Arb. Appeal Nos. 8 & 13 of 2005 & Cross Objection No. 72/05 in Arb. Appeal No. 8 of 2005; OPARB.22/1994 of III Addl. Sub Court, Ernakulam

Case / Petition Number:
Arb. Appeal Nos. 8 & 13 of 2005; Cross Objection No. 72/05 in Arb. Appeal No. 8 of 2005; OPARB.22/1994

Case Synopsis & Summary

Arb.A Nos. 8 and 13 of 2005, along with Cross Objection No. 72/05, were heard by a Division Bench of the Kerala High Court (Pius C. KuriaKose and P. Q. Barkath Ali, JJ) on 14 July 2009. The dispute arose from an arbitration between the Union of India (General Manager, Southern Railway, and Chief Engineer, Construction) and P. P. Xavier, a railway contractor, concerning contract works. The joint arbitrators’ Annexure I award granted Rs. 7,35,000 to the claimant, with Claim No. 7 (interest) declined. Annexure II proceedings were filed under the Arbitration Act before the Sub Court, Ernakulam (OP 22/1994), with objections (Annexure III) challenging jurisdiction, maintainability, and merits. The Sub Court, after hearing IA.719/03 and related petitions, directed the arbitrators to file the award, and later, by an interlocutory order dated 11-8-2004, modified the award by allowing pendente lite interest at 14% p.a. from 30-09-1990 to 13-04-1994 (Rs. 3,64,684). The appellants argued that this modified the award and should not have been done; the claimant filed Cross Objection asserting that Claim No. 7 should have been upheld and sought interest from the date of award to payment. The High Court held that Section 15(c) of the Arbitration Act, 1940 enables correction of clerical mistakes or accidental slips, and sustained the Sub Court’s action to award interest, while dismissing the appeals and cross-objections with costs.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • Pius C. Kuriakose
  • P. Q. Barkath Ali
Judgment Date
2009-07-14
Court Decision / Holding
Appeals and Cross Objections dismissed; parties to bear their own costs.
Final Disposition
Appeals and cross-objections dismissed; costs to be borne by the parties.

Parties to the Case

Appellants / Petitioners

  • P.P. Xavier, Railway Contractor, Pidiya... House, Chakkalakkal Road, Kochi-15

Respondents

  • Union of India represented by the General Manager, Southern Railway, Park Town, Madras-3
  • Chief Engineer (Construction), Southern Railway, Egmore, Madras-8

Legal Representation & Advocates

Counsels for Petitioners

  • • S. Ramesh Babu
  • • Adv.

Counsels for Respondents

  • • M. C. Cherian

Provisions of Law Cited

Arbitration Act, 1940 - Sections 13, 14, 15, 16, 30 and 33Arbitration Act, 1940 - Section 39Code of Civil Procedure, Order 41, Rule 22

Legal Doctrines & Maxims

  • Section 15(c) Arbitration Act, 1940 enables the court to modify and correct an award for clerical mistakes or errors arising from accidental slips or omissions
  • Doctrine of substantial justice
  • Pendennte lite interest concept in arbitration awards (interest as per period within the arbitration process)

Submissions & Arguments

Contentions of Appellants / Petitioners

The claimant contends that annexure II petition under the Arbitration Act was filed and the Sub Court’s IA.719/03 sought to invoke sections 13, 15, 16, 30 and 33, to act on the signed copy of the award. The Sub Court’s 11-08-2004 order modifying the award to grant pendente lite interest at 14% p.a. for 30-09-1990 to 13-04-1994 (Rs. 3,64,684) was challenged as a modification of the joint arbitrators’ award; the claimant seeks to sustain the award amount including the asserted interest. The cross-objection requests that Claim No. 7 be upheld and interest be awarded from the date of award till payment. The claimant relies on Section 15(c) to justify correction to ensure substantial justice and avoid financial prejudice to the claimant.

Contentions of Respondents

The railways contend that the Sub Court’s order amounts to modifying the arbitrators’ award and should not have been entertained under the original petition; the grounds raised in IA.719/03 are filed under Section 14, and the cross objections do not fit under Section 39 of the Arbitration Act or Rule 22 of Order 41 CPC. They argue the prorogation for interest is improper, and the appropriate remedy would have been a new arbitration; the award cannot be modified by interlocutory application filed in an original petition.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (2)

Case NameCitationTreatmentExplanation
TP George v. State of KeralaAIR 2001 SC 816Mentioned OnlyCited as a judicial precedent among authorities; not expressly distinguished or applied as the decisive basis of the judgment.
G.C. Roy's case—Mentioned OnlyCited in the course of discussion; no explicit, direct application shown in the excerpt.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•1,612 words•~8 min read

In The Court Record

Arb. Appeal Nos. 8 & 13 of 2005 & Cross Objection No. 72/05 in Arb. Appeal No. 8 of 2005; OPARB.22/1994 of III Addl. Sub Court, Ernakulam

## IN THE HIGH COURT OF KERALA AT ERNAKULAM PRESENT : THE HONOURABLE MR. JUSTICE PIUS C.KURIAKOSE & THE HONOURABLE MR. JUSTICE P.Q.BARKATH ALI TUESDAY, THE 14TH JULY 2009 / 23RD ASHADHA 1931 Arb.A.No. 8 of 2005 & C.O. No. 72/05 --------------------OPARB.22/1994 of III ADDL.SUB COURT, ERNAKULAM .................... ## APPELLANTS/RESPONDENTS ------------------------------ 1. UNION OF INDIA, REPRESENTED BY THE GENERAL MANAGER, SOUTHERN RAILWAY, PARK TOWN, MADRAS-3. 2. CHIEF ENGINEER (CONSTRUCTION), SOUTHERN RAILWAY, EGMORE, MADRAS-8. BY ADV. SRI.M.C.CHERIAN,SR.SC.,RAILWAYS ## RESPONDENT/PETITIONER --------------- P.P.XAVIER, RAILWAY CONTRACTOR, PIDIYANCHERIL HOUSE, CHAKKALAKKAL ROAD, KOCHI-15. ADV. SRI.S.RAMESH BABU THIS ARBITRATION APPEALS HAVING BEEN FINALLY HEARD ON 14/07/2009, ALONG WITH ARBA NO. 13 OF 2005 CO NO. 72 OF 2005 THE COURT ON THE SAME DAY PASSED THE FOLLOWING: ## **PIUS C. KURIAKOSE & P.Q. BARKATH ALI, JJ.** ------------------------------------------------------- Arb. Appeal Nos. 8 & 13 OF 2005 & Cross Objection No. 72/05 in Arb. Appeal No. 8 of 2005 -------------------------------------------------------Dated this the 14[th] day of July, 2009 ## **J U D G M E N T** ## **Pius C.Kuriakose, J.** The Union of India represented by General Manager, Southern Railway and the Chief Engineer, Southern Railway are the appellants in Arbitration Appeal No. 8 of 2005. They are referred to hereinafter collectively as the railway. The respondent in the appeal is the railway contractor. He is referred hereinafter as the claimant. There was an arbitration in respect of a contract work executed by the claimant for the railway. The joint arbitrators passed annexure-I award granting an amount of Rs.7,35,000/- to the claimant. Annexure -I award is a non-speaking award which was not challenged by the railway. Under annexure-I claim No. 7 which was a claim for interest has been declined. However, there is a direction in annexure – I that if the award amount is not paid within one month railway Arb. Nos. 8 & 13 of 2005 -2- would pay interest at the rate of 14% per annum to the claimant on the award amount. The appellant submits that the entire amount due under the award was paid to the claimant who has issued a no claim certificate to the railway. The appellant submits that thereafter the railway issued notice of annexure – II petition filed by the claimant (O.P. No. 22 of 1994) before the Sub Court, Ernakulam. To annexure – II, the railway filed annexure -III objections before the Sub Court. By Annexure – III the territorial jurisdiction, maintainability etc. of the petition was seriously challenged. On merits also the claims in the petition were disputed. The joint arbitrators who were impleaded as R3 and R4 in annexure – II remained ex parte. The Sub Court passed an order directing the arbitrators to file the award in court. Along with annexure – II which was Arb. O.P. No. 22 of 1994 the claimants filed Arb. O.P. No. 21 of 1994 in respect of another work and arbitration award passed by the Arb. Nos. 8 & 13 of 2005 -3- same arbitrators in relation to that work. Appellant submits that the position and stage of O.P. No. 21 of 1994 is the same as that of Arbitration O.P. No. 22 of 1994. While matters stood so, the claimant filed a common petition in the two arbitration O.Ps. which was numbered as IA. 719/03. Annexure -IV is copy of that IA. The prayer in annexure – IV was that the Sub Court may act on the basis of the signed copy of the award available in court and pass orders invoking sections 13, 15, 16, 30 and 33 of the Arbitration Act. Thus, though the scope of Arb. O.P. No. 22/94 was under section 14 of Arbitration Act, 1940, the prayer in the interlocutory application annexure- IV was to take a decision invoking sections 13, 15, 16, 30 and 33 also. By a common order dated 11-8-2004 annexure – IV IA was allowed by the Sub Court modifying the portion of the award relating to interest prior to passage of the award. Appellants submit that by the said order the Sub Court has Arb. Nos. 8 & 13 of 2005 -4- granted interest at the rate of 14% per annum to the claimant during the period 30-9-90 to 13-4-1994 which will amount to Rs.3,64,684/-. According to the appellants, the above order amounts to modification of the award passed by the joint arbitrators to the extent the same pertains to claim No. 7 which was specifically declined by the joint arbitrators. It is challenging the legality and propriety of the above order that the appellants have preferred Arb. Appeal No. 8/05. 2. Arb. Appeal No. 13/05 is also directed against the very same order in so far as it pertains to Arb. O.P. No. 21/94. It is submitted that the order amounts to modification of the award of the joint arbitrators, copy of which is produced as annexure – I in Arb. Appeal No. 13/05. By virtue of the modification an additional amount of Rs.6,44,199/- has become payable by the railway and in both Arb. Appeal Nos. 8/05 and 13/05 the appellants have Arb. Nos. 8 & 13 of 2005 -5- raised various grounds challenging the order of the Sub Court in the above IA. 3. Cross Objection No. 72 of 2005 is filed by the claimant in Arb. Appeal No. 8/05 and the ground urged therein is that claim No.7 raised by the claimant before the arbitrators in both the arbitrations should have been upheld. It is contended therein that the trial court having rightly held that claim No. 7 is liable to be allowed, interest should have been awarded during the period of one month from the date of the award till date of actual payment, i.e., from 183-1994 till date of payment. To the memorandum of cross objection, objection is filed by the railway contending that the cross objection is not maintainable since the same does not fit in under any of the provisions of Section 39 of the Arbitration Act or rule 22 of Order 41 C.P.C. 4. Sri.M.C.Cherian, learned counsel for the railways and Mr. Sukumar, representing learned counsel for the Arb. Nos. 8 & 13 of 2005 -6- claimant addressed us very extensively on the grounds raised in the memorandum of appeal and memorandum of cross objections respectively. Our attention was drawn by the learned counsel to the relevant statutory provisions, viz. Sections 13, 14, 15, 16, 30 and 33 of Arbitration Act, 1940. Our attention was drawn also to various judicial precedents including the judgment of the Supreme Court in T.P. George v. State of Kerala, AIR 2001 SC 816 and the judgment in G.C.Roy's case. 5. Having anxiously considered the rival submissions addressed at the Bar in the light of the relevant statutory provisions and judicial precedents to which our attention was drawn by the learned counsel we are of the view that the impugned order passed by the learned Subordinate Judge can be sustained. Section 15(c) of Arbitration Act 1940 enables the court to modify and correct any award “where the award contains a clerical mistake or an error Arb. Nos. 8 & 13 of 2005 -7- arising from an accidental slip or omission.” In the instant case the amount which has been awarded under the impugned order is only pendente lite interest and the interest during the period from the date of accrual of cause of action till the date of initiation of the proceedings for arbitration. The court below noticed the four stages during which the claimant is entitled for interest in terms of judgment of Supreme Court and has awarded interest during the period from the date of accrual of cause of action till the date of the award. It is seen from the impugned order that there was no serious opposition raised before the Sub Court in awarding interest for the above period from 30-9-1990 till 13-4-1994. According to us, by awarding interest for the said period also the court below has only exercised its powers under section 15(c) of the Arbitration Act, 1940. Though it would appear as if there is some impropriety in rectifying the award on the basis of an Arb. Nos. 8 & 13 of 2005 -8- interlocutory application filed in an original petition wherein only provision of Section 14 had been invoked, we feel that the action of the learned Sub Judge can be approved since the result of the same is to render substantial justice to the claimant who would have otherwise lost these amounts which he was obliged to pay to his bankers towards interest on the loans advanced by them. Moreover, we notice that the railway did not have serious opposition to this before the Sub Court. 5. At the same time, we are not inclined to uphold the memorandum of cross objections. If the claimant was genuinely aggrieved in that claim No.7 raised by him was not adjudicated his remedy was to invoke section 14 of Arbitration Act, 1940, the only provision which was invoked by him in the main petitions filed by him. We would have thought in terms of relegating the issue for adjudicating claim No. 7 to the same arbitrators. We are informed by Arb. Nos. 8 & 13 of 2005 -9- both sides that at this distance of time it will become necessary to constitute a fresh arbitration trial. Under the above circumstance we are of the view that the appeals as well as the memorandum of cross objections can be dismissed. Accordingly the appeals as well as the memorandum of cross objections are dismissed, but in the circumstances parties are directed to suffer their respective costs. ## **(PIUS C.KURIAKOSE, JUDGE)** **(P.Q.BARKATH ALI, JUDGE)** ksv/-
End of Judgment Record
Browse All High Court of Kerala (2009) Decisions
2009-06-26

Nishana Mol.N v Alappuzha Municipality & Secretary, Alappuzha Municipality

This writ petition concerns the registration of a marriage under the Kerala Registration of Marriages (Common) Rules, 2008 (Common Rules). The petitioner Nishana Mol.N, whose marriage was solemnized on 8 March 2009, sought registration of her marriage by the Local Registrar. Her husband was abroad, and she submitted Form No. 1 along with documents; however, the Local Registrar demanded the presence of both spouses for registration, a point contested by the petitioner. The court recalls the apex court’s directions in Seema v. Ashwani Kumar (2006) to frame rules ensuring compulsory registration to protect women and provide evidence of marriage, while noting that registration under the Rules does not itself create a marriage but evidences one solemnized otherwise. The Rules specify that registration is mandatory for marriages solemnized within the state, with various procedural requirements (Rules 5, 6, 9, 10, 11, 13, 16, 17) and mechanisms for correction, appeal, and re-registration. The court clarifies that the presence of both parties is not ordinarily required; the registrar may require appearance only in cases where there is reasonable doubt about identity, and even then as an exception rather than a rule. Ultimately, the court directs that registration and certificate issuance be completed within one month from copy of the judgment, without insisting on joint appearance, provided the memorandum is in order.

2009-07-27

Abdul Majeed Kalathil v. District Collector, Malappuram & Others

This batch of writ petitions concerns the constitutional validity of Section 17 of the Kerala Anti-Social Activities (Prevention) Act, 2007, and the power of District Magistrates to confiscate vehicles used in anti-social activities. The petitions challenge the absence of a substantive prohibition against using vehicles for anti-social activities and the lack of a defined procedure for confiscation or an appellate remedy. In W.P.C. No. 9925 of 2009 (the lead case), Abdul Majeed Kalathil contends that his goods carriage KL 11-B/6651 was seized by the Sub Inspector of Pandikkad Police and reported to the District Collector, Exts.P1–P2. The court scrutinizes Section 17's scope, defining anti-social activity (Section 2(a)) and whether the District Collector’s power to confiscate is constitutionally tenable. It finds Section 17 to be vague and violative of Articles 14, 19(1)(g) and 21, as it rests on subjective police satisfaction with no clear standards or process. It also notes environmental objectives but concludes that fundamental rights must prevail. The court does not sustain confiscation under Section 17; instead, it directs that such vehicles be dealt with under the Kerala Protection of River Banks and Regulation of Removal of Sand Act, 2001 and Rules, with interim release under specified conditions. It further directs initiation of Sand Act proceedings within a month and finalization within another month. The writ petitions are disposed of accordingly, preserving the rule of law and environmental protection.

2009-06-11

WA No. 671 of 2006 (Fertilizers and Chemicals Travancore Ltd v Union of India)

This writ appeal concerns the pay revision and pensionary benefits of employees of the Fertilizers and Chemicals Travancore Ltd (FACT). The long-term settlement covering terms of employment expired on 31 December 1996. A fresh settlement was concluded (notified 28 August 2001) and made retroactive to 1 January 1997, with revisions in wages and benefits. Clause 29 of Ext. P1 provides that arrears relating to wage revision and dearness allowance for the period 1 January 1997 to 30 June 2001 will be reviewed and decided by management/government only when the company earns profits for at least three consecutive years; Clause 33.1 provides that employees who retired on or after 1 January 1997 will be eligible for arrears calculated from 1 January 1997 to the date of retirement, subject to adjustments for interim relief already paid, with any unclaimed amount transferred to a Welfare Fund. The appellants—the retirees who fall in the 1 January 1997 to 1 July 2001 window—argue that they were denied arrears and were paid pensionary benefits at pre-revised rates, creating discrimination. Respondents contend Ext. P1 binds the parties and arrears depend on profits, and that pay revision administered to others does not compel retroactive change. The court held that Ext. P1 terms survive as terms of employment and directed the management to consider terminal benefits at revised rates within two months and to release arrears when paid to current workers, with connected matters following."

2009-05-29

M/S. Palm Fibers & Yars Trading Co. v. State of Kerala & Others

The petitioner, a Small Scale Industrial unit, ran two LT power connections (No.13070 and No.13427) with commercial production starting in July 1994 and July 1995. On 06/02/1992, the Government issued Ext.P1 guaranteeing concessional tariffs (pre-1992 tariff) for five years from the date of commencement or substantial capacity expansion, certified by the District Industries Centre. Ext.P2 certified eligibility for this concession. Subsequently, the petitioner increased power demand to 300 KVA and was reclassified/advised to HT status from 15/05/1998, converting LT supply to HT. The petitioner argued that Ext.P1 benefits should extend for the full five-year period, covering the LT quantities certified in Ext.P2, and that the HT conversion was a mere reclassification directed by the Board, not a cessation of eligibility. The Board argued Ext.P1 targets only those who commenced production during 1992–1996 and that HT conversion from 15/05/1998 falls outside the Ext.P1 window, rendering the petitioner eligible only up to 15/05/1998. Earlier orders (Ext.P3) had set aside a cut-off date for merits, and Ext.P6/Ext.P4 handled appeals. Ultimately, the Court held that the HT conversion was outside Ext.P1’s period, but directed that the LT benefits for the two LT connections be extended only until 23/05/1998 (LT dismantling date) and without reimbursement from the Industries Department, as held in OP No.7622/1998. The petition was disposed of as above.