Supreme Court of IndiaSupreme Court · 1992Division BenchAppeals Partly allowed

ANSAL PROPERTIES & INDUSTRIES (P) LTD. AND ANR. v. DELHI DEVELOPMENT AUTHORITY AND ORS.

Case / Petition Number:
Civil Appeal Nos. 2457 and 2458 of 1992
Neutral Citation:1992 SCR 465

Case Synopsis & Summary

This is a Special Leave Petition involving Ansal Properties & Industries (P) Ltd. (and Anr.) against the Delhi Development Authority (DDA) and others concerning lease rights for plot No. 38, Nehru Place, Delhi. The auction was won by the appellants for Rs. 8.13 crores in January 1981, with 25% paid and the balance to be discharged within 90 days of acceptance (February 1982). The appellants failed to pay the balance and contended ownership confusion between DDA and the Union of India, seeking more time due to adverse market conditions. In 1984 the DDA issued revised terms: 25% within 90 days of the revised term letter; the remaining 50% plus delayed payment interest in five equal installments (18% p.a.). A bank guarantee was furnished in 1985, and possession was given in 1985. Building plans were submitted; DUAC sought clarifications; a government memorandum dated 17.10.1985 ordered a ban on high-rise construction; plans were not sanctioned; construction proceeded under High Court stay orders. The High Court later directed payment of the balance with 18% interest and allowed encashment of the bank guarantee. The Supreme Court partly allowed the appeals, holding that compound interest could not be charged on the compounding fee, while upholding other aspects and clarifying that the ban period did not invalidate the contract. The appellate orders were modified to exclude interest on the compounding fee, with directions to carry out the High Court’s orders from the date of this Court’s judgment.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • N. M. Kasliwal
  • R. M. Sahai
Judgment Date
1992-05-28
Court Decision / Holding
Appeals Partly allowed. The Court upheld the High Court’s conclusions except that the DDA is not entitled to charge any interest on the amount of the compounding fee. The directions issued by the High Court to liquidate the encashment against the outstanding amount and to grant occupancy certificates remain in effect, but the interest on compounding fees is struck down. The Court directed that the modified terms be applied from the date of this Judgment and clarified that there would be no order as to costs.
Final Disposition
Appeals Partly allowed

Parties to the Case

Appellants / Petitioners

  • ANSAL PROPERTIES & INDUSTRIES (P) LTD.
  • Anr.

Respondents

  • Delhi Development Authority
  • Ors.

Legal Representation & Advocates

Counsels for Petitioners

  • • Harish Salve
  • • Ms. J.S. Wad
  • • Ms. Tamali Wad
  • • Mr. Manoj Wad

Counsels for Respondents

  • • V.R. Reddy
  • • Addl. Solicitor General
  • • Arun Jaitley
  • • Ms. Indu Malhotra
  • • C. Ramesh
  • • V.K. Verma
  • • C.V.S. Rao

Provisions of Law Cited

Delhi Development Act, 1947 – Section 9(2)Delhi Development Act, 1947 – Section 41Delhi Development Act, 1957 – Section 41Delhi Urban Arts Commission Act, 1973 – Section 12Building Bye-Laws, 1983 – Bye-law 6.7.4Building Bye-Laws, 1983 – Section 6.1Building Bye-Laws, 1983 – Appendix 'q' (Clause B)

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellants contended that the DDA was not entitled to charge any compound interest and that no interest should be payable during the ban period when construction was halted by the central government. They argued that the charges of compounding fees and interest (including on the compounding fee) were improper since the original terms of auction (1982) had expired and subsequent rescheduling in 1985 was for their benefit. They asserted that deemed sanction under bye-law 6.7.4 did not apply due to DUAC clarifications and the central ban, and that the DDA could not claim interest on the compounding fee. They also argued that the ban itself was illegal and the developments should be allowed without liability for interest during the ban. respondents: The respondents maintained that the DDA was entitled to charge interest on delayed payments under the revised terms, that the 1985 rescheduling created a new principal with simple interest at 18% per annum, and that the ban period did not absolve the applicants from paying interest (though it accepted that the ban was government action). They argued the compounding fee, and related interest were proper under the Building Bye-Laws and the terms of the agreement, and that the bank guarantee could be encashed to recover sums due. They contended that the deemed sanction was not applicable given the DUAC process and that sanctions were contingent on central directions.

Contentions of Respondents

The respondents argued that the delays and non-compliance with the revised terms warranted interest at 18% per annum on installments and that the 1985 rescheduling, though advantageous to the appellant, constituted a valid framework for computing interest. They asserted that the government ban was a valid exercise of executive power under the Delhi Development Act and that the DDA could not be faulted for enforcing the terms. They defended the compounding fee as a levy for unauthorised construction, permissible under Appendix 'q' of the Building Bye-Laws, and argued that interest could be charged on the compounding fee as simple interest post-novation. They maintained the legality of encashing the bank guarantee and aligning recoveries with the outstanding amount, while urging adherence to court directives for expeditious sanction.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (1)

Case NameCitationTreatmentExplanation
Bangalore Medical Trust v. B.S. Muddappa and others(1991) 3 JT 172DistinguishedThe Court reasoned that, unlike in Bangalore Medical Trust, where a statutorily approved plan was violated, there was no violation of law in imposing the central ban on high-rise constructions during the master plan formulation in this case.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•6,088 words•~28 min read

In The Court Record

ANSAL PROPERTIES & INDUSTRIES (P) LTD. AND ANR. v. DELHI DEVELOPMENT AUTHORITY AND ORS.

c - # ANSAL PROPERTIES & INDUSTRIES (P) LTD. AND ANR. _v._ # DELHI DEVELOPMENT AUTHORITY AND ORS. MAY 28, 1992 [N.M. KASLIWAL AND R. M. SAHAI, JJ.] _Delhi Development Act, 1947-Sections 9(2), 41-Legis/ative object-Master plan-Restriction 011 high rise constroction by Central Government-Legality of._ _De/Iii Development Act, 1947-Sections 41 read with Bye-Laws 6. 7.4, 6.1 of the Building Bye-Laws, 1983 of the Delhi Development Authority-Requ irem ent unde,.-.Deemed sanction-When arises-Compounding fee-Charging of interest-Whether arises._ The auction of leasehold rights on the plot in question was in favour D of the appellants for Rs. 8.13 crores on 19.1.1981. The appellant paid 25% of the auction amount on the fail of the hammer. According to the terms and conditions of the auction the balance 75% was required to be paid within 90 days of the formal acceptance of the bid which was made on 18.2.1982. E E The appellants did not pay the balance amount and took a stand that there was some confusion as to whether it was D.D.A. or the Union of India, which was the owner of the plot in question. The appellant also sought for time for payment on the ground that money market in relation to the land property had gone down tremendously. F On 14.17.1984 revised terms were communicated by the D.D.A. to the appellants. The essential terms of the revised agreement were that 25% of the bid amount was to be paid within 90 days of the issuance of the letter of revised terms. 50% of the remaining bid amount along with interest for G delayed payments was to be paid in five equal half yearly instalments which included the interest calculated at 18% per annum. The appellants submitted a bank guarantee dated 15th July, 1985 in favour of the D.D.A. The fresh schedule of instalments was specifically mentioned in the bank guarantee. Thereafter on 23.7.1985, a formal deed H 465 _y_ 466 SUPREME COURT REPORTS (1992] 3 S.C.R. A of agreement was executed between the parties and poss~ssion over the plot was given on 25.7.1985. The building plans were submitted by the appellant on 12.8.1985. The D.D.A. forwarded building plans to the Delhi Urban Arts Commission (DUAC). The DUAC by its letter dated 18.9.1985 sought certain clarifications from the appellant within ten days and again B sent a reminder on 24.9.1985, but the appellant did not send any reply. The appellant sent a notice for commencement of construction on 15.10.1985 claiming that they having not received any order of rejection of the plans within sixty days as contemplated under bye-law No.6.7.4 had become entitled to deemed sanction; that the first instalment, according to C the re-schedule of instalments was payable on 15.11.1985 but even before that they had paid Rs. 47 lakhs on 8.10.1985 itself. D Thereafter the Government of India by an office memorandum dated 17.10.1985 decided to stop construction of multi-storeyed buildings 'in New Delhi including areas under D.D.A. and Municipal Corporation, with immediate effect till the Master plan for 2001 was finalised. The DUAC then returne«' t.~he proposals of the building plans of the appellants to the D.D.A. on "J.11.1985. The D.D.A. by its letter dated 9.12.1985 informed the appellants regarding the decision of the GovernE ment of India and returned the building plans and it was directed not to process the sanction further till further directions were received from the Government of India. A notice to stop the construction immediately till the plans were sanctioned finally by the D.D.A. was given to the appellants on 17.1.1986. F On 25.3.86 the D.D.A. informed the appellants that their plans had been rejected as the same had not been approved by the DUAC. The appellants filed writ petition challenging the notice issued by the D.D.A. of stopping the construction work and also the ban introduced by G the Government of India. The High Court on 17.9.1986 passed an interim order permitting the appellants to continue the construction work at their own risk. On 15.10.1987 the bank guarantee was invoked by the D.D.A. for a H sum of Rs.8 crores approximately. 467 ANSAL PROPERTIES _v._ D.D.A A The appellants filed a seeond writ petition challenging the encashment of the bank guarantee by D.D.A. and obtained an interim-order on 28.10.1987 restraining the D.D.A. from encashing the bank guarantee. The ban imposed by the Central Government was lifted on 8.2.1988. The appellants completed the constmction of the building in 1988 under B the cover of the stay order given by the High Court. The two writ petitions were dismissed by the High Court. - These appeals were filed by the contractors against the judgment of the High Court, by special leave, contending that the D.D.A. was not entitled to charge any compound interest; that the D.D.A. was not entitled C to claim any interest for the period 7.10.1985 to 8.2.1988 during which the ban in respect of construction of multi-storeyed buildings remained in force; that the ban itself was also illegal; that the D.D.A. was not entitled to claim any compounding fee; and that the D.D.A. was not entitled to claim any interest on the compounding fee. D Partly allowing the appeals of the contractors, this court, HELD: 1.1. The object of Delhi Development Act is to provide for the development of Delhi according to the plan. While under Section 9(2) of the Delhi Development Act every master plan has to be submitted to the E Central Government for approval and the Government may either approve the plan without modifications or with such modifications as it may consider necessary or reject the plan with directions to the Authority to prepare a fresh plan according to such directfons. The Development Authority had sent the new master plan for approval of the Central Government and as such the Government for the planned development or F Delhi was entitled to issue directions in consonance with law. (475 H-476B] 1.2. There was no violation of law in issuing a restriction on high rise constmctions during the formulation stages of the new master plan pend· ing for approval before the Central Government. Thus it cannot be said G that the ban imposed by the Central Government was in any manner unauthorised or illegal. (476 DJ 2.1. The question of deemed sanction only arises If within sixty days of the receipt of notice under 6.1. of the bye-laws the authority fails to Intimate In writing to the person who has given· a notice of its refusal or H _y_ _I_ SUPREME COURT REPORTS [1992) 3 S.C.R. 468 A sanction or any intimation. [ 478 BJ r 2.2 In the instant case the D.D.A. had informed the appellant that the plans had been sent to DUAC for approval and the DUAC was also seeking some clarifications from the appellant by their letters dated 18.9.1985 and 24.9.1985. (478 B] ## B 2.3. The requirement as contemplated under bye-law· 6.7.4 is that the fact of deemed sanction has to be immediately brought to the notice of the authority in writing by the person who bas given notice and thereafter if no intimation is received from the authority within 15 days of giving such c[written notice the provision of deemed sanction comes into operation. ] [478 CJ ~ ~ 2.4. The appellant only sent a notice for commencement of construe· tion on 15.10.1985 and the same does not fulfil the requirement of the notice which i's contemplated under bye-law 6.7.4 in as much as intimation D[had ][already been given ][by ][DUAC ][seeking information. Apart from this the ] ban on the construction of multi-storeyed buildings came into operation from 17 .10.1985 itself and in view of this circumstance also there was no question of the applicability of deemed sanction in the facts of this case. [478 D-E] E E 2.5. The amount which was required to be paid in five instalments of Rs.166.20 lakhs each from 15.11.1985to15.11.1987, included simple interest charged at the rate of 18% per annum but it was based on a fresh agreement and the appellants cannot claim any right to re-open the transaction on the basis of terms of auction made originally in 1982. The indulgence of rescheduling of delayed payment of bid amount in July, 1985 was made on the F request of the appellant and for its own benefit. Thus the D.D.A. is perfectl3 right andjustified in claiming future interest at the rate of18% per annum on the instalments fixed in the agreement dated 23rd July, 1985. The D.D.A. is not charging any compound interest but are claiming simple interest at the rate of 18% per annum on the amount of instalments fixed in the fresh G[agreement dated 23rd July, 1985 till payment, After novation of the agree-] ment the instalments fixed shall be considered as principal amount and thus it is not a case of charging compound interest. (474 H-475 C) - ~ 2.6. For charging of interest during the ban period is concerned, the D.D.A. cannot be held responsible as the ban ·was imposed by the Central H[. Government. This action was taken for the whole of Delhi ][and ][the D.D.A. ] 469 ANSAL PROPERTIES _v._ D.D.A [KASLIWAL, J.) was to carry out such directions as provided under Section 41 of the Delhi A Development Act, 1957. (475 D-EJ 2.7. It is not in dispute that the building has been constructed without any sanction or permit from the D.D.A. as required under the building bye-laws !lnd the building has been constructed at the risk of the appellant under the stay order of the High Court. (478 F] B 2.8. No building permit has been given to the appellants and as such they are bound to pay the compounding fee according to the rates prescribed in this regard. (479 CJ 2.9. In the facts and circumstances of the case the D.D.A. is not C e,ntitled to charge any interest on the compounding fee. [479 DJ CIVIL APPELLATE JURISDICTION: Civil Appeal Nos. 2457 and 58of1992. From the Judgment and Order dated 31.10.1991 of the Delhi High D Court in C.W.P. Nos. 1499/86 and 3068 of 1987. Harish Salve, Ms. J.S. Wad, Ms. Tamali Wad and Manoj Wad for the Appellants. _)...._ V .R. Reddy, Addi. Solicitor General, Arun J aitley, Ms. Indu MalE hotra, C. Ramesh, V.K. Verma and C.V.S. Rao for the Respondents. D.D. Sharma, C.L. Chopra and Ms. Rachna Issar for the Intervener. The Judgment of the Court was delivered by F ## KASLIWAL, J. Special leave granted. It is one more avoidable litigation between Ansals, a big building contractor and the Delhi Development Authority in which allegations and counter allegations for breach of terms of contract have been levelled G against each other. We would have asked the appellant to stand in queue for hearing of the matter, but the real sufferers would be those persons who have invested the.ir hard earned life time savings in forlorn hope of an allotment of a flat in a commercial building on plot No. 38 situated in Nehru Place near Kalkaji a prime place of importance in Delhi. It is the repetition of the usual bureaucratic rigmarole from the side of the _Delhi_ H _y_ (1992] 3 S.C.R. 470 ## SUPREME COURT REPORTS A Development Authority anci th usual payment of some instalments of the lease money and thereafter withholding the payment of the balance amount on one pretext or the other form the side of the builders. Facts in brief, shorn of details and necessary for the disposal pf this case are that the auction of leasehold rights on plot No. 38, Nehru Place B was knocked down in favour of _Mis_ Ansal Properties & Industries (P) Ltd., hereinafter referred to as "the appellant" for Rs. 8.13 crores on 19.1.1981. 25% of the auction amount was paid on the fall of the hammer. According to the terms and conditions of the auction the balance 75% was required to be paid within 90 days of the formal acceptance of the bid which was C made on 18.2.1982. The appellant admittedly did not pay the balance amount and took a stand that there was some confusion as to whether it was D.D.A or the Union of India, which was the owner of the plot in question. The appellant also sought the indulgence of granting more time for payment on the ground that money market in relation to the land property had gone dowp tremendously. On 14.12.1984 revised terms were D communicated by the D.D.A to the appellant. The essential terms of the revised agreement were that 25% of the bid amount was to be paid within 90 days ofthe issuance of the letter of revised terms. 50% of the remaining bid amount along with interest for delayed payments was to be paid in five equal half yearly instalr11ents which included the interest calculated at 18% E per annum. These instalments were fixed in the following manner : - (i) 1st instalment payable on 15.11.1985 Rs. 166.20 lacs. - (ii) 2nd instalment payable on 15.5.1986 Rs. 166.20 lacs. F - (iii) 3rd instalment payable on 15.11.1986 Rs. 166.20 lacs. - (iv) 4th instalment payable on 15.5.1987 Rs. 166.20 lacs. - (v) 5th instalment payment on 15.11.1987 Rs. 166.20 lacs. G The appelhnt in this regard submitted a bank guarantee dated 15th July, 1985 of the Canara Bank and New Bank of India in favour of the D.D.A. The aforesaid fresh schedule of instalments was specifically mentioned in the bank gqarantee. Thereafter a formal deed of agreement was executed between the parties on 23.7.1985 and possession over the plot was given on 25.7:1985. The building plans were submitted by the appellant on H 12.8.1985. The D.D.A. vide letter dated 13.9.1985 forwarded building plans 'f I ANSAL PROPERTIES _v._ D.D.A [KASLIWAL, J.] 471 ' - to the Delhi Urban Arts Commission (DUAC). The DUAC by its letter A dated 18.9.1985 sought certain clarifications from the appellant within ten days and again sent reminder on 24.9.1985, but the appellant did not send any reply. The appellant then sent a notice for commencement of construction on 15.10.1985. The appellant claimed that they having not received any order of rejection of the plans within sixty days as contemplated under bye B law No.6.7.4. had become entitled to deemed sanction. The appellant claimed that the first instalment, according to the re-schedule of instalments was payable on 15.11.1985 but even before that they had paid Rs. 47 lakhs on 8.10.1985 itself. Thereafter the Govdnment of India by an office memorandum dated 17.10.1985 decided to· stop construction of multistoreyed buildings in New Delhi includ~ng areas under D.D.A. and C Municipal Corporation of Delhi falling in .South Delhi, with immediate . effect till the Master plan for 2001 was finalised. It was clarified that a 'multi-storeyed building' may be taken as a building going beyond. 45 feet or above four storeys, which has to be serviced. by lifts. The DUAC then returned the proposals of the building plans of the appellant to the D.D.A. D on 20th November, 1985. The D.D.A. by its letter dated 9.12.1985 informed the appellant regarding the decision of the Government of India and returned the building " plans and requested them to depute their architect to discuss about the height of the building. It was mentioned in the letter that the sanction shall not be processed further till further directions are received from the Ministry of Urban Development, Government of India. 'E A notice to stop the construction immediately till the plans were sanctioned fmally by the D.D.A. was given to the appellant on 17.1.1986. By another letter dated 25.3.1986 the D.D.A. informed the appellant that their plans had been rejected as the same had not been approved by the DUAC. The appellants then filed writ petition No. 1499/86 on 17th July, 1986 challengF ing the notice issued by the D.DA. of stopping the construction work and also the ban introduced by the Government of India. The High Court on 17.9.1986 passed an interim order permitting the appellants to continue the construction work at their own risk. On 15.10.1987 the bank guarantee was . invoked by the D.D.A. for a sum oCRs. 8 crores approximately. The appellants filed a second writ petition No. 3068 of 1987 challenging the G encashment of the bank guarantee by D.D.A. and obtained an ·interim order on 28.10.1987 restraining the D.D.A. from encashing the bank guarantee. The ban imposed by the Central Government was lifted on 8.2.1988. The appellants completed the construction of the building in 1988 H _r_ [1992) 3 S.C.R. SUPREME COURT REPORTS 472 A under the cover of they stay order given by the High Court. The aforesaid two writ petitions have been disposed of by the High Court by order dated October 31, 1991. The High Court after examining the matter in detail arrived to the conclusion as under :- "After considering the pleadings of the parties, documents on record and submissions made before this court, it is absolutely evident that the petitioner has be~n consistently making defaults in payment of_the amount due to the D.D.A. on one pretext or the other. According to the terms of the auction, the petitioner's bid was accepted on February 19, 1982 and the petitioner was supposed to deposit the balance 75% of the bid amount within 90 days. The amount which ought to have been deposited with the D.D.A. way back in 1982 has not been deposited ·till this date. Further more at the request of the petitioner, the D.D.A. entered into an agreement with the petitioner. This agreement was entered into because the petitioner pleaded grave financial difficulty and according to the agreement, the first instalment had to be deposited by the petitioner on or before November 15, 1985 and all subsequent instalments on or before 15th November, 1987. Astonishingly, till this date not even one full instalment has been deposited by the petitioner. Looking to the entire past conduct of the petitioner, no indulgence can be granted in any manner because any indulgence would be at the cost of public money". · B c D E The High Court then observed that after careful consideration of the facts and the issues Qivolved in the case it would be proper to dispose the writ petitions with the following directions: F ~ - **==> picture [36 x 14] intentionally omitted <==** **----- Start of picture text -----**<br> J._ .<br>**----- End of picture text -----**<br> (i) The petitioner is directed to pay the balance outstanding amount due to the Delhi Development Authority, including interest at the rate of 18% per annum within a period of two months from today. G H (ii) the respondent-D.DA. would be entitled to encash the bank guarantee furnished by the petitioner. The amount recovered by encashment of bank guarantee from the petitioner would stand adjusted from the total outstanding amount. ,.. (iii) On the petitioner's mal<ing the entire payment, the respondent ANSAL PROPERTIES _v._ D.D.A [KASLIWAL, J.] 473 _J_ shall sanction the building plans forthwith and in no case later than one A month of receiving the entire outstanding amount from the petitioner. (iv) Thereafter the petitioner shall apply for the grant of occupancy certificate as per rules, if not already applied. \,.;- The respondent D.D.A. shall grant necessary certificate as per rules B without any delay but in any event not later than two weeks from the date of the petitioner's submitting application pertaining to occupancy certificate. _ Subject to these directio_ns, both these writ petitions are dismissed. C Counsel's fee is addressed at Rs. _5,000._ It is made clear that if the petitioner fails to comply with the above directions, the respondent shall be at liberty to take necessary action as permi5sible according to law. Aggrieved against the aforesaid Judgment of the High Court the appellants by grant of special leave have come in appeal before this Court. D We have heard learned counsel for the parties at length and have thoroughly perused the record. The contentions now raised before us on behalf of the appellants can be summarised under the following points: --- _-(if The D.D.A. is not entitled to charge any compound interest. E """'!"" (ii) The D.DA. is not entitled to claim any interest for the period 7.10.1985 to 8.2.1988 during which the ban in respect of construction of multi-storeyed buildings remained in force. The ban itself was also illegal. (iii) The D.D.A. is not entitled to claim any compounding fee which amounts to Rs. 93 lakhs. (iv) The D.D.A. is not entitled to claim any interest on the compounding fee. We shall consider the above submissions in seriatim. _Point No.1_ : It has been submitted by the Learned counsel for the appellants that the authority to levy interest in the instant case flows from the statutory directive issued by the Government and incorporated in the letter dated 14.12.1984. This letter states that " ............. The delayed payment of premium will carry interest 18 per cent p.a. from the due date, viz. (1992) 3 S.C.R. 474 ~ ## SUPREME COURT REPORTS - A 17.5.1982, to the actual dated of payment... ..... ". The revised agreement dated 23rd July, 1985 accordingly provides in clause 2 " ........ The balance amount and the interest for delayed payment of the bid amount shall be payable by the auction purchaser in five equated half yearly instalments including interest calculated at 18 per cent per annum on the following - B dates ....... ". It has been contended that the bank guarantee dated 15.7.1985 is really a part of the same transaction. In fact the licence agreement of 23.7.1985 was issued clily upon furnishing of the bank guarantee dated 15.7.1985. It is submitt:\~ that the total amount demanded by the D.D.A. C includes an element of Rs. 6.69 crores as further interest. This interest amounting to Rs. 6.69 crores comprises of the following .......... (a) Rs. 3.27 crores is the interest on the balance unpaid premium of Rs. 3.60 crores (as on 15.11.1985) (b) Rs. 3.42 crores is the interest on interest component already included in the instalments referred to in the bank guarantee. - ## D It has been contended that the further claim of interest on the five instalments of Rs. 1.66 crores each amounts to charging compound interest as the instalments already include interest. According to the appellants even if the interest is charged then it should be a simple interest re-calculated as though the instalments instead of being paid in the period 1985-87 E are being paid in 1991-92 on the same principle which was adopted when the instalments were initially fixed in 1985. We find no force in the above contention. As already mentioned above the auction was knocked down for Rs. 8.13 crores on 19.1.1982. and the appellant had paid only 25% of the auction amount on the fall of the hammer. According to the conditions of F the auction the balance 75% was required to be paid within 90 days of the formal acceptance of the bid which was made on 18.2.1982. The balance amount was thus payable by 18.5.1982. Admittedly the appellant did not pay the balance amount uptil 18.5.1982 and thereafter sought to raise certain objections regarding the ownership of the plot in question, but G ultimately made a request that due to money market in relation to the land property having gone down tremendously some more time may be given for making the balance payment. Thereafter a fresh agreement was executed by the appellant on 23.7.1985 re-scheduling the payment in instalments and according to which the amount was required to be paid in five instalments of Rs. 166.20 lakhs each from 15.11.1985 to 15.11.1987. This H amount no doubt included simple interest charged at the rate of 18% per -- ----l -. \ 475 ANSAL PROPERTIES _v._ D.D.A (KASLIWAL, J.] - anntam but it was based on a fresh agreement and the appellants cannot A claim any right to re-open the transaction on the basis of terms of auction made originally in 1982. The indulgence of re-scheduling of delayed payment of bid amount in July, 1985 was made on the request of the appellant and for its own benefit. Thus the D.D.A. is perfectly right and justified in claiming future interest at the rate .of 18% per annum on the instalments B fixed in the agreement dated 23rd July, 1985. The D.D.A. is not charging any compound interest but are claiming simple interest at the rate of 18% per annum on the amount of instalments fixed in the fresh agreement dated 23rd July, 1985 till payment. After novation of the agreement the instalments fixed shall be considered as principal amount and thus it is not a case of charging compound interest as contended on behalf of the appelC _(7_ lants. _Point No. (ii)_ :- So far as charging of interest during the ban period is concerned, the D.D.A. cannot be held responsible as the ban was imposed by the Central Government. The Central Government by an office D memorandum dated 17.10.1985 decided to stop construction of multistoreyed buildings in New Delhi including areas under D.D.A. and Municipal Corporation of Delhi falling in South Delhi with immediate effect till master plan for 2001 was finalised. This action was taken for the whole of Delhi and the D.D.A. was to carry out such directions as provided under Section 41 of the Delhi Development Act, 1957. There is no allegaE tion that such action was taken _malafidely_ and it cannot be considered as a valid ground for not paying the interest for the period during which the ban on multi~storeyed constructions remained in force. It may also be noted that so far as the appellant is concerned it was not affected by such ban as the construction contained under the umbrella of stay order obF tained from the High Court. According to the admitted case of the appellant the construction of the building had completed in 1988 itself and as such the appellant was not put to any loss on account of the ban imposed by the Central Government. The master plan for Delhi was formulated originally in 1962 with G projections up to 1981. There was no provision in any law, master plan, zonal development plans or building bye-laws wherein the appellant was entitled to construct sixteen storeys. Thus the directive of the Central Government dated 17.10.1985 imposing a ban on high rise structures was not contrary to any law. The object of Delhi Development Act is to provide H .... _!_ SUPREME COURT REPORTS [1992) 3 S.C.R. 476 ,-, A[for the development of ][Dell_ii ][~ccording ][to the plan. While under Section ] 9 (2) of the Delhi Developm~nt Act every master plan has to be subii!itted to the Central Government for approval and the Government may either approve the plan without modifications or with such modifications ~ it may consider necessary or reject . the plan with directions to the Authority to B[prepare a fresh plan according to such. directions. The Development ] Authority had sent the new master plan for approval of the Central Government and as such the Government for the planned development of Delhi was entitled to issue directions in consonance with law. Learned counsel for the appellants has placed strong reliance on _Bangalore Medical Trust_ v. _B.S. Muddappa and others,_ (1991) 3 JT 172. This case isdearly c distinguishable since in that case the zonal plan statutorily provided for the user of a plot of land as a park. Th~ Chief Minister contrary to the said plan, sanctioned the plot for a nursing home. Thus there was a positive violation of law in that case. In the case in hand before us there was no violation of law in issuing a restriction on high rise constructions during D[the formulation stages of the new master plan pending for approval before ] the Central Government.· Thus it cannot be said that the ban imposed-by the Central Government was in any manner unauthorised o~. _Point No. (iii)_ :- It has been contended on behalf of the appellants that no compounding fee can be levied since the D.D.A. had wrongfully E withheld grant of sanction to the building plans submitted by the appellant. It has been further contended that in view of the commitment made in the licence deed as well as the agreement read together with the letter o~ 14.12.1984, the D.D.A. was bound to sanction the plans. It has been contended that when the plans were submitted to the D.D.A. for sanction F on 12.8.1985, there was no sum outstanding as due and payable as all the sums which were payable under the agreement up to that date had been duly paid. According to the fresh agreement the first instalment was payable on 15.11.1985 and so far as other payments are concerned the same had already been paid by the appellants. Even according to the bye-laws, the D.D.A. had to sanction plans within sixty days and the _D.DA._ had no G justification of withholding the sanction as nothing was required to be done on behalf of the appellants. It has been further contended that according to the stand taken by the D.D.A. itself the sanction was not withheld on accotlnt of non-payment of any dues but on account of the ban put by the Central Government. It has been further argued that in any . event, the H building has been constructed pursuant to the interim orders of[~he ] High G **==> picture [16 x 11] intentionally omitted <==** **----- Start of picture text -----**<br> r-<br>**----- End of picture text -----**<br> - -• **==> picture [15 x 10] intentionally omitted <==** **----- Start of picture text -----**<br> >-<br>**----- End of picture text -----**<br> 477 ANSAL PROPERTIES _v._ D.D.A [KASLIWAL, J.] > Court which expressly permitted the construction of the building albeit at A the risk ~d-c:ost of the appellant. The High Court has itself recorded a finding __,,_. that the 16 storeyed building stands constructed according to the -·-bye-laws and even if a formal sanction is given now it should relate back to the date on which such sanction ought to have been granted and the building constructed by the appellant in the present case cannot be considered as unauthorised in law. B \ The admitted fa~ts of the case are that the building plans were submitted to the 0.0.A. on 12.8.1985 and the D.DA. had forwarded the plans for approval of Delhi Urban Arts Commission (DUAC) on 13.9.1985. Section 12 of the Delhi Urban Art Commission Act, 1973 clearly provides C that notwithstanding anything contained in any other law for the time being m force, every local body shall, before according approval in respect of any building operation refer the same to the DUAC for scrutiny and the decision of the Commission in respect thereof shall be binding on such local body. The DUAC by its letter dated 18.9.1985 sought certain clarifica- D tions from the appellant within ten days and again sent a reminder on 24.9.1985 but the appellants did not send any reply. On the other hand the appellant sent notice of commencement of construction on 15.10.1985 and on that basis is claiming that having not received any order of r~jection of the plans within sixty days as contemplated under bye-law No.6.7.4 the appellant had become entitled to deemed sanction. We find no force in E this submission. As already mentioned above, it was necessary to obtain the approval of the DUAC and the DUAC by letter dated 18.9.1985 and 24.9.1985 were seeking certain clarifications from the ,appellant. Bye-law No.6.7.4 of the building bye-laws, 1983 of the Delhi Development Authority reads as under:..., F "If within 60 days of the receipt of notice under 6.1 of the Bye-Laws; the authority fails to intimate· in writing to the person, who has given the notice, of its refusal or sanction or any intimation, the notice with its plans and statements shall be .deemed to have been sanctioned provided the fact is immedi- G ately brought to the notice of the Authority in writing by the person who has given notice and having not received any intimation from the Authority within fifteen days of giving such written notice. Subject to the conditions mentioned in this bye-laws, nothing shall be construed to authorise any person to H (1992) 3 S.C.R. 478 SUPREME COURT REPORTS do anything in contravention or against the terms of lease or titles of the land or against any other regulations, bye-laws or ordinance operating on the site of the work". A According to the above provision the question of deemed sanction only arises if within sixty day5 of the receipt of notice under 6.1 of the B bye-laws the authority fails to intimate in writing to the person who has given a notice of its refusal or sanction or any intimation. In the present case the D.D.A. had informed the appellant that the plans had been sent to DUAC for approval and the DUAC was also seeking some clarifications from the appellant by their letters dated 18.9.1985 and 24.9-.1985. The C further requirement as contemplated under bye-law 6.7.4 is that the fact of deemed sanction has to be immediately brought to the notice of the authority in writing by the person who has given notice and thereafter if no intimation is received from the authority within 15 days of giving such written notice the provision of deemed sanction comes into operation. In the present case the appellant only sent a notice for commencement of D construction on 15.10.1985 and the same in our view does not fulfil the requirement of the notice which is contemplated under bye-law 6.7.4. in asmuch as intimation had already been given by DU.AC seeking information. Apart from this the ban on the construction of multi-storeyed buildings came into operation from 17.10.1985 itself and in view of this E circumstance also there was· no questi?n of the applicability of deemed sanction in the facts of this case. It is not dispute that the building has been constructed without any sanction or permit from the D.D.A. as required under the building bye-laws and the building has been constructed at the risk of the appellant under the stay order of the High Court. Clause (B) F of the Appendix "q" of the building bye-laws, 1983 provides for compoundable items as under: - F - ## _COMPOUNDABLE ITEMS_ G Deviations in terms of covered area - If a building or part thereof has been constructed unauthorisedly i.e. without obtaining the requisite building permit from the authority as required under clause 6.1 & 6.7.1 of the building bye-laWs, the same shall be compounded at the following rates provided the building or part thereof so constructed otherwise conforms to the provisions contained in the Building Bye-Laws and ANSAL PROPERTIES _v._ D.D.A. (KASLIWAL, J.] 479 Master/Zonal Plan regulations. For this party shall have to submit the request for building permit in the prescribed procedure". Thus under the above provision any building or part thereof constructed without obtaining the requisite building permit from the authority as required under clause 6.1 and 6.7.1 of the building bye-laws will be B considered as a construction made unauthorisedly and the same can be compounded at the rates mentioned in clause (B). It is an admitted position i~ the present case that no building permit has been given to the appellants till now and as such they are bound to pay the compounding fee according to the rates prescribed in this regard. Thus we find no force in the contention of the appellant that they are not liable to pay any compounding fee. (iv) So far as charging of interest on the compounding fee is concerned, we are definitely of the view that in the facts and circumstances of the case the D.D.A. is not entitled to charge any interest on the com, pounding fee. In the result we find no force in these appeals and we uphold the order of the High Court except with the modification that the D.D.A. is not entitled to charge any interest on the amount of compounding fee. It is further ordered that the directions given by the High Court shall now be carried out from the date of the Judgment of this Court instead of the date of the Judgment of the High Court. Thus except the -abovementioned modifications, we uphold the order of the High Court as well as the directions given by it. There will 1,-e no order as to costs in this Court. V.P.R. Appeals Partly allowed.
End of Judgment Record
Browse All Supreme Court of India (1992) Decisions
1992-01-07

Jaiswal v. Debi Mukherjee

Dr. P. K. Jaiswal challenged a UPSC process for the post of Assistant Director General (Prevention of Food Adulteration). The Union Government had initially asked UPSC to fill the post by direct recruitment but, before advertisements, informed it to withhold the process while examining possible promotion from Assistant Secretary and amending recruitment rules to create higher tiers. Despite this, the UPSC advertised the post and the appellant was interviewed. Debi Mukherjee, then Assistant Secretary and seeking promotion upon the rule-amendment, obtained an interim stay from the Central Administrative Tribunal and later a direction to provide promotional avenues. In the meantime, two higher-pay tiers were created, without separate designations, under an amendment directed by the Court in a related matter. The appellant argued that once the selection process begins, the Government and Tribunal cannot freeze it and that the Commission should complete the selection; and that overlooking the two new layers amended later was erroneous. The respondents contended on points of vested rights and the proper policy- and rule-based framework for promotions versus direct recruitment. The Supreme Court held that the Government can withdraw the requisition before the advertisement if it intends to amend rules to permit promotion, that the Government’s pre-advertisement decision is permissible, and that a right to be considered for selection crystallizes only after advertisement and interview. The appeal was dismissed.

1992-09-24

S.B. Dogra v. State of Himachal Pradesh and Ors.

This Civil Appeal concerns the seniority of S.B. Dogra in the Himachal Pradesh Police Service in the wake of the demobilised armed forces concession. After HP State was formed, Rule 5(1) of the Demobilised Armed Forces Personnel (Reservation of Vacancies in the HP State Non-Technical Services) Rules, 1972, provided that the seniority of officers appointed against reserved vacancies shall be determined on the assumption that they joined the service at the first opportunity after their military service or training prior to commission. Dogra, who had military service and later joined the HP Police Service against a reserved vacancy for Demobilised Armed Forces Personnel, was placed with a notional entry year (1964) and thus ahead of some officers, including Durga Shanker Amist. The dispute escalated through High Court proceedings and a Central Administrative Tribunal decision relying on earlier cases. The Supreme Court, comparing Rule 5(1) with Punjab/Haryana rules and distinguishing the applicable statutory framework, held that the Tribunal erred in confining the seniority to the period of actual military service during the emergency. It noted that the rules are not pari materia with Haryana’s rules and that the language of Rule 5(1) permits a broader interpretation for notional entry. The Court distinguished certain earlier rulings (A.S. Parmar; Narendra Nath Pandey) as inapplicable here, while applying the State of Madhya Pradesh v. Rameshwar Prasad approach to preserve fair seniority. Ultimately, the appeal was allowed, the Tribunal’s seniority order was set aside, and the prior position was restored with directions for implementation of the judgment.

1992-12-11

State of Maharashtra v. Rattanlal

This is a Supreme Court decision interpreting the revisional powers of the State Government under the Maharashtra Agricultural Land (Ceiling and Holdings) Act, 1961. The respondent-declarant had a declaration under Sec. 12; the Surplus Land Determination Tribunal found surplus land (9 acres 8 guntas). On appeal, the Revenue Tribunal modified the resumption from Survey No. 11 to Survey No. 29, which was upheld. Later, after undisclosed lands came to light, the Additional Commissioner issued a show cause, remitted the matter to the primary Tribunal for redetermination and delimitation, and the High Court held that once an appeal under Sec. 21 is filed and an order is made, the Commissioner or the State Government lacks jurisdiction to determine the ceiling area. The State Government challenged this view. The Court held that under Sec. 45(2) and (3), the Commissioner has revisional powers, either suo motu or on an aggrieved person’s application, to call for records of inquiries under Secs. 17–21 and to pass orders after a hearing, subject to provisos including time limits and restrictions when appeals are pending. The decision also clarifies that suo motu revisional action can correct fraud or suppression of material facts, and that finality does not bar such action in cases of concealed lands. The High Court’s view was set aside and the Commissioner's order restored, with the appeal allowed along with costs.

1992-10-13

State of Madhya Pradesh and Anr. v. Syed Naseem Zahir and Others

State of Madhya Pradesh and Anr. v. Syed Naseem Zahir and Others concerns the legality and timing of the 'sealed cover' procedure used by the Departmental Promotion Committee (DPC) for recommending promotions when disciplinary proceedings were contemplated. Syed Naseem Zahir, who rose to Superintending Engineer, was included in a 1987 panel for promotion to Chief Engineer, but his name was kept in sealed cover due to potential misconduct. A charge-sheet was issued in 1988. The Madhya Pradesh Administrative Tribunal later directed promotion based on the sealed-cover recommendation, prompting the State's special leave appeal. The Supreme Court held that the departmental enquiry had been completed and the charges proved, and while it emphasized that Jankiraman's case governs sealed-cover use, the peculiar facts allowed keeping the sealed cover unopened until the disciplinary proceedings concluded. The Court outlined that if exonerated, the sealed-cover would be opened and the respondent would be notionally promoted from the date a junior was promoted, with consequential benefits, including back wages; if punished, action would be taken in accordance with Jankiraman's guidelines. The Court set aside the Tribunal's order and allowed the State's appeal, directing that no promotion be granted until proceedings end, and that the sealed-cover mechanism be used consistent with the facts.