These writ petitions challenge a denial of a regular permit on the circular nationalised interdistrict route Kadakkal–Parippally via Nilamel–Pallickal. The petitioner sought a permit on the route between Parippally and Nilamel, which would connect two intermediate points on a circular route notified under the nationalisation scheme Ext. P7. The Regional Transport Authority, Kollam, rejected the application (Ext. P1), and the State Transport Appellate Tribunal dismissed the appeal (Ext. P5). The core issue is whether permits between two intermediate points on a circular route can be forbidden under Ext. P7, when such prohibition may not benefit KSRTC or travelling public in a straightforward manner due to the peculiar geometry of circular routes. The petitioner relied on a previous decision in W.P(C) No. 30812/2004. The learned Single Judge had taken a more sympathetic view toward public convenience, suggesting that strict application of the exclusion on circular routes would cause hardship. The Division Bench, however, agrees that the interpretation should not be mechanical; it should promote the object of Ext. P7 and the travelling public. It holds that restriction applies to linear routes, not circular ones, and directs reconsideration of permit applications afresh in light of this judgment and Ext. P7.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • V. K. Bali
  • S. Siri Jagan
Judgment Date
2006-12-19
Court Decision / Holding
The Division Bench set aside the learned Single Judge’s order in W.P(C) No. 25825/2005 and quashed the impugned orders in W.P.C Nos. 26307/2004, 37328/2004 and W.A. No. 1210/2006. It directed the RTAs to reconsider the permit applications between two intermediate points in circular routes afresh, in accordance with the observations and directions in this judgment and Ext. P7.
Final Disposition
Writ petitions and writ appeal disposed of; impugned orders quashed; RTAs directed to reconsider permit applications between intermediate points on circular routes in light of the judgment and Ext. P7.

Parties to the Case

Appellants / Petitioners

  • Anish V. Kumar; K.R. Dardons; Kattuputhussseri, NavaiKulam, Thiruvananthapuram

Respondents

  • The Regional Transport Authority, Kollam, represented by its Secretary
  • The Secretary, Regional Transport Authority, Kollam
  • The District Transport Officer, K.S.R.T.C., Kollam
  • C. Vijayakumar, Vidya Bhavan, Kadakkal P.O., Kollam
  • T.S. Sudheesh Kumar, Charuvila Veedu, Kooyayil, Nedungalam P.O., Kollam
  • The State Transport Appellate Tribunal, Ernakulam

Legal Representation & Advocates

Counsels for Petitioners

  • • Sri. L. Muraleedharan

Counsels for Respondents

  • • Sri. T. Ravikumar (SC, KSRTC)
  • • Sri. James Koshy (SC, KSRTC)
  • • KSRTC Government Pleader Sri M.K. Sabu
  • • Sri K. Prabhakaran (SC, K.S.R.T.C.)

Provisions of Law Cited

Article 14 of the Constitution of IndiaArticle 19(1)(g) of the Constitution of India

Legal Doctrines & Maxims

  • Interpretation to promote the object of a statute and prevent mischief (purposive / mischief-rule interpretation)
  • Constructive task of finding the intention of Parliament and giving force and life to that intention (Seaford Court Estates Ltd v. Aher)

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioners argued that the nationalised circular route between Parippally and Nilamel should not be stifled by a rigid application of Ext. P7. Parippally is a terminus, and the route between two intermediate points on a circular scheme would not necessarily benefit KSRTC or travelers to the same extent as a linear route. They relied on a prior decision (W.P(C) No. 30812/2004) and urged a purposive interpretation that would avoid unnecessary public hardship while preserving the scheme’s object.

Contentions of Respondents

The respondents contended that Ext. P7, the nationalisation scheme, bars permits between two intermediate points on a nationalised route to protect KSRTC’s revenue and the integrity of the route network. They argued that circular routes are still nationalised and that the permits sought would defeat the scheme’s purpose by enabling private operators to encroach on the KSRTC’s business.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (2)

Case NameCitationTreatmentExplanation
Seaford Court Estates Ltd v. Aher(1949) 2 All ER 155PositiveCited to justify a purposive, intention-driven interpretation of legislation to give force to Parliament’s aims and avoid drafting anomalies (the court quotes the judgment and Denning’s remarks).
W.P(C) No. 30812/2004W.P(C) No. 30812/2004Mentioned OnlyPetitioner relied on this Court’s prior decision; referenced as supportive context but not as binding authority in the present ruling.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•1,885 words•~9 min read

In The Court Record

Anish V. Kumar v. Regional Transport Authority, Kollam and others

IN THE HIGH COURT OF KERALA AT ERNAKULAM PRESENT : THE HON'BLE THE CHIEF JUSTICE MR.V.K.BALI & THE HONOURABLE MR. JUSTICE S.SIRI JAGAN TUESDAY, THE 19TH DECEMBER 2006 / 28TH AGRAHAYANA 1928 WP(C).No. 26307 of 2004(F) -------------------------- PETITIONER: - ------------ ANISH V.KUMAR, K.R.DARDONS, KATTUPUTHUSSERI, NAVAIKULAM, THIRUVANANTHAPURAM. BY ADV. SRI.L.MURALEEDHARAN RESPONDENTS: - ------------- 1. THE REGIONAL TRANSPORT AUTHORITY, KOLLAM, REPRESENTED BY ITS SECRETARY. 2. THE SECRETARY, REGIONAL TRANSPORT AUTHORITY, KOLLAM. 3. THE DISTRICT TRANSPORT OFFICER, K.S.R.T.C., KOLLAM. 4. C.VIJAYAKUMAR, VIDHYA BHAVAN, KADAKKAL P.O., KOLLAM. 5. T.S.SUDHEESH KUMAR, CHARUVILA VEEDU, KOONAYIL, NEDUNGALAM P.O.,KOLLAM. 6. THE STATE TRANSPORT APPELLATE TRIBUNAL, ERNAKULAM. BY ADV. SRI.T.RAVIKUMAR, SC, KSRTC SRI.JAMES KOSHY.N., SC. KSRTC GOVERNMENT PLEADER SRI. M.K. SABU SRI.K.PRABHAKARAN, SC, K.S.R.T.C. THIS WRIT PETITION (CIVIL) HAVING BEEN FINALLY HEARD ON 4/12/2006, ALONG WITH WPC NO. 37328 OF 2004 WA NO. 1210 OF 2006 THE COURT ON 19/12/2006, DELIVERED THE FOLLOWING: PETITIONER'S EXHIBITS: W.P.C.NO. 26307/2004 ----------------------------------- EXT.P1 TRUE COPY OF PROCEEDINGS OF R1 HELD ON 25-1-2003. EXT.P2 APPEAL PETITION FILED ON 4-3-2003. EXT.P3 COPY OF TEMPORARY PERMIT. EXT.P4 DO. DO. EXT.P5 JUDGMENT DT. 31-7-2004 IN MVAA 264/2003. EXT.P6 ROUGH SKETCH OF THE ROUTE KADAKKAL-PARIPPALLY. EXT.P7 THIRUVANANTHAPURAM CIRCULAR SCHEME. RESPONDENTS' EXHIBITS: ------------------------------------- EXT.R3(a) PHOTOCOPY OF NOTIFICATION DT. 23-11-1960. [TRUE COPY] P.S TO JUDGE. V.K. Bali, C.J. & S. Siri Jagan, J. =-=-=-=-=-=-=-=-=-=-=-=-=-=-=-= **==> picture [224 x 38] intentionally omitted <==** **==> picture [227 x 23] intentionally omitted <==** **==> picture [102 x 12] intentionally omitted <==** ## Siri Jagan, J. These three cases raise a very peculiar issue viz. whether a permit can be issued connecting two intersecting points in a nationalised route in violation of the scheme notified by the Government although such prohibition of grant of permits would not in any way benefit either the KSRTC or the travelling public in any manner. In all these three cases, the nationalised route is the same but the intersecting points between which grant of permits are applied for are different. Therefore, for the purpose of deciding these cases, it is sufficient to refer only to the facts in one case, which we choose as W.P(C) No. 26307/2004. The facts are as follows. 2. The petitioner applied for a regular permit on the interdistrict route Kadakkal-Parippally, (via) Nilamel-Pallickal. The R.T.A, Kollam considered the application and rejected it by Ext. P1 decision dated 25-1-2003. Appeal filed by the petitioner against that order was dismissed by Ext. P5 judgment dated 31-7-2004 of the State Transport Appellate Tribunal. The writ petition is filed challenging Exts. P1 and P5. The reason for rejection of the application for permit was that it connects two intermediate points at Parippaly and Nilamel on the Thiruvananthapuram-Kollam-KottarakkaraThiruvananthapuram circular route, which is covered by the nationalisation scheme, which is Ext. P7. All the routes indicated in Annexure A of Ext. P7 and connecting or passing through any two or more intermediate points of such route are covered by the said scheme. It is also not disputed that Parippally and Nilamel are W.P.C. No.26307/2004 etc. -: 2 :- intermediate points on such circular route and therefore it would connect two intermediate points on the notified routes. The scheme concerned is a complete exclusion scheme with exception. The contention of the petitioner is that Parippally is a terminus and his route cuts across the nationalised routes at Nilamel. Therefore, limited overlapping without passing through or connecting two intermediate points is tolerated since an intersection even in complete exclusion scheme is permissible. So, touching at Nilamel may be treated as intersection and if that be so, permit can be granted. In support of that submission, the petitioner also places reliance on a judgment of this Court in W.P(C) No. 30812/2004. 3. The present nationalised route has a peculiarity unlike other routes which is that it is a circular route. It starts from Thiruvananthapuram, passes through Attingal and Parippally, goes to Kollam, from there goes to Kottarakkara and then passes through Nilamel and back to Thiruvananthapuram. This is a very long circuitous route covering a lot of distance by the very nature of the route, whereas the distance between Parippally and Nilamel between which the permit is applied for by the petitioner is comparatively of much smaller distance. No sensible person who wants to go to Nilamel from Parippally or vice versa would ever board a KSRTC bus from Parippally to go to Nilamel via Kollam and Kottarakkara and vice-versa by wasting time and money, which time and money would be rather very considerable going by the distance one would have to travel along the nationalised route to reach the respective destinations. 4. In the reference order in W.P(C) Nos. 26307/2004 and 37328/2004, the learned Single Judge opined that the framers of the scheme imposed restrictions in the matter of granting of permits W.P.C. No.26307/2004 etc. -: 3 :- between the intermediate points in a nationalised route keeping in mind the linear routes instead of circular routes as in this case. The intention behind such prohibition was to discourage private operaters operating on the same line of travel as that of KSRTC buses causing dent into the income of the KSRTC. The learned Single Judge noted that out of 22 routes covered by Ext. P7 scheme, 20 are linear routes and only two are circular routes, that too somewhat in opposite directions of the same route. The learned Single Judge further opined that if the intention of the scheme is kept in mind, passing through two intermediate points or connecting two intermediate points prohibited under the scheme should generally be in the same or opposite direction of travel. If such conditions are mechanically applied to the circular route also, very serious prejudice would be caused to the applicants for permits without any corresponding benefit to the KSRTC and in such cases, Ext. P7 being a piece of subordinate legislation, an interpretation which is violative of the fundamental rights of the petitioner under Articles 14 and 19(1)(g) of the Constitution of India should be avoided. The learned Single Judge (K. Balakrishnan Nair, J) also extracted a passage from the Laws of England by Sir Blackston in support of his views thus: “For since in laws all cases cannot be foreseen or expressed, it is necessary, that when the general decrees of the law come to be applied to particular cases, there should be somewhere a power vested of defining those circumstances, which (had then been foreseen) the legislator himself would have excepted.” He also quoted the words of Lord Denning M.R in the case of **Seaford Court Estates Ltd** v. **Aher** (1949) 2 All ER 155(CA), which reads thus: “When a defect appears, a Judge cannot simply fold his hands and blame the draftsman. He must set to work on the constructive task of finding the intention of Parliament, . . . and then he must supplement the written word so as to W.P.C. No.26307/2004 etc. -: 4 :- give 'force and life' to the intention of the legislature . . . A Judge should ask himself the question how, if the makers of the Act had themselves come across this ruck in the texture of it, they would have straightened it out? He must then do as they would have done. A Judge must not alter the material of which the Act is woven, but he can and should iron out the creases.” The learned Single Judge was of opinion that in such circumstances the interpretation should be adopted, which would avoid the mischief caused by, and promote the intention of Ext. P7, legislation. Viewed thus, according to the learned Single Judge, the restriction which is normally applied in the case of linear nationalised routes should not be applied to circular routes failing which not only would the KSRTC be not benefitted but also the travelling public for whose benefit the scheme and permits are provided would be put to untold sufferings. However, because of the judgment of the the learned Single Judge, which is impugned in W.A.No.1210/2006, in which another learned Single Judge took the strict view that since the permits applied for is in respect of a route connecting two intermediate points of a nationalised route such grant of permits would violate Ext. P7 scheme and is therefore prohibitory, the other learned Single Judge, chose to refer the matter to a Division Bench for consideration and it is thus these writ petitions came up before us along with the writ appeal. 5. We have heard counsel appearing for the parties. The respondents argued in support of the impugned orders. 6. In the facts and circumstances of the case, we are in full agreement with the views expressed by the learned Single Judge in his reference order in W.P(C) Nos. 26307 and 37328 of 2004. Even if the impugned orders may be regarded as technically correct, we think that the law in this case should not be applied mechanically without taking into account the impact of imposing such restrictions on a circular route on the travelling public. We are also of opinion that no W.P.C. No.26307/2004 etc. -: 5 :- persons in their sensible mind would want to travel between the two connecting points in the circular route of KSRTC bus traversing the entire circular route wasting their time and money. While imposing such restrictions on issue of permits between these two points, the public would be put to unnecessary hardships which could not have been the intention of the Government while issuing Ext. P7 notification. As such, we are of opinion that as held by Sir Blackston as also Lord Denning M.R. a situation has arisen wherein this Court should put an interpretation to Ext. P7 notification in respect of the circular routes which is in consonance with the object of Ext. P7 notification and the convenience of the travelling public. Nobody can dispute the fact that the very object of issue of permits is intended for the benefit of the travelling public. Of course, it is in order to safeguard the interest of the KSRTC that the schemes like Ext. P7 are being issued with restrictions on issue of permits in between two connecting points in the nationalised routes. If, for this purpose, linear routes and circular routes are considered at par not only would the KSRTC be not benefitted but also the travelling public would be seriously inconvenienced. We are, therefore, satisfied that an interpretation which would promote the object and prevent the mischief of the legislation should be adopted in this case. This can be done by holding that restriction on issuing of permits between two intermediate points in a nationalised route would be applicable only to linear routes and not to circular routes as in the cases under consideration. 7. Accordingly, the judgment of the learned Single Judge in W.P(C) No. 25825/2005 is set aside and the impugned orders in all the three writ petitions are quashed allowing W.P(C) Nos. 26307 & 37328 of 2004 and W.A.No. 1210 of 2006. The RTAs are directed to W.P.C. No.26307/2004 etc. -: 6 :- reconsider the applications of the petitioners for permit submitted by them between the two intermediate points in the circular routes afresh in accordance with the observations and directions in this judgment. The writ appeal and the writ petitions are disposed of accordingly. V.K. Bali, Chief Justice. S. Siri Jagan, Judge. Tds/
End of Judgment Record
Browse All High Court of Kerala (2006) Decisions
2006-11-30

Baburaj v. State of Kerala

Baburaj, the appellant, was convicted under Section 302 IPC for intentionally causing the death of his wife Geetha by constrictive neck compression. The Thrissur Sessions Court had sentenced him to life imprisonment on a conviction based on circumstantial evidence. The Kerala High Court heard Crl.A. No. 794 of 2004, challenging that conviction. The occurrence occurred in the early hours of 1 February 2002, approximately at 1:30 A.M., at Engandiyoor, where Geetha was found dead in her home after prior quarrels between husband and wife. The FIR was lodged on 1 February 2002 by Geetha’s brother. Dr. Cyriac Job conducted the post-mortem on 1 February 2002 and found signs of asphyxia with constrictive force on the neck, as well as multiple ante-mortem injuries suggesting a struggle. The prosecution relied on motive—frequent quarrels between the spouses—and the accused’s presence in the house that night to connect him to the crime. The defense contended that timing of death could be earlier than alleged and that the chain of circumstantial evidence was not complete, possibly pointing to accidental death. The High Court evaluated the medical testimony, ocular and accepted witnesses, and found the circumstantial chain sufficient to prove guilt beyond reasonable doubt, applying the principle of last-seen-together, and upholding the Sessions Court’s verdict. The appeal was dismissed, and the conviction affirmed.

2006-11-22

K. Gopi (D/o Late Ex.GS-142996 PNR) v Union of India and others

Petitioner K. Gopi, daughter of late Ex.GS-142996 PNR, sought compassionate appointment in the Border Roads Organisation after her father’s death on 03.03.2002. The petition, filed in 2004, contends that the family, comprising the petitioner, her brother and mother, was very poor and dependent on government employment. An application for compassionate appointment was made on 16.12.2003 but Ext.P4 rejected it, noting a revised policy that the dependent must be a major at the time of death. Subsequently, the government issued policy extensions (Ext.P7 and Ext.P8) allowing a three-year window, and the mother was advised to submit fresh documents. The petitioner argued that completion of 18 years by a dependent at death is not a precondition for eligibility. The respondents asserted that under the revised policy only those who were minor at death qualify; if the son attains 18 later, he may be advised to apply as per rules then in force. The court referred to a Kerala case (O.P.3338/2002) allowing merits-based consideration where there is no laches and noting that policy changes cannot retroactively defeat rights fixed as of death. It also cited Umesh Kumar Nagpal (1994) 4 SCC 138 to acknowledge the need for a reasonable period. Ultimately, the writ petition was allowed, directing the respondents to consider the claim on merits and dispose of it within four months.

2006-11-29

V. Bahuleyan v. State of Kerala and The Secretary to Government, Transport (C) Department, Government Secretariat, Thiruvananthapuram

V. Bahuleyan, a retired Regional Transport Officer, challenged Ext.P5 denying notional promotion to Deputy Transport Commissioner based on a pre-existing select list (Ext.P1) in which he was ranked No.4 as of 15 June 2002. A vacancy for the post arose on 1 December 2002 in the retirement vacancy of Sri Kunhambu, but Bahuleyan, though still in service, was bypassed and superseded by the immediate junior through Ext.P2 dated 6 January 2003. Disciplinary proceedings against him were initiated but later dropped as per Ext.P3 dated 23 August 2003, with his representation Ext.P4 dated 11 February 2004 seeking placement as Deputy Transport Commissioner with effect from 6 January 2003 and arrears. Ext.P5 dated 1 April 2004 rejected the claim. Bahuleyan contends that Note iii to Rule 28(b)(i)(7) of the Kerala State and Subordinate Services Rules provides that an officer included in a select list who is exonerated from major penalties must be promoted on the basis of his position in the list; if fully exonerated, retrospective promotion should be granted. Delhi Jal Board v. Mahinder Singh (JT 2000 (10) SC 158) is cited to support the right to be considered for promotion under Article 16. The High Court holds that Ext.P5 is unsustainable, and Bahuleyan is entitled to notional promotion from 1 December 2002, but no monetary benefits; salary and pension are to be fixed accordingly, and arrears, if any, to be settled within four months. The petition is allowed as above.

2006-12-11

The Correspondent and Chairman Standing Committee, MES, Central College Committee, MES Office, Kozhikode - Rep. by the General Secretary, Muslim Education Society, Kozhikode v. M. Syed Mohammed

This writ petition challenges execution of an order of the University Appellate Tribunal directing re-posting and monetary benefits to the respondent, an employee of a private MES college. The respondent had been moved from M.E.S. College, Kodungallur to M.E.S. College, Mampad, and claimed salary for the period he was kept out of duty. The University Appellate Tribunal held in his favour, and the High Court later directed payment of monetary benefits and posting, but the matter escalated to execution proceedings in which the petitioner (the MES management) contends that Sub Court Kozhikode lacks jurisdiction to execute the order under Calicut University Act, section 60(8). The petition traces the chain of litigation since the Tribunal’s order and a prior High Court order in CRP Nos.895/79 etc. The core issue is where an execution petition under the Tribunal’s order should be heard and executed: should it be the Sub Court with jurisdiction over the private college’s location, or the court where MES’s main office or the employee’s work was situated at the time of the appeal. The court ultimately held that Sub Court Kozhikode has no jurisdiction under section 60(8) and transferred the execution to Sub Court Manjeri, directing expeditious disposal within six months, while disposing of the writ petition.