BHARATSING S/O GULABSINGH JAKHAD & ORS. v. THE STATE OF MAHARASHTRA & ORS.

Case / Petition Number:
CIVIL APPEAL NO. 21792 OF 2017

Case Synopsis & Summary

This Supreme Court Civil Appeal concerns the interpretation and application of Section 28A of the Land Acquisition Act, 1894, in the context of re-determination of compensation on awards of courts where an appeal under Section 18/26 is pending. The notification under Section 4(1) was issued on 17.01.1974, and the initial compensation was fixed by the Land Acquisition Officer on 04.06.1977. Several other landowners pursued enhancement, and the Reference Court increased rates to Rs. 5,000 per acre, with references numbered 123 and 129 of 1983. The appellants filed a Section 28A application on 31.12.1992 seeking enhancement based on later appellate awards. While this was pending, the High Court delivered a judgment on 23.03.2009 in related appeals, fixing compensation at Rs. 18,000 per acre. Meanwhile, the LAO issued an award dated 25.10.2000 on the 28A application. In 2009 the High Court’s judgment led to a dispute about the propriety of a second Section 28A application, and the Writ Petition was dismissed. The Court ultimately holds that although the single-application principle applies, the peculiar fact that appeals were pending necessitates fresh consideration of the 1992 28A application, setting aside the 2000 order and directing afresh consideration by the LO within a specified timeframe, with disbursement of benefits. There are no costs.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Landmark Cases
Hon'ble Judges
  • KURIAN JOSEPH
  • R. BANUMATHI
Judgment Date
2017-12-12
Court Decision / Holding
The Court disposed of the appeal with directions: the Land Acquisition Collector is directed to consider afresh the Section 28A application dated 31.12.1992 in light of the High Court’s judgment dated 23.03.2009; the order dated 25.10.2000 is set aside; amounts already paid shall be adjusted; the LO shall pass fresh orders within three months from the copy of this judgment and the consequential benefits shall be disbursed within one more month; there shall be no order as to costs.
Final Disposition
Appeal disposed of with directions to reconsider afresh the 28A application, set aside prior order, and proceed in light of the final appellate judgment; no costs.

Parties to the Case

Appellants / Petitioners

  • Bharatsing S/o Gulabsingh Jakhad

Respondents

  • The State of Maharashtra
  • Ors.

Provisions of Law Cited

The Land Acquisition Act, 1894Section 4(1) NotificationSection 11Section 18Section 26Section 28ASection 28A(1)Section 28A(2)Section 28A(3)Section 31

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellants contended that Section 28A is a beneficial provision allowing redetermination of compensation on the basis of an award of the Court, even where earlier reliefs have been or are being pursued in appeal. They argued that the application under Section 28A filed on 31.12.1992 should not be defeated by the pendency of related appeals and that natural justice and the real benefit of late awards should be given effect. The arrangement under Section 28A(1)-(3) contemplates redetermination on basis of Court’s award, with due notice and opportunity to all interested, and allows then for a reference to the Court under Section 18 if necessary. The appellants urged that the Collector should have kept the 1992 28A application pending and should have reconsidered it after final appellate judgment, rather than allowing a separate 2000 award and later second application to stand.

Contentions of Respondents

The respondents argued that Section 28A permits only a single application for redetermination; once an award is made and appeals are pending, the status quo should be maintained, and further applications are not permissible. They contended that the 28A remedy is circumscribed by the sixth condition laid down in Union of India v. Pradeep Kumari (1995) 2 SCC 736, and that a second application cannot be entertained. They also emphasized that the final award should ideally be determined through the appellate forum and that enrichment via multiple 28A applications would undermine finality and fiscal stability. The respondent State maintained that pendency of appeals warrants staying the 28A process and that the High Court’s reliance on earlier precedents should not disturb settled law on limitation and maintainability.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (6)

Case NameCitationTreatmentExplanation
Babua Ram and others v. State of U.P. and another(1995) 2 SCC 689DistinguishedCited for principles on redetermination and the stay of 28A proceedings pending appeal; court distinguishes due to peculiar facts and uses the principle to insist on fresh consideration in this case.
U.P. State Industrial Development Corpn. Ltd v. State of U.P. and others(1995) 2 SCC 766PositiveReiterated the need to keep the 28A application pending when an appeal is pending, forming part of the persuasive backdrop for the present case.
Union of India and another v. Pradeep Kumari and other s(1995) 2 SCC 736PositiveEstablished six conditions for filing 28A; cemented the principle that only one application can be moved, which the court applies in the present context.
Jose Antonio Cruz Dos R. Rodriguese and another v. Land Acquisition Collector(1996) 6 SCC 746PositiveClarified the meaning of ‘award’ and ‘court’ in Section 28A and the basis for the three-month limitation from the award.
Union of India v. Munshi Ram (Dead) By Lrs. and others(2006) 4 SCC 538PositiveExplains final payable compensation parity with the award reached in reference; supports the position on keeping consistency in relief awarded and refunds if excess payment occurs.
Kendriya Karamchari Sehkari Grah Nirman Samiti Limited, Noida v. State of Uttar Pradesh and another(2009) 1 SCC 754PositiveAffirmed that pendency of appeals can justify non-decision on 28A; the present Court cites this in support of not prematurely denying relief under 28A when related appeals are pending.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,592 words•~12 min read

In The Court Record

BHARATSING S/O GULABSINGH JAKHAD & ORS. v. THE STATE OF MAHARASHTRA & ORS.

## **REPORTABLE** # SUPREME COURT OF INDIA ## CIVIL APPELLATE JURISDICTION CIVIL APPEAL NO. 21792 OF 2017 (Arising out of S.L.P.(Civil) No. 16449/2016) BHARATSING S/O GULABSINGH JAKHAD & ORS. ... APPELLANT (S) ## VERSUS THE STATE OF MAHARASHTRA & ORS. ... RESPONDENT (S) ## **J U D G M E N T** ## **KURIAN, J.:** Leave granted. **2.** What is the course to be adopted by the Land Acquisition Collector under Section 28A of The Land Acquisition Act, 1894 (hereinafter referred to as “the Act”), when the award based on which enhancement is sought is pending Signature Not Verified Digitally signed by NARENDRA PRASAD Date: 2017.12.12 17:12:30 IST Reason: 1 in appeal, is the issue arising for consideration in this case. **3.** The Section 4(1) Notification was issued on 17.01.1974. The compensation was determined by the Land Acquisition Officer on 04.06.1977. The appellants did not pursue the matter further under Section 18 of the Act in Reference. However, other claimants of the lands covered by the same Section 4(1) Notification took up the matter further and the Reference Court allowed enhancement and fixed the land value at Rs.5,000/- per acre in the place of Rs.3,000/3,500 offered by the Land Acquisition Officer, as per the award dated 01.10.1992 in LAR Nos. 123 and 129 of 1983 on the file of the Second Additional District Judge, Aurangabad. The appellants filed an application on 31.12.1992 under Section 28A of the Act seeking similar enhancement within the period of three months as required under Section 28A. **4.** While the application under Section 28A of the Act was pending, the award under LAR Nos. 123 and 129 of 1983 was challenged in appeals and there were also cross 2 objections. The High Court disposed of these appeals by judgment dated 23.03.2009 granting compensation at the rate of Rs.18,000/- per acre. **5.** During the pendency of the appeal, it is seen that the Land Acquisition Collector passed an award dated 25.10.2000 on the application filed by the appellants under Section 28A of the Act, awarding compensation at the rate of Rs.5,000/- per acre, as awarded in LAR Nos. 123 and 129 of 1983 referred to above. **6.** On 27.05.2009, the appellants filed fresh applications under Section 28A for enhancement of compensation based on the judgment of the High Court dated 23.03.2009. They also approached the High Court praying for the Writ of Mandamus. By the impugned order, the Writ Petition was dismissed holding that Section 28A of the Act permits only one application, and successive applications as and when further enhancement is made, are not permissible. **7.** Thus aggrieved, the present appeal. 3 ## **8.** Section 28A of the Act which was inserted in 1984 reads as follows :- “28A. **Re-determination of the amount of compensation on the basis of the award of the Court** . – (1) Where in an award under this Part, the Court allows to the applicant any amount of compensation in excess of the amount awarded by the Collector under section 11, the persons interested in all the other land covered by the same notification under section 4, sub-section (1) and who are also aggrieved by the award of the Collector may, notwithstanding that they had not made an application to the Collector under section 18, by written application to the Collector within three months from the date of the award of the Court require that the amount of compensation payable to them may be re-determined on the basis of the amount of compensation awarded by the Court: Provided that in computing the period of three months within which an application to the Collector shall be made under this sub-section, the day on which the award was pronounced and the time requisite for obtaining a copy of the award shall be excluded. (2) The Collector shall, on receipt of an application under sub-section (1), conduct an inquiry after giving notice to all the persons interested and giving them a reasonable opportunity of being heard, and make an award determining the amount of compensation payable to the applicants. 4 (3) Any person who has not accepted the award under sub-section (2) may, by written application to the Collector, require that the matter be referred by the Collector for the determination of the Court and the provisions of sections 18 to 28 shall, so far as may be, apply to such reference as they apply to a reference under section 18.” **9.** The nuances of Section 28A have been subject matter of various decisions of this Court. In **Babua Ram and 1 others v. State of U.P. and another** ~~,~~ one of the questions considered by a two-judge Bench of this Court was whether the Collector/LAO on receipt of application under Section 28A (1) is bound to re-determine the compensation when the award is pending in appeal before the High Court or appellate forum. This Court, at paragraph- 39 held as follows- “ **39.** The next question is whether the Collector/LAO on receipt of the application under sub-section (1) of Section 28-A is bound to redetermine the compensation while the award and decree under Section 26 is pending consideration in the appeal in the High Court or appellate forum. If he does so, whether award under Section 28-A(2) is illegal? It is settled law that the decree of the trial court gets merged in the > 1 (1995) 2 SCC 689 5 decree of the appellate court which alone is executable. The finality of the determination of the compensation is attained with the decree of the appellate forum, be it the High Court or this Court. Take for instance that ‘A’, ‘B’ and ‘C’ are interested persons in the land notified under Section 4(1) and the compensation determined in the award under Section 11. ‘A’ received the compensation without protest. ‘B’ and ‘C’ received the compensation under Section 31 under protest and sought and secured reference under Section 18. The court enhanced the compensation from the Collector’s award of Rs 10,000 to Rs 20,000. ‘B’ did not file appeal under Section 54 while ‘C’ filed the appeal. The High Court, suppose, further enhances the compensation to Rs 25,000 or reduces the compensation to Rs 15,000 per acre. ‘A’ is a person aggrieved only to the extent of the excess amount awarded either by the award and decree of the court under Section 26 but he will not get the enhancement of further sum of Rs 5000 granted by the High Court in favour of ‘C’. The decree of the High Court is the executable decree made in favour of ‘C’. Unless redetermination is kept back till the appeal by the High Court is disposed of, incongruity would emerge. Suppose the State filed appeal in this Court under Article 136 against the High Court decree and this Court confirms the award of the Collector and sets aside the decree of civil court under Section 26 and of the High Court under Section 54. There is nothing left for redetermination. With a view to save ‘A’ or ‘B’ or the State from the consequences of 6 such incongruous situations, the Collector/LAO should stay his hands in the matter of redetermination of compensation till the appeal is finally disposed of and he should redetermine the compensation only on the basis of the final judgment and decree of the appellate forum. Adoption of such course, would not merely avoid the chance element in the claimants getting the amounts of redetermined compensation but also avoids needless burden on public exchequer. As soon as the award of the civil court is carried in appeal, it becomes obligatory for the Collector to keep the application/applications for redetermination of compensation filed within limitation pending, awaiting decision by the appellate forum and to redetermine the compensation on the basis of the final judgment and decree….” **Babua Ram** (supra), also dealt with the question as to when the period of limitation of three months begins to run under Section 28A. The Court held that the period of three months prescribed for application under Section 28A has to be computed from the date of the first award. **10.** Soon after the decision in **Babua Ram** (supra), this Court in **U.P. State Industrial Development Corpn. Ltd v. State of U.P. and others2** ~~,~~ reiterated **Babua Ram** (supra) to hold that since an appeal preferred by the > 2 (1995) 2 SCC 766 7 State against the award of the District Judge under Section 26 was pending, the proper course would have been to keep the application under Section 28A (1) pending till the appeal was disposed of. ## **11.** In **Union of India and another v. Pradeep Kumari and** **other** ~~**s**~~ **3** ~~,~~ a three-judge Bench of this Court disagreed with **Babua Ram** (supra) on the point that an application for redetermination of compensation can be made only on the basis of the first award made after coming into force of Section 28A. It was clarified that compensation under Section 28A could be availed of on the basis of any one of the awards that has been made by the court after coming into force of Section 28A provided that the application is made within the prescribed period of three months from the making of the award on the basis of which re-determination is sought. This Court also laid down six conditions for filing an application under Section 28A and the sixth condition is- “only one application can be moved > 3 (1995) 2 SCC 736 8 under Section 28A for redetermination of compensation by an applicant”.[4] ## **12.** Subsequently, in **Jose Antonio Cruz Dos R. Rodriguese** **5 and another v. Land Acquisition Collector** ~~,~~ a three-Judge Bench of this Court explained the scheme of the Act and noted that Section 28A was under Part III of the Act. Further, Section 2(d) of the Act defines ‘court’ to mean principal Civil Court of original jurisdiction unless a special judicial officer is appointed. Therefore, this Court was of the opinion that in Section 28A the ‘award’ means an award under Part III and ‘court’ can only mean the court to which reference is made by the Collector under Section 18. It was held that “the plain language of Section 28-A, therefore, prescribes the three months period of limitation to be reckoned from the date of award by the > 4 The other five conditions are- **1.** The award has been made by the court under Part III after coming into force of Section 28A; **2** . By the said award the amount of compensation in excess of the amount awarded by the Collector under Section 11 has been allowed to the applicant in that reference; **3** . The person moving the Section 28A application is interested in other land covered by the same Section 4 (1) notification to which the award related; **4** . The person moving the application did not make an application under Section 18; **5** .The application is moved within three months from the date of the award on the basis of which redetermination of amount of compensation is sought. > 5 (1996) 6 SCC 746 9 Court disposing of the reference under Section 18, and not the appellate court dealing with the appeal against the award of the Reference Court”. ## **13.** In **Union of India v. Munshi Ram (Dead) By Lrs. and** **other** ~~**s**~~ **6** ~~,~~ while dealing with a situation where the compensation awarded by the Reference Court was modified by the High Court and further modified by the Supreme Court in appeal, this Court held as follows at paragraph-9: - “9. We hold that under Section 28 A of the Act, the compensation payable to the applicants is the same which is fnally payable to those claimants who sought reference under Section 18 of the Act. In case of reduction of compensation by the superior courts, the applicants under Section 28-A may be directed to refund the excess amount received by them in the light of reduced compensation finally awarded.” (Emphasis supplied) ## **14.** In **Kendriya Karamchari Sehkari Grah Nirman Samiti** ## **Limited, Noida v. State of Uttar Pradesh and** **another7** ~~,~~ this Court held that in the facts of the case, the 6 (2006) 4 SCC 538 7 (2009) 1 SCC 754 10 Collector was justified in not deciding the Section 28A application on account of pendency of an appeal before the High Court. In that case, the appellant had also challenged the Government Orders as per which the Collector could not have decided the Section 28A application in case the order of the Reference Court enhancing the compensation is challenged and the appeal is pending before the High Court/Supreme Court. This Court, specifically held that the Government Orders were in consonance with the law laid down in **Babua Ram** (supra). **15.** In the case of the appellants, when their Section 28A application was decided, based on awards in LAR Nos. 123 and 129 of 1983, the very same awards were pending in appeal before the High Court. However, the Collector proceeded to consider their application and decided the same on 25.10.2000. Thereafter, fresh application under Section 28A was filed on 27.05.2009 based on the judgment of the High Court dated 23.03.2009. It was this 11 application that was held to be not maintainable, being a second application. **16.** Though there is no quarrel with the principle that only a single application is maintainable, in the instant case, unfortunately, the High Court omitted to take note of the fact that the appeals on the relied on awards were pending when the Section 28A application was decided. That is the special and distinctive factual position in the instant case. It must also be kept in mind that Section 28A is a beneficial provision. **17.** The Section 28A application dated 31.12.1992 based on the awards in LAR Nos. 123 and 129 of 1983 was decided on 25.10.2000 when the appeals therefrom were pending. The Collector ought to have kept the application pending till the appeals were decided on 23.03.2009. On principle, the High Court is correct and justified in the view taken in the impugned judgment that there cannot be successive applications under Section 28A in view of **Pradeep Kumari** (supra). But that is not the point arising for consideration here. No doubt, the second application 12 dated 27.05.2009 for re-fixation in light of the appellate court judgment is not maintainable. However, since the Collector is also at fault in deciding the application when the matter was pending in appeal, we are of the view that in the peculiar facts of the instant case, the application dated 31.12.1992 should be considered afresh. Accordingly, the appeal is disposed of as follows. The Land Acquisition Collector is directed to consider afresh the Section 28A application dated 31.12.1992 and pass orders in the light of the judgment of the High Court dated 23.03.2009 in First Appeal Nos.569 and 570 of 1997 on the file of the High Court of Bombay, Bench at Aurangabad. For enabling the Collector to pass orders as above, the order dated 25.10.2000 is set aside. However, the amounts already paid are to be duly adjusted. **18.** The orders as above shall be passed by the Land Acquisition Collector within three months from the date of presentation of a copy of this judgment by the appellants and the consequential benefits shall be disbursed to them within another one month. 13 ## **19.** There shall be no order as to costs. **............................J. (KURIAN JOSEPH) ............................J. (R. BANUMATHI)** **NEW DELHI; DECEMBER 12, 2017.** 14
End of Judgment Record
Browse All Landmark Cases Judgments
2019-01-22

State of Himachal Pradesh & Anr. v. Pinju Ram & Others; State of Himachal Pradesh & Ors. v. Ganesh Dutt & Anr.

This batch of appeals concerns regularisation and monetary benefits of part‑time employees in Himachal Pradesh who were converted to daily‑wage status. The State had issued a policy on 27 February 2004: part‑time Class‑IV employees who had completed ten years of continuous service as on 31 December 2003 would be made daily wagers with prospective effect, and posts vacated by such employees would stand abolished; Education and Ayurveda were excluded from the policy. Revenue Chowkidars, engaged by Panchayats, were not covered by that policy and received separate treatment. Following writ petitions and an order of the Himachal Pradesh High Court and in light of later developments, the State drew‑up directions in 2011 (22 September) to give seniority to Revenue Chowkidars on the basis of ten years of service, but with wages from the date of actual appointment and without back‑dated monetary benefits; 7 July 2012 further instructions reiterated this stance for remaining part‑time employees, with monetary benefits not guaranteed in the interregnum. The respondents pressed for back wages dating from 1 January 2007 and broader coverage. The Supreme Court held that the 2007 back‑pay direction was unsustainable, clarified that seniority would count from ten years without past benefits, and that the 2011 policy and Moti Singh principle should guide the approach. The appeals are allowed; no costs. The related writ petitions are to be disposed of consistent with these directions.

2018-08-14

Union Bank of India and Others v. C.G. Ajay Babu and Anr.

This is a Supreme Court of India appeal concerning the forfeiture of gratuity under the Payment of Gratuity Act, 1972. The respondent was a branch manager of the appellant bank and was dismissed on 3 June 2004 after disciplinary proceedings. A show-cause notice sought to forfeit gratuity due to misconduct involving moral turpitude, which was ordered on 20 April 2004. The High Court upheld the dismissal but held that gratuity could be paid since there was no financial loss to the bank, and that a bipartite settlement between the bank and employees permitted forfeiture only where misconduct caused financial loss. The Division Bench, however, held that forfeiture under Section 4(6) must be read together with Section 4(5) and that no loss was proven, thus entitling the employee to gratuity in accordance with the bipartite settlement. The Supreme Court agreed with the High Court that forfeiture is not automatic; it is controlled by Sections 4(5) and 4(6) of the Act and by the bipartite settlement, which requires loss to justify forfeiture. The Court emphasized that an act must constitute an offence involving moral turpitude and that conviction is generally required for forfeiture under 4(6)(b)(ii). The appeal is dismissed with no costs.

2018-09-25

Reema Salkan v. Sumer Singh Salkan

This is a Supreme Court of India criminal appeal under the Criminal Appellate Jurisdiction arising from a maintenance dispute under Section 125 Cr.P.C. The parties, married in 2002, had a protracted litigation history. The Family Court granted maintenance to the wife from 17 July 2003 to 8 December 2010, and held no maintenance thereafter. The High Court, in revision, partly allowed the application, directing Rs.9,000 per month from 9 December 2010 onward, while upholding the earlier period’s Rs.10,000 per month. This Court had earlier granted interim maintenance of Rs.20,000 per month in 2014 (Criminal Appeal Nos. 2347-2349 of 2014). The appellant contends there has been no change in circumstances since the interim order and that the respondent’s substantial assets, education, and overseas earnings establish the capacity to pay higher maintenance. The respondent defends the High Court’s reasoning, arguing that the Family Court’s assessment, demeanor observations, and the principle that maintenance should not be perpetual require careful scrutiny, and that the notional minimum wage approach used by the High Court is flawed. The overarching issue is the quantum of monthly maintenance payable to the appellant and whether the interim amount should be augmented beyond the period up to 2010.”

2019-12-03

M/s Embassy Property Developments Pvt. Ltd. v State of Karnataka & Ors.

This judgment concerns three Civil Appeals filed by a Resolution Applicant, the Corporate Debtor (through its Resolution Professional) and the Committee of Creditors, challenging an Interim Order of the Karnataka High Court staying an NCLT order in proceedings under the Insolvency and Bankruptcy Code, 2016. The NCLT Chennai had admitted an application under Section 7 of the IBC against M/s Tiffins Barytes Asbestos & Paints Ltd. and directed a moratorium under Section 14. The Interim Resolution Professional then sought a deemed extension of a mining lease under MMDR Act, 1957 and the Government of Karnataka rejected it. The NCLT, by an order dated 11.12.2018, set aside the Government’s order and directed execution of Supplement Lease Deeds for the period up to 31.03.2020. The Government of Karnataka challenged this in a High Court writ petition, which stayed the impugned NCLT order. The core issues were: (i) whether the High Court may interfere under Article 226/227 with an NCLT order in IBC when an appeal lies to the NCLAT, and (ii) whether fraud can be inquired into by NCLT/NCLAT in CIRP. The Court reiterates that IBC is a complete, umbrella code with a three‑tier mechanism (NCLT, NCLAT, Supreme Court) and that public‑law disputes arising from MMDR Act obligations lie outside IBC. It ultimately holds that while NCLT/NCLAT may inquire into fraud, they cannot adjudicate MMDR‑related public legal disputes; and the High Court’s writ jurisdiction in public‑law contexts remains permissible. The appeals are dismissed.