High CourtDivision BenchWrit petitions disposed of with directions for ...

ASSAM SILLIMANITE LTD. AND ANR. v. UNION OF INDIA AND ORS.

Case / Petition Number:Writ Petition No. 105 of 1973
Neutral Citation:[1990] 1 S.C.R. 983

Case Details & Bench

Court
High Court
Hon'ble Judges
  • S. Ranganathan
  • A. M. Ahmadi
Judgment Date
1990-03-16
Court Decision / Holding
The order dated 7 December 1972 terminating the leases under Section 4A was held null and void for violating the principles of natural justice as the lessees were not given a hearing. The Court followed the Ram Kishan judgment and, while acknowledging the policy goals behind termination, directed that compensation/damages be determined by arbitration—limited to five years from termination or up to the expiry of the original leases, whichever is less. An arbitrator (retired Judge S. Natarajan) was appointed; deposits of Rs. 10,000 each were ordered to commence the process; writ petitions disposed of; no costs awarded.
Final Disposition
Writ petitions disposed of with directions for arbitration to determine compensation, and no costs awarded; interim measures and deposits for arbitration ordered.

Parties to the Case

Appellants / Petitioners

  • Assam Sillimanite Ltd.
  • Anr.

Respondents

  • Union of India
  • Ors.

Legal Representation & Advocates

Counsels for Petitioners

  • • Kapil Sibal
  • • A.K. Sen
  • • P.C. Jain
  • • Ranbir Chandra
  • • A. Minocha
  • • Indu Goswami

Counsels for Respondents

  • • Kuldip Singh
  • • M.M. Abdul Khadar
  • • L.N. Sinha
  • • V.C. Mahajan
  • • R.B. Dattar
  • • A.K. Ganguli
  • • R.B. Misra
  • • Ms. A. Subhashini
  • • D.N. Mukharjee
  • • R.P. Gupta
  • • T.V.S.N. Chari
  • • Mrs. Binu Tamta
  • • Mrs. B. Sunita Rao
  • • Ms. Manjula Gupta
  • • Badrinath

Case Synopsis & Summary

ASSAM SILLIMANITE Ltd. obtained three mining leases from the Government of Assam to extract sillimanite in the Khasi and Jaintia Hills District for 15-year terms beginning in 1952, 1963, and 1967. As negotiations for transferring the leases to public sector firms Hindustan Steel Ltd. and Bokaro Steel Ltd. faltered, the Central Government, through the Government of Meghalaya, issued an order on 7 December 1972 prematurely terminating the leases under Section 4A of the Mines and Minerals (Regulation and Development) Act, as amended. A fresh lease was granted in favor of Hindustan Steel Ltd. The petitioner challenged the order in a writ petition under Article 32, arguing that no notice or opportunity to be heard had been given, violating the principles of natural justice. The respondents contended that the 4A provision was broad and could exclude hearing because of policy considerations—transferring mining operations to public sector entities. They also relied on 1986 amendments expanding the grounds for termination. The Court held that the 7 December 1972 order was null and void for violating natural justice, following the Ram Kishan line of reasoning, and recognized the policy context but emphasized the necessity of a hearing. It directed compensation via arbitration, limited to five years from termination or until expiry of the original leases, and appointed an arbitrator (retired Judge S. Natarajan). The matter was disposed of by writ petition with no costs, while deposits were ordered to commence arbitration.

Provisions of Law Cited

Mines and Minerals (Regulation & Development) Act, 1957 – Section 4A(1)Mines and Minerals (Regulation & Development) Act, 1957 – Section 4A(2)Mines and Minerals (Regulation & Development) Act, 1957 – Section 4A(3)Mines and Minerals (Regulation & Development) Amendment Act, 1972Mines and Minerals (Regulation & Development) Amendment Act, 1986Industries Development & Regulation Act, 1951 – Section 18-AAConstitution of India – Article 32

Legal Doctrines & Maxims

  • Natural justice
  • Opportunity of hearing (audi alteram partem)

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioners contended that the termination under section 4A without any notice or hearing violated the principles of natural justice. They sought either restoration of possession or compensation for wrongful termination, arguing that, given the long lease periods and the de facto disruption, arbitration could fairly determine damages. They relied on Ram Kishan’s decision to insist on an opportunity to be heard prior to termination and urged that, despite policy aims, due process could not be dispensed with. They urged the Court to adopt an expeditious method to quantify compensation rather than re-litigating through separate suits, and supported referral to arbitration.

Contentions of Respondents

The respondents argued that statutory policy and changing circumstances warranted premature termination to transfer mining operations to government-owned corporations. They argued that providing an opportunity to be heard would be meaningless for a policy-driven termination and that the 1986 amendment to 4A explicitly involved a hearing, reinforcing the preference for expediency. They asserted that damages should be pursued through separate remedies and that the court should not annul the termination but interpret 4A to align with policy objectives.

Cited Precedents (4)

Case NameCitationTreatmentExplanation
State of Haryana v. Ram Kishan & Ors.[1988] 3 SCC 416PositiveCourt follows this decision’s principle that a hearing is required and implements natural justice before terminating leases.
Dharam Veer v. Union of IndiaAIR 1989 Delhi 227Mentioned OnlyCited as a reference in the discussion but not adopted as controlling authority.
The Barium Chemicals Ltd. and Anr. v. Company Law Board and Others[1966] Suppl. SCR 311OverruledEarlier view that natural justice can be statutorily excluded was rejected in light of Ram Kishan and the present decision.
R.S. Dass v. Union of India and Others[1985] Supp. SCC 617OverruledEarlier stance that natural justice can be excluded by statute was not upheld; related precedents were displaced by the Ram Kishan approach.

Diagnostic Tool

Beta

Does this judgment govern your specific facts?

Don't risk relying on a distinguishable precedent. Enter your facts or proposition below. We will test it against ASSAM SILLIMANITE LTD. AND ANR. v. UNION OF INDIA AND ORS. and instantly map out authorities that support, challenge, or govern your position.

Extracted Judgment Text

Exact text extracted from official judgment records.

ASSAM SILLIMANITE LTD. AND ANR. _v._ UNION OF INDIA AND ORS. MARCH 16, 1990 [S. RANGANATHAN AND A.M. AHMADI, JJ.] .lf' _Mines and Minerals (Regulation and Development) Act,_ _1951:_ _Section_ _4A-Termination_ _of_ _mining /ease-Necessity for giving_ _of_ _opportunity to holder._ The petitioner company had obtained three mining leases from the Government of Assam to extract sillimanite in the Khasi and Jaintia Hills District, for a period of 15 years. A B Negotiations between the Union of India and the petitioner for having the mining leases transferred to the public sector companies, Hindustan Steel Ltd. and Bokaro Steel Ltd., having failed, the Govern- . D ment of Meghalaya, on the request of the Central Government, passed an order dated 7th December, 1972 prematurely terminating the mining leases in terms of section 4-A( 1) of the Mines and Minerals (Regulation & Development) Act, 1957 as amended by the Mines & Minerals (Regulation and,Development) Amendment Act, 1972. Thereupon, the petitioner company filed the present petition under Article 32 of the E Constitution. On behalf of the petitioner it was _inter alia_ contended that since no notice had been issued by the State Government before terminating the leases prematurely, it amounted to denial of natural justice thus vitiating the order of termination. F _State_ _of Haryana_ v. _Ram_ _Kishan._ _&_ _Ors.,_ [1988] 3 S.C.C. 416, relied upon. It was further submitted that having regard to the comparatively long periods of leases and the lapse of time, the petitioner would not G pray for being put back in possession of the leased premises but would be content with an award for compensation for wrongful premature termination, to be determined by any arbitrator appointed by the Court. On behalf of the respondents it was submitted that the decision of H 983 A 984 SUPREME COURT REPORTS [1990] I S.C.R. this Court in _Ram Kishan's_ case was distinguishable; that the rules of natural justice could be statutorily excluded either expressly or by necessary implication; that grant of an opportunity to the lessee would be totally meaningless and futile; that the object and purpose of the statute clearly excluded the provision of an opportunity to the lessee before termination of the leases; that amendment of section 4-A of 1986 specifically providing for an opportunity of bearing became necessary because the grounds for premature termination set out in the new subsection (1) of section 4-A were made wider and more comprehensive; that in the writ petition the only prayer made was for quashing the order of premature termination; and that it was open to the petitioner to file a suit or take other appropriate remedies for obtaining compensation in respect of the unlawful termination. 'f· _The Barium Chemicals Ltd. and Anr._ v. _Company Law Board_ _and Others,_ [1966] Suppl. S.C.R. 311 and _R.S. Dass_ v. _Union of India_ -"" _and Others,_ [1985] Supp. S.C.C. 617, referred to. _D_ Disposing of the writ petition, this Court, HELD: (1) The order dated 7.12.1972 passed under section 4A of the Act whereby the leases were terminated prematurely was null and ).._ void as it violated the principles of natural justice and was passed without giving an opportunity to the lessee of being heard. _State_ _of Haryana_ v. _Ram Kishan_ _&_ _Ors.,_ [1988] 3 SCC 416, followed. p _q_ _Dharam Veer_ v. _Union_ _of India,_ AIR (1989) Delhi 227, referred to. (2) Though it is true that the scope of section 4-A (1) has been widened, the insertion of sub-section 4-A(3) clearly reflects a statutory intention that an opportunity of hearing must be given before the order of termination is passed, presumably as such an order widely effects the rights of the lessees. [992A] (3) It is difficult to accept the contention that because an order under section 4-A is to be passed in order to give effect to a policy of the Government, it is not necessary or useful to provide the lessees, whose leases are about to be terminated, an opportunity of hearing. [992D J Ii ( 4) It is true that the petitioner could have r.Jed a suit or taken ASSAM SILLIMANITE _v._ U.0.1. IRANGANATHAN, J.] 985 other appropriate remedies for obtaining compensation in respect of the unlawful termination. But, in the facts and circumstances of this case, it is not fair to ask the petitioner to go back and tile a suit for compensation or damages which may be barred. by limitation. The writ P.,tition was filed by the petitioner company in 1973 and has been pending in this Court for about 17 years. After a lapse of such a long time the proper course is to adopt some method for deciding the quantum of compensation and damages, which can at once be simple and expeditious and which will avoid further unnecessary litigation. [992G-H; 993A] A B (5) The request made on behalf of the petitioner that the matter may be referred to arbitration is a fair one and indeed this course is also not seriously resisted by the respondents. The issue of compensation/ damages is accordingly referred to Arbitration. [993B] C ,).- (6) Having regard to the circumstances of the case, the rompensation/damages should be restricted to a period of five years from the ilate of termination of the leases or upto the date of expiry of the original lease deeds whichever is less and not for the entire unexpired period of D all the leases. [993C] ORIGINAL JURISDICTION: Writ Petition No. 105 of 1973. (Under Article 32 of the Constitution of India) _::'_ Kapil Sibal, A.K. Sen, P.C. Jain, Ranbir Chandra, A. Minocha .and Ms. Indu Goswami for the Petitioners. Kuldip Singh, Additional Solicitor General, M.M. Abdul Khadar, L.N. Sinha, V.C. Mahajan, R.B. Dattar, A.K. Ganguli, R.B. Misra, Ms. A. Subhashini, D.N. Mukharjee, R.P. Gupta, T.V.S.N. Chari, Mrs. Binu Tamta, Mrs. B. Sunita Rao, Ms. Manjula Gupta and Badrinath for the Respondents. The Judgment of the Court was delivered by RANGANATHAN, J. The petitioner company obtained mining leases from the Government of Assam to extract sillimanite in the Khasi and Jaintia Hills District. In pursuance thereof, three lease deeds were executed by the State Government in favour of the petitioner. The first was a lease deed dated 25.4.1952 for a period of IS years in respect of an area of 129.60 hectares at Lalmati. The second, dated 10.4.1963, was for a period of 15 years in respect of an area of E F G H A 986 SfIPREME COURT REPORTS [ 1990] 1 S.C.R. 777.60 hectares at Nongmawait. The third one dated 8.6.1967 was for a period of 15 years and covered an area of 363 hectares at Wamsophi. ~. The three lease deeds were to expire on 26.5.77, 9.4.78 and 7.6.82 respectively but there was a clause for further renewal. The petitioner company had also established a refractory Plant in B 1961 near Ramgarh in District Hazaribagh. It appears, however, that petitioner faced a number of difficulties in operating the refractory plant and was explaining its difficulties to the State of Maghalaya which was formed in 1970. Between 1970 to 1972, the Union of India, through its public ###### c [sector companies, Hindustan Steel Ltd. and Bokaro Steel Ltd. ] negotiated with the petitioner for the purchase of its refractory plant and also for having the mining leases transferred to them. Though the refractory plant was not functioning properly and was on the verge of -""' closure, the petitioner was not willing to transfer its mining leases to the public sector companies but was willing to supply the required D [quantity of sillimanite to the Bakaro Steel Plant. ] [It ] [is ] [also stated that ] some negotiations took place as a result of which the petitioner was planning to re-open the factory on 6.11.1972. However, in the meantime on the 2nd of November, 1972, the Central Government took over the management of the refractory plant under section ~ 18-AA of the Industries Development & Regulation Act, 1951. PosE [session ][of ][the plant ][as ] [well ][as ] [its management ][was ][also taken over ][by ] the Hindustan Steel Ltd. on the same day. This take over was challenged by the petitioner company but its challenge was repelled by the Delhi High Court and a Special Leave Petition was filed, which is pending in this Court. We are not concerned with this issue in the present case. _..., F _F-_ _-:_ **1""'** _..., On 12.9.1972, the Mines and Minerals (Regulation and Development) Act, 1951, was amended by Act No. 56 of 1972. By this amend**ment, section 4-A was introduced in the Act, which reads as follows:** "(l) Where the Central Government, after consultation with the State Giwemment is of opinion that it is expedient G in the interest of regulation of mines and 1'1.ineral develop ment so to do it may request the State Government to make #### a premature termination of a Mining Lease in respect of >1; any mineral other than a minor mineral, and, on receipt of such request, the State Government shall make an order H making a premature termination of such mining lease and ASSAM SILLIMANITE _v._ U.0.1. IRANGANATHAN, J.J 987 granting a fresh mining lease in favour of such Government Comany or Corporation owned or controlled by Government as it may think fit. A ### ' (2) Where the State Government, after consultation with the Central Government, is of opinion that it is expedient in the iterest of regulation of mines and mineral develop- B ment so to do, it may, be an order, make premature termination of a mining lease in respect of any minor mineral and grant a fresh lease in respect of such mineral in favour of such Government Company or Co-operation owned or controlled by Government as it may think fit." This amendment came into effect in September 1972. At this juncture it may be mentioned that Act 37 of 1986 has further amended the 1951 Act and substituted section 4A by the following section, which in.sofar as it is relevant for our present purposes reads as follows: c D "4A (1) Where the Central Government, after consultation with the State Government, is of opinion that it is expedient in the interest of regulation of mines and mineral development, preservation of natural environment, control of floods, prevention of pollution, or to avoid danger to E public health or communications or to ensure safety of buildings, monuments or other structures or for conservation of mineral resources or for maintaining safety in the mines or for such other purposes, as the Central Government may deem fit, it may request the State Government to make a premature termination of a prospecting licence or F mining lease in respect of any mineral other than a minor mineral in any area or part thereof, and, on receipt of such request, the State Government shall make an order making a premature termination of such prospecting licence or mining lease with respect to the area or any part thereof. (2) Where the State Government, after consultation with the Central Government, is of opinion that it is expedient in the interest of regulation of mines and mineral development, preservation of natural environment, control of floods, prevention of pollution or to avoid danger to public G health or communications or to ensure safety of buildings, H A B c 988 SUPREME COURT REPORTS [ 1990] I S.C.R. monuments or other structures or for such other purposes, as the State Government may deem fit, it may, by an order, in respect of any minor mineral, make premature termination of a prospecting licence or mining lease with respect to the area or any part thereof covered by such licence or lease: Provided that the State Government may, after the premature termination of a prospecting licence or mining lease under sub-section (1) or sub-section (2), as the case may be, grant a prospecting licence or mining lease in favour of such Government company or corporation owned or controlled by Government as it may think fit. (3) No order making a premature termination of a prospecting licence or mining lease shall be made except after giving the holder of the licence or lease a reasonable opportunity of being heard. D In pursuance of the 1972 amendment, the State Government passed an order termminating the mining leases granted to the petitioner and granted fresh leases over the same areas in favour of M/s. Hindustan Steel Ltd., a Government company, fully owned by the Central Government. The order, made in the name of the GoverE nor, reads as follows: ###### .. Dated, Shillong 7th Dec., 1972. _oFC_ ## F G H No. MG. 133/72: Whereas the Central Govt., having consulted the Govt. of Meghalaya, is of opinion that it is expedient in the interest of mineral regulation and development that the mining leases of sillimanite mentioned below held by M/s. Assam Sillimanite Ltd. (having its Registered Office at 13 A.T. Road, Gauhati) in Megbalaya are terminated forthwith; And, whereas, in terms of Sec. 4A of the Mines and Minerals (Regulation & Development) Act, 1957, as amended by the Mines and Minerals (Regulation & Development) Amended Act, 1972, the Central Govt. has requested the Govt. of Meghalaya to make a premature termination of the said mining leases held by M/s. Assam Sillimanite Ltd.; A B c D } . ).. ~ ## The petitioner filed a writ petition in the Gauhati High Court against the order dated 7 .12.1972 but it was not able to obtain any _ex_ - _parte_ interim orders. The petition was withdrawn from the Gauhati High Court and the present petition under Article 32 has been filed in E this Court. On 5.3.1973, this Court issued _rule nisi_ and also directed the maintenance of the _status quo_ pending notice. It, however, appears that Hindustan Steel Ltd. had taken possession of the properties in question and the interim stay was also vacated on 20th of January, 1987. The present position, therefore, is that the mining leases have been granted to the Hindustan Steel Ltd. and they have also been F operating the mines for the past several years. Though several objections have been raised to the action of the State Government in the writ petition, including a challenge to the validity of section 4A, the arguments before us were restricted by Shri P.C. Jain to only two aspects. He submitted that, admittedly, no G notice had been issued by the State Government before terminating the leases prematurely. This, according to him, amounts to denial of natural justice and vitiates the order dated 7.12.1972. The second contention is that the order does not fulfil the requirements specified in section 4-A justifying the premature termination of leases in pursuance thereof. H ASSAM SILLIMANl1E _v._ U.0.1. [RANGANATHAN, J.] 989 Now, therefore, the Govt. of Meghalaya in exercise of the powers conferred by Sec. 4A(l) of the Mines and Minerals (Regulation & Development) Act, 1957, as amended by the Mines & Minerals {Regulation & Development) Amendment Act, 1972 hereby terminates prematurely the mining leases of sillimanite. mentioned below held by M/s. Assam Sillimanite Ltd. with immediate effect and grants fresh mining leases over the same areas in favour of M/s. Hindustan Steel Ltd., a Government Company, fully owned by the Central Government. Area in hectares 129.60 Period of Date of Lease expiry 15 years 24.4.1977 Lease No. 5. 6. 7. Locality Lalmati N ongmawait _'777._ 60 Wamsophi 363.00 -do -do 9.4.1978 7.6.1982" 990 SUPREME COURT REPORTS [ 1990] 1 S.C.R. This writ petition came up for hearing on earlier occasions but it A was adjourned from time to time as the same issue was pending decision in this Court in the case of _State_ _of Haryana_ v. _Ram Kishan_ _&_ _Ors.,_ Civil Appeals Nos. 1472-77 of 1987. Our task in the present writ petition has been considerably simplified because the above civil ap peals have been disposed of by this Court by its .iudgment date<.! 6th B May, 1988, which Is reported in _[1988]_ _3 S.C.C._ _416._ Shri P.C. Jain, learned counsel for the petitioner company submits that the first point raised by him has been squarely decided in his favour in the above case and that, therefore, he is entitled to succeed in the present writ petition. Learned counsel also referred to a decision of the Delhi High Court reported in _Dharam Veer_ v. _Union_ _of {ndia,_ AIR 1989 Delhi 227, which has followed the decision in _Ram Kishan's_ case. In that C case, a similar order of premature termination was set aside by the High Court and the lessees were directed to be put back in possession of .the leased premises which had been taken away from . them in pursuance of their unlawful order. Learned counsel submits that, in the present case, having regard to the comparatively long periods of .lj) leases and the lapse of time, be would not pray for the petitioner being put back in possession of the leased premises b"t he contends that the least that could be done is to award compensation to the petitioner company for, (what has now to be held to be), the wrongful premature termination of the leases. He submits that the petitioner is willing to have this aspect of the matter referred to arbitration by any arbitrator E appointed by this Court. On the other hand, Shri R.B. Datar, learned counsel for the Union of India submits that, in the _State_ _of Haryana_ v. _Ram Kishan_ _and Others,_ [1988] 3 S.C.C. 416, the Central Government had expressed its willingness to reconsider the matter after hearing the parties F concerned and that, therefore, the decision of this Court in that case is distinguishable. He sought to contend, on the strength of observations made by this Court in _The Barium Chemicals Ltd. and Anr._ v. _Com-_ _pany Law Board and Others,_ [1966] Suppl. S.C.R. 311 as well as the decision in _R.S. Dass_ v. _Union_ _of India and Others,_ [1985] Suppl. S.C.C. 617 that rules of natural justice can be statutorily excluded G either expressly or by necessary implication. In the present case, he ·submits that it became expedient, in the interest of regulation of mines and mineral development, to have the mining operations in respect of raw materials necessary for the production of iron and steel entrusted to public sector companies and a policy decision to this effect had been taken by the Government. In this context, he submits, the grant of an H opportunity to the lessee would be totally meaningless and futile. He ASSAM SILLIMANITE _v._ U.O.l. IRANGANATHAN, J.J 991 says that the object and purpose of the statute clearly excludes the _).-_ A provision of an opportunity to the lessees before termination of the leases. If at all, he submits, it will be open to a lessee, whose lease is prematurely terminated unper section 4-A, to challenge the order of premature termination, after it was passed, on the ground that it did not satisfy the conditions set out in section_ 4-A but that the section should not be construed as envisaging a hearing of the lessees before B an.order of premature termination is made. Referring to the amendment of section 4-A in 1986, which specifically provides for an opportunity of hearing under sub-section (3), Shri Datar says that this ~ provision became necessary because the grounds for premature termination set out in the new sub-section (1) of section 4-A were made wider and made more comprehensive. Under the new sub-section, ###### premature termination of leases was permissible in various other c circnmstances, such as: preservation of natural environment, control )>._ ~f floods, prevention of pollution, avoidance of danger to public health or communications, ensuring of safety of buildings, monuments and other structures, conservation of mineral resources, maintenance of safety in mines and such other purposes as the <;entral Government D may deem fit. These were purposes in respect of which an opportunity of hearing to the lessee would be really needed and helpful but that, in ,J, the context of earlier sub-section, which was much narrower, no such opportunity of hearing was at all contemplated. We do not propose to reconsider this matter as, in our opinion, E the contention raised by Shri P.C. Jain is directly and squarely con# - eluded by the decision in Ram Kishan's case (supra). It is no doubt true { that in that case the Central. Government appears to have been willing to rehear the parties but the court did not proceed on the basis of any _>-_ length and held that there was no suggestion concession. The court discussed the provisions of section 4-A at great in the section to deny the F right of the affected persons to be heard and that the section must be interpreted to imply that the person who may be affected by such a decision should be afforded an opportunity to prove that the proposed step would not advance the interest of mines and mineral development. Not to do so, it was held, would be violative of the principles of natural justice. The court concluded that the lessee-respondents were G ###### ---( entitled to be heard before a decision to prematurely terminate their leases was taken and that, since it was not done, the High CQJirt was right in quashing the order passed under section 4-A. In our opinion, the decision in _Ram Kishan's_ case fully covers the present case and should be followed by us. In fact, we think that the H 992 SUPREME COURT REPORTS I 1990) 1 S.C.R. A subsequent amendment in 1986 lends support to the plea of the petitioners. Though it is true that the scope of section 4-A (1) has been widened, the insertion of sub-section (3) clearly reflects a statutory intention that an opportunity of hearing must be given before the order of termination is passed, presumably as such an order widely B ##### c D affects the rights of the lessees. We are not able to agree with Shri Datar that under section 4-A, as it stood before 1986, no useful purpose would have been served by the giving of such an opportunity. Several situations and circumstances can be conceived of where, given an opportunity of hearing, the lessee may be able to either dissuade the Government from terminating the leases prematurely or in persuading the government to do it subject to certain safeguards for its benefit. For example, the lessee may be able to show that the public sector corporation to whom it is proposed to entrust the working of the mines is not yet adequately equipped to exploit the mines and that, atleast for some more time the _status quo_ should continue; or, again, if there is only a short period before the leases are to expire in the normal course, the lessee may be able to persuade the Government that no great advantage would be derived by premature termination of the lease. These are only illustrative. Several such other situations can be thought of. It is very difficult, therefore, to accept the contention that because an order under section 4-A is to be passed in order to give effect to a policy of the Government, it is not necessary or useful to provide the lessees, whose leases are about to be terminated, an opportunity of hearing. We, therefore, hold, respectfully following the decision in _Ram Kishan's_ case (supra), that the order passed under section 4-A dated 7 .12.1972 is null and void as it violated the principles of natural justice and was passed without giving an opportunity to the lessees of being heard. F The next question is regarding the relief to be granted to the petitioner. Shri Datar submits that in the writ petition the only prayer made by the petitioners is for the quashing of the order dated 7 .12.1972 and that no further claim has been made in the writ petition. He submits that if the petitioners are aggrieved because of the premature tenilination of the leases, it is open to them to file a suit or take G other appropriate remedies for obtaining compensation in respect of the unlawful termination. We do not think that this a fair course to be adopted in this case. The writ petition was filed by the petitioner company as early as in February 1973 and has been pending in this Court for about 17 years. It is true that the petitioner could have filed a suit for the same purpose with a prayer for additional relief by way of H compensation or damages. Bnt we do not think that it should now be # ASSAM SILLIMANITE _v._ U.0.1. [RANGANATHAN, J.] 993 asked to go back to file a suit for compensation or damages which may be barred by limitation. After the lapse of such a long time, in our opinion, the proper course is to adopt some method for deciding the quantum of relief that coutd_be granted to the petitioner by way of compensation and damages, which can at once be simple and expeditious and which will avoid further unnecessary litigation. We think that the request of the learned counsel that the matter may be referred to arbitration is a fair one and indeed this course is also not seriously resisted by the respondents. The short question that remains to be decided is whether the petitioners have suffered any damages as a - result of the premature termination of the three leases in their favour either in the shape of loss of profits for the unexpired periods of the leases or in any other material respect. We, however, direct that, having regard to the circumstances of the case, the compensation/damages should be restricted to a period of five years from the date of termination of the leases or upto the date of expiry of the original lease deeds referred to above whichever is less and not for the entire unexpired period of all the leases. We refer this issue to arbitration. Shri Justice S. Natarajan, retired Judge of this Court, is appointed as Arbitrator to decide the above issue. The Union of India has promised to place the services of a mining engirieet/expert at the disposal of the arbitrator to assist him on the technical aspects of the matter. The name of the nominee should be communicated to the arbitrator within four weeks from today. It will be open to the arcitrator to avail himself of the services of such nominee. Parties may settle the terms of arbitration with the arbitrator. The company and Union of India should, how.ever, deposit Rs.10,000 each with the arbitrator as soon as the terms are settled to enable him to start the proceedings without delay. The Arbitrator may enter upon the refe~ rence within four weeks of the date of communication of this order to him. He may make his award within a period of four months thereafter. He will not be obliged to give reasons for his conclusions. A _copy of this order may be sent to the learned Arbitrator by the Registry. The writ petitions disposed of in the above terms. In the **circumstances, we make no order as to costs.** R.S.S. Petition disposed of. A B c D E F G