreted. The parties were to bear their own costs.

1989-07-13

Sundarjas Kanyalal BhatiJa & Ors. v. Collector, Thane, Maharashtra & Ors.

This matter concerns judicial review of Government action under Section 3 of the Bombay Provincial Municipal Corporations Act, 1949, in the context of proposing the formation of the Kalyan Municipal Corporation by merging Kalyan, Ambarnath, Domoivali, and Ulhasnagar. Objections poured in, including from Ulhasnagar’s Sindhi community which sought to preserve its identity via the All India Sindhi Panchayat Federation. The Government undertook a draft notification under Section 3(3) and later issued a final notification excluding Ulhasnagar under Section 3(2). The Bombay High Court held that excluding Ulhasnagar while keeping contiguous areas in the proposed Corporation was arbitrary and irrational, and it directed the Government to reconsider the proposal under Section 3(3), inviting hearing for petitioners and Federation. The appellants contended that the formation of a corporation is a legislative function, thus subject to no general rules of natural justice, and that the State had complied with statutory requirements. The Supreme Court, in a Division Bench, reversed the High Court, emphasizing that judicial review aims at predictability and certainty of law, and that the procedure for forming a Corporation under Section 3 is a legislative act not bound by ordinary hearing requirements unless expressly prescribed. It criticized the High Court’s approach and held that the Government’s action was within the scheme of law, while affirming the need for proper procedure and respecting the decorum of judicial process.

1989-08-08

ATUL MATHUR v. ATUL KALRA

This appeal from the Bombay criminal proceedings concerns Section 630 of the Companies Act, where a company sought to recover possession of a flat occupied by a former employee after resignation. The leave-and-licence agreement for the flat was executed on behalf of Jenson and Nicholson (India) Ltd by the first respondent, who served as Divisional Sales Manager, under a power of attorney. The first respondent filed a civil suit asserting he was the licencee, while the company paid deposits and continued to pay licence fees. After resignation, the respondent did not vacate, was convicted under Section 630 by the Additional Chief Metropolitan Magistrate, and the conviction was upheld by the Sessions Court. The Bombay High Court, via Article 227 converted to Section 482 Cr.P.C., reversed the judgments, holding that two letters by a junior employee, Exs. 3 and 4, and the existence of a civil suit created a bona fide dispute that should be resolved in civil court rather than a criminal proceeding. The Supreme Court allowed the appeal, holding that Section 630 aims to provide speedy relief to the company, that the complaint was properly filed, and that the two letters did not establish a bona fide dispute. The Court restored the lower court judgments and granted the respondent time to vacate.