Supreme Court of IndiaSupreme Court · 2021Division BenchAppeals allowed; the impugned orders set aside;...

ASSAM INDUSTRIAL DEVELOPMENT CORPORATION LTD. v. GILLAPUKRI TEA COMPANY LIMITED & ORS. ETC.

Case / Petition Number:
Civil Appeal Nos. 251-252 of 2021
Neutral Citation:[2021] 1 S.C.R. 181

Case Synopsis & Summary

This appeal concerns a land acquisition for setting up a plastic park in Gillapukri Tea Estate, Assam, under the Land Acquisition Act, 1894. Notifications under Sections 4 and 6 were issued in 2008–2009, and the Deputy Commissioner sought approval of the award (Form No. 15) and the land acquisition estimate (Form No. 5) on 30 January 2010. The State Government granted approval by its letter dated 5 March 2010. Compensation was paid, possession delivered to the Deputy Commissioner on 21 May 2010, and possession ultimately handed to the appellant on 11 June 2010. The landowner also sought reassessment under Section 18 on 5 May 2010. The owner and government proceeded under the assumption that the original award was approved on 5 March 2010, and subsequent actions followed accordingly. The landowner later contended that no award was approved until 2014, and fresh acquisition proceedings were initiated in 2012–14, culminating in a new award under the 2013 Act. The High Court held in favor of the landowner. The Supreme Court held that the award was indeed approved on 5 March 2010; once an award is approved, compensation paid and possession delivered, there is no basis for lapsing under Section 24 LA Act, 1894, and re-notification for acquisition cannot be made. It relied on D. Hanumanth SA and Indore Development Authority, and held that the 2013 Act could not apply to the original proceedings. The appeals were allowed and the impugned orders set aside.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • S. Abdul Nazeer
  • Sanjiv Khanna
Judgment Date
2021-01-28
Court Decision / Holding
Appeals allowed. The orders impugned are set aside. Pending applications, if any, shall stand disposed of. The parties shall bear their own costs.
Final Disposition
Appeals allowed; the impugned orders set aside; pending applications disposed; costs borne by the parties.

Parties to the Case

Appellants / Petitioners

  • ASSAM INDUSTRIAL DEVELOPMENT CORPORATION LTD.

Respondents

  • Gillapukri Tea Company Limited
  • Others (Ors.)

Legal Representation & Advocates

Counsels for Petitioners

  • • Jayant Bhushan
  • • Nishant Das
  • • Abhay Singh
  • • Kaustubh C Shukla
  • • Ms. Ankita Agarwal
  • • Atul Kumar
  • • Ms. Ayushi Jain

Counsels for Respondents

  • • Senthil Jagadeesan
  • • Ms. Suriti Chowdhary
  • • Ms. Mrinal Kanwar
  • • Ms. Sonakshi Malhan
  • • Shuvodeep Roy
  • • Rahul Raj Mishra

Provisions of Law Cited

Land Acquisition Act, 1894 - Sections 4 and 6Land Acquisition Act, 1894 - Section 18Land Acquisition Act, 1894 - Section 24Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013Assam Land Acquisition Manual

Legal Doctrines & Maxims

  • Once possession is taken, land vests absolutely with the State and the title of the landowner ceases.
  • Government cannot acquire its own land.
  • An award already approved cannot be reopened; lapsing under Section 24 cannot arise if the award has been approved.

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellants contended that the 5 March 2010 approval covered both the award and the land acquisition estimate (Form No. 15 and Form No. 5). Compensation was paid, possession delivered in May–June 2010, and the landowner sought reassessment under Section 18. The letters of 21 July 2012 and 6 January 2014 do not negate the earlier approval, nor do they justify reopening the proceedings. Once the award was approved, the land vested in the State and acquisition could not be reopened; lapsing under Section 24 was not triggered. The 2013 Act would not apply to the original proceedings. The Court should rely on established authorities (D. Hanumanth SA; Indore Development Authority) supporting finality of an approved award.

Contentions of Respondents

The respondents argued that no award was approved on 5 March 2010; the 5 March 2010 letter only approved the land acquisition estimate. Fresh awards were prompted under 2013 Act due to omissions in the original award. The letters of 21 July 2012 and 6 January 2014 indicate no approval of the original award. Thus fresh acquisition proceedings and a new award under the 2013 Act were valid. The High Court’s approach to permit re-notification and re-acquisition procedures should stand; the 2013 Act’s Section 24 should apply to lapsing of the original award if not approved timely.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (5)

Case NameCitationTreatmentExplanation
D. Hanumanth SA & Ors. v. State of Karnataka and Ors.(2010) 10 SCC 656PositiveRelied on and followed; held that once an award is approved and possession is taken, further re-notification is impermissible; Section 24 stipulations cannot be invoked to reopen settled acquisition.
Indore Development Authority v. Manoharlal and Ors.(2020) 8 SCC 129PositiveConstitution Bench decision; affirmed vesting of land in the State on possession and stated that the Government cannot acquire its own land; followed to deny fresh award/re-notification.
Meher Rusi Dalal v. Union of India(2004) 7 SCC 362PositiveCited in para 15-16 to support the proposition that the Government cannot acquire its own land; used as part of the settled legal framework.
State of Orissa v. Brundaban SharmaNot specifiedPositiveCited to assert that the LA Act does not contemplate acquisition of government property interests; used as supportive authority.
Collector of Bombay v. Nusserwanji Rattanji MistriAIR 1955 SC 298; (1955) 1 SCR 1311Mentioned OnlyReferenced as part of the historical line of authorities; not a central basis for the present core ruling.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•3,818 words•~18 min read

In The Court Record

ASSAM INDUSTRIAL DEVELOPMENT CORPORATION LTD. v. GILLAPUKRI TEA COMPANY LIMITED & ORS. ETC.

181 [2021] 1 S.C.R. 181 ASSAM INDUSTRIAL DEVELOPMENT CORPORATION LTD. A v. GILLAPUKRI TEA COMPANY LIMITED & ORS. ETC. (Civil Appeal Nos. 251-252 of 2021) JANUARY 28, 2021 B ## **[S. ABDUL NAZEER AND SANJIV KHANNA, JJ.]** _Land Acquisition:_ _Acquisition of land – Notifications u/ss. 4 and 6 of Land Acquisition Act issued respectively on 4.8.2008 and 17.6.2009 –_ C _By letter dated 30.01.2010 sought approval of the ‘award’ and the ‘land acquisition estimate’ (in the prescribed Form No. 15 and Form No. 5 respectively) – Approval granted by letter dated 05.03.2010 – Land-owner thereafter sought reference u/s. 18 of Land Acquisition Act for reassessment of compensation – The Land-owner also_ D _received the compensation and possession of the land was handedover on 21.05.2010 – The land-owner thereafter relying on letters that 21.07.2012 and 06.01.2014 contended that no award was approved by letter dated 05.03.2010 (thereby only land acquisition estimate was approved) and thus it led to lapsing of previous acquisition proceedings and initiation of fresh acquisition_ E _proceedings on 07.08.2012, culminating in approval of the award for the first time on 04.01.2014 – The landowner claimed fresh award by determining the compensation payable in terms of 2013 Act because the award under the fresh proceedings was made and approved after coming into force of 2013 Act – High Court allowed_ F _the case of the land-owner – Appeal to Supreme Court – Held: The facts of the case including conduct of the land-owner show that the award was approved on 05.03.2010 – Once the award had been approved, compensation paid, possession of the land handed-over, there was no question of lapsing u/s. 24 of Land Acquisition Act, 1894 – Such land cannot be re-opened for acquisition – Land_ G _Acquisition Act, 1894 – Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 – s. 24 – Assam Land Acquisition Manual._ D G H 181 182 SUPREME COURT REPORTS [2021] 1 S.C.R. ## A **Allowing the appeals, the Court** - **HELD : 1.It is uncontested that vide letter dated 30.01.2010** - **both the award and the land acquisition estimate were sent to the State Government for its approval. It is pertinent to note that the award was in the format of Form No. 15 which is the statutorily** - B **prescribed form for a land acquisition award under the Assam Land Acquisition Manual. This is also true of the land acquisition estimate which was as per the prescribed format of Form No. 5. As such, the only further action required of the State Government was to approve the award which was already in the statutorily prescribed form. This is precisely what was done vide the letter** - C **dated 05.03.2010 issued by the Deputy Secretary to the Government of Assam, Revenue Department. [Para 13] [187-G-H; 188-A-B]** **2. The letter dated 05.03.2010 was issued in response to** **the letter dated 30.01.2010, whereunder approval of the award** D **and the land acquisition estimate was sought. While this letter only expressly mentions the land acquisition estimate and not the award, a combined reading of this letter with the preceding letter dated 30.01.2010 and the subsequent conduct of the parties, including the first respondent, make it evident that the award** E **stood approved by letter dated 05.03.2010. Copies of both the letters of 30.01.2010 and 05.03.2010 were also addressed to the Industries & Commerce Department of the Government of Assam. Vide the initial letter of 30.01.2010, the said Department was requested to arrange balance funds for making payment to the land owners as per the award. In furtherance of this, vide the** F **letter of 05.03.2010, the said Department was directed to place the balance estimated fund at the disposal of the Deputy Commissioner. If the award which had been sent for approval alongwith the estimate had not been approved by the said letter dated 05.03.2010, this direction for making funds for payment to** G **landowners available to the Deputy Commissioner would not have been called for. This view is fortified by the subsequent conduct of the parties. [Para 14][188-C-F]** **3. It is undisputed that the award amount was indeed made available to the Deputy Commissioner and the awarded sum was** H 183 ASSAM INDUSTRIAL DEVELOPMENT CORPN. LTD. v. GILLAPUKRI TEA COMPANY LTD. **duly paid to and received by the first respondent. Not only did the first respondent receive compensation pursuant to the award, it in fact sought enhancement of the same vide its reassessment petition dated 05.05.2010 u/s 18 of the L.A. Act addressed to the Deputy Commissioner. It is also not contested that vide possession certificate dated 21.05.2010, the first respondent handed over possession to the Deputy Commissioner and that on 11.06.2010 possession of the land was ultimately handed over to the appellant by the Deputy Commissioner. What clearly emerges from the above is that after the letter dated 05.03.2010, it was the common belief of the State Government, the appellant as well as the first respondent that the award had been approved and that now actions subsequent thereto viz. payment and receipt of compensation, handover of possession, seeking reassessment of the compensation were needed to be undertaken. [Para 15][188-F-H; 189-A-B]** **4. Once the award has been approved, compensation has been paid thereunder and possession of the land has been handed over to the Government, acquisition proceedings could not have been reopened, including by way of re-notification of the already acquired land under Section 4 of the L.A. Act by the Government. The question of lapsing under Section 24 of the L.A. Act could not have arisen in this case once the award was approved on 05.03.2010. [Para 17][189-C-D]** A B C D E _D. Hanumanth SA & Ors. vs. State of Karnataka and Ors._ **(2010) 10 SCC 656 : [2010] 12 SCR 1098 – relied on.** F **5. Once possession is taken by the State, the land vests absolutely with the State and the title of the landowner ceases. High Court wrongly relied on the letters dated 21.07.2012 and 06.01.2014 to nullify the original award and allow fresh acquisition proceedings in respect of the first respondent’s land which had already been acquired and has been under the possession of the** G **appellant since 11.06.2010. [Para 18][190-D-E]** _Indore Development Authority v. Manoharlal and Ors._ **(2020) 8 SCC 129: [2020] 3 SCR 1 – followed.** H 184 SUPREME COURT REPORTS [2021] 1 S.C.R. |A<br>**[2010] 12 SCR 1098**<br>**[2020] 3 SCR 1**|**Case Law Reference**<br>**relied on**<br>**Para 18**<br>**followed**<br>**Para 18**| |---|---| CIVIL APPELLATE JURISDICTION : Civil Appeal Nos. 251B 252 of 2021. From the Judgment and Order dated 14.03.2019 of the High Court of Gauhati at Guwahati in Writ Appeal No. 219 of 2017 and Writ Appeal No. 220 of 2017. Jayant Bhushan Sr. Adv., Nishant Das, Abhay Singh , Kaustubh C Shukla, Ms. Ankita Agarwal, Atul Kumar, Ms. Ayushi Jain, Senthil Jagadeesan, Ms. Suriti Chowdhary, Ms. Mrinal Kanwar, Ms. Sonakshi Malhan, Shuvodeep Roy, Rahul Raj Mishra, Advs. for the appearing parties. The Judgment of the Court was delivered by ## D **S. ABDUL NAZEER, J.** 1. Leave granted. 2. Assam Industrial Development Corporation Limited has filed these appeals challenging the judgment and order in Writ Appeal Nos. 219 & 220 of 2017 dated 14.03.2019 whereby the Division Bench of the High Court of Guwahati has dismissed the said appeals confirming the E order of the Learned Single Judge in Review Petition Nos. 79 & 80 of 2016. 3. Brief facts necessary for disposal of these appeals are as under. 4. In order to set up a plastic park, the Government of Assam F decided to acquire a portion of the land belonging to the first respondent situated at Gillapukri Tea Estate, Village Gillapukri, Tinsukia, Assam. The Government of Assam, in exercise of the power vested in it under Section 4 of the Land Acquisition Act, 1894 (for short ‘L.A. Act’) issued a notification dated 04.08.2008, which was published in the Assam Gazette on 08.08.2008, expressing its intention to acquire 1,166 biggas, 1 G katha, 14 lessas of land of the aforesaid Gillapukri Tea Estate. The proceedings being L.A Case No. 1 of 2008 were also initiated for the purpose of acquisition before the District Collector, Tinsukia and, for that purpose, declaration dated 17.06.2009 in terms of Section 6(1) of the L.A. Act was published in the Assam Gazette. The appellant was H 185 ASSAM INDUSTRIAL DEVELOPMENT CORPN. LTD. v. GILLAPUKRI TEA COMPANY LTD. [S. ABDUL NAZEER, J.] appointed as the nodal agency to deal with the acquisition proceedings vide appointment letter dated 24.06.2009. 5. The Deputy Commissioner and Collector, District Tinsukia, addressed a letter dated 30.01.2010 to the Principal Secretary to the Government of Assam, Revenue Department to seek approval of the award and the land acquisition estimate which were enclosed therewith in the prescribed Form No. 15 and Form No. 5 respectively. In response, the Commissioner and Secretary to the Government of Assam, Revenue Department, addressed a letter dated 05.03.2010 to the Deputy Commissioner whereby approval, as sought vide the aforesaid letter dated 30.01.2010, was granted. As will be seen in the following paragraphs, the controversy between the parties before us is whether this letter was approval of both the award and the estimate or only the estimate. Thereafter, the owner of the land, i.e. the first respondent herein, addressed a letter dated 05.05.2010 to the Commissioner seeking reference of the matter to the District Judge, Tinsukia, under Section 18 of the L.A. Act for reassessment of the compensation awarded to it. It is contended that other similar applications were also received from different families at different levels. It is further contended that in the letter dated 05.05.2010, the first respondent admitted that it had received a sum of Rs. 4.95 crores on 08.04.2010 by a crossed cheque immediately after the letter for approval dated 05.03.2010 was passed by the Commissioner. It is also contended that vide possession certificate dated 21.05.2010, possession was delivered to the Deputy Commissioner, and thereafter on 11.06.2010, possession of the land was handed over to the appellant by the Deputy Commissioner. 6. The first respondent has not disputed the issuance of the preliminary and final notification. However, it is contended that no award was approved pursuant to the letter dated 05.03.2010. It is the first respondent’s case that vide this letter, only the land acquisition estimate was approved and not the award. This, in the first respondent’s view, led to lapsing of the proceedings and initiation of fresh acquisition proceedings in 2012 which culminated in approval of the award for the first time on 04.01.2014. For this purpose, a fresh notification under Section 4 of the L.A. Act was published on 07.08.2012 and a declaration was also issued on 20.11.2012. Thereafter, the Commissioner issued a notice purportedly under Section 9 of the L.A. Act to the persons interested in the land to submit their objections and claims. On 04.01.2014, a fresh award was A B C D E F G H 186 SUPREME COURT REPORTS [2021] 1 S.C.R. - A passed and the Deputy Secretary, Government of Assam, Revenue Department addressed a letter dated 06.01.2014 to the Deputy Commissioner conveying approval of the said fresh award. The first respondent contends that a comparison of this approval letter dated 06.01.2014 with the approval letter dated 05.03.2010 under the original acquisition proceedings would clearly indicate that under the letter dated - B 05.03.2010, only the estimate was approved and not the award. Since the award under the fresh proceedings was approved and made after coming into force of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (for short ‘2013 Act’), the first respondent approached the Deputy Commissioner - C to seek a fresh award by determining the compensation payable in terms of Section 24(1)(a) of the 2013 Act. 7. The first respondent has denied the claim of the appellant that an award had been approved on 05.03.2010 and has mainly rested its case on the letter dated 21.07.2012 addressed by the Deputy Secretary, D Government of Assam, Revenue Department to the Deputy Commissioner wherein the Deputy Secretary admitted to not having drawn the award within two years from the date of publication of the declaration under the original acquisition proceedings. The first respondent has also relied upon the letter dated 06.01.2014 sent by the Deputy Secretary to the Government of Assam which, as per the first E respondent, suggests that no award had been approved under the original acquisition proceedings. 8. On the contrary, the State Government has taken a stand that an award was approved by the State Government on 05.03.2010 and that the same had been made within two years of the declaration. It is F also contended that pursuant to the award, possession of the land was taken from the first respondent by the acquiring authority and the land was then handed over to the appellant. It was also submitted that the entire compensation had been paid to the first respondent. The State Government contends that the need for an additional award arose only G because some of the land owners of the land initially proposed to be acquired were left out in the original award that was approved on 05.03.2010. 9. Appearing for the appellant Shri Jayant Bhushan, learned senior counsel has submitted that the award had been passed in Form No. 15 H of the Assam Land Acquisition Manual and was approved by the State 187 ASSAM INDUSTRIAL DEVELOPMENT CORPN. LTD. v. GILLAPUKRI TEA COMPANY LTD. [S. ABDUL NAZEER, J.] on 05.03.2010. Possession of the land was also handed over by the first respondent to the acquiring authority on 21.05.2010 and was thereafter handed over to the appellant on 11.06.2010. Shri Bhushan submitted that the compensation was also received by the first respondent and, in fact, the first respondent had also sought enhancement of the compensation allowed under the said award. It is Shri Bhushan’s submission that once the land stood vested in the State, it could not have been acquired again. Therefore, any issuance of fresh notification under Section 4 and 6 or even preparing of a fresh award by the State Government in respect of the first respondent’s land will be _non est_ or infructuous. He further submits that the letters dated 21.07.2012 and 06.01.2014 relied upon by the High Court could not have had the effect of re-acquiring the land in question since it already stood vested in the State Government. A B C 10. Learned counsel appearing for the State of Assam has supported the stand of the appellant. 11. However, Shri Senthil Jagadeesan, learned counsel for the first respondent submits that the aforesaid two letters would conclusively establish that no approval to an award was granted by the State Government under the original acquisition proceedings. It is his submission that the two aforesaid letters dated 21.07.2012 and 06.01.2014 which were relied upon by the Division Bench of the High Court would clearly establish the same. Therefore, he prays for dismissal of these appeals. 12. We have carefully considered the submissions of the learned counsel made at the Bar and perused the materials placed on record. Having regard to the contentions urged, the crucial question for consideration is whether an award in respect of the first respondent’s land was approved by the State Government on 05.03.2010. Needless to say, if the award was not approved on 05.03.2010, but rather on 06.01.2014 as contended by the first respondent, then the 2013 Act will be applicable and the first respondent will be eligible to receive compensation in accordance therewith. 13. To determine whether the award had indeed been approved on 05.03.2010, we first have to examine the letter dated 30.01.2010 through which the State Government’s approval of the award was sought by the Deputy Commissioner. It is uncontested that vide this letter both the award and the land acquisition estimate were sent to the State Government for its approval. It is pertinent to note that the award was in D E F G H 188 SUPREME COURT REPORTS [2021] 1 S.C.R. - A the format of Form No. 15 which is the statutorily prescribed form for a land acquisition award under the Assam Land Acquisition Manual. This is also true of the land acquisition estimate which was as per the prescribed format of Form No. 5. As such, the only further action required of the State Government was to approve the award which was already in the statutorily prescribed form. This is precisely what was done vide - B the letter dated 05.03.2010 issued by the Deputy Secretary to the Government of Assam, Revenue Department. 14. This letter dated 05.03.2010 was issued in response to the letter dated 30.01.2010, whereunder approval of the award and the land acquisition estimate was sought. While this letter only expressly mentions C the land acquisition estimate and not the award, a combined reading of this letter with the preceding letter dated 30.01.2010 and the subsequent conduct of the parties, including the first respondent, make it evident that the award stood approved by this letter of 05.03.2010. It is noteworthy that copies of both the letters of 30.01.2010 and 05.03.2010 D were also addressed to the Industries & Commerce Department of the Government of Assam. Vide the initial letter of 30.01.2010, the said Department was requested to arrange balance funds for making payment to the land owners as per the award. In furtherance of this, vide the letter of 05.03.2010, the said Department was directed to place the balance estimated fund at the disposal of the Deputy Commissioner. We E find strength in the appellant’s submission that if the award which had been sent for approval alongwith the estimate had not been approved by the said letter dated 05.03.2010, this direction for making funds for payment to landowners available to the Deputy Commissioner would not have been called for. This view is fortified by the subsequent conduct of the F parties, as particularly evinced by the below mentioned actions. 15. It is undisputed that the award amount was indeed made available to the Deputy Commissioner and the awarded sum was duly paid to and received by the first respondent. Not only did the first respondent receive compensation pursuant to the award, it in fact sought G enhancement of the same vide its reassessment petition dated 05.05.2010 u/s 18 of the L.A. Act addressed to the Deputy Commissioner. It is also not contested that vide possession certificate dated 21.05.2010, the first respondent handed over possession to the Deputy Commissioner and that on 11.06.2010 possession of the land was ultimately handed over to the appellant by the Deputy Commissioner. What clearly emerges from H 189 ASSAM INDUSTRIAL DEVELOPMENT CORPN. LTD. v. GILLAPUKRI TEA COMPANY LTD. [S. ABDUL NAZEER, J.] the above is that after the letter dated 05.03.2010, it was the common A belief of the State Government, the appellant as well as the first respondent that the award had been approved and that now actions subsequent thereto viz. payment and receipt of compensation, handover of possession, seeking reassessment of the compensation were needed to be undertaken. B 16. It is clear from the materials on record that the plastic project for which the subject Land Acquisition was initiated has already been developed on the acquired land including boundary wall, entrance gate, laying of roads, drains and electrical distribution networks, electrical substation, industrial sheds and warehouses. C 17. In the above scenario, the arguments of the first respondent are untenable. Once the award has been approved, compensation has been paid thereunder and possession of the land has been handed over to the Government, acquisition proceedings could not have been reopened, including by way of re-notification of the already acquired land under Section 4 of the L.A. Act by the Government. Contrary to the first respondent’s contention, the question of lapsing under Section 24 of the L.A. Act could not have arisen in this case once the award was approved on 05.03.2010. D 18. So far as the second set of acquisition proceedings are concerned, without addressing the factual veracity of the State Government’s contention that the second award was meant to be only in respect of landowners not covered by the original award, we are of the opinion that it would not have been possible for the State Government to initiate acquisition proceedings in respect of already acquired land such as that of the first respondent herein. This position has been affirmed by this Court in _**D. Hanumanth SA & Ors.**_ **v.** _**State of Karnataka and Ors.[1]**_ in the following terms: E F _“17. Even otherwise, if land already stands acquired by the Government and if the same stands vested in the Government there is no question of acquisition of such a land by issuing a_ G _second notification for the Government cannot acquire its own land. The same is by now settled by various decision of this Court in a catena of cases._ 1 (2010) 10 SCC 656. H 190 SUPREME COURT REPORTS [2021] 1 S.C.R. A _18. In State of Orissa v. Brundaban Sharma,[2] this Court has held that the Land Acquisition Act does not contemplate or provide for the acquisition of any interest belonging to the Government in the land on acquisition This position was reiterated in a subsequent decision of this Court in Meher Rusi Dalal v. Union of India[3] in paras 15 and 16 of the said_ B _judgment, this Court has held that the High Court clearly erred in setting aside the order of the Special Land Acquisition Officer declining a reference since it is settled law that in land acquisition proceedings the Government cannot and does not acquire its own interest. While laying down the aforesaid_ C _law, this Court has referred to its earlier decision in Collector of Bombay v. Nusserwanji Rattanji Mistri[4]_ " The recent decision of the Constitution Bench of this Court in _**Indore Development Authority**_ **v.** _**Manoharlal and Ors.[5]**_ has also affirmed that once possession is taken by the State, the land vests D absolutely with the State and the title of the landowner ceases. We find no reason to deviate from this settled position of law and thus are unable to agree with the High Court’s reliance on the letters dated 21.07.2012 and 06.01.2014 to nullify the original award and allow fresh acquisition proceedings in respect of the first respondent’s land which had already been acquired and has been under the possession of the appellant since E 11.06.2010. 19. Therefore, for the foregoing reasons, the appeals succeed and are accordingly allowed. The orders impugned herein are set aside. Pending applications, if any, shall stand disposed of. The parties shall bear their own costs. F Kalpana K. Tripathy Appeals allowed. G 2 1995 Supp (3) SCC 249. 3 (2004) 7 SCC 362. H 4 AIR 1955 SC 298 : (1955) 1 SCR 1311. 5 (2020) 8 SCC 129.
End of Judgment Record
Browse All Supreme Court of India (2021) Decisions
2021-01-05

HARI OM @ HERO v. STATE OF U.P.

This is a Supreme Court appeal arising from six accused tried in multiple trials for offences under IPC sections 396 and 412, the SC/ST Act (3(2)(v)) and the Arms Act. The Trial Court convicted Hari Om @ Hero of the 396 IPC offence and awarded death, while other accused received varying outcomes. The High Court confirmed Hari Om’s death sentence and upheld some convictions, while acquitting three co-accused. The Supreme Court, in a Division Bench led by Justice Uday Umesh Lalit, allowed the appeals by Hari Om and others, finding serious infirmities in the prosecution case, especially the testimony of PW5, a five-year-old child witness (Ujjwal). The Court held that corroboration of a child witness is a prudential rule rather than a hard requirement and that, given glaring inconsistencies and lack of reliable corroboration, the evidence could not sustain a conviction under Section 396 IPC against Hari Om. It also highlighted ambiguities in fingerprint evidence—its collection, handling, and interpretation—and noted the absence of robust link evidence connecting the accused to the crime. Consequently, Hari Om, Sanjay @ Sonu and Saurabh @ Sanju were acquitted and ordered to be set at liberty, with the Court emphasizing careful, circumspect evaluation of child-witness testimony and forensic evidence.

2021-01-22

INDIAN BANK AND ANOTHER v. MAHAVEER KHARIWAL

This appeal concerns an Indian Bank employee who sought voluntary retirement under the Indian Bank Employees Pension Regulations, 1995 (Regulation 29), including a request for waiver of the three-month notice. The bank rejected the request on the ground that the employee was not eligible under Regulation 29, and initiated departmental proceedings which culminated in penalties. The employee challenged the rejection in a writ petition; the Single Judge dismissed it to the extent challenged here, but the Division Bench quashed the rejection and directed the bank to release retiral dues under the Pension Regulations. The Supreme Court, upholding the employer’s challenge, held that the voluntary retirement application dated 21.01.2004 was absolutely in consonance with Regulation 29 and that the 20.04.2004 rejection was illegal and contrary to Regulation 29. It held that the employee is entitled to all retiral benefits on the basis of voluntary retirement, and that the subsequent departmental enquiry would be non est since there would be no employer–employee relationship after retirement. The Court analyzed Regulation 29, including the three-month notice, the need for acceptance by the appointing authority, and the curtailment mechanism under Sub-Regulation 3, as well as the proviso to Sub-Regulation (1) relating to deputation. The appeal is dismissed with no costs, and the employee’s retiral benefits are secured while any further proceedings are void.

2021-11-29

Hasmat Ali v. Amina Bibi & ORS.

This is a Civil Appeal under Section 100 of the Code of Civil Procedure, 1908, arising from a suit in which the plaintiff sought a declaration that the defendant was a tenant up to 31.03.2003, eviction of the defendant from the suit shop, and other reliefs. The Trial Court partly decreed the suit directing the defendant to vacant possession; the Appellate Court dismissed the appeal, and the High Court, in Regular Second Appeal No. 403 of 2017, dismissed the appeal in limine without giving reasons. The essential issue is whether the High Court could dismiss a second appeal in limine without recording reasons and whether the appeal should be admitted for consideration of substantial questions of law under Section 100(1)–(5). The Supreme Court examines the interplay between Section 100 and Order XLII, clarifying that a second appeal lies only if the High Court formulates a substantial question of law under Section 100(4) and that the appeal must be heard on that question under Section 100(5). It reinforces that a dismissal in limine requires explicit reasons and that “so far as may be” in Order XLII indicates procedural alignment with Order XLI. Applying these principles, the Court sets aside the High Court’s order for lack of reasons, allows the appeal, and remits the matter to the High Court for fresh disposal in accordance with law, with no costs. The decision underscores the mandatory requirement of reasoned orders in second-appeal dismissals.

2021-02-15

Sudipta Chakrobarty & Anr. v. Ranaghat S.D. Hospital & Ors.

This Civil Appeal concerns the practice of delivering a final operative order without accompanying reasons in proceedings before the National Consumer Disputes Redressal Commission (NCDRC) and the consequences of delaying reasons. The National Commission pronounced the operative order in 2019 but took eight months to issue a reasoned judgment, prompting scrutiny under Article 21 of the Constitution. The Supreme Court recalls established authority that the right of aggrieved parties to challenge an order on its merits is prejudiced when reasons are withheld or delayed, and that due process requires timely, reasoned decisions. Citing State of Punjab & Ors. v. Jagdev Singh Talwandi (1984), Anil Rai v. State of Bihar (2001) and Zahira Habibulla M. Sheikh & Ors. v. State of Gujarat (AIR 2004 SC 3467), among others, the Court reiterates that pronouncing the operative portion without reasons undermines the fruits of litigation and defeats subsequent remedies. In the instant case, there was a hiatus of eight months between the operative order dated 26.04.2019 and the accompanying reasons. The Court orders that the President of the National Commission examine the matter and take steps to discontinue this practice, ensuring that reasoned judgments are delivered together with operative orders. The appeal and pending applications are disposed of.