Tenetowl LogoTenetowl
Supreme Court of IndiaSupreme Court · 2010Single JudgeArbitration Petition disposed of.

Anil Kumar v. B.S. Neelkanta & Ors.

Case / Petition Number:
Arbitration Petition No. 7 of 2008
Neutral Citation:[2010] 6 S.C.R. 480

Case Synopsis & Summary

Anil Kumar v. B.S. Neelkanta & Ors. concerns appointment of an arbitrator under the Arbitration and Conciliation Act, 1996, in a long-drawn dispute relating to ownership, control and management arrangements for Varsha Hill Fort Resorts Pvt. Ltd. (Varsha) and related agreements. Goldstone entered into agreements with the BSN Group and Varsha around 1999–2004, entrenching 74% equity with the BSN/Varsha group and 26% with Goldstone, with a key arbitration clause (Clause 41) in the January 2004 agreements mandating arbitration via a sole arbitrator, initially to be mutually agreed and, failing agreement within 15 days, nominated by the Managing Director of the Andhra Pradesh Tourism Development Corporation (APTDCL). Disputes emerged over breach allegations, validity of shareholding arrangements and termination notices in 2005, and which parties actually fall within the arbitration agreement. The Andhra Pradesh High Court earlier appointed a sole arbitrator, which this Court later scrutinized after petitioners obtained leave to appeal. The Supreme Court held that Section 11(5)-(6) requires the Chief Justice to (i) assess territorial jurisdiction and (ii) determine the existence of a live arbitration agreement and whether the claim is dead, leaving live disputes to be resolved by the arbitrator under Section 16. The petition was allowed, appointing Justice M. Jagannadha Rao as the sole arbitrator with instructions for an expeditious reference and no costs.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • D.K. Jain
Judgment Date
2010-05-07
Court Decision / Holding
The petition is allowed. The Supreme Court appointed Mr. Justice M. Jagannadha Rao, a former Judge of this Court, as the sole Arbitrator to adjudicate the claims/disputes, on terms deemed fit, and directed the Arbitrator to enter upon the reference and give his Award expeditiously. The order clarifies that the Arbitrator shall decide matters on the merits, independently of any observations in the High Court order, and the petition stands disposed of with no order as to costs.
Final Disposition
Arbitration Petition disposed of.

Parties to the Case

Appellants / Petitioners

  • Anil Kumar

Respondents

  • B.S. Neelkanta
  • B. Renuka
  • Amogh Hotels Ltd.
  • Varsha

Legal Representation & Advocates

Counsels for Petitioners

  • • Rajiv Sawhney

Counsels for Respondents

  • • C.A. Sundaram
  • • Ritu Bhalla
  • • Dhruv Dewan
  • • Monark Gehlot
  • • Anandh Kannan
  • • Roshini Musa

Provisions of Law Cited

Arbitration and Conciliation Act, 1996 - sections 2(1)(f), 9, 11(5), 11(6), 16

Legal Doctrines & Maxims

  • ad idem
  • live issue vs dead issue in arbitration
  • arbitrator’s jurisdiction under Section 16 to rule on existence/validity of arbitration agreement
  • two-step approach under Section 11 (jurisdiction and live dispute) leading to merits/arbitration by Tribunal

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioner contends that arbitration is mandated by Clause 41 of the January 2004 agreements, covering disputes including breaches and questions about the live status of equity transfers. They argue that there exists a valid arbitration agreement and a live dispute that cannot be resolved without evidence; the Chief Justice should appoint an arbitrator under Section 11(5)-(6), and the arbitrator under Section 16 can determine his own jurisdiction. The High Court’s earlier appointment should be reinforced, and the matter should proceed to arbitration with expedited reference and no adverse cost implications.

Contentions of Respondents

The respondents contend that after equity transfer to the petitioner’s associates, the arbitration agreement ceased to govern ongoing disputes; they assert there is no live dispute under the agreement and that present contentions involve third parties not party to the arbitration agreement (the Progressive Group). They rely on Sukanya Holdings and SBP to argue that arbitrability and the live-dispute question may not require arbitration under the agreement.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (2)

Case NameCitationTreatmentExplanation
Sukanya Holdings (P) Ltd. v. Jayesh H. Pandya & Anr.(2003) 3 SCR 558 = (2003) 5 SCC 531Mentioned OnlyCited to illustrate limitations on arbitrability and the relationship between parties and arbitration agreements; used as background reference rather than a controlling ruling in this decision.
SBP & Co. v. Patel Engineering Ltd. & Anr.(2005) 4 Suppl. SCR 688 = (2005) 8 SCC 618PositiveCited as authority for the proposition that the function of the Chief Justice under Section 11 is judicial and to define the scope of determining the arbitration question, including the live/dead dispute analysis and the process for appointing an arbitrator.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•5,114 words•~24 min read

In The Court Record

Anil Kumar v. B.S. Neelkanta & Ors.

## [2010] 6 S.C.R. 480 A ## ANIL KUMAR _v._ 8.S. NEELKANTA & ORS. (Arbitration Petition No. 7 of 2008) 8 # MAY 7, 2010 **[D.K. JAIN, J.]** ## _Arbitration and Conciliation Act, 1996:_ / c _ss. 2 (1 )(f) and 11 (5) and (6)_ - _International commercial arbitration_ - _Appointment of arbitrator_ - _HELD: In order to set into motion the arbitral procedure, the Chief Justice or his designate has to examine and record his satisfaction (i) regarding territorial jurisdiction, (ii) that an arbitration_ 0 _[agreement exists ][between ][the ][parties and ][(iii) ][that ][in ][respect ] of the agreement_ a _live issue, to be decided between the_ - _parties, still exists On being so satisfied, he may allow the application and appoint an arbitral tribunal or_ a _sole arbitrator, as the case may be_ - _In the instant case, from the material_ E _placed on record by the parties, it appears that (i) there are disputes between the parties on the issues/claim raised by the petitioner and countered by the respondents, including whether the claim still subsists or has been extinguished as alleged by the respondents, which cannot be resolved without evidence; (ii) there is an arbitration agreement in Clause 41_ F _of agreement dated 19th January 2004, to which the petitioner is_ a _party along with the respondents_ - _The arbitration agreement is in clear terms and brings within its ambit the disputes sought to be raised by the petitioner: whether there was_ a _breach of the terms of agreement dated 19th January_ G _2004, which would be a matter in the realm of arbitration and this Court cannot go into that question; (iii) the issues/claim raised by the petitioner, on a mere assertion cannot be said to be_ a _dead one without evidence to be produced by the parties in support of and rebuttal thereto, on their respective_ **H** 480 **H** ANIL KUMAR _v._ B.S. NEELKANTA 481 _stands, regarding rights and obligations of the parties under_ A _agreements dated 19th January 2004 and 23rd January 2004, on allotment of_ 7 _4% of equity in favour of I/CL and petitioner's right to nominate or being himself on the Board of Directors_ . _of Varsha; and (iv). the arbitrator is competent u/s 16 of the Act to rule on its own jurisdiction, including to rule on any objections with respect to existence or validity of the arbitration agreement, on_ a _plea being raised before him that he has no jurisdiction_ - _Application allowed_ - _The sole Arbitrator appointed to adjudicate upon the claims/disputes raised by the petitioner. [Para 14-16]_ c B · c _Sukanya Holdings (P) Ltd. Vs. Jayesh H. Pandya_ & _Anr._ (2003) 3 SCR 558 = (2003) 5 SCC 531; _SBP_ & Co. _Vs. Patel Engineering Ltd._ & _Anr._ (2005) 4 Suppl. SCR 688 = (2005) - 8 sec 618, referred to. D ## Case Law Reference: (2003) 3 SCR 558 referred to para 10 (2005) 4 Suppl. SCR 688 referred to para 10 E CIVIL ORIGINAL JURISDICTION : Arbitration Petition No. 7 of 2008. Under Section 11 (5) & (6) of the Arbitration and Conciliation Act, 1996. F Rajiv Sawhney, Jyoti Mendiratta, Vineet Jhanji for the Appellant. C.A. Sundaram, Ritu Bhalla, Dhruv Dewan, Monark Gehlot, Anandh Kannan, Roshini Musa (for Suresh A. Shroff & Co.) for G the Respondents. The Order of the Court was delivered by H 482 SUPREME COURT REPORTS [2010) 6 S.C.R. ., ## A ## ORDER D.K. JAIN, J. 1. This is a petition under Sections 11 (5) and 11 (6) of the Arbitration and Conciliation Act, 1996 (for short 'the Act') for appointment of an Arbitrator for adjudication of the 8[disputes which are stated to have arisen between the parties ] to this petition. 2. Since the case has had a chequered history, it would be appropriate to narrate the background facts, giving rise to this petition, in detail: ## c On 13th April 1998, the Andhra Pradesh Tourism Development Corporation Ltd. (hereinafter referred to as the "Corporation"), a statutory body owned and controlled by the State of Andhra Pradesh, awarded a lease in favour of one Ml D s Goldstone Engineering Ltd., presently known as Goldstone Teleservices Ltd. (hereinafter referred to as the "Goldstone") for a piece of land for oevelopment of the existing Hotel Ritz as a "Heritage Grand" category hotel, as notified by the Department of Tourism, Government of India. E On 8th November 1999, Goldstone entered into an agreement with respondents No.1, 2 and 3 (hereinafter referred to as the "BSN Group") by which they agreed to execute the said project through a new company known as M/s Varsha Hill Fort Resorts Pvt. ltd. (for short "Varsha"), respondent No.4 in F this petition. As per the said agreement BSN Group agreed to acquire 74% of equity in VarSiha whilst Goldstone agreed to retain 26% of equity in the said Company. On 17th May 2001, the Corporation executed a lease deed for the said site in favour of Varsha. The lease provided in extenso the rights and G obligations of the parties with respect to the project. Clause 12(u) of the lease deed provided that there would be no change in the constitution of the Lessee viz. Varsha, without the prior consent of the Corporation and clause 21 thereof - the nonassignability clause, provided that neither of the parties to the H lease. deed shall directly or indirectly sell, transfer, assign or ANIL KUMAR v. B.S. NEELKANTA [D.K. JAIN, J.] 483 otherwise part with the whole or part of their respective interest A and/or benefits or obligations under the lease deed in any manner whatsoever to any other person or party without obtaining the priorwritten consent of the Corporation. On 29th November 2002, Goldstone and BSN Group entered into yet another agreement whereby the latter agreed to take over the B - entire stake of Goldstone in Varsha. The Corporation felt that agreements dated 8th November 1999 and 29th November 2002 were in breach of the terms of the lease deed dated 17th May 2001 as no written consent of the Corporation had been · sought prior to the purported change of shareholding in Varsha, c on 4th August 2003, a notice for termination of the lease deed was issued to Varsha. According to the petitioner, in order to prevent the Corporation from resuming possession of the hotel site, on 22nd November 2003 the shareholders of Varsha, i.e. Goldstone and BSN Group, invited the petitioner to take over D shareholding of Varsha, subject to the prior approval of the Corporation. A meeting of the Board of Directors of Varsha was held on 22nd November 2003, where, according to the petitioner, three Directors; namely, B.S. Neelkanta (respondent No.1 ), Mr. P. Rameshbabu and Mrs. 8. Renuka (respondent · No.2) were present. Minutes of the meeting were duly drawn E. wherein it was recorded that the petitioner shall be investing funds to the tune of Rs.15 to 18 crores in the form of equity in Varsha. It was also resolved that the proposal approved by the Board shall be subject to the approval by the Corporation and the execution of the relevant documents. In furtherance of the F said Resolution, Varsha requested the Corporation to accord permission for change in the shareholding pattern in favour of Mis Anil Kumar & Associates (hereinafter referred to as "AKA"). The Corporation granted the permission vide their letter dated 10th December 2003. · G Pursuant to Corporation's approval, an agreement dated 19th January 2004 was entered into between AKA, BSN Group comprising Mr. B.S. Neelkanta, Mrs. B. Renuka, Amogh .. Hotels Ltd. and Varsha respectively as parties of the first, H [2010] 6 S.C.R. ## 484 SUPREME COURT REPORTS A second and third part, whereunder BSN Group agreed to transfer 19,68,300 shares in Varsha to AKA under the terms and conditions of the said agreement. The said agreement was signed on behalf of AKA by Anil Kumar, the petitioner herein and a resident of great Britain, Mr. B.S. Neelkanta (Respondent B No.1) and Mrs. B. Renuka (Respondent No.2). The agreement contained the following arbitration clause: c D E, "41. Any dispute, difference or controversy of whatever nature howsoever arising under, out of or in relation to this agreement between the parties and so notified in writing by either party to the other (the Dispute) in the first instance shall be attempted to be resolved amicably by them. If the parties are unable to do so, such dispute shall be referred ta arbitration by a sole Arbitrator mutually agreed by the parties to the dispute. In the event the parties are unable to agree on an Arbitrator with 15 days, then the arbitrator shall be nominated by Managing Director of APTDCL on the request of any party. The arbitration shall be governed by the provisions of Arbitration and Conciliation Act, 1996 and the venue of arbitration shall be at Hyderabad, and shall be conducted in English Language. Any decision or award resulting from arbitration shall be final and binding upon the parties." The said agreement was followed up by another F agreement dated 23rd January 2004 between AKA represented by Mr. Anil Kumar, Goldstone, BSN Group represented by Mr. B.S. Neelkanta, respondent No.1 in this .'petition, and Varsha, represented again by Mr. B.S. Neelkanta, as its Director. Under the said agreement, AKA agreed to purchase 1,00,000 equity shares of Varsha held by Goldstone G for a consideration of Rs.1 O lacs. As a result of the aforesaid two agreements, AKA became entitled to acquire 74% equity stake in Varsha whilst the equity shareholding of BSN Group stood reduced to 26%. As per agreement dated 23rd January 2004, upon transfer of shares of Goldstone to AKA, all H ANIL KUMAR _v._ B.S. NEELKANTA [D.K. JAIN, J.] 485 Directors of Varsha, representing Goldstone were to resign from A the Board of Directors of Varsha and AKA was entitled. to nominate its directors on the Board of Varsha. The Corporation withdrew its order cancelling lease deed and signed a supplemental lease deed dated 21st February 2004 with Varsha. The supplemental lease deed recorded the shareholding pattern of Varsha as on that date as Anil Kumar & Associates holding 74% equity shares and Mr. B.S. Neelkanta holding 26% of the equity share capital of Varsha. The said supplemental agreement was signed by the petitioner on behalf of Varsha as its director. The stand of the petitioner is that in furtherance of the said arrangement, he engaged the services of an architect in London to prepare the plans for construction of the Ritz hotel and on 14th March 2004, executed two contracts, being a management agreement and a technical services agreement with Meridien S.A. It appears that as per the understanding between AKA, Varsha and Goldstone, the shares .of Varsha, which were to be acquired by AKA under agreements dated 19th January 2004 and 23rd January 2004 were actually subscribed by a Company known as M/s India International Construction Private Ltd. (for short "llCL"), purportedly belonging to a group called the "Progressive Group". B C D E On 31st August 2005, the petitioner received an email from one Mr. Ashish Kumar attaching a copy of letter dated F 22nd August 2005 addressed by Varsha to the petitioner, advising the petitioner that Varsha was contemplating to issue a public notice for the information of the general public that petitioner's association with the hotel project had been terminated and that promoter group, including the BSN Group G did not require petitioner's support and association with the hotel project. It was alleged that the petitioner had not invested a single rupee in the project, thus hampering the progress of the hotel project and that the promoter group viz. the BSN group, was forced to mobilize the requisite resources in the form of H G 486 SUPREME COURT REPORTS (2010] 6 S.C.R. - A debt and equity. The petitioner was also informed that he was no longer representing Varsha as its director. A separate email dated 5th September 2005 addressed by Mr. S.S. Neelkanta (respondent No.1 ). purportedly on behalf of Varsha, was sent to Le Meridien, informing them that their agreement with Varsha - s regarding the hotel project had been terminated. As expected, vide his advocate's letter dated 23rd September 2005, the petitioner objected to the termination of his association with Varsha, as conveyed to him vide respondent No.1 's letter dated 22nd August 2005 and asserted C that he, through his nominee and associate llCL is a stake holder of 74% equity in Varsha and would take steps to seek registration of the said shareholding in his own name. The relevant portion of the reply is extracted below: - D "My client has fully honored his obligations under the Agreement and has through his nominee made substantial investments into the Company. My client is the approved investor in the Company and pursuant to his assurances given to the Andhra Pradesh Tourism Development - E Corporation Ltd., that Corporation signed the Supplementary Lease Deed dated 21st February, 2004. The said Supplementary Lease is signed by my client as the Director of the Company. As you are fully aware the Andhra Pradesh Tourism Development Corporation Ltd. - F was holding the Company in breach of the Lease Agreement and had issued a notice terminating the Lease Deed. The notice of cancellation was withdrawn and a Supplemental Lease executed in favour of the Company pursuant to the request and representations made by any clie~t. Further the Corporation has approved my client - G holding 74% of the Capital and my client has the first preemptive right and option to purchase the 26% shares held by the BSN Group as defined in the Agreement of 19th January, 2004. The BSN Group is obliged to first offer the sale of those shares to my client and is further obliged - H ANIL KUMAR _v._ S.S. NEELKANTA [D.K. JAIN, J.] 487 not to sell those shares to any other party. My client A accordingly exercises his rights to purchase the said 26% shares held by the BSN Group directly in his own name." On 1st October 2005, the petitioner received a letter from the Corporation seeking certain clarifications of documents B attached with the letter on the change in shareholding pattern ofVarsha. According to the petitioner, it was only on receipt of this letter from the Corporation that he came to know that BSN Group and Varsha were trying to create rights in the so-called "progressive group", the said group having acquired shares in C Varsha. Thereafter, some correspondence ensued between the Corporation and the petitioner with which I am not directly concerned. 3. On 22nd November 2005, the petitioner filed a petition under Section 9 of the Act before the City Civil Court at Hyderabad seeking certain interim reliefs including a direction to Varsha to maintain status quo in connection with the terms and conditions of lease agreement dated 17th May 2001, as amended by supplemental lease deed dated 21st February 2004. Eventually, on 17th ,December 2005, the petitioner through his Advocate sent a letter to Varsha and the BSN Group calling upon them to confirm the appointment of an Arbitrator within 15 days of the said letter, in terms of the arbitration agreement. Since no reply to the said notice was received, vide his letter dated 30th January 2006, the petitioner approached the Corporation requesting them to nominate an Arbitral Tribunal as per the arbitration agreement dated 19th January 2004. The respondents as also the Corporation having failed to appoint an Arbitrator, the petitioner filed a petition under Section 11 (6) of the Act before Hon'ble the Chief Justice of High Court of Andhra Pradesh for appointment of an Arbitrator. Vide order dated 6th February 2007, rejecting the objections raised by the respondents, the learned Single Judge of the High Court allowed the petition and appointed a former Judge of this Court as the sol~ Arbitrator. D E F G H 488 SUPREME COURT REPORTS (2010) 6 S.C.R. A 4. Aggrieved by order dated 6th February 2007, respondent No.4 in this petition, filed a Special Leave Petition (C) No.5493 of 2007. This Special Leave Petition was subsequently amended with the permission of this Court, incorporating the objection of the respondent with regard to the B jurisdiction of the High Court to entertain the petition under Section 11 (6) for appointment of an Arbitrator. The stand of the said respondent was that the dispute, if any, involved International Commercial Arbitration and, therefore, the jurisdiction to appoint an Arbitrator vested in the Chief Justice c of India alone. On 23rd November 2007, leave to appeal was granted to the respondents. 5. On 22nd January 2008, the petitioner filed the present petition under Sections 11 (5) and 11 (6) of the Act seeking appointment of an Arbitrator in terms of the Arbitration D Agreement dated 19th January 2004. 6. A common affidavit has been filed on behalf of the respondents resisting the petition. By way of preliminary submissions, it is pleaded that: (a) the petitioner has no _locus_ E _standi_ to file the present petition inasmuch as the Arbitration Agreement dated 19th January 2004 was between the BSN Group, Varsha and a business concern known as M/s Anil Kumar & Associates. Therefore, the petitioner in his individual capacity has no _locus standi_ to file the present petition without F specific plea that it was being filed for and on behalf of Anil Kumar & Associates, allegedly a distinct entity and claiming shareholding in his individual capacity; (b) the shares in Varsha were to be acquired by M/s Anil Kumar & Associates under agreements dated 19th January 2004 and 23rd January 2004 G which were actually subscribed by yet another company known as llCL, in the assumed name of the "Progressive Group" - an undertaking of AKA and some others, who have not invoked the arbitration clause and, therefore, the present petition is liable to be dismissed as the petitioner has not brought any documentary record to show that he was authorised by llCL to H ANIL KUMAR _v._ B.S. NEELKANTA [D.K. JAIN, J.] 489 file the present petition and (c) in the absence of llCL and other associate companies of llCL, holding shares in Varsha, in the arbitration proceedings no declaration can be made by the Arbitral Tribunal to the effect that the petitioner is entitled to 74% shareholding in Varsha. The plea of the petitioner with regard to the minutes dated 22nd November 2003 has also been disputed. Needless to say, at the outset, that all these questions are within the competence of the Arbitrator as under Section 16 of the Act, it is for him to rule on his own jurisdiction, including the question about existence or validity of the Arbitration Agreement. 7. At this juncture, it may be relevant to note that since in the Special Leave Petitions, filed against the orders passed by the Andhra Pradesh High Court including the order appointing the Arbitrator, leave had been granted by this Court vide order dated 23rd November 2007, the hearing in the present petition on 25th August 2008 was deferred with a view to await the decision in those appeals (Civil Appeal Nos.56455647 of 2007 and 5642-5644 of 2007), which were disposed of on 22nd May 2009 as the withdrawal of the original application under Section 11 (6) of the Act filed by the petitioner before the High Court was allowed. The effect of the said order is that the order passed by the· High Court on petitioner's application under Section 11 (6) has been set at naught. 8. I have heard learned counsel for the parties. 9. Mr. Rajiv Sawhney, learned Senior Counsel appearing for the petitioner, strenuously urged that in terms of agreement dated 19th January 2004, it was agreed that the petitioner and his associates would acquire 74% of equity in Varsha, they having fulfilled their part of the obligation under the said agreement by contributing towards 74% of the equity, respondent No.1, in breach of the said agreement, has by notice dated 22nd August 2005 sought to unilaterally terminate petitioner's association with Varsha for no rhyme or reason. It was argued that not only the dispute with regard to the validity A B c D E F G H 490 SUPREME COURT REPORTS [2010] 6 S.C.R. A of the said notice is a live issue, even the geAuineness of the minutes dated 22nd November 2003, forwarded by Varsha to the Corporation and agreement dated 23rd January 2004, creating rights in a Group of Companies viz., the "Progressive Group" has been seriously contested by the petitioner, which B matters can be resolved only through the medium of arbitration, as stipulated in Arbitration Agreement dated 19th January 2004. It was, thus, submitted that either the Arbitrator appointed by the High Ccurt may be permitted to re-enter the reference or a new Arbitrator be appointed to adjudicate upon the c disputes between the parties. 10. Mr. C.A. Sundaram, learned Senior Counsel appearing on behalf of the respondents, on the other hand, vehemently contended that the present petition is utterly misconceived inasmuch as the controversy regarding D termination of relationship between the petitioner and Varsha in terms of letter dated 22nd August 2005 is not connected with agreement dated 19th January 2004 as after allotment of 74% of equity in Varsha to the associates of the petitioner, the agreement dated 19th January 2004 worked itself out and, E therefore, there is no subsisting dispute between the parties to the agreement. It was asserted that the agreement was only for transfer of shares of Varsha to Anil Kumar & Associates and with transfer of 74% of equity in favour of the associates of Anil Kumar, the petitioner, no cause of action to file the F present petition survived. It was also contended that the disputes now sought to be raised necessarily involve the companies forming the "Progressive Group", who were neither parties to the Arbitration Agreement nor are before me in these proceedings. In support of the proposition that any matter which G lies outside the Arbitration Agreement and is also between some of the parties who were not parties to the Arbitration Agreement, there is no question of reference to Arbitration under Section 11 (6) of the Act, reliance is placed on a decision of this Court in _Sukanya Holdings (P) Ltd._ Vs. _Jayesh H._ H ANIL KUMAR _v._ S.S. NEELKANTA ,[D.K. JAIN, J.] 491 _Pandya_ & _Anr[1] •_ Reference was also made to the decision of A a Bench of seven Judges of this Court in _SBP_ & _Co. Vs. Pawl_ · _Engineering Ltd._ & _Anr.,_[2 ] to eontend that the question of subsistence of an arbitrable dispute between the parties is to be demonstrated by the party requesting for arbitration and is required to be decided by me in these proceedings. B B 11. It is manifest from the pleadings that the parties are _ad idem_ that there is an Arbitration Agreement between them vide Clause 41 of agreement dated 19th January 2004, but the contention of the respondents is that there is no live issue requiring resolution by arbitration. C 12. Thus, the question that falls for consideration before me is whether the dispute regarding termination of relationship between Varsha and the petitioner is dead one in the sense that on alleged allotment of equity in favour of an associate of D the petitioner, agreement dated 19th January 2004 has worked itself out and no live issue in terms of the said agreement subsists? 13. The controversy in regard to the nature of function to be performed by the Chief Justice or his designate under Section 11 of the Act has been set at rest by a Bench of seven ·Judges of this Court in _**SBP**_ case _(supra)._ It has been held, per majority, that the function performed by the Chief Justice or his nominee under the said Section is a judicial function. Defining as to what the Chief Justice or his designate is required to determine while dealing with an application under Section 11 of the Act, P.K. Balasubramanyan, J., speaking for the majority said: (Para 39, SCC) E F "It is necessary to define what exactly the Chief Justice, approached with an application under Section 11 of the Act, is to decide at that stage. Obviously, he has to decide his own jurisdiction in the sense whether the party making G 1. c2003) 5 sec 531. 2. c2005) a sec a1a. **H** 492 SUPREME COURT REPORTS [2010] 6 S.C.R. - A the motion has approached the right High Court. He has to decide whether there is an arbitration agreement, as defined in the Act and whether the person who has made the request before him, is a party to such an agreement. It is necessary to indicate that he can also decide the - B question whether the claim was a dead one; or a longba rred claim that was sought to be resurrected and whether the parties have concluded the transaction by recording satisfaction of their mutual rights and obligations or by receiving the final payment without objection. It may not be possible at that stage, to decide whether a live claim - c made, is one which comes within the purview of the arbitration clause. It will be appropriate to leave that question to be decided by the Arbitral Tribunal on taking evidence, along with the merits of the claims involved in the arbitration. The Chief Justice has to decide whether - D the applicant has satisfied the conditions for appointing an arbitrator under Section 11 (6) of the Act. For the purpose of taking a decision on these aspects, the Chief Justice can either proceed on the basis of affidavits and the documents produced or take such evidence or get such - E evidence recorded, as may be necessary. We think that adoption of this procedure in the context of the Act would best serve the purpose sought to be achieved by the Act of expediting the process of arbitration, without too many approaches to the court at various stages of the - F proceedings before the Arbitral Tribunal." 14. It is clear from the above extracted paragraph that in order to set into motion the arbitral procedure, the Chief Justice or his designate has to decide the issues, if raised, regarding: G (i) territorial jurisdiction; (ii) existence of an Arbitration Agreement between the parties and (iii) whether the claim made by the applicant was a dead one in the sense that the parties have already concluded the transaction by recording satisfaction of their mutual rights and obligations or have . H recorded satisfaction regarding their financial claims. ANIL KUMAR _v._ B.S. NEELKANTA [D.K. JAIN, J.] 493 Nevertheless, the Court made it clear that at that stage it may A not be possible to decide whether a live claim made, is one which comes within the purview of the arbitration clause and this question should be left to be decided by the Arbitral Tribunal on taking evidence. It is, therefore, plain that purely for the _ purpose of deciding whether the arbitral procedure is to be set B into motion or not, the Chief Justice or his designate has to examine and record his satisfaction. that an Arbitration Agreement exists between the parties and that in respect of the agreement a live issue, to be decided between the parties, still exists. On being so satisfied, he may allow the application c and appoint an Arbitral Tribunal or a sole Arbitrator, as the case may be. However, if he finds and is convinced that the claim is a dead one or is patently barred by time or that he lacks territorial jurisdiction, he may hold so and decline the request for appointment of an Arbitrator. 0 15. Having examined the whole matter in the light of aforenoted principles, I am of the opinion that the petition deserves to be allowed. From the material placed on record by the parties, it appears to me that: (i) there are disputes between the parties on th.a issues/claim raised by the petitioner and E countered by the respondents, including whether the claim still subsists or has been extinguished as alleged by the respondents, which cannot be resolved without evidence; (ii) there is an Arbitration Agreement in Clause 41 of agreement dated 19th January 2004, to which the petitioner is a party along F with the respondents. The Arbitration Agreement is in clear terms and brings within its ambit the disputes sought to be raised by the petitioner: whether there was a breach of the terms of agreement dated 19th January 2004, in as much as the petitioner failed to pump in the requisite funds in Varsha either G by way of equity or otherwise, as alleged, in Varsha's letter dated 22nd August 2005, would be a matter in the realm of arbitration and this Court cannot go into that question; (iii) the issues/claim raised by the petitioner, on a mere assertion cannot be said to be a dead one without evidence to be H [2010) 6 S.C.R. ## 494 SUPREME COURT REPORTS A produced by the parties in support of and rebuttat thereto, on their respective stands, regarding rights and obligations of the parties under agreements dated 19th January 2004 and 23rd January 2004, on allotment of 74% of equity in favour of llCL and petitioner's right to nominate or being himself on the Board B of Directors of Varsha; and (iv) the Arbitrator is competent under Section 16 of the Act to rule on its own jurisdiction, including rule on any objections with respect to existence or validity of the Arbitration Agreement, on a plea being raised before him that he has no jurisdiction. c 16. For the foregoing reasons, the petition is allowed and Mr. Justice M. Jagannadha Rao, a former Judge of this Court is appointed as the sole Arbitrator to adjudicate upon the claims/disputes raised by the petitioner, subject te his consent and such terms as he may deem fit and proper. It goes without D saying that the learned Arbitrator shall deal with the matter uninfluenced by the observations made by the High Court of Andhra Pradesh in its order dated 6th February 2007 or in this order, on the rival stanqs of the parties. E 17. The Registry is directed to communicate this order to the learned Arbitrator to enable him to enter upon the refereAce and give his Award as expeditiously as practicable. The petition stands disposed of with no order as to' costs. R.P. Arbitration Petition disposed of.
End of Judgment Record
Browse All Supreme Court of India (2010) Decisions
2010-09-24

Department of Telecommunications v. Gujarat Co-operative Milk Marketing Federation Ltd.

This Supreme Court decision concerns a billing dispute arising from two bi-monthly telephone bills totaling Rs. 4,54,652 raised against the Managing Director of the Gujarat Co-operative Milk Marketing Federation Ltd. for calls categorized as international “party” or “sex talk” calls. The respondent subscriber alleged mischarging and that calls were made from another number, prompting a complaint to the Department. Verification upheld the bills; an administrative appeal was dismissed; the matter was referred to arbitration under section 7B of the Indian Telegraph Act, 1885, following a High Court direction. The arbitrator, Vineet Bhatia, concluded the bills were proper. The respondent challenged this award by writ petition, which the High Court (Single Judge) quashed, holding that the arbitrator was junior to the appellate authority, and proceeded to find the award invalid on presumptions and inferences unsupported by evidence; a Letters Patent Appeal was dismissed. The Supreme Court reversed, holding that the High Court exceeded its judicial review scope, misapplied the standard for review of arbitral awards under section 7B, and erred in imputing bias based on rank. It affirmed that the arbitrator’s findings were grounded in the department’s records and meters, and that independence was maintained. The appeal is allowed and the writ petition dismissed, with the High Court orders set aside.

2010-11-23

BHAGWAN BUDHA PRATHMIK TECHNICAL TRAINING COLLEGE NIRMALI v. STATE OF BIHAR

This is a consolidated Supreme Court decision in Civil Appeal Nos. 9896 and 9897 of 2010 arising out of Bihar. Bhagwan Budha Prathmik Technical Training College, Nirmali, a minority Buddhist institution established in 1987, challenged Bihar’s and other authorities’ recognition/approval decisions for its teacher-training course in light of the National Council for Teacher Education Act, 1993 (NCTE Act). The central issue is whether, after the NCTE Act’s appointed day (1 July 1995), State Governments retain power to grant recognition to teacher-education institutes and whether students of unrecognized colleges may sit for qualifying examinations. The matter traces a long litigation history: initial directions in the early 1990s required the Government to decide recognition while allowing students to appear at their own risk; subsequent orders and representations culminated in a 16 March 2007 order recognizing the college from 1987-89 on the ground that inspection warranted it, followed by a 2 September 2008 order withdrawing that recognition in light of NCTE’s sole jurisdiction post-appointed day. The High Court affirmed the sequence, but this Court held that a power to issue an order includes a power to withdraw it for valid reasons, and that recognition is vested in the NCTE after the appointed day. The judgment emphasizes that the NCTE Act must be implemented with full force to protect standards in teacher education. Ultimately, the Supreme Court dismissed the appeals, modified a cost order, and held there should be no further costs in these appeals, while acknowledging the students’ plight and the need for orderly implementation of the regulatory regime.

2010-06-03

State of Punjab & ors. v. G.S. Randhawa

This Civil Appeal arises from a petition challenging a demand for additional price under the Punjab Urban Estate (Sale of Sites) Rules, 1965. The Supreme Court hears counsel for the appellant and notes that the respondent did not enter appearance. Relying on the decision in Smt. Fuljit Kaur v. State of Punjab & Ors., (2010) 7 SCR 317, the Court states that, for the reasons recorded in Civil Appeal No. 5292 of 2004 (the Fuljit Kaur decision) decided on this date, the appeal must be allowed. The High Court’s December 6, 2006 order is set aside and the Demand Notice is upheld. The appellant is entitled to recover the additional price in accordance with law. The decision clarifies that liability to pay additional price under the Punjab Urban Estate Rules can be enforced consistent with the Fuljit Kaur framework, upholding the validity of the demand and permitting recovery by the State. The judgment thus resolves the previous split on allotment price adjustments and prescribes a uniform approach for enforcing such recoveries in analogous cases going forward.

2010-07-15

Harish Singh Nagra & Ors. v. Kapil Sibal & Ors.

Mehfil-e-Wukala, a Supreme Court cultural-literal association of lawyers, published a souvenir containing messages, articles, and poems by judges and senior advocates. Kapil Sibal, a senior advocate and then a candidate for President of the Supreme Court Bar Association, sent a message criticizing the junior Bar and urging reforms, which was circulated within Mehfil’s members but not released to the press or sold publicly. Petitioners, five practicing advocates from the Punjab and Haryana High Court, filed criminal contempt proceedings under Article 215 of the Constitution alleging that Sibal conspired with others to bring the administration of justice into disrepute. The High Court transferred the case to this Court. The central issue was whether the message, read in its proper context, amounted to contempt under Section 2(c) of the Contempt of Courts Act, 1971. The Court held that the message, read in its prospective context, did not scandalize or tend to scandalize any court, nor obstruct the administration of justice; it was a fair critique aimed at improving the system. Citing P.N. Duda, Mulgaokar, Ambard, Vishwanath, and others, the Court reaffirmed that freedom of expression under Article 19(1)(a) protects fair, reasoned criticism of judgments and judicial institutions. It noted that the Times of India article excerpt misrepresented the message, but the souvenir’s limited internal distribution and the respondent’s apology supported dismissal. Accordingly, the contempt petition was dismissed and notices discharged.