Baljeet Singh (Dead) through Lrs. …Petitioners vs State of U.P. and others

Case / Petition Number:
Special Leave Petition (C) Nos. 30404-30442/2017; 30455-30460/2017; 23522-23530/2018
Neutral Citation:/

Case Synopsis & Summary

The judgment deals with condonation of extreme delays in filing special leave petitions challenging a High Court order (1996) in land acquisition compensation matters. The petitioners, original landowners, allege that lands acquired in villages Gulsitapur and Tilpta (near Kasna) merit parity with village Kasna landowners, who were compensated at Rs. 65 per square yard. The notification under Section 4 of the Land Acquisition Act for the Gulsitapur/Tilpta lands was issued in 1985, with possession in 1987 and a compensation award of Rs. 8–10 per sq yard; reference under Section 18 increased it to Rs. 30 per sq yard, but the High Court later reduced it to Rs. 22–20 per sq yard in 1996. The Kasna lands received enhanced compensation in 2016. The petitioners filed SLPs after a staggering delay of about 21 years (7534–7886 days) and refiling delays, requesting condonation and merits-based adjudication. The respondents (UPSIDC and GNIDA) opposed condonation, arguing non-application of prior precedents and potential cascading effects of granting late relief. The Court first evaluates whether delay can be condoned, ultimately concluding that no sufficient cause was shown and that the cited precedents do not apply to the present facts. The judgment emphasizes laches, acquiescence, and financial/public policy considerations in rejecting relief, and dismisses the petitions; no costs are awarded.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Landmark Cases
Hon'ble Judges
  • M. R. Shah
  • Arun Mishra
  • S. Abdul Nazeer
Judgment Date
2019-08-08
Court Decision / Holding
Condonation of delay applications were dismissed; the Special Leave Petitions (C) Nos. 30404-30442/2017; 30455-30460/2017; 23522-23530/2018 are dismissed on the ground of limitation. No order as to costs.
Final Disposition
Dismissed on limitation grounds; no costs.

Parties to the Case

Appellants / Petitioners

  • Baljeet Singh (Dead) through LRs.

Respondents

  • State of U.P. and others
  • UPSIDC (U.P. State Industrial Development Corporation)
  • Greater Noida Industrial Development Authority

Legal Representation & Advocates

Counsels for Petitioners

  • • Rishi Malhotra

Provisions of Law Cited

Land Acquisition Act, Section 4Land Acquisition Act, Section 18

Legal Doctrines & Maxims

  • Doctrine of Laches
  • Doctrine of Acquiescence

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioners contend that years after acquisition, parity with Kasna's Rs.65 per sq yard compensation should be extended to lands at Gulsitapur and Tilpta due to better location near a highway. They argue the delay in filing SLPS should not nullify their rights and rely on Market Committee, Hodal v. Krishan Murari; Dhiraj Singh v. State of Haryana; and K. Subbarayudu v. Special Deputy Collector for condonation guidance. They request condonation of delay and merits-based consideration, possibly excluding interest for the delayed period to avoid cascading financial burden. They assert that the 2016 Kasna enhancement justifies parity and that public policy and fairness demand protection of legitimate rights despite the lapse, urging reversal of the High Court’s reductions and restoration of higher compensation.

Contentions of Respondents

The respondents oppose condonation of a multi-decade delay (about 21 years) as unjustified and prejudicial to defendants and the state. They argue there is no sufficient cause for delay, no prior grievance about inadequacy of compensation, and reliance on the Kasna decision is misplaced due to differences in village location, development, and timing. They emphasize that the lands were acquired in 1985, development occurred long ago, and granting late relief would create a cascading financial burden for the State and its allottees. They contend the petitioners acquiesced in the impugned order and that allowing the relief now would undermine settled expectations. Distinguishing the present facts from cited precedents, they urge dismissal on limitation with no costs.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (3)

Case NameCitationTreatmentExplanation
Market Committee, Hodal v. Krishan Murari1996 (1) SCC 311OverruledCourt held none of the cited decisions were applicable to the facts of the case, effectively superseding their relevance for condonation here.
Dhiraj Singh v. State of Haryana(2014) 14 SCC 127OverruledHeld not applicable to present facts; the delay and village-specific considerations differed, rendering the precedents inapplicable.
K. Subbarayudu v. Special Deputy Collector (Land Acquisition)(2017) 12 SCC 840OverruledNot applicable to the case’s facts; potential cascading financial implications to the State/allottees were not considered in those decisions.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•3,486 words•~16 min read

In The Court Record

Baljeet Singh (Dead) through Lrs. …Petitioners vs State of U.P. and others

**REPORTABLE** ## **IN THE SUPREME COURT OF INDIA CIVIL APPELLATE JURISDICTION** ## **­ SPECIAL LEAVE PETITION (C) NOS.30404 30442/2017** **Baljeet Singh (Dead) through Lrs. and others etc. etc.** **…Petitioners** ## **versus** ## **State of U.P. and others** ## **…Respondents** ## **WITH** **­ SPECIAL LEAVE PETITION (C) NOS.30455 30460/2017 ­ SPECIAL LEAVE PETITION (C) NOS.23522 23530/2018** ## **J U D G M E N T** ## **M.R. SHAH, J.** Delay of 193, 224 and 142 days respectively in refiling the special leave petitions is condoned. Signature Not Verified Digitally signed by NARENDRA PRASAD Date: 2019.08.08 17:05:20 IST Reason: 2. Feeling aggrieved and dissatisfied with the common impugned judgment and order dated 2.4.1996 passed by the 1 High Court of Judicature at Allahabad in First Appeal No. 919/1993 and other allied first appeals, the respective original claimants – land owners have preferred the present special leave petitions. 3. At the outset, it is required to be noted that there is an inordinate delay of 7534, 7542 and 7886 days respectively (approximately 21 years) in preferring the special leave petitions before this Court challenging the impugned common judgment and order passed by the High Court. There is a further delay of 193, 224 and 142 days respectively in refiling the special leave petitions. 3.1. The application/applications for condonation of delay is/are vehemently opposed by the respondents herein. Therefore, this Court is first required to consider and decide the application/applications submitted by the petitioners/applicants praying to condone the huge delay of 7534, 7542 and 7886 days respectively in preferring the special leave petitions. 4. Shri Rishi Malhotra, learned Advocate appearing on behalf of the respective petitioners has vehemently submitted that the lands of the respective petitioners have been compulsorily 2 acquired under the provisions of the Land Acquisition Act, and therefore, they are entitled to the fair compensation for the lands acquired. It is submitted that the dispute is with respect to the lands acquired of village Gulsitapur and Tilpta which are only 4 kms. away from village Kasna. It is submitted that the location wise the lands of village Gulsitapur and Tilpta were better located and were abutting the national highway, i.e, Noida – Dadri Road. It is submitted that village Kasna is 4 kms. behind village Gulsitapur. It is submitted that for the lands acquired of village Kasna, Section 4 notification was issued on 1.3.1989 and the compensation was awarded @ Rs.65/­ per square yard, which has been confirmed by this Court vide order dated 05.12.2016. It is submitted that therefore the respective petitioners are entitled to the fair compensation for the lands acquired of village Gulsitapur and Tilpta at par with the land owners of village Kasna, i.e., at Rs.65/­ per square yard. It is submitted that therefore the agriculturists/farmers are entitled to the fair compensation for the lands acquired. It is submitted that for the lands compulsorily acquired, the delay should not defeat the valuable rights of the petitioners to get fair compensation. It is submitted that the petitioners may not be awarded the interest 3 and other statutory benefits under the Land Acquisition Act for the period of delay. 4.1 Making the above submissions and relying upon the decisions of this Court in the cases of _Market Committee, Hodal v. Krishan Murari reported in (1996) 1 SCC 311; Dhiraj Singh v. State of Haryana reported in (2014) 14 SCC 127; and K. Subbarayudu v. Special Deputy Collector (Land Acquisition) reported in (2017) 12 SCC 840_ , it is prayed to condone the delay and consider the special leave petitions on merits. 5. All these applications are vehemently opposed by the learned Advocates appearing on behalf of respondent no.3 – Uttar Pradesh State Industrial Development Corporation (UPSIDC) and on behalf of respondent no.4 – Greater Noida Industrial Development Authority. Counter affidavits are filed on behalf of respondent nos. 3 and 4 opposing the present applications for condonation of delay. 5.1 It is vehemently submitted by the learned counsel appearing on behalf of the respondents that there is an inordinate delay of approximately 21 years in preferring the special leave petitions. It is submitted that at no point of time earlier the respective 4 petitioners made any grievance with respect to inadequacy of the compensation as awarded by the High Court. 5.2 It is further submitted by the learned counsel appearing on behalf of the respondents that as such no sufficient cause has been shown explaining the huge delay of approximately 21 years. It is submitted that merely because in view of the subsequent decision in the case of lands acquired of another village, relying upon which the petitioners have preferred the present petitions, huge delay of approximately 21 years may not be condoned. 5.3 It is further submitted by the learned counsel appearing for the respondents that even otherwise the reliance placed upon the decisions of the High Court and this Court is with respect to entirely different village, i.e., village Kasna and that too in respect of the land which was acquired after about four years of acquisition of the petitioners’ land. It is submitted that therefore the lands acquired of village Kasna are not comparable at all with respect to the lands acquired of village Gulsitapur and Tilpta. 5.4 It is further submitted that so far as the impugned common judgment and order dated 2.4.1996 is concerned, as such, the same has attained finality. It is submitted that not only the 5 petitioners accepted the compensation but after the said judgment was delivered by the High Court no special leave petition has been filed by the present petitioners all these years. It is submitted that therefore they have acquiesced with the impugned common judgment and order of the High Court. 5.5 It is further submitted by the learned counsel appearing on behalf of the respondents that any attempt by the present petitioners to reopen the judgment shall lead to a cascading effect where every one whose land has been acquired by the said notification with respect to the land acquired at village Gulsitapur and Tilpta would start demanding enhanced compensation @ Rs.65/­ per square yard. It is submitted that similarly the other land owners whose land has been acquired though at different villages between the years 1985­1989, too start demanding the same rate of compensation. 5.6 It is further submitted by the learned counsel appearing on behalf of the respondents that after the acquisition, the land is developed, infrastructure and amenities are laid. They are maintained. The developed land has been allotted decades ago. It is submitted that the rate of allotment is based on the cost of 6 acquisition and the amounts spent on development, laying out the infrastructure. It is submitted that if the cost of acquisition is increased, then how this cost would now be recovered from the allottees after decades of allotment. It is submitted therefore that to entertain the present petitions now after a period of approximately 21 years and to increase the amount of compensation would have a cascading effect. 5.7 It is further submitted that it is disputed and denied that the land in village Gulsitapur is superior to the land in village Kasna. It is submitted that the correct fact is that village Kasna is located on the main road, which connects Greater Noida to Sikanderabad, District Bulandshar, unlike the land of village Gulsitapur which is in the interiors. 5.8 Now so far as the reliance placed upon the decisions of this Court by the learned Advocate appearing on behalf of the petitioners, referred to hereinabove, is concerned, it is vehemently submitted by the learned counsel appearing on behalf of the respondents that none of the aforesaid decisions of this Court shall be applicable to the facts of the case on hand. It is submitted that in the present case there is an inordinate delay 7 of approximately 21 years. It is submitted that in the present case the petitioners have failed to make out a sufficient cause to condone the huge delay of approximately 21 years in preferring the special leave petitions. It is submitted that in the relied upon cases this Court was satisfied on the sufficient cause for delay. It is submitted that in the relied upon cases the parity was claimed with respect to the land acquired under the very notification and it was pointed out that due to poverty and financial difficulty some of the land owners whose land was acquired under the same notification could not prefer the appeals earlier and they preferred the appeals subsequently and claimed parity of compensation at par with the lands acquired under the very notification. It is submitted that in the present case the petitioners are claiming the parity in compensation with respect to the land acquired of another village and that too the land in the said village was acquired after a period of four years and location wise etc. the lands are different. It is submitted that therefore on facts the same shall not be applicable to the facts of the case on hand. 8 5.9 Making the above submissions, it is prayed to dismiss the present applications for condonation of delay and consequently dismiss the special leave petitions as barred by limitation. 6. We have heard the learned counsel appearing for the respective parties at length. 6.1 At the outset, it is required to be noted that as such there is an inordinate delay of approximately 21 years in preferring the special leave petitions before this Court challenging the impugned common judgment and order passed by the High Court which has been passed in the year 1996. It is required to be noted that the notification under Section 4 of the Land Acquisition Act with respect to the land situated in village Gulsitapur and Tilpta was issued in the year 1985; possession was taken over in the month of January, 1987; the Land Acquisition Officer declared the award in the year 1988 awarding compensation at the rate of Rs.8­10 per square yard. At the instance of the petitioners herein ­ the original land owners, reference under Section 18 of the Land Acquisition Act was made to the reference Court. By judgment and award dated 22.3.1993, the reference Court enhanced the compensation to Rs.30/­ per 9 square yard. However, on appeals and considering the material on record, by the impugned common judgment and order, the High Court reduced the amount of compensation to Rs. 22­20 per square yard. That thereafter, after a period of approximately 21 years, now the petitioners have preferred the present petitions claiming compensation at par with the compensation awarded for the land owners of another village Kasna. It is required to be noted that so far as the land acquisition of village Kasna is concerned, notification under Section 4 of the Land Acquisition Act was issued in the year 1989, i.e., after a gap of four years and it appears that in between certain developments have also taken place. 7. Having considered the averments made in the application/applications for condonation of delay, we are of the opinion that as such the petitioners have miserably failed to make out a case to condone the huge delay of approximately 21 years. No sufficient cause has been shown to condone the huge delay of approximately 21 years. It is required to be noted that as such in the application itself it is submitted by the petitioners that there is an inordinate delay in approaching this Court. The 10 only explanation in approaching this Court after about 21 years is given in paragraph 3 of the application, which reads as under: “That the primary reason in not approaching this Hon’ble Court in time was the fact that it was only in December, 2016, the claimants pertaining to village Kasana got the enhanced compensation from this Hon’ble Court to the tune of Rs.65/­ per sq. yard. The petitioners herein came to know about the said fact in the month of January, 2017 causing not only lots of heartburn but spelling miseries over them. It took not only lots of courage in mustering support from number of affected families but also it took time for the petitioners to collectively file the instant special leave petition claiming not only the enhanced compensation but also parity with regard to the compensation awarded to their co­villagers at village Kasana.” 7.1 That thereafter the petitioners have stated that though there is a reasonable case made out by the petitioners to get the enhanced compensation to the tune of Rs.65/­ per square yard, but fairly enough in order to balance the equity, this Court may not grant interest from the date of the judgment of the High Court i.e., 2.4.1996 till the filing of the special leave petitions before this Court. Except the explanation in paragraph 3, reproduced hereinabove, there is no other explanation whatsoever explaining the huge delay of approximately 21 years. Neither any poverty is pleaded nor any financial difficulty is pleaded. Nothing is on 11 record that after the impugned common judgment and order is passed by the High Court, the petitioners made any grievance/objection with respect to inadequacy of the compensation determined by the High Court. On the contrary, all the petitioners have accepted the compensation as per the judgment and award passed by the reference Court determining the compensation at the rate of Rs.30/­ per square yard. It appears that with respect to some of the land owners even the execution petitions are pending with respect to recovery of the differential amount of compensation, determined by the reference Court and the High Court as by the impugned common judgment and order the High Court has reduced the compensation from Rs.30­/ per sq. yard to Rs.22/­ per sq. yard. Be that as it may, the fact remains that after the impugned common judgment and order is passed by the High Court, no grievance at all is made by the petitioners with respect to inadequacy of the compensation determined by the High Court. Thus, it can be said that for a period of approximately 21 years no grievance was made by the petitioners. Therefore, considering the terms of doctrine of acquiescence, the petitioners lose their right to complain. This principle is based on the doctrine of acquiescence implying that 12 in such a case the party who did not make any objection acquiesced into the alleged wrongful act of the other party and therefore has no right to complain against that alleged wrong. 8. The matter requires examination from another aspect, viz., laches and delay. It is a very recognised principle of jurisprudence that a right not exercised for a long time is non­ existent. Even when there is no limitation period prescribed by any statute relating to certain proceedings, in such cases, courts have coined the doctrine of laches and delay as well as doctrine of acquiescence and non­suited the litigants who approached the court belatedly without any justifiable explanation for bringing the action after unreasonable delay. In those cases, where the period of limitation is prescribed within which the action is to be brought before the court, if the action is not brought within that prescribed period, the aggrieved party loses remedy and cannot enforce his legal right after the period of limitation is over, however, subject to the prayer for condonation of delay and if there is a justifiable explanation for bringing the action after the prescribed period of limitation is over and sufficient cause is shown, the court may condone the delay. Therefore, in a case 13 where the period of limitation is prescribed and the action is not brought within the period of limitation and subsequently proceedings are initiated after the period of limitation along with the prayer for condonation of delay, in that case, the applicant has to make out a sufficient cause and justify the cause for delay with a proper explanation. It is not that in each and every case despite the sufficient cause is not shown and the delay is not properly explained, the court may condone the delay. To make out a case for condonation of delay, the applicant has to make out a sufficient cause/reason which prevented him in initiating the proceedings within the period of limitation. Otherwise, he will be accused of gross negligence. If the aggrieved party does not initiate the proceedings within the period of limitation without any sufficient cause, he can be denied the relief on the ground of unexplained laches and delay and on the presumption that such person has waived his right or acquiesced with the order. These principles are based on the principles relatable to sound public policy that if a person does not exercise his right for a long time then such right is non­existent. 14 9. Now so far as the reliance placed upon the decisions of this Court in the cases of _Market Committee, Hodal (supra); Dhiraj Singh (supra); and K. Subbarayudu (supra)_ , relied upon by the learned Advocate appearing on behalf of the petitioners is concerned, having gone through the said decisions, we are of the opinion that none of the said decisions shall be applicable to the facts of the case on hand and/or the said decisions shall be of any assistance to the petitioners. First of all, in the relied upon cases, there was no such inordinate delay of approximately 21 years. In the relied upon cases, this Court was satisfied on the sufficient cause for delay. In the relied upon cases, parity was claimed with respect to the land acquired under the very notification and it was pointed out that due to poverty and financial difficulty some of the land owners whose land was acquired under the same notification could not prefer the appeals earlier and thereafter they preferred the appeals subsequently and claimed parity of compensation at par with the land acquired under the same notification. It is also required to be noted that as such in none of the aforesaid decisions, this Court had dealt with and/or considered the adverse impact/effect on the State/acquiring body if after inordinate delay/laches the 15 State/acquiring body is directed to pay the enhanced amount of compensation. In the present case, lands were acquired as far back as in the year 1985 and the award by the Special Land Acquisition Officer was declared in the year 1988. The reference Court enhanced the amount of compensation to Rs.30/­ per square yard, which came to be reduced by the High Court by the impugned common judgment and order in the year 1996. It is required to be noted that the lands were acquired for Industrial development purposes. That after the acquisition, the land has been developed, infrastructure and amenities are laid and the developed land has been allotted approximately before 30 years. It is the specific case on behalf of the respondents that the rate of allotment was based on the cost of acquisition and the amount spent on development, laying out the infrastructure. Therefore, if the cost of acquisition is increased now and the State/acquiring body is directed to pay enhanced compensation, in that case, it would be very difficult to recover the difference of amount of compensation from the allottees after decades of allotment. The acquiring body will have to make additional budgetary provision and as observed hereinabove it would be very difficult for the acquiring body to recover the difference of compensation from the 16 allottees after so many years. All these aspects and the cascading effect on the State/acquiring body if they are directed to pay the additional compensation after number of years, have not been considered by this Court in the aforesaid decisions relied upon by the learned Advocate for the petitioners. Even if the petitioners are denied the interest and/or the other statutory benefits for the delayed period as requested by the learned counsel for the petitioners, in that case also, to direct the State/acquiring body to pay the enhanced amount of compensation after number of years (21 years) would be unreasonable and would have a financial burden upon them and as observed hereinabove it would be very difficult for the State/acquiring body to recover the same from the allottees. Under the circumstances, none of the aforesaid decisions shall be applicable to the facts of the case on hand and/or the same shall not be of any assistance to the petitioners. 10. In view of the above and for the reasons stated above, we refuse to condone the huge delay of 7534, 7542 and 7886 days respectively in filing the special leave petitions. Accordingly, the applications for condonation of delay stand dismissed. Consequently, all these special leave petitions are dismissed on 17 the ground of limitation. However, in the facts and circumstances of the case, there shall be no order as to costs. **…………………………………..J. [ARUN MISHRA]** **……………………………………J. [S. ABDUL NAZEER]** **NEW DELHI; AUGUST 08, 2019.** **……………………………………J. [M.R. SHAH]** 18
End of Judgment Record
Browse All Landmark Cases Judgments
2019-01-22

State of Himachal Pradesh & Anr. v. Pinju Ram & Others; State of Himachal Pradesh & Ors. v. Ganesh Dutt & Anr.

This batch of appeals concerns regularisation and monetary benefits of part‑time employees in Himachal Pradesh who were converted to daily‑wage status. The State had issued a policy on 27 February 2004: part‑time Class‑IV employees who had completed ten years of continuous service as on 31 December 2003 would be made daily wagers with prospective effect, and posts vacated by such employees would stand abolished; Education and Ayurveda were excluded from the policy. Revenue Chowkidars, engaged by Panchayats, were not covered by that policy and received separate treatment. Following writ petitions and an order of the Himachal Pradesh High Court and in light of later developments, the State drew‑up directions in 2011 (22 September) to give seniority to Revenue Chowkidars on the basis of ten years of service, but with wages from the date of actual appointment and without back‑dated monetary benefits; 7 July 2012 further instructions reiterated this stance for remaining part‑time employees, with monetary benefits not guaranteed in the interregnum. The respondents pressed for back wages dating from 1 January 2007 and broader coverage. The Supreme Court held that the 2007 back‑pay direction was unsustainable, clarified that seniority would count from ten years without past benefits, and that the 2011 policy and Moti Singh principle should guide the approach. The appeals are allowed; no costs. The related writ petitions are to be disposed of consistent with these directions.

2018-08-14

Union Bank of India and Others v. C.G. Ajay Babu and Anr.

This is a Supreme Court of India appeal concerning the forfeiture of gratuity under the Payment of Gratuity Act, 1972. The respondent was a branch manager of the appellant bank and was dismissed on 3 June 2004 after disciplinary proceedings. A show-cause notice sought to forfeit gratuity due to misconduct involving moral turpitude, which was ordered on 20 April 2004. The High Court upheld the dismissal but held that gratuity could be paid since there was no financial loss to the bank, and that a bipartite settlement between the bank and employees permitted forfeiture only where misconduct caused financial loss. The Division Bench, however, held that forfeiture under Section 4(6) must be read together with Section 4(5) and that no loss was proven, thus entitling the employee to gratuity in accordance with the bipartite settlement. The Supreme Court agreed with the High Court that forfeiture is not automatic; it is controlled by Sections 4(5) and 4(6) of the Act and by the bipartite settlement, which requires loss to justify forfeiture. The Court emphasized that an act must constitute an offence involving moral turpitude and that conviction is generally required for forfeiture under 4(6)(b)(ii). The appeal is dismissed with no costs.

2018-09-25

Reema Salkan v. Sumer Singh Salkan

This is a Supreme Court of India criminal appeal under the Criminal Appellate Jurisdiction arising from a maintenance dispute under Section 125 Cr.P.C. The parties, married in 2002, had a protracted litigation history. The Family Court granted maintenance to the wife from 17 July 2003 to 8 December 2010, and held no maintenance thereafter. The High Court, in revision, partly allowed the application, directing Rs.9,000 per month from 9 December 2010 onward, while upholding the earlier period’s Rs.10,000 per month. This Court had earlier granted interim maintenance of Rs.20,000 per month in 2014 (Criminal Appeal Nos. 2347-2349 of 2014). The appellant contends there has been no change in circumstances since the interim order and that the respondent’s substantial assets, education, and overseas earnings establish the capacity to pay higher maintenance. The respondent defends the High Court’s reasoning, arguing that the Family Court’s assessment, demeanor observations, and the principle that maintenance should not be perpetual require careful scrutiny, and that the notional minimum wage approach used by the High Court is flawed. The overarching issue is the quantum of monthly maintenance payable to the appellant and whether the interim amount should be augmented beyond the period up to 2010.”

2019-12-03

M/s Embassy Property Developments Pvt. Ltd. v State of Karnataka & Ors.

This judgment concerns three Civil Appeals filed by a Resolution Applicant, the Corporate Debtor (through its Resolution Professional) and the Committee of Creditors, challenging an Interim Order of the Karnataka High Court staying an NCLT order in proceedings under the Insolvency and Bankruptcy Code, 2016. The NCLT Chennai had admitted an application under Section 7 of the IBC against M/s Tiffins Barytes Asbestos & Paints Ltd. and directed a moratorium under Section 14. The Interim Resolution Professional then sought a deemed extension of a mining lease under MMDR Act, 1957 and the Government of Karnataka rejected it. The NCLT, by an order dated 11.12.2018, set aside the Government’s order and directed execution of Supplement Lease Deeds for the period up to 31.03.2020. The Government of Karnataka challenged this in a High Court writ petition, which stayed the impugned NCLT order. The core issues were: (i) whether the High Court may interfere under Article 226/227 with an NCLT order in IBC when an appeal lies to the NCLAT, and (ii) whether fraud can be inquired into by NCLT/NCLAT in CIRP. The Court reiterates that IBC is a complete, umbrella code with a three‑tier mechanism (NCLT, NCLAT, Supreme Court) and that public‑law disputes arising from MMDR Act obligations lie outside IBC. It ultimately holds that while NCLT/NCLAT may inquire into fraud, they cannot adjudicate MMDR‑related public legal disputes; and the High Court’s writ jurisdiction in public‑law contexts remains permissible. The appeals are dismissed.