High Court of KeralaSingle JudgeWrit petition dismissed

Basheer v. State of Kerala and others

Case / Petition Number:WP(C).No. 24555 of 2012 (T)

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • T.R. Ramachandran Nair
Judgment Date
2013-01-01
Court Decision / Holding
Writ petition dismissed
Final Disposition
Writ petition dismissed

Parties to the Case

Appellants / Petitioners

  • Basheer

Respondents

  • State of Kerala represented by its Secretary to Government, Department of Fisheries & Ports, Government Secretariat, Thiruvananthapuram
  • Chief Engineer, Harbour Engineering Department, Manacaud P.O., Thiruvananthapuram
  • Union of India represented by its Secretary to Government, Ministry of Water Resources, 626, Shram Shakti Bhawan, Rafi Marg, New Delhi-110001
  • Central Water and Power Research Station, Mathematical Modelling Centre, Pune, Maharashtra
  • P. Saidalavi, S/o. Assamu, Pulikkalakkathu House, Chettipadi P.O., Parappanangadi, Malappuram District
  • C. Balagopalan, S/o. Kunjuttu, Chakyattu, Chettippadi P.O., Parappanangadi, Malappuram District
  • Moideen Koya, S/o. Moideenkutty, Korayantepurakkal, Aalungal, Chettippadi P.O., Parappanangadi, Malappuram District

Legal Representation & Advocates

Counsels for Petitioners

  • • Sri.K.T.Shyamkumar
  • • Sri.Harish R. Menon
  • • Smt.M.S.Kiran
  • • Sri.K.Jayakumar (Sr.)

Counsels for Respondents

  • • Sri.C.S.Manilal
  • • Sri.K.N.Vinodkumar
  • • Sri.P.Parameswaran Nair, ASG of India

Case Synopsis & Summary

Basheer v. State of Kerala and others concerns Ext.P5, the Government’s order fixing the location of a fishing harbour at Parappanangadi. The petitioner challenges the final site on the ground that it departs from the findings in Exts.P1 and P2 prepared by the fourth respondent, which considered two sites: Alungal (Fig.2A) and Chappappadi (Fig.2B). Ext.P1 concluded that Alungal’s layout near submerged rocks rendered it unsuitable, while Ext.P2 proposed alternative arrangements including shifting the harbour northward and diverting a drain to meet the sea. The Government’s Ext.P5 locates the harbour with a southern breakwater about 300 m north of the Murithodu drain and a northern breakwater 600 m north of the southern breakwater, after weighing the reports and advice of the Central Water and Power Research Station and the Harbour Engineering Department’s Chief Engineer. The petitioner alleges political pressure and mala fides, arguing that the final location was not warranted by the reports and that the Government improperly substituted its policy judgment for technical findings. The respondents contend that harbour location is a policy decision squarely within the Government’s domain and that reference to reports does not render the decision illegal or liable to interference under Article 226. The High Court refused to re-evaluate the facts in this policy matter, accepted that Ext.P5 was reasoned and non-arbitrary, and dismissed the petition. The court cited the principle of non-interference in policy decisions and affirmed judicial restraint in reviewing such matters.

Provisions of Law Cited

Constitution of India, Article 226

Legal Doctrines & Maxims

  • Non-interference with policy decisions by the courts unless they are arbitrary
  • Judicial restraint in reviewing government policy decisions under Article 226

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioner contends that Ext.P1 showed Alungal near submerged rocks and unsuitable; Ext.P2 proposed northward shifts and alternate options. The final Ext.P5 fixes a site despite these findings, raising allegations of political pressure and mala fides. He submits that the Government’s reliance on Ext.P5 to supersede technical recommendations is arbitrary and warrants judicial scrutiny under Article 226, with support from APM Terminals B.V. v. Union of India. He relies on Ext.P4 to emphasize adherence to technical reports and argues that hydro-engineering constraints (e.g., Murithodu) were not adequately addressed. The petitioner prays for the court to direct implementation of the Ext.P1 findings and policy-consistent options. The concern is to safeguard that the harbour site aligns with technical evaluations and avoids submerged rocks or adverse hydrodynamics, preserving public interest.

Contentions of Respondents

The respondents submit that locating the harbour is a policy decision within the Government’s remit, to be made after considering the final reports of the fourth respondent and the Chief Engineer, CWPRS feedback, and other material. Ext.P5 is a reasoned decision balancing feasibility and policy concerns, not illegal or mala fide. The government asserts the court cannot substitute its own assessment in such policy matters under Article 226 and cites the same policy-principle that courts normally refrain from interfering in non-arbitrary decisions. Ext.P4’s earlier stance is cited to support the principle of non-interference in policy decisions; additional works and land acquisition considerations for alternative options are acknowledged. The court is urged to decline to re-evaluate factual matters and to leave the decision to executive authorities in the public interest.

Cited Precedents (1)

Case NameCitationTreatmentExplanation
APM Terminals B.V. v. Union of India(2011) 6 SCC 756PositiveCited to support the principle that courts normally do not interfere with policy decisions unless they are arbitrary; the present court applies this doctrine to decline interference.

Diagnostic Tool

Beta

Does this judgment govern your specific facts?

Don't risk relying on a distinguishable precedent. Enter your facts or proposition below. We will test it against Basheer v. State of Kerala and others and instantly map out authorities that support, challenge, or govern your position.

Extracted Judgment Text

Exact text extracted from official judgment records.

IN THE HIGH COURT OF KERALA AT ERNAKULAM PRESENT: THE HONOURABLE MR.JUSTICE T.R.RAMACHANDRAN NAIR TUESDAY, THE 1ST DAY OF JANUARY 2013/11TH POUSHA 1934 WP(C).No. 24555 of 2012 (T) --------------------------- PETITIONER(S): ------------- BASHEER, AGED 44 YEARS, S/O. LATE ALIKUNJU, SECRETARY, PARAPPANANGADI ARAYANKADAPURAM THEERADESA VALLA COMMITTEE, P.O. PARAPPANANGADI, MALAPPURAM DISTRICT, PIN-676303, RESIDING AT KARANAMAN HOUSE, SADDAM BEACH, NEDUVA, PARAPPANANGADI. BY ADVS.SRI.K.T.SHYAMKUMAR SRI.HARISH R. MENON SMT.M.S.KIRAN SRI.K.JAYAKUMAR (SR.) RESPONDENT(S): -------------- 1. STATE OF KERALA REPRESENTED BY ITS SECRETARY TO GOVERNMENT, DEPARTMENT OF FISHERIES & PORTS, GOVERNMENT SECRETARIAT, THIRUVANANTHAPURAM, PIN-695001. 2. CHIEF ENGINEER, HARBOUR ENGINEERING DEPARTMENT, MANACAUD P.O., THIRUVANANTHAPURAM, PIN-695009. 3. UNION OF INDIA REPRESENTED BY ITS SECRETARY TO GOVERNMENT, MINISTRY OF WATER RESOURCES, 626, SHRAM SHAKTI BHAWAN, RAFI MARG, NEW DELHI-110001. 4. CENTRAL WATER AND POWER RESEARCH STATION, MATHEMATICAL MODELLING CENTRE, PUNE, MAHARASHTRA, PIN-411024, REPRESENTED BY ITS DIRECTOR. WP(C).No. 24555 of 2012 (T) * ADDL. R5 TO R7 WERE IMPLEADED 5. P.SAIDALAVI, AGED 62 YEARS, S/O. ASSAMU, PULIKKALAKATHU HOUSE, CHETTIPPADI P.O., PIN-676319, PARAPPANANGADI, MALAPPURAM DISTRICT. 6. C.BALAGOPALAN, AGED 60 YEARS, S/O. KUNJUTTY, CHAKYATTU, CHETTIPPADI P.O., PIN-676 319, PARAPPANANGADI, MALAPPURAM DISTRICT. 7. MOIDEEN KOYA, AGED 35 YEARS, S/O. MOIDEENKUTTY, KORAYANTEPURAKKAL, AALUNGAL, CHETTIPPADI P.O., PIN-676 319, PARAPPANANGADI, MALAPPURAM DISTRICT. - ADDL. R5 TO R7 WERE IMPLEADED AS PER ORDER DATED 17.12.2012 IN I.A.NO.16775/2012. R1 BY SR.GOVERNMENT PLEADER SRI.C.S.MANILAL ADDL.R5 TO R7 BY ADV. SRI.K.N.VINODKUMAR BY ADV. SRI.P.PARAMESWARAN NAIR, ASG OF INDIA THIS WRIT PETITION (CIVIL) HAVING COME UP FOR ADMISSION ON 17/12/2012, THE COURT ON 01.01.2013 DELIVERED THE FOLLOWING: DSV/- WP(C).No. 24555 of 2012 (T) APPENDIX PETITIONER(S) EXHIBITS : EXHIBIT P1- COPY OF THE TECHNICAL REPORT SUBMITTED BY THE 4TH RESPONDENT. EXHIBIT P2- COPY OF THE REPORT SUBMITTED BY THE 4TH RESPONDENT IN DECEMBER 2010. EXHIBIT P3- COPY OF THE LETTER DATED 10-06-2011 ISSUED BY THE 2ND RESPONDENT. EXHIBIT P4- COPY OF THE JUDGMENT DATED 23-05-2012 IN WPC NO. 3984/2012. EXHIBIT P5- COPY OF THE GO(RT)NO. 693/2012/F&PD DATED 3-8-2012 ISSUED BY THE 1ST RESPONDENT. EXHIBIT P6- COPY OF THE REPLY DATED 19-08-2011 ISSUED BY THE EXECUTIVE ENGINEER, HARBOUR ENGINEERING DIVISION, KOZHIKODE. EXHIBIT P7- COPY OF THE SATELLITE IMAGE OBTAINED FROM THE WEBSITE 'GOOGLE MAPS'. RESPONDENTS' EXHIBITS : NIL // TRUE COPY // P.A. TO JUDGE DSV/- ## **T.R.RAMACHANDRAN NAIR, J.** **- - - - - - - - - - - - - - - - - - - - - - - - - -** ## **W.P.(C).No. 24555 of 2012** **- - - - - - - - - - - - - - - - - - - - - - - - - -** ## **DATED THIS THE 1[st] DAY OF JANUARY, 2013** ## **JUDGMENT** The petitioner seeks to challenge Ext.P5 order passed by the Government concerning the location of a fishing harbour at Parappanangadi. Mainly it is pointed out that the finalisation of the location goes against the findings in the reports, Exts.P1 and P2 by the fourth respondent herein. 2. Heard learned Senior Counsel for the petitioner Shri K. Jayakumar, learned Asst. Solicitor General and learned Senior Government Pleader, Shri C.S. Manilal 3. The petitioner's case, as argued by the learned Senior Counsel, is that the fourth respondent had conducted a model study for the purpose of development of the fishing harbourr. It can be seen from Ext.P1 that the site at Alungal which is the one among the two suggested sites, was not considered suitable as it is near submerged rocks. In Ext.P1 technical report, the said site is shown as Fig. 2(A). The other site is at Chappappadi which is shown as Fig.2(B). It is submitted that due to political pressure, a further report has been called for as per Ext.P2 and suggestions have W.P.(C).No.24555/12 -2- been made to locate the fishing harbour towards northward by about 900 metres from the layout suggested in Ext.P1, which is one of the options and the other option is to shift the Harbour northward by about 400 metres from the layout suggested in Ext.P1 and to divert a drain towards south of the southern breakwater to meet the sea at about 300 m from the southern breakwater. 4. Learned Senior Government Pleader submitted that it is entirely within the purview of the Government to take a final decision regarding the location of the fishing harbour. In terms of the reports alone a decision has been taken and it is not illegal or malafide. It is submitted that the acceptance of the technical report cannot be said to be arbitrary and illegal warranting interference under Article 226 of the Constitution of India. It is a policy decision taken by the Government, especially in the light of an earlier judgment of this Court produced as Ext.P4 in this writ petition itself, leaving open the liberty of the Government to take a decision in such matters. 5. Ext.P5 decision regarding the location of fishing harbour, is seen taken after referring to a letter by the Chief Engineer, as item 3 therein and the contents of the reports submitted by the 4[th] respondent. In para 4 of Ext.P5, it is stated that the agency who had conducted the studies, had not W.P.(C).No.24555/12 -3- recommended the second option since the diversion of the 'murithodu' is practically not possible. Accordingly, the location was fixed. 6. Learned Senior Counsel appearing for the petitioner emphasised that in Ext.P1 there is clear mention that Alternative 1 of the layout is near the submerged rocks and the layout plan shown as Fig.2(A). A reading of Ext.P1 shows that in para 1.1, under the heading “Tentative layout of fisheries harbour”, it is stated that as the alternative 1 of the layout shown in Fig.2(A) is near the submerged rock, it is not considered suitable. In the later report Ext.P2 which is also by the fourth respondent, para 8.1 is under the heading “Wave tranquility and shoreline changes due to the modified layout” and para 9 gives the conclusions. Based on the same, the Chief Engineer, by Ext.P3, informed the Government about the options in the matter. Referring to the two options, viz. one at Alungal and the next one at Chappappadi, it is stated that, the first option is near the submerged rocks and the second option is also not possible as a thodu namely 'Murithodu is joining the sea there and to locate the harbour there is not feasible. If a breakwater is constructed near Murithodu, its outlet will be covered by mud (slit). It is stated in Ext.P3 that if the harbour is constructed as per option one in the final report, it will be between Chappappadi and Alungal. It is clear from Ext.P3 that as far as Alungal is concerned, the fourth respondent W.P.(C).No.24555/12 -4- was of the view that there are submerged rocks, whereas at Chappappadi there is a 'murithodu' which joins the sea therein and that place is also not suitable. It is in this context the location has been fixed by shifting it to the middle of Chappadi and Alungal which fact is explained in Ext.P3. It is also recorded in Ext.P3 that for considering option two, additional works will be required as well as acquisition of 2.50 acres of land also will be necessary. 7. The Government in Ext.P5, has now fixed the location of the proposed fishing harbour at Parappanangadi as the southern breakwater towards 300m north of drain 'murithodu' and northern breakwater 600m towards north of southern breakwater. 8. It cannot be said that the said decision is one bad for non consideration of any relevant aspects and so unreasonable as argued by the learned Senior Counsel for the petitioner. The court exercising jurisdiction under Article 226 of the Constitution of India, cannot act as an appellate authority and re-evaluate the facts. The allegation of malafides and political considerations have also not been sustainable, since the Government has relied on the final report of the fourth respondent as well as the recommendation by the Chief Engineer. 9. The statement filed by the Government explains that it is after W.P.(C).No.24555/12 -5- examining all matters in detail and based on the report of the Central Water Power Research Station and the Chief Engineer of the Harbour Engineering Department, that the Government has issued Ext.P5 order. The Government is free to take a decision as it concerns with the location of a fishing harbour, after weighing various aspects. 10 The Court cannot substitute the views of the Government in such matters. This Court in Ext.P4 judgment, was of the view that in a matter like this, where a policy decision is involved, at this stage, this Court cannot issue any directions to the Government or to any authority as regards the location of the fishing harbour. It is entirely for the Government to take an appropriate decision, which will be duly taken expeditiously. 11. In the light of the above, the vehement contention raised by the learned Senior Counsel for the petitioner that political considerations alone have gone into in fixing the site, cannot be accepted. The report Ext.P1 had taken the view that the layout near the submerged rocks is not suitable and the final report has suggested two options considering various aspects. The location now fixed is evidently by shifting the same, which is also as suggested by the fourth respondent. Learned Senior Counsel had also relied upon a decision of the Apex Court in **APM Terminals B.V. v. Union of India** {(2011) 6 SCC 756} to contend for the position that the W.P.(C).No.24555/12 -6- court can interfere if the decision is arbitrary. In fact, in para 66 the Apex Court held as follows: “Normally, the courts do not interfere with policy decisions of the Government unless they are arbitrary or offend any of the provisions of the Constitution. In the present cases, the adoption of a course of non-interference would be apposite.” In the light of the factual scenario reflected above, this Court will not be justified in interfering with the location of the harbour as it cannot be termed as arbitrary. Hence, the writ petition is dismissed. No costs. **(T.R.RAMACHANDRAN NAIR, JUDGE)** ## **kav/**