Case Synopsis & Summary

This Special Leave Petition (and the accompanying Contempt Petition) arises from an auction of Bharat Steel Tubes Ltd.’s assets under the SARFAESI Act and related stay orders. The Debts Recovery Tribunal directed the petitioner to deposit Rs.35 crores with IFCI Ltd. and stayed possession/public notices; the Debts Recovery Appellate Tribunal stayed the proceedings in the Original Application and Securitization Appeal. Bharat Steel sought to challenge the interim High Court orders in writ proceedings, contending that a winding-up was ordered by the High Court on BIFR recommendations and that the One-Time Settlement (OTS) with Punjab National Bank had liquidated the primary debt. ACE (Assets Care Enterprises Ltd), a third-party financier, funded the settlement and subsequently assigned its rights to IFCI Ltd., creating a new liability for Bharat Steel under the SARFAESI regime. Bharat Steel argued that once the Bank’s dues were liquidated, the debt ceased to exist and that IFCI, as ACE’s assignee, had no standing to pursue under SARFAESI; they also argued that steps under SARFAESI prior to final adjudication of the amount due were improper. The Court reserved judgment, stayed auction proceedings pending DRAT decision, and ultimately disposed of the SLP with directions for expeditious disposal of the pending appeal by the Debts Recovery Appellate Tribunal and continued stay on the auction until then.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • Altamas Kabir
  • Cyriac Joseph
Judgment Date
2010-11-30
Court Decision / Holding
The Special Leave Petition is disposed of with a direction to the Debts Recovery Appellate Tribunal to dispose of the pending appeal as early as possible. Until a decision is reached by the DRAT, the auction proceedings under the SARFAESI Act shall remain stayed. The Court did not express a definitive view on the pending questions, directing DRAT to adjudicate them in the pending appeals.
Final Disposition
SLP disposed of; DRAT to decide pending appeals; auction stayed until DRAT decision.

Parties to the Case

Appellants / Petitioners

  • Bharat Steel Tubes Limited

Respondents

  • IFCI Limited

Legal Representation & Advocates

Counsels for Petitioners

  • • Arun Kathpalia
  • • Bharat Kumar
  • • Virender Singh
  • • Thakur
  • • Abhijit Sengupta

Counsels for Respondents

  • • Subramonium Prasad

Provisions of Law Cited

Securitization and Reconstruction of Financial Assets and Enforcement of Security Interest Act, 2002 – Section 3Securitization and Reconstruction of Financial Assets and Enforcement of Security Interest Act, 2002 – Section 5Securitization and Reconstruction of Financial Assets and Enforcement of Security Interest Act, 2002 – Section 13(2)Securitization and Reconstruction of Financial Assets and Enforcement of Security Interest Act, 2002 – Section 13(4)Recovery of Debts Due to Banks and Financial Institutions Act, 1993 – Section 17Contempt of Courts Act, 1971 – Section 3(b)

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioner contends that the stay order passed by this Court on 8 October 2010, and the subsequent stay orders, were not complied with in the auction process. It asserts that the One-Time Settlement (OTS) with Punjab National Bank liquidated the primary debt; ACE’s funding created a new liability in favour of ACE, subsequently assigned to IFCI. Bharat Steel argues that once the Bank’s dues were settled, the demand under Section 13(2) SARFAESI could not survive against Bharat Steel, and that IFCI’s action under SARFAESI is unjustified until the actual amount payable is determined. It further contends that the winding-up order by the High Court, with Official Liquidator involvement, should guide the process, and the pending DRAT proceedings determine the allocation of proceeds. The argument seeks quashing of the contempt petition and staying any further auction actions beyond DRAT adjudication.

Contentions of Respondents

IFCI Ltd. argues that the petitioner defaulted on its debts, that ACE, as a reconstruction entity under Section 3 SARFAESI, could securitize the asset and assign rights to IFCI, and that Section 13(2) notices and sale steps are valid even while quantum is being determined. It asserts that the High Court’s interim order allowed proceedings with safeguards and that the assignee has a right to proceed under SARFAESI, especially since the actual dues had not yet been determined. It contends that the DRAT proceedings are pending and that the initiation of auction steps was proper under the interim orders and the statutory framework governing securitization and debt recovery.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (1)

Case NameCitationTreatmentExplanation
Bank Limited v. Official Liquidator etc.2010 (10) SCALE 378PositiveCited and relied upon to support that inter se transfers of NPAs by banks are permissible under the Banking Regulation Act, 1949; the Court had set aside the High Court’s unfavorable view on the locus standi of the assignee of a debt.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•6,381 words•~30 min read

In The Court Record

BHARAT STEEL TUBES LIMITED v. IFCI LIMITED

## [201 O] 15 (ADDL.) S.C.R. 993 ## BHARAT STEEL TUBES LIMITED ## IFCI LIMITED (Special Leave Petition (C) No. 29421 of 2010) ## NOVEMBER 30, 2010 **[ALTAMAS KABIR AND CYRIAC JOSEPH, JJ.]** _Securitization and Reconstruction of Financial Assets and Enforcement of Security Interest Act,_ 2002 - _ss. 3 and 13(2)_ - _Moneys were borrowed by Petitioner-Company from Bank_ C _which it was unable to repay in full_ - _One-Time Settlement_ - _arrived at between Petitioner-Company and Bank PetitionerCompany made part payment and defaulted in payment of the rest_ - _It entered into an agreement with ACE,_ a _third-party financier to pay off the entire dues of the Bank, which it did_ - D - _ACE assigned its rights to IFCI Ltd Question regarding_ - _auction of the assets of Petitioner Company Proceedings_ - _before the Debts Recovery Tribunal Stayed by Debts_ - _Recovery Appellate Tribunal Writ Petition filed by IFCI Ltd. seeking to set aside the order passed by the Debts Recovery_ E - _Appellate Tribunal Interim order passed by the High Court_ - - _SLP against Held: The entire dues of the Bank stood satisfied, but_ a _new liability was created by the PetitionerCompany in favour of ACE which assigned its rights to IFCI_ . _Ltd_ - _Issues involved regarding steps taken under the_ **F** _SARFAESI Act yet to be determined by Debts Recovery_ - _Appellate Tribunal However, since meanwhile the impugned order of High Court had ceased to exist, SLP disposed of with_ a _direction upon the Debts Recovery Appellate Tribunal to dispose of the pending appeal expeditiously_ - _Till_ a _decision_ G _is arrived at by the Debts Recovery Appellate Tribunal, auction proceedings being conducted under the SARFAESI_ - _Act to remain stayed Recovery of Debts Due to Banks and Financial Institutions Act, 1993_ - ·s. _17._ 993 H 994 SUPREME COURT REPORTS [2010] 15 (ADDL.) S.C.R. A A _Contempt of Courts Act, 1971_ - _s.3(b)_ - _Stay order_ - - _passed by Supreme Court Alleged violation of Contempt_ - _petition filed Held: It is for the Petitioner in a contempt petition who alleges contempt, to establish that the alleged contemnor had defied and/or violated the order deliberately_ B _and wilfully, despite having knowledge thereof- In a contempt proceeding, which is entirely of a summary nature, a person can be sentenced to imprisonment and also punished with fine, withoJt a regular trial, even in the nature of a summons_ - _trial Accordingly, the Courts have to strictly construe the_ c _provisions of s.3(b) of the Contempt of Courts Act, 1971, in order to find a person guilty of having committed contempt_ - _of Court On facts, Supreme Court was not satisfied with the materials placed that the alleged contemnors had any_ - _knowledge of the stay order passed by Supreme Court Contempt petition accordingly dismissed._ 0 **In relation to an order passed by the Debts Recovery Tribunal, on an application· filed by the Petitioner under Section 17 of the Recovery of Debts Due to Banks and Financial Institutions Act, 1993, a direction was given by E the Tribunal to the Petitioner to deposit a sum of Rs.35 crores with the Industrial Finance Corporation. of India Ltd. (IFCI Ltd.) without prejudice to its rights and contentions. The Respondent was also directed not to implement the possession notice as well as the public F notice till the next date of hearing.** **Against the said order, IFCI Ltd. fired Misc. Appeal before the Debts Recovery Appellate Tribunal, which stayed the proceedings before the Debts Recovery** G **Tribunal. Aggrieved by such direction, the respondent filed writ petition, in which an interim order was passed by the High Court directing that during the pendency of the writ petition, the writ petitioner would be free to proceed in pursuance of the public notice, but the bid** **H** BHARAT STEEL TUBES LIMITED _v._ IFCI LIMITED 995 was not to be finalized. Since a winding-up qrde~ had A been passed in respect of the petitioner company on the recommendation of the Board for Industrial and Financial Reconstruction (BIFR) and the Official Liquidator had been appointed, it was also directed that the Official Liquidator would be associated with the proces~ .of s auction and the amount received by the Petitioner from prospective purchasers, as earnest money under .the bids, would be kept in a No Lien· Account. · Aggrieved by the said interim order of the Division Bench of the High Court, the Petitioner Company moved the instant Special Leave Petition. While issuing notice . and giving directions for filing of affidavits, this Court ·stayed the operation of the interim order of the High Court. Resultantly, the order of the Debts Recovery Appellate Tribunal revived. However, according to the Petitioner, despite such order of stay passed by this Court, the auction process was continued in violation of - the order of stay passed by this Court. C D The Petitioner submitted that since steps were taken by the Respondent Company despite the order of stay passed by this Court, contempt of Court was committed and the alleged contemnors were liable to :Je dealt with accordingly before the Special Leave Petition was taken up _:for_ consideration. E F · · Disposing of the Srecial Leave Petition and the Contempt Petition, the Court HELD:1. On being asked as to whether _the stay order passed by this Court had been communicated to the G alleged contemnors or not, the Petitioner submitted that since the order had been passed in the presence of the counsel for the Respondent Company, it had to. be presumed that the same had been conveyed to the Respondent Company by their counsel. The Petitioner H 996 SUPREME COURT REPORTS [2010] 15 (ADDL.) S.C.R. A submitted that a presumption would have to be drawn regarding knowledge of the stay order passed by this Court by the alleged contemnors since it was duly represented on the said date through counsel. One is unable to accept the submissions made on behalf of the B Petitioner Company, since it is for the Petitioner in a contempt petition who alleges contempt, to establish that the alleged contemnor had defied and/or violated the order deliberately and wilfully, despite having knowledge thereof. One cannot lose sight of the fact that in a c contempt proceeding, which is entirely of a summary nature, a person can be sentenced to imprisonment and also punished with fine, without a regular trial, even in the nature of a summons trial. Accordingly, the Courts have to strictly construe the provisions of Section 3(b) of the 0[Contempt of Courts Act, ][1971, ][in order to find a person ] guilty of having committed contempt of Court. This Court is not satisfied with the materials placed that the alleged contemnors had any knowledge of the stay order passed by this Court, and, accordingly, this Court is not inclined to entertain the contempt petition which is, therefore, E dismissed. The Special Leave Petition is therefore taken up for consideration on its merits. [Paras 7, 8] (1001-F-H; 1002-A-D] 2. In the instant case, moneys were admittedly F borrowed by the Petitioner-Company from the Punjab National Bank which it was unable to repay in full. Ultimately, a One-Time Settlement was arrived at between the Petitioner-Company and the Punjab National Bank for a sum of Rs.26.16 crores. Out of the said amount, the G Petitioner-Company paid a sum of Rs.13.80 crores and defaulted in payment of the rest. It entered into an agreement with Assets Care Enterprises Ltd.(ACE), a third-party financier to pay off the entire dues of Punjab National Bank, which it did. The entire dues of the Bank, H BHARAT STEEL TUBES LIMITED _v._ IFCI LIMITED 997 therefore, stood satisfied, but a new liability was created A by the Petitioner-Company in favour of ACE which assigned its rights to IFCI Ltd. By virtue of Section 3 of the Securitization and Reconstruction of Financial Assets and Enforcement of Security Interest Act, 2002, a reconstruction company, such as ACE, would be entitled B to carry on the business of securitisation. This Court is not, therefore, impressed with the Petitioner's submission that once the dues of the Bank were liquidated and a. · separate arrangement was entered into by the Petitioner-" Company with ACE, the demand under section 13(2) of ,C the said Act ceased to exist and IFCI Ltd, which acquired the interest of ACE in the Memorandum of Understanding with the Petitioner-Company, could not take action against the Petitioner-Company under the SARFAESI Act. IFCI Ltd. is a financial institution which is an assignee of 0 the interest of ACE in dues recoverable from the Petitioner-Company. [Paras 25, 26] [1009-G-H; 1010-A-D] 3. However, this Special Leave Petition has been filed _ against the interim order passed by the High Court in the Writ Petition filed by IFCI Ltd. seeking to set aside the E order passed by the Debts Recovery Appellate Tribunal · limited to the question as to whether the auction sale should be proceeded with further. In effect, the question regarding the auction of the assets of the Petitioner Company is still the subject matter of the proceedings F pending before the Debts Recovery Appellate Tribunal. All the questions raised in this Special Leave Petition are at large in the pending proceedings before the Appella 1 te - Tribunal which had stayed the proceedings before the Debts Recovery Tribunal, directing stay of the auction G sale proceedings. [Para 27] [1010-E-G] · _i_ - 4. Having heard the matter, this Court had reserved judgment in the matter. However, it has subsequently been brought to the notice of this Court that certain H _.>_ 998 SUPREME COURT REPORTS (2010] 15 (ADDL.) S.C.R. A developments had taken place in the pending Writ Petition before the High Court. The High Court took note of the fact that the matter was still pending before the Debts Recovery Appellate Tribunal and that judgment in the Special Leave Petition before this Court was yet to s be passed. It, therefore, held that nothing survived in the Writ Petition as the parties had to abide by the directions passed by this Cou:t and, accordingly, the Writ Petition and the applications were disposed of. The matter before the High Court may have come to an end, but the issues c involved regarding steps taken under the SARFAESI Act are yet to be determined by the Debts Recovery Appellate Tribunal. However, since the order impugned in these proceedings has ceased to exist, this Court is not inclined to decide the questions that have been raised 0[and instead this Court can only direct the Debts Recovery ] Appellate Tribunal to consider all the questions raised in the two appeals pending before it. [Paras 28, 29] [1010H; 1011-A-D] 5. The Special Leave Petition is therefore disposed E of with a direction upon the Debts Recovery Appellate Tribunal to dispose of the pending appeal as early as possible since it would not be proper on the part of this Court to express any definite view with regard to the pending proceedings before the said Tribunal. Till a _r=_ decision is arrived at by the Debts Recovery Appellate Tribunal in the matter, the auction proceedings being conducted under the SARFAESI Act shall remain stayed. [Para 30] [1011-E] G CIVIL APPELLATE JURISDICTION : SLP (Civil) No. 29421 of 2010. From the Judgment & Order dated 29.9.2010 of the High Court of Delhi at New Delhi in Writ Petition (C) No. 6652 of 2010. H BHARAT STEEL TUBES LIMITED _v._ IFCI LIMITED 999 ## WITH A Contempt Petition (C) No. 271 of 2010. Arun Kathpalia, Bharat Kumar, Virender Singh, Thakur, Abhijit Sengupta for the Petitioner. B Subramonium Prasad for the Respondent. The Judgment of the Court was delivered by **ALTAMAS KABIR, J.** 1. Before the Special Leave Petition which had been specially fixed for hearing on 9th C November, 2010, could be taken up for consideration, Mr. T.R. Andhyarujina, learned Senior Advocate, appearing for the Petitioner, M/s Bharat Steel Tubes ltd., submitted that Contempt Petition (Civil) No.271 of 2010 had been filed in regard to wilful and deliberate violation of the order passed by D this Court on 8th October, 2010, by the alleged contemnors in entertaining bids for the auction proposed to be held in respect _ of the Petitioner's property despite the said order. 2. Mr. Andhyarujina submitted that in relation to an order passed by the Debts Recovery Tribunal, Delhi, on an application filed by the Petitioner under Section 17 of the Recovery of Debts Due to Banks and Financial Institutions Act, 1993, hereinafter referred to as "the Debts Recovery Act, 1993", a direction was given by the Tribunal on 15th September, 2010, to the Petitioner to deposit a sum of Rs.35 crores with the • Industrial Finance Corporation of India ltd. (IFCI ltd.) without prejudice to its rights and contentions. The Respondent was also directed not to implement the possession notice as well as the public notice published on 13th September, 2010, till the next date of hearing. Against the said order, IFCI ltd. filed Misc. Appeal No.352 of 2010 before the Debts Recovery Appellate Tribunal, which stayed the proceedings before the Debts Recovery Tribunal by its order dated 22nd September, 2010. Aggrieved by such direction, the Respondent had moved Writ E F G H ## 1000 SUPREME COURT REPORTS [2010] 15 (ADDL.) S.C.R. A Petition (Civil) No.6652 of 2010, in which an interim order was passed by the Division Bench of the Delhi High Court on 29th September, 2010, directing that during the pendency of the writ. petition, the writ petitioner would be free to proceed in pursuance of the Public Notice dated 13th September, 2010, B but the bid was not to be finalized. Since a winding-up order had been passed in respect of the petitioner company on the recommendation of the Board for Industrial and Financial Reconstruction (BIFR) and the Official Liquidator had been appointed, it was also directed that the Official Liquidator would C be associated with the process of auction and the amount received by the Petitioner from prospective purchasers, as earnest money under the bids, would be kept in a No Lien Account. 3. Mr. Andhyarujina pointed out that such an _ex-parte_ order D was passed on the supposition that there were dues to the extent of Rs.1, 100.00 crores payable by the Respondent and that proceedings had also been taken under Section 17 of the Securitization and Reconstruction of Financial Assets and Enforcement of SecuritY. Interest Act, 2002 (SARFAESI Act, E 2002) even though the BIFR had recommended the winding up of the Petitioner Company and finalization of those proceedings was still pending before the Company Court where the Official Liquidator had been put in charge of the functioning of the Petitioner Company. The Petitioner Company, being F aggriEwed by the said interim order of the Division Bench of , the High Court, moved the instant Special Leave Petition and on 8th October, 2010, while issuing notice and giving directions for filing of affidavits, this Court stayed the operation of the order of the High Court which has been impugned in the Special G Leave Petition. The result was that the order of the Debts Recovery Appellate Tribunal revived and according to the Petitioner, despite such order of stay passed by this Court, the alleged contemnors continued with the auction process in violation of the order of stay passed by this Court. H I BHARAT STEEL TUBES LIMITED _v._ IFCI LIMITED 1001 [ALTAMAS KABIR, J.] 4. Mr. Andhyarujina submitted that while the order of stay was passed on 8th October, 2010, and the date of auction was fixed on 15th October, 2010, the Respondent Company continued to sell bid documents at least till 13th October, 2010, and the Bid Box was kept available in the office premises of the Respondent Company till 15th October, 2010, when the auction was to be conducted. A B 5. Mr. Andhyarujina submitted that since the said steps were taken by the Respondent Company despite the order of stay passed by this Court on 8th October, 2010, the alleged contemnors had committed contempt of Court and were liable to be dealt with accordingly before the Special Leave Petition was taken up for consideration. c 6. Both Mr. Parag P. Tripathi, learned Additional Solicitor General and Mr. Ranjit Kumar, learned Senior Advocate, who appeared for the alleged contemnors denied the allegations made on behalf of the Petitioner Company and submitted that except for sweeping allegations having been made, there was no material proof before the Court to hold that the alleged contemnors had wilfully and deliberately violated the order ofstay passed by this Court on 8th October, 2010. / _I_ D E / 7. On being asked as to whether the order passed on 8th October, 2010 had been communicated to the alleged . contemnors or not, Mr. Andhyarujina submitted that since the order had been passed in the presence of learned counsel for the Respondent Company, it had to be presumed that the same had been conveyed to the Respondent Company by their learned counsel. Learned counsel submitted that a presumption would have to be drawn regarding knowledge of the order passed by this Court on 8th October, 2010, by the alleged contemnors since it was duly represented on the said date through counsel. F G 8. We are unable to accept the submissions made on behalf of the Petitioner Company, since it is for the Petitioner H ## 1002 SUPREME COURT REPORTS [2010] 15 (ADDL.) S.C.R A in a contempt petition who alleges contempt, to establish that the alleged contemnor had defied and/or violated the order deliberately and wilfully, despite having knowledge thereof. We cannot lose sight of the fact that in a contempt proceeding, which is entirely of a summary nature, a person can be B sentenced to imprisonment and also punished with fine, without a regular trial, even in the nature of a summons trial. Accordingly, the Courts have to strictly construe the provisions of Section 3(b) of the Contempt of Courts Act, 1971, in order to find a person guilty of having committed contempt of Court. We are c not satisfied with the materials placed before us that the alleged contemnors had any knowledge of the stay order passed by this Court on 8th October, 2010, and, accordingly, we are not inclined to entertain the contempt petition which is, therefore dismissed. The Special Leave Petition filed by _Mis_ Bharat D Steel Tubes Ltd. is taken up for consideration on its merits. 9. Mr. Andhyarujina submitted that the Petitioner, M/s Bharat Steel Tubes Ltd., had obtained a loan of Rs.55 crores from the Punjab National Bank in 1973. On 11th November, · 2008, a lock-out was declared in the factory of the petitioner E and ultimately on 1st May, 1990, the Petitioner made a reference to the BIFR. On 23rd February, 2010, the BIFR recommended winding up of the Company and forwarded its recommendation to the High Court. Three years thereafter, the Punjab National Bank filed O.A. No.12 of 2003 before the F , Debts Recovery Tribunal, Delhi, for recovery of a loan of Rs.3,27,62,27,044.00. On 14th August, 2003, the High Court passed an order winding up the Company and appointing the Official Liquidator to implement the order of winding up. At this stage, on 2nd September, 2004, the Punjab National Bank G entered into a One-Time Settlement with the Petitioner Company for a sum of Rs.26.16 crores out of which the Petitioner was able to pay a sum of Rs.13.80 crores and was unable to pay the rest. However, on 9th February, 2005, the High Court stayed the winding up order passed on 14th August, H BHARAT STEEL TUBES LIMITED _v._ IFCI LIMITED 1003 [ALTAMAS KABIR, J.] 2003, and directed the Official Liquidator to continue as the Liquidator and to also observe the functioning of the unit. 10. On account of the default committed by the Petitioner Company in respect of the One-Time Settlement entered into on 2nd September, 2004, the Punjab National Bank revoked the said settlement on 14th June, 2007. B 1.1. Thereafter, certain further developments took place, which ultimately brought the present Respondent Company into the picture. On 5th May, 2008, the Petitioner Company entered into an agreement with Assets Care Enterprises Ltd., C hereinafter referred to as "ACE", a third-party financier, whereby on payment of the balance amount of the One-Time Settlement by ACE to the Punjab National Bank, the dues of the Bank stood completely settled and there was- no existing liability of the Petitioner Company as far as the Bank was concerned. A D default clause was, however, included in the Memorandum of Understanding that in case of default of the Petitioner to repay ACE, the latter would be at liberty to proceed against the Petitioner in terms of the financing documents assigned to it by the Petitioner. In fact, a Deed of Assignment was executed E between the Punjab National Bank and ACE on 15th July, 2008, for a sum of Rs.15,01,28,752.00. This was followed by a further Deed of Assignment between ACE and the Respondent • Company for a sum of Rs.18.63 crores. C F 12. Thereafter, on 10th August, 2009, IFCI Ltd. issued a notice of demand to the Petitioner Company under Section 13(2) of the SARFAESI Act, 2002, for a sum of Rs.1139.75 crores. The said claim was refuted by the Petitioner Company on 17th September, 2009, denying the right of IFCI Ltd. to the sum as demanded. It was stated that the Memorandum of Understanding between the Petitioner Company and ACE would indicate that ACE was only entitled to a sum of Rs.15,01,28,752.00 and nothing more. Subsequent thereto, on 10th October, 2009, IFCI Ltd. took symbolic possession of the property of the Petitioner Company situated at Gannore in the G H 1004 SUPREME COURT REPORTS [2010] 15 (ADDL.) S.C.R. A State of Haryana. The Petitioner Company also filed a suit, being CS (OS) No.1886 of 2009, to injunct IFCI Ltd. from proceeding in accordance with the notice dated 10th August, 2009, which was, however, dismissed by the High Court on the ground of lack of jurisdiction on 10th September, 2010. B 13. On the same date, an application was filed by the Petitioner before the Debts Recovery Tribunal-Ill, Delhi, under Section 17 of the Debts Recovery Act, 1993, which passed an ex-parte stay order in favour of the Petitioner in the said appeal. Thereafter, on 13th September, 2010, IFCI Ltd. issued C possession notice with regard to the residential property, being Plot No.17, Friends Colony Cooperative Housing Building Society Ltd., New Delhi, and on the same date a public notice was also" issued inviting bids for the factory at Gannore in Haryana. In terms of the public notice issued, it was intimated D for the information of the public that the sealed bids would be . opened on 15th October, 2010. On 15th September, 2010, the Debts Recovery Tribunal-Ill, Delhi, passed an order of stay in favour of the Petitioner Company restraining IFCI Ltd. from taking steps in accordance with the possession notice as well 1E as the public notice for sale. The Petitioner Company was also directed to deposit a sum of Rs.35 crores within 30 days of the order. 14. The IFCI Ltd. filed two appeals against the said order F dated 15th September, 2010, being Misc. Appeal Nos.352 and 353 of 2010, and on 22nd September, 2010, the Debts Recovery Appellate Tribunal issued notice and stayed the proceedings before the Debts Recovery Tribunal-Ill, Delhi, in the Original Application as also in the Securitization Appeal. G Directions were given for filing affidavits and the case was adjourned by the Appellate Tribunal to 27th October, 2010. Since the time granted by the Appellate Tribunal was beyond the date for op011ing of the bids, IFCI Ltd. filed Writ Petition No.6652 of 2010 before the Delhi High Court against the orders dated 10th September, 2010 and 15th September, H •'· BHARAT STEEL TUBES LIMITED _v._ IFCI LIMITED 1005 [ALTAMAS KABIR, J.] 2010 passed by the Debts Recovery Tribunal-Ill, Delhi, and order dated 27th September, 2010, passed by the Debts Recovery Appellate Tribunal. On 29th September, 2010, the High Court allowed the IFCI Ltd. to proceed with the public notice dated 13th September, 2010, with the directions mentioned hereinbefore in paragraph 2. A B 15. Mr. Andhyarujina submitted that till such time as the actual· dues payable by the Petitioner Company was determined by the Debts Recovery Tribunal-Ill, Delhi, no proceedings could be continued under the SARFAESI Act, 2002, in respect of a nebulous figure. Mr. Andhyarujina submitted that in view of the One-Time Settlement, which had been arrived at between the Petitioner Company and the Punjab National Bank, the demand raised on behalf of IFCI Ltd. was entirely absurd since at best the said Company could claim what had been assigned to it by ACE. How a sum of Rs.15,01,28, 752.00 could become Rs.1139.75 crores, remains unexplained and till such. determination of the actual amount payable, proceedings under Section 13(2) of the SARFAESI Act, 2002, should not be allowed to be taken, since it would not be possible for IFCI Ltd. to determine as .to what part of the Petitioner's property was liable to be taken possession ·of. c D E 16. Mr. Andhyarujina submitted that it had also to be considered as to whether when the dues of the Punjab National Bank had been duly liquidated by ACE, its assignee could maintain the demand against the Petitio.ner Company. F 17. Mr. Andhyarujina submitted that the steps taken by IFCI Ltd. pursuant to its demand notice dated 10th August, 2009 under Section 13(2) of the SARFAESI Act, 200.2, were wholly illegal and were liable to be quashed. G 18. Learned Additional Solicitor General, Mr. Parag P. Tripathi, appearing for the respondent IFCI Limited, submitted that there was no substance in the Special Leave Petition since the Petitioner-Company had not only failed to repay its debts, H ## 1006 quPREME COURT REPORTS (2010] 15 (ADOL.) S.C.R. A but had also failed to abide by the One-Time Settlement which had been arrived at with the Punjab National Bank. Having entered into a One-Time Settlement with the Punjab National Bank for a sum of Rs.26.16 crores on 2nd September, 2004, the Petitioner-Company paid a sum of Rs.13.80 crores only B and was unable to pay the balance of the Settlement amount. Ultimately, the One-Time Settlement was revoked by the Bank on account of such default. Thereafter, the Petitioner-Company entered into a Memorandum of Understanding with ACE on 5th March, 2008, whereby ACE agreed to pay the Punjab National c Bank the balance amount of the settlement amount. The said agreement made it clear that in the event the PetitionerCompany failed to repay ACE, the latter would be at liberty to proceed against the Petitioner-Company. Thereafter, on 15th July, 2008, a Deed of Assignment was executed between the D Punjab National Bank and ACE for an amount of Rs.15,01,28, 752.00. ACE, in its turn, assigned its rights under the above-mentioned Memorandum of Understanding to the Respondent-Company on 17th April, 2009, amounting to Rs.18.63 crores, whereunder notice was ultimately issued by E IFCI Limited to the Petitioner-Company under Section 13(2) of the SARFAESI Act, 2002. 19. The learned Solicitor General, who also appeared for IFCI Ltd .. urged that ACE as a "reconstruction company" within the meaning of Section 3 of the SARFAESI Act, 2002, was F entitled under Section 5 thereof to acquire interest in the financial assets of the Petitioner-Company and was entitled to maintain a proceeding before the Debts Recovery Tribunal under Section 17 of the Debts Recovery Act, 1993. The learned Solicitor General contended that the Petitioner-Company had G not made any effort to clear any amount even from the unpaid balance of the One-Time Settlement and it was virtually under the control of the Official Liquidator inspite of the interim order passed by the Division Bench of the High Court under challenge. The learned Solicitor General submitted that not only H had a recommendation been made for winding up of the ## BHARAT STEEL TUBES LIMITED _v._ IFCI LIMITED 1007 [ALTAMAS KABIR, J.] Petitioner-Company by the BIFR, but an order of winding up was actually passed by the High Court, whereby the Official Liquidator was appointed to take over the Company and its assets. It was submitted that the High Court had merely allowed IFCI Limited to proceed in terms of the Public Notice issued, but had prevented it from taking any final decision in the matter and the same did not warrant any interference by this Court on account of the financial condition of the Petitioner-Company. A B 20. As to the submissions made by Mr. Andhyarujina on behalf of the Petitioner-Company, regarding quantification of _ C • the dues in the pending proceedings before the Debts Recovery Tribunal-Ill, Delhi, the learned Solicitor General submitted that the same could not be a reason to stay the auction in terms of Section 13(4) of SARFAESI Act, 2002, since the sale proceeds could be kept in a separate account for distribution, once the amount was determined. D 21. Mr. Ranjit Kumar, learned Senior Advocate, who appeared for the alleged contemnors, while reiterating the submissions made by the learned Solicitor General and the Additional Solicitor General, submitted that Public Notice was issued by IFCI Limited on 13th September, 2010, inviting bids for sale of the factory of the Petitioner-Company at Gannore in Haryana in which it was indicated that the sale bids would be opened on 15th October, 2010. The Respondent-Company was served with notice of the securitisation appeal filed by the Petitioner-Company under Section 12 of the SARFAESI Act, 2002, before the Debts Recovery Tribunal-Ill, Delhi, on 13th September, 2010, in the evening, and, thereafter, stay was granted by the said Tribunal on 15th September, 2010, restraining IFCI Limited from implementing the possession notice, as well as the Public Notice for sale, .~ith a further direction to the Petitioner-Company to deposit a sum of Rs.35 crores within 30 days of the order. Mr. Ranjit Kumar submitted that the Petitioner-Company has not deposited the said sum, as directed, till today. On the other hand, IFCI Limited preferred E F G H 1008 SUPREME COURT REPORTS [201.0] 15 (ADDL.) S.C.R. - A the above-mentioned appeals before the Debts Recovery Appellate Tribunal against the said order of 15th September, 2010, and the Appellate Tribunal stayed the proceedings before the Debts Recovery Tribunal in the Original Application, as also the Securitisation Appeal by its order dated 22nd September, - B 2010. It is against the order subsequently granting time to the Petitioner-Company to file a reply and adjourning the case to 27th September, 2010, which would be beyond the date of opening the bids, that IFCI Limited moved Writ Petition No.6652 of 2010 before the Delhi High Court, which passed - c the impugned order on 29th September, 2010, allowing IFCI Limited to proceed with the Public Notice dated 13th September, 2010, but with the direction that the bids were not to be finalised and that the Official Liquidator was to be associated with the bidding process. Furthermore, any amount - D received from the prospective purchaser as earnest money, was to be kept in a no-lien account. 22. With regard to the allegation made on behalf of the Petitioner-Company that the Bid Box had been kept available in the company premises for filing bids till 15th October, 2010, E Mr. Ranjit Kumar submitted that there was nothing on record to show that th,. Bid Box had been used after 13th September, 2010, or that the contents thereof had been used for the purposes of the auction which was scheduled to be held on 15th October, 2010. Mr. Ranjit Kumar urged that it would be clear F from the above that the alleged contemnors had neither violated the order of stay made by this Court on 8th October, 2010, nor did it have any intention to do so. 23. On the question of maintainability of the proceedings G before the Debts Recovery Tribunal by the Respondent No.1Company, Mr. Ranjit Kumar urged that there was no prohibition either under the Banking Regulation Act, 1949 or under the SARFAESI Act, 2002, debarring an assignee financial institution or a reconstruction company from continuing a H proceeding initiated before the Debts Recovery Tribunal by a ## BHARAT STEEL TUBES LIMITED _v._ IFCI LIMITED 1009 [ALTAMAS KABIR, J.] banking/financial institution and, in any event, the said question A could be raised and answered before the Appellate Tribunal itself. In this regard, learned Senior counsel referred to and relied upon the decision of this Court in /C/C/ _Bank Limited vs. Officia/Liquidator etc. etc._ [2010 (10) SCALE 378], in which this Court was called upon to decide whether _inter_ se transfers B of Non-Performing Assets (NPA) by banks is illegal under the Banking Regulation Act, 1949, as was held by the Gujarat High Court. After considering the submissions made and the materials on record, this Court set aside the judgment of the Division Bench of the High Court, which had upheld the order c of the learned Company Court on the ground that the. assignment of debts py the banks _inter_ se is an activity which is impermissible under the Ban.king Regulation Act, 1949. The matter was remitted to the Division Bench on other issues after setting aside the view taken by the Division Bench of the 0 Gujarat High Court regarding the _locus standi'Of_ the assignee of a debt as being an activity permissible under the aforesaid . Act. It was urged that the Special Leave Petition and the Contempt Petition were both liable to be dismissed. 24. Although, the Special Leave Petition is directed against an interim order passed by the High Court on 29th September, 2010, granting liberty to the Petitioner to proceed in pursuance of the Public Notice dated 13th September, 2010, during the pendency of the writ petition, extensive submissions were advanced on behalf of the parties. E F 25. In this case, we have a situation in which moneys,were admittedly borrowed by the Petitioner-Company from the Punjab National Bank which it was unable to repay in full. Ultimately, a One-Time Settlement was arrived at between the Petitioner-Company and the Punjab National Bank for a sum of Rs.26.16 crores. Out of the said amount, the PetitionerCompany paid a sum of Rs.13.80 crores and defaulted in payment of the rest. It entered into an agreement with ACE to pay off the entire dues of Punjab National Bank, which it did. G H 1010 SUPREME COURT REPORTS (2010] 15 (AODL.) S.C.R. A The entire dues of the Bank, therefore, stood satisfied, but a new liability was created by the Petitioner-Company in favour of ACE which assigned its rights to IFCI Ltd. As explained hereinbefore, by virtue of Section 3 of the SARFAESI Act, 2002, a reconstruction company, such as ACE, would be entitled to B carry on the business of securitisation. 26. We are not, therefore, impressed with Mr. ·Andhyarujina's submission that once the dues of the Bank were liquidated and a separate arrangement was entered into by the C Petitioner-Company with ACE, the demand under section 13(2) of the said Act ceased to exist and IFCI Ltd, which acquired the interest of ACE in the Memorandum of Understanding with the Petitioner-Company, could not take action against the Petitioner-Company under the SARFAESI Act. There is no dispute that IFCI Ltd. is a financial institution which is an D assignee of the interest of ACE in dues recoverable from the Petitioner-Company. 27. However, as indicated hereinabove, this Special Leave Petition has been filed against the interim order passed by the E High Court on 29th September, 2010, in the Writ Petition filed by IFCI Ltd. seeking to set aside the order dated 27th September, 2010, passed by the Debts Recovery Appellate Tribunal limited to the question as to whether the auction sale should be proceeded with further. In effect, the question F regarding the auction of the assets of the Petitioner Company is still the subject matter of the proceedings pending before the Debts Recovery Appellate Tribunal. All the questions raised in this Special Leave Petition are at large in the pending proceedings before the Appellate Tribunal which had stayed the G proceedings before the Debts Recovery Tribunal-Ill, Delhi, directing stay of the auction sale proceedings. 28. Having heard the matter on 9th November, 2010, we had reserved judgment in the matter. However, it has subsequently been brought to our notice that certain H developments had taken place in the pending Writ Petition ## BHARAT STEEL TUBES LIMITED _v._ IFCI LIMITED 1011 [ALTAMAS KABIR, J.] before the High Court on 11th November, 2010. The High Court A took note of the fact that the matter was still pending before the Debts Recovery Appellate Tribunal and that judgment in the Special Leave Petition before this Court was yet to be passed. It, therefore, held that nothing survived in the Writ Petition as the parties had to abide by the directions passed by this Court B and, accordingly, the Writ Petition and the applications were disposed of. B 29. The matter before the High Court may have come to an end, but the issues involved regarding steps taken under the C SARFAESI Act are yet to be determined by the Debts Recovery Appellate Tribunal. However, since the order impugned in these proceedings has ceased to exist, we are not inclined to decide the questions that have been raised and instead we can only direct the Debts Recovery Appellate Tribunal to consider all the questions raised in the two appeals pending before it, being D Miscellaneous Appeal Nos.352 and 353 of 2010. D > 30. We, therefore, dispose of the Special Leave Petition 1 with a direction upon the Debts Recovery Appellate Tribunal to > 1 dispose of the pending appeal as early as possible since it would not be proper on our part to express any definite view with regard to the pending proceedings before the said Tribunal. Till a decision is arrived at by the Debts Recovery Appellate Tribunal in the matter, the auction proceedings being conducted under the SARFAESI Act shall remain stayed. E B.B.B. Matters disposed of.
End of Judgment Record
Browse All Supreme Court of India (2010) Decisions
2010-09-24

Department of Telecommunications v. Gujarat Co-operative Milk Marketing Federation Ltd.

This Supreme Court decision concerns a billing dispute arising from two bi-monthly telephone bills totaling Rs. 4,54,652 raised against the Managing Director of the Gujarat Co-operative Milk Marketing Federation Ltd. for calls categorized as international “party” or “sex talk” calls. The respondent subscriber alleged mischarging and that calls were made from another number, prompting a complaint to the Department. Verification upheld the bills; an administrative appeal was dismissed; the matter was referred to arbitration under section 7B of the Indian Telegraph Act, 1885, following a High Court direction. The arbitrator, Vineet Bhatia, concluded the bills were proper. The respondent challenged this award by writ petition, which the High Court (Single Judge) quashed, holding that the arbitrator was junior to the appellate authority, and proceeded to find the award invalid on presumptions and inferences unsupported by evidence; a Letters Patent Appeal was dismissed. The Supreme Court reversed, holding that the High Court exceeded its judicial review scope, misapplied the standard for review of arbitral awards under section 7B, and erred in imputing bias based on rank. It affirmed that the arbitrator’s findings were grounded in the department’s records and meters, and that independence was maintained. The appeal is allowed and the writ petition dismissed, with the High Court orders set aside.

2010-11-23

BHAGWAN BUDHA PRATHMIK TECHNICAL TRAINING COLLEGE NIRMALI v. STATE OF BIHAR

This is a consolidated Supreme Court decision in Civil Appeal Nos. 9896 and 9897 of 2010 arising out of Bihar. Bhagwan Budha Prathmik Technical Training College, Nirmali, a minority Buddhist institution established in 1987, challenged Bihar’s and other authorities’ recognition/approval decisions for its teacher-training course in light of the National Council for Teacher Education Act, 1993 (NCTE Act). The central issue is whether, after the NCTE Act’s appointed day (1 July 1995), State Governments retain power to grant recognition to teacher-education institutes and whether students of unrecognized colleges may sit for qualifying examinations. The matter traces a long litigation history: initial directions in the early 1990s required the Government to decide recognition while allowing students to appear at their own risk; subsequent orders and representations culminated in a 16 March 2007 order recognizing the college from 1987-89 on the ground that inspection warranted it, followed by a 2 September 2008 order withdrawing that recognition in light of NCTE’s sole jurisdiction post-appointed day. The High Court affirmed the sequence, but this Court held that a power to issue an order includes a power to withdraw it for valid reasons, and that recognition is vested in the NCTE after the appointed day. The judgment emphasizes that the NCTE Act must be implemented with full force to protect standards in teacher education. Ultimately, the Supreme Court dismissed the appeals, modified a cost order, and held there should be no further costs in these appeals, while acknowledging the students’ plight and the need for orderly implementation of the regulatory regime.

2010-06-03

State of Punjab & ors. v. G.S. Randhawa

This Civil Appeal arises from a petition challenging a demand for additional price under the Punjab Urban Estate (Sale of Sites) Rules, 1965. The Supreme Court hears counsel for the appellant and notes that the respondent did not enter appearance. Relying on the decision in Smt. Fuljit Kaur v. State of Punjab & Ors., (2010) 7 SCR 317, the Court states that, for the reasons recorded in Civil Appeal No. 5292 of 2004 (the Fuljit Kaur decision) decided on this date, the appeal must be allowed. The High Court’s December 6, 2006 order is set aside and the Demand Notice is upheld. The appellant is entitled to recover the additional price in accordance with law. The decision clarifies that liability to pay additional price under the Punjab Urban Estate Rules can be enforced consistent with the Fuljit Kaur framework, upholding the validity of the demand and permitting recovery by the State. The judgment thus resolves the previous split on allotment price adjustments and prescribes a uniform approach for enforcing such recoveries in analogous cases going forward.

2010-07-15

Harish Singh Nagra & Ors. v. Kapil Sibal & Ors.

Mehfil-e-Wukala, a Supreme Court cultural-literal association of lawyers, published a souvenir containing messages, articles, and poems by judges and senior advocates. Kapil Sibal, a senior advocate and then a candidate for President of the Supreme Court Bar Association, sent a message criticizing the junior Bar and urging reforms, which was circulated within Mehfil’s members but not released to the press or sold publicly. Petitioners, five practicing advocates from the Punjab and Haryana High Court, filed criminal contempt proceedings under Article 215 of the Constitution alleging that Sibal conspired with others to bring the administration of justice into disrepute. The High Court transferred the case to this Court. The central issue was whether the message, read in its proper context, amounted to contempt under Section 2(c) of the Contempt of Courts Act, 1971. The Court held that the message, read in its prospective context, did not scandalize or tend to scandalize any court, nor obstruct the administration of justice; it was a fair critique aimed at improving the system. Citing P.N. Duda, Mulgaokar, Ambard, Vishwanath, and others, the Court reaffirmed that freedom of expression under Article 19(1)(a) protects fair, reasoned criticism of judgments and judicial institutions. It noted that the Times of India article excerpt misrepresented the message, but the souvenir’s limited internal distribution and the respondent’s apology supported dismissal. Accordingly, the contempt petition was dismissed and notices discharged.