B. P. Jain and Associates v. State of Haryana and Another

Case / Petition Number:
Writ Petition(Civil) No. 981 of 1991
Neutral Citation:[1991] SUPP. 3 S. C.R.

Case Synopsis & Summary

This Supreme Court case concerns a writ petition filed by B. P. Jain & Associates, builders who owned 24.45 acres near Surajkund, Faridabad, seeking a licence under the Haryana Development and Regulation of Urban Areas Act, 1975 for a group housing scheme. The Director of Town and Country Planning had invited the applicant to fulfil conditions under Rule 11 of the Haryana Rules (1976) within 30 days, including execution of a bank guarantee of Rs. 109.30 lacs and stamping on non-judicial paper, and submission of development estimates. The petitioner sought to construct a multi-storey housing project; subsequent communications reduced the area to 21.15 acres and demanded higher external development charges, which the petitioner argued should be reduced in light of the reduced area. After extensions, the applicant could not furnish the bank guarantee within the extended period. The Governor suggested revalidating the licence if the petitioner agreed to pay interest on Rs. 109.30 lacs from 1984 and to compute total dues, but changes in government halted implementation of those directions. The petitioner invoked Article 32, arguing promissory estoppel and that denying the licence would be arbitrary and detrimental to housing for the weaker sections. The respondents argued lack of exhaustion of statutory remedies (Sections 19/20) and delay, and that Sections 8(2) & (3) were inapplicable since no licence had been granted. The Court held Sections 8(2)&(3) inapplicable but allowed the writ petition, subject to conditions for revalidation, reflecting a policy emphasis on housing and the right to shelter.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • K. N. Singh
  • R. M. Sahai
  • S. Mohan
Judgment Date
1991-12-12
Court Decision / Holding
Writ petition allowed. The Court held that Sections 8(2) & (3) were not applicable since no licence had been granted, but allowed the petition subject to conditions for revalidation: (i) comply with Rule 11; (ii) execute Form LCD IV(A) within 6 weeks; (iii) furnish a bank guarantee of Rs. 2.20 crores within 6 weeks (including interest on Rs. 109.30 lacs from 1984); (iv) reserve 15% of the constructed houses for the weaker sections. The area covered is limited to 21.15 acres. No order as to costs. The decision emphasizes housing as a basic need and supports revalidation upon compliance with conditions, linking to the broader housing policy and shelter rights.
Final Disposition
Writ petition allowed.

Parties to the Case

Appellants / Petitioners

  • B. P. Jain and Associates

Respondents

  • State of Haryana
  • Another

Legal Representation & Advocates

Counsels for Petitioners

  • • Gobinda Mukhoty
  • • R. C. Kaushik
  • • D. K. Garg

Counsels for Respondents

  • • K. C. Bajaj
  • • L. S. Goyal

Provisions of Law Cited

Haryana Development and Regulation of Urban Areas Act, 1975 - Section 8(2) and 8(3)Haryana Development and Regulation of Urban Areas Rules, 1976 - Rule 11Haryana Development and Regulation of Urban Areas Act, 1975 - Sections 19 and 20Constitution of India - Article 32Constitution of India - Article 226

Legal Doctrines & Maxims

  • Promissory estoppel
  • Right to shelter as a component of the fundamental right to life (Right to life includes shelter / reasonable accommodation)

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioner argued that it had assurances from the Governor to revalidate the licence upon fulfilling conditions and paying interest, and that rescinding those assurances after promising to comply would amount to promissory estoppel and arbitrary action. It contended that Sections 8(2) & (3) were inapplicable since no licence had yet been granted, and that housing for the weaker sections justified relief. The petitioner also asserted a fundamental housing need and argued for enforcement of the Governor’s assurances to facilitate the development.

Contentions of Respondents

The respondents contended that the petitioner had not exhausted available remedies under Sections 19 and 20 and that the petition was barred by delay and laches. They maintained that Sections 8(2) & (3) were not applicable as no licence had been granted, and argued that the petition under Article 32 was improper where Article 226 should have been used. They stressed that the project’s beneficiaries would not necessarily be the weaker sections and highlighted that extensions granted did not compel final approval without meeting conditions.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (2)

Case NameCitationTreatmentExplanation
Prabhakaran Nair etc. etc. v. State of Tamil Nadu and OthersAIR 1987 SC 2117PositiveUsed to emphasize the acute housing shortage and the need for a National Housing Policy; cited to support the entitlement to shelter and the policy objective.
Mis. Shanlistar Builders v. Narayan Khimalal Totame and OthersAIR 1990 SC 630PositiveUsed to reinforce the principle that shelter is a fundamental need within the right to life; cited as supportive authority for housing obligations.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•4,052 words•~19 min read

In The Court Record

B. P. Jain and Associates v. State of Haryana and Another

A ## B. P. JAIN AND ASSOCIATES _v._ # STATE OF HARYANA AND ANOTHER [K. N. SINGH, CJ., R.M.SAHAI AND S. MOHAN, JJ.] ## B DECEMBER 12, 1991 _Haryana Development and Regulation of Urban Areas Act, 1975Section 8 (2) & (3)-Applicability of._ _Town Planning-Group housing or housing colony-Object._ c > _Haryana Development and Regulation of Urban Areas Rules,_ 197~ _Rule 11-Applicationfor licence for group housing scheme--'DirectiOn to fulfil the conditions for 'grant of licence-Refusal on the ground of nonfulfilment of_ condition~epresentation _agreeing to fulfil the requirements-Rejected by authority-Governor's direction to revalidation of the order of authority-_ D _Held, revalidation of licence/permission on fulfilment of the conditions._ The petitioner-firm, which was carrying on construction activities owned 24.25 acres of vacant land. Or121.7.1983, under the provisions of the Haryana Development and E · Regulation of Urban Areas Act, 1975 and the Haryana Development and Regulation of Urban Areas Rules, 1976, the petitioner-firm applied for the grant of licence for group housing scheme. The firm was noticed to fulfil the conditions laid down in Rule 11 of the Rules within a period of 30 days. F The agreement was required to be executed on non-judicial stamp paper of Rs. 3. The petitioner was a1so called upon to execute a bank guarantee for Rs. 109.30 lacs. On petitioner's request for furnishing the ban~ guarantee, time was extended by four weeks on two occasions. While returning the estimates for development and. service plans for G 24.45 acres the second responden.t directed the petit. ner to submit the estimate only for 21.15 acres to which the petitioner replied that the external development charges which were demanded to be reduced in view of the reduction in the area. The request of the petitioner was not acceded and the petitioner was H called upon to execute an agreement under bank guarantee as already asked for. 392 B. P. JAIN v. STATE 393 After some lapse of time the petitioner explained the circumstances under which he could not arrange for the bank guarantee of Rs. 109.30 lacs earlier and also stated that it was willing to abide by all the directions and conditions, pre.scribed by the second respondent. A > The second respondent refused petitioner's request for grant of a licence since it had failed to fulfil the conditions laid down under rule 11 within the stipulated/extended period. B The petitioner filed a memorandum to the Governor. > The Governor made a suggestion that the licence granted in Feb. 1984 could be revalidated if the petitioner was ready and willing to pay . C interest on bank rate on the amount of Rs.109.30 lacs, which the petitioner agreed. The Governor directed to submit a report and to calculate the total amoun~. With the change of the Government, the directions of the Governor were not implemented. The petitioner filed this writ petition contending that having given an assurance it was not open to the respondent to withdraw that assurance and in such a case the principle of promissory estoppel would apply; that as the petitioner was willing to comply with the directions as given by the , Governor, to refuse to accord licence would amount to acting in an arbitrary· and unreasonable manner; that the respondent could not be allowed to frustrate the setting up of the' Group Housing Colony as it was provided to help the weaker sections. D E The respondents submitted that the petitioner did not exhaust the alternative remedy of appeal and review provided under sections 19 and 20. of the Act; that the writ petition suffered from delay and laches, as the order was passed on 25.9.89, the petition not to be considered at this belated stage; that there was nojustitication for approaching this Court directly under Article 32 of the Constitution, as the petitioner could havt; approached the High Court under Article 226 of the Constitution. F ## Allowing the _writ_ petition, this Court, G HELD: 1. Sections 8(2) & 8(3) are not applicabie to the pre~ent case, as no licence had been granted to the petitioner. [397 F] 2. The basic need· of every citizen of this country is to have a reasonable accommodation to life. The house-building activities is to be H [1991] SUPP. 3 S. C.R. 394 SUPREME COURT REPORTS A encouraged. The Court need not underscore the magnitude of the problem and the urgent need to provide solution, excepting to subscribe to the judicial pronouncement in AIR 1987 SC 2117 and AIR 1990 SC 630. [400 A] 3. As the object is to provide a housing colony and help the weaker B[sections ][of ][the society, it cannot be turned away by contending ][that ][the ] houses or flats, if constructed would be beyond the reach of the weaker sections. Equally, the contentions are fallacious that the petitioner is a big industrialist and it is not expected that after investing crores of rupees in the scheme, it will provide cheaper houses to the poorer people even beyond the cost price. [400G-401A] ## c 4. Revalidation of the licence/permission granted by respondent No.2 for an area to the extent of 21.12 acres to be done on fulfilment of the following conditions: that the petitioner shall comply with all the conditions stipulated in Rule 11 of the Haryana Development of Rural and Urban Areas Rules, 1976; that he shall execute the agreement in Form LCD IV(A) as prescribed under Rule 11 of Haryana Development and Regulations of Urban Area Rules, 1976 within 6 weeks; that initially a bank . guarantee shall be furnished to the satisfaction of the second respondent for a sum of Rs. 2.20 crores within 6 weeks which includes interest on Rs. 109.30 lacs from 1984 and that 15% of the constructed house shaJJ be reserved only for the weaker sections. [401 B-E] ## E ) _Prabhakaran Nair etc.etc._ v. _State ofTamilNadu and Others,_ AIR 1987 SC 2117; _Mis. Shanlistar Builders v.1:'arayan Khimalal To-tame and Others,_ AIR 1990 SC 630, followed.· CIVIL APPELLATE JURI~DICTION: Writ Petition(Civil) No. 981 of - F 1991. (Under Article 32 ofthe Constitution of India). Gobinda Mukhoty, R;C.Kaushik and-D.K.Garg for the Petitioners. ,• KC.Bajaj and LS.Goyal for the Respondents .. ## G The Judgment of the Court was delivered by MOHAN, J. The petitioner is a firm carrying on .business as builders, colonizers and contractors. The petitioner is the owner of 24.45 acres of vacant . land situated in village Lakkarpur, near Surajkund, District Faridabad, Haryana H[State. Being engaged in construction activities it made ][an ][application under the ] 395 B. P. JAIN _v._ STATE [MOHAN, J.] \ \ provisions of llaryana Development and Regulation of Utban Areas Act of 1975(hereinafter referred to as the Act) read with Rules 1976 for the grant of' Licence for group housing scheme. This application was submitted by the petitioner on 21st July, 1983 without necessary documents. After several representations the Director of Town and Country Planning Department Haryana, Chandigarh replied that it was proposed to grant licence to the .. petitioner for setting· up of Group Housing Colony at Village Lakkarpur, District Faridabad. The petitioner was called upon to fulfil the conditions laid down in Rule 11 of the Haryana Development and Regulation of Urban Rules .1976 within a period of 30 days from the date of service of that notice .. Th~ agreement was required to be executed on non-judicial stamp paper of Rs 3: A B The petitioner was also called upon to execute a bank guarantee for R~. 109.30 lacs as required under Rule 11(1) of the said rules. On a request made by the petitioner for extension of time for furnishing the bank guarantee, time was extended (vide letter dated 5.4.84) by four weeks. A further extension was prayed by the petitioner that was also granted on 5-7-84 granting a further extension by four weeks. On 19-10-84, while returning the estimates for development and servi~e plans, the second respondent (Director of Town and Country Planning, Haryana, Chandigarh) for 24.45 acres, the petitioner was directed to submit the estimate only for 21.15 acres. On receipt of this letter, the petitioner wrote on 14.11.84 that the external development charges which were demanded by the second respondent might be reduced in view of the. reduction in the area. Tl}is . request of the petitioner was not acceded to by the Director. The petitioner w.as called upoQ to execute an agreement under bank guarantee as already asked for. c D E After some lapse of time, on 12-12-87, the petitioner explained the circumstances under which he could not arrange for the bank guarantee of Rs. 109.30 lacs earlier. The bankers was willing to provide a bank guarantee for Rs. 109.30 lacs within 30 days of his intimating them to do so. It was also stated that he was willing to abide by all the directions and conditions, which had byen prescribed by the second respondent. Again, on 26-9-88, 11-10-88, 2-1-89 and . 7-1-89, the request was rejected for the revival of the sanction and agreeing to comply with the rules and conditions. On 25.9.89, the petitioner was informed that it is a request for grant of a licence which was refused since it had failed to fulfil the conditions laid dow.n under rule 11 within the stipulated/ extended period. F . G . . Upon receipt of this letter, the petitioner filed a memorandum to the Governor of Haryana on 4-5-91 since the State of Haryana was under H [1991] SUpP. 3 S. C.R. SUPREME COURT REPORTS 396 - A President's Rule. ·It appears from the affidavit that the Governor made a suggestion that the licence granted in Feb. 1984 could be revalidated if the petitioner was ready and willing to pay interest on bank rate on the amount of Rs. 109 .30 lacs which was demanded as a security by the Directot of Town and Country Planning, Haryana, Chandigarh w.e.f. 1984. Thereupon, the petitioner consented to such a course. The affidavit further avers that the Governor while - B recording the statement of the petitioner directed to submit a report and to calculate the total amount With the change of the Government, these directions of the Governor . were not implemented. Hence, in this present petition, the petitioner prays for an order in the nature of Mandamus to direct the State of Haryana to revalidate C the licence/permission granted by the Director by his letter dated 'Nil' Memo No. 1823-5 DP-84 permitting the petitioner to construct the multi-storeyed houses and flats in accordance with law by accepting security/bank guarantee to the tune of Rs 109 .30 lacs as demanded by the respondent under rule 11 (a). A further prayer is for permission, approval or sanction to enable the D petitioner to construct the multi-storeyed houses in pursuance of the licence granted by the second respondent in the year 1984. In support of the petition, the grounds are as under: - (a) since the petitioner is the owner. of the land and permission has - E been granted subject to compliance with rule 11, on furnishing bank guarantee of Rs .. 109 .30 lacs by grant of extension of time for compliance with those conditions no prejudice whatsoever is caused to the respondent. - (b) Having given an assurance it is not open to the respondent to - F withdraw that assurance and in such a case the principle of promissory estoppel will apply.· In any event, the petitioner was willing to comply with the directions as given by the Governor. Under those circumstances, to refuse to accord licence would amount to acting in an arbitrary and unreasonable manner, more - G so, when the second respondent is exercising powers under sections 8(2) & (3) of the Act Certainly, the respondent could not be allowed to frustrate the setting up of the Group Housing Colony~ The counter affidavit has been filed on behalf of the respondents in which the preliminary objection is taken that the petitioner has not exhausted the H alternative remedy of appeal and review provided u .. der section 19 and 20 of B. P. JAIN 11. STATE [MOHAN, J.) 397 ~· the AcL Disputed question of facts sought to be raised cannot be adjudicated 1 upon in a writ petition under Article 32 of the Constitution. The writ petition , also suffers from delay and laches as the impugned order was passed on 25-9-89 the petition cannot be considered at this belat~ stage. · '. There is no justification for approaching this court directly under Article 32 of the Constitution. The petitioner could well approach the High Court B under Article 226 of the Constitution. Ori the merits it is submitted that there is no violation of fundainental rights so as to enable the petitioner to-approach this court. Tue petitioner's scheme was to construct multi-storeyed building but it is made out that his scheme is ·to accommodate/give shelter to the weaker c sections of the society: The flats, if constructed, ean only be purchased by high/ middle-class group of people as the site where the petitioner wanted to build up Jjis colony falls in a well-devaloped area. Hence, it would be beyond the reach of the weaker sections of the society to purchase these multi-storeyed, flats. D When the petitioner was called upon to execute the necessary agreements and furnish bank guarantee, it did not do so. Therefore, the blame lies only at the door of the petitioner. When repeated extensions were granted in order that the provisional decision to grant licence could be finally ordered. the petitioner· did not do so. It is denied that the petitioner ever submitted a letter on 4-5-91 to the Governor of Haryana. In any event, it could be considered an appeal under section 19 of the Act. E Section 8(2) & (3) are not applicable to the present case, as no licence · had been gninted to the petitioner. ~ F Learned counsel for the petitioner submitted before us that the only condition on which the provi_sional decision to grant licence could not be finalised was because of the non-execution of agreement by the petitioner as well as non-furnishing of bank guarantee by way of security for a sum of R~ 109.30 lacs. As of today, the petitioner . is willing to comply . with all the ' conditions set out under rule and will deposit such amount as is required. As G a matter of fact, on the basis of the suggestion of the Governor, inclusive _of_ interest from 1984 it has come to 2.20 crores, which the petitioner is willing · to deposit Since, essentially, the housing scheme is intended to benefit the weaker sections, 15% of the houses will be reserved for weaker sections only. > Subject to these conditions, if licence is granted, no prejudice is caused· H [1991] SUPP. 3 S. C.R. 398 SUPREME COURT REPORTS - A to the respondent. The respondent cannot be allowed to act arbitrarily and unreasonably, merely because at the time when the petitioner was called upon· to furnish bank guarantee, it was in difficult circumstances. The learned counsel for the respondents would reiterate the averments in the counter affidavit and would urge upon us that the petitioner had not B exhausted the alternative remedy. Nothing prevented it from approaching the High Court since there is no violation of any fundamental right tinder articles 14, 19 or 21 of the Constitutions. When the petitioner itself failed to carry out the conditions of executing the agreement and furnishing bank guarantee, it cannot go after so many years C tum round and say that it is now willing regardless of passage of time. There is no arbitrariness or unreasonableness in the act of the respondent in not granting further extensions, espeeially so, when two extensions w~re granted. We will now proceed to consider the above submissions~ It is not - disputed before us that there is acute housing problem in the State. In fact the D respondent in the counter admits and states as follows: "It is not disputed that in some areas there is a housing problem but that is general problem". · E About the necessity for promoting a national housing policy to overcome the acute shortage of housing in our country, this Court has occaiion to consider in _Prabhakaran Nair etc. etc._ v. _State o/Tami/ Nadu and others,_ AIR 1987 SC 2117. In para 38, it was stated as under: - "It is common knowledge that there is acute shortage of housing, various factors have led to this problem. The laws relating to - F letting and of landlord and .tenant in different States have from different States'. angles tried to grapple the problem. Yet in view of the magnhude of the problem, the problem has become insol- - . ~ ; -uble and the litigations abound and the people suffer. More houses - ' ' -- must, therefore, be built, more acc:ommodation and more spaces - G made available for the people to live in ....... Men with money should be given proper and meaningful incentives as in some European countries to build .houses, tax holidays for new houses can be encouraged. The tenants should also be given protection and security and certain amount of reasonableness in the rent. Escalation of prices in the urban properties, land, materials and houses H '/ 399 B. P. JAIN _v._ STATE [MOHAN, J.] A must be rationally checked. This country very vitally and very urgently reqliires a National Housing Policy if we want to prevent a major breakdown of law and order and gradual disillusionment of people. After all shelter is one of our fundamental rights. New national housing policy must attract new buildings, encourage new· buildings, make available new spaces, rationalise the rent structure and rationalise the rent provision~ and bring certain amount of . B uniformity though having scope for sufficient flexibility among the States to adjust such legislation according to itc; needs". Again, in _Mis. Shanlistar Builders_ v. _Narayan Khimalal Totame and others,_ AIR 1990 SC 630, dealing with the case, it was observed as under : "Basic needs of man have traditionally been accepted to be threefood, clothing and shelter. The right to life is guaranteed in any Civilized society. That would take within its sweep the right to . food, the right to clothing, the right to decent environment and a reasonable accommodation to live in. The difference between the . need of an animal and a human being for shelter has to be kept in D: view. For the animal it is the bare protection of the body; for a human being it has to be a suitable accommodation which would allow him to grow in every aspect-physical, mental and intellectual. The constitution aims at ensuring fuller development ofevery child. That would be possible only if the child is in a proper home. E It is not necessary that ever citizen must be ensured of living in a well-built comfortable house but a reasonable home particularly for people in India can even be mud-built thatched house or a mudbuilt fireproof accommodation. With the increase of population and the shift of the rural masses to urban areas over the decades the ratio of poor people without houses in the urban areas has rapidly increased. This is a feature which has become more perceptible after independence. Apart from the fact that people in search of work move to urban agglomerations, availability of amenities and living conveniences also attract people to move from, rural areas to cities. Industrialisation is equally responsible for concentration of population around industries. These are features which are mainly responsible for increase in the homeless urban population. Millions of people today, live on the pavements of different cities of India and a greater number live animru like existence in Jhuggis". F G H I • [1991] SUPP. 3 S. C.R. SUPREME COURT REPORTS 400 r A Thus, it would be clear that both the decisions clearly emphasis the basic need of every citizen of this country to have a reasonable accommodation to life. They also emphasize the need to encourage house building activities. We need not underscore the magnitude of the problem and the urgent need to · provide solution excepting to subscribe to the above judicial pronouncementS. B Here, the petitioner desires to build houses on his own land. It cannot be denied and it is not denied before us that on his application dt 21.7.83, the · Director of Town and Country Planning, Haryana, Chandigarh categorically stated, "it is now proposed to grant licence to you for setting up Group Housing Colony at village Lakkarpur, District Faridabad". · C Of course, this proposal was subject to the following conditions: - (i) fulfilment of the conditions laid down in Rule 11,. - (ii) executing of bank guarantee of Rs. 109.30 lacs as required under Rule J l(a); and D - (iii) to give an undertaking to the effect that the petitioner shall pay the proposed developmental charges to be deterinined by the Director. - No doubt he could not comply with these cond.itions inspite of two - extensions one on 5-4-84 and the other on 5-7-84 for four weeks respectively. - E However, on 12-12-87; the petitioner did make it clear that he was willing to abide by all the conditions. There is nojustification for the respondent to keep silent inspite of repeated requests made in several communications by the petitioner. It was only on 25-9-89, the petitioner was informed that his requests for revalidation could not be considered as he had failed to fulfil the stipulated conditions. But the matter did not rest there, as the petitioner did approach the F Governor. It was suggested that licence ~ould be re-validated should the petitioner be (l) willing and ready to pay interest at bank rate on Rs. 109.30 lacs, with effect from 1984. Though the respondent denies the submission of · this letter dated 4-5-91 to the Governor, we cannot agree with the respondent as if the document is introduced for the purpose of this case. Even otherwise, G as rightly contended by the petitioner what is the prejudice caused to the respondent so long as the petitioner is willing to comply with each and every condition? As stated by the learned counsel, after all, the object is to provide a housing colony and help the weaker sections of the society. It cannot be turned away by contending that the houses or flats, if constructed, would be beyond the reach of the weaker sections. Equally, the contentions are fallacious H that the petitioner is a big ind.ustrialist and it is not expected that after investing 401 B. P.JAIN v. STATE [MOHAN, J.] crores of rupees in the scheme, it will provide cheaper houses to the poorer A people even beyond the cost price. These arguments proceeded on hypothetical lines. Hence, we reject them. We are firmly of the view that having regard to the undertaking given by the petitioner's Counsel as stated above, it is a case in which the petitioner is entitled to succeed. Accordingly, we allow this Writ Petition, subject to the following conditions: B - (i) The petitioner shall comply with all the conditions stipulated in Rule 11 of the Haryana Development of Rural and Urban Areas Act, 1976. - - (ii) He shall execute the agreement in From LC-IV(A) as prescribed under Rule 11 of Haryana Development and Regulations of Urban C Act, 1976 within 6 weeks from today. - (iii) Initially a bank guarantee shall be furnished to the satisfaction of the second respondent for a sum of Rs. 2.20 crores within 6 weeks which includes interest on Rs. 109.30 lacs from 1984. D - (iv) 15% of the constructed house shall be reserved only for the weaker sections. As to who constitute the weaker sections will be decided by the Director of Backward Classes or the Director, Social Services, Govt. of Haryana. E On fulfilment of the above conditions there shall be a re-validation of the licence/permission granted by the respondent No. 2 in his letter dated 'nil' vide Memo No. 1823-SDP-84. - We make it clear that this permission is required to be granted only for an area to the extent of 21.15 acres. There will be no order as to costs. V.P.R. Writ petition allowed.
End of Judgment Record
Browse All Supreme Court of India (1991) Decisions
1991-04-16

Municipal Corporation, Raipur v. Ashok Kumar Misra

This Supreme Court decision concerns the termination of a probationer, Ashok Kumar Misra, who was appointed as a Lower Division Clerk in the Raipur Municipal Corporation for a two-year probation. Three months after the two-year period, he received a one-month termination notice, prompting a civil suit for declaration that the termination without enquiry violated Rule 9A of the Madhya Pradesh Civil Services Classification, Control and Appeal Rules, 1966, and that he became a permanent employee with continuity of service and arrears of salary. The Trial Court dismissed the suit; the first appellate court upheld the dismissal; the High Court, however, decreed the suit in the respondent’s favor. The appellant Corporation contends that a probationer attains permanent status only on express confirmation, and that termination before confirmation, drawn under Rule 8 of the Madhya Pradesh Government Servants’ General Conditions of Service Rules, 1961, is legally valid if effected with proper notice; the High Court incorrectly held that expiry of probation automatically confers deemed confirmation under Rule 14 (now superseded). The respondent argues that recruitment rules under the Central Provinces and Berar Municipality Act, 1922 (including Rule 14) applied, and absence of action at the end of two years implies deemed confirmation, hence an enquiry would be required for termination. The Supreme Court reverses, holding that deemed confirmation does not arise from mere expiry; confirmation requires express order following prescribed examinations; the appointed authority may terminate during probation with one month’s notice. The rules governing service, not the old Rule 14, apply after the Municipal Corporation adopted government rules.”

1991-07-09

B.P. Singh v. Director General, Ordnance Factories and Ors.

This Supreme Court case concerns the retirement age of teachers employed in central government schools run by Ordnance Factories under the Defence Department. The petitioners, led by B.P. Singh, challenged their retirement at 58 years, arguing that similarly situated teachers in other central government departments were retired at 60, and that such differential treatment violated Articles 14 and 16 of the Constitution. They relied on memoranda that had previously raised the retirement age to 60 for Delhi School Teachers and for Railway school teachers (Sept. 6, 1983 and March 9, 1984). The petition contended there was no rational justification to fix 58 years for Ordnance Factory teachers, and sought to fix the age at 60. The respondents presented an Office Memorandum dated March 10, 1989 issued by the Ministry of Personnel, which announced a de novo review and stated that the age of retirement for all central government employees would be uniformly fixed at 58, with limited exceptions. The memorandum explained that teachers who had joined before 1 April 1989 would continue to enjoy the existing benefit of 60, and that no new appointments to 60-year posts would be made between the memorandum date and 1 April 1989. On these grounds, the Court held there is a uniform policy fixing 58 for central government teachers and dismissed the petition, thus standardizing retirement at 58 across departments.

1991-04-03

Burn Standard Company Limited v. McDermott International Inc. and Another

This is a Supreme Court of India decision addressing whether a Technical Collaboration Agreement (TCA) between Burn Standard Company Ltd. (a Government of India undertaking) and McDermott International Inc. (foreign collaborator) is void ab initio for want of RBI permission under the Foreign Exchange Regulation Act, 1973 (FERA) and whether the arbitration clause can survive if the agreement itself is void. The agreement, executed after approvals by the Secretariat for Industrial Approvals (SIA) and later taken on record by the Government, involved payment in foreign exchange for technical know-how and services. The key dispute centers on what constitutes valid RBI permission under section 28(1) and whether the Exchange Control Manual provisions (paragraphs 24A.11 and 25A.2) can substitute for statutory RBI permission, or if failure to follow the prescribed forms invalidates the contract under section 28(2). The High Court held that the arbitration clause could survive even if the contract were void, and emphasized that RBI permission had been granted after due consideration. The Supreme Court ultimately held that RBI permission under section 28(1) had in fact been granted and that the agreement could not be voided under section 28(2); accordingly, the appeal was dismissed, and the arbitration clause remained enforceable. The decision underscores substance over form and the importance of the RBI’s substantive decision rather than mere procedural lapses.

1991-10-29

Sub-Committee on Judicial Accountability v. Union of India

These writ petitions address the constitutional framework for removal of a Judge under Articles 124(4) and 124(5) and the Judges (Inquiry) Act, 1968, in the wake of a notice of motion by 108 MPs for the removal of Justice V. RamamSwami. The Lok Sabha was dissolved shortly after the Speaker admitted the motion and constituted an Inquiry Committee. Petitioners contended that dissolution of the House lapses the motion and that courts should not intrude in a political process; they pressed for enforcement of the statute and, if required, restraint of the Judge from judicial functions during pendency. The Union of India argued that dissolution causes lapse of all pending business, including the motion, and that Parliamentalone can decide the matter; it also contended that Article 124(5) is merely enabling and that the prevailing parliamentary rules govern the process. The Court, by a majority, held that the motion does not lapse on dissolution and the Court retains jurisdiction to adjudicate the lawfulness of the Speaker’s action. It held that Article 124(5) creates a two-part process: investigation and proof outside Parliament under the statute, followed by a parliamentary motion; the Parliament’s enactment under Article 124(5) overrides the Rules framed under Article 118. The judgment clarifies standing, procedural propriety, and the constitutional balance between judicial independence and political accountability, while declining to grant interim restraining orders and disposing of the petitions accordingly.