Supreme Court of IndiaSupreme Court · 2010Division BenchAppeal disposed of.

Andhra Pradesh Tourism Development Corporation Ltd. v. Pampa Hotels Ltd.

Case / Petition Number:
Civil Appeal No. 3272 of 2007
Neutral Citation:[2010] 4 S.C.R. 942

Case Synopsis & Summary

This is a Civil Appeal concerning whether disputes arising from a lease and a development-and-management agreement between the Andhra Pradesh Tourism Development Corporation (APTDC) and Pampa Hotels Ltd. could be referred to arbitration under the Arbitration and Conciliation Act, 1996. The central issue is whether there existed a valid arbitration agreement when the underlying contract dated 30 March 2002 was signed, at a time when Pampa Hotels Ltd. had not yet been incorporated (its registration is shown as 9 April 2003) and when the respondent sought the appointment of a sole arbitrator under section 11. APTDC contends that there was no arbitration agreement because one of the contracting parties did not exist, and therefore there was no contract capable of containing an arbitration clause, emphasizing that the law treats contracts entered by non-existent entities as unenforceable; the promoters’ pre-incorporation contracts are only binding if entered into by promoters for the company to be incorporated under section 15(h) of the Specific Relief Act and accepted by the company upon its incorporation. The respondent argues that the agreements described Pampa Hotels Ltd. as the contracting party and included an arbitration clause; it asserts that post-incorporation acceptance could validate the agreement under the law. The matter traverses a line of arbitration jurisprudence (Konkan Railway, SBP, National Insurance, Maharishi Dayanand University, Sarwan Kumar) to determine who should decide existence/validity under s.11 and how pending matters are to be treated. The Supreme Court ultimately holds that the existence/validity issue is to be examined as a preliminary matter, not by the arbitrator, and directs the arbitrator to decide it while preserving the appointment, in light of SBP’s prospective overruling and related authorities.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • R.V. Raveendran
  • H. L. Dattu
Judgment Date
2010-04-20
Court Decision / Holding
Appeal disposed of; the Arbitrator is directed to decide the issue of existence/validity of the arbitration agreement as a preliminary issue relating to jurisdiction, in light of SBP and Maharishi Dayanand University principles, and not to disturb the appointment.
Final Disposition
Appeal disposed of.

Parties to the Case

Appellants / Petitioners

  • Andhra Pradesh Tourism Development Corporation Ltd.
  • Anr.

Respondents

  • M/s Pampa Hotels Ltd.

Legal Representation & Advocates

Counsels for Petitioners

  • • Bhaskar P. Gupta
  • • T. V. Ratnam
  • • K. Paari Vendhan

Counsels for Respondents

  • • L. Nageswara Rao
  • • G. Ramakrishna Prasad
  • • C. Suyodhan
  • • Amarpal
  • • Bharat J. Joshi

Provisions of Law Cited

Arbitration and Conciliation Act, 1996, s. 7Arbitration and Conciliation Act, 1996, s. 2(h)Arbitration and Conciliation Act, 1996, s. 11Arbitration and Conciliation Act, 1996, s. 16Specific Relief Act, 1963, s. 15(h)Companies Act, 1956, s. 149(4)Companies Act, 1956, s. 149(3)Companies Act, 1956, s. 34(2)

Legal Doctrines & Maxims

  • Prospective overruling

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellant contends there was no arbitration agreement because one party (Pampa Hotels Ltd.) did not exist on the date of the contract (30 March 2002), so there could be no contract capable of containing an arbitration clause. The agreements were allegedly entered into by a non-existent entity, not by the promoters on behalf of a company to be incorporated, and thus there could be no binding arbitration clause. The question of existence/validity of the arbitration agreement is argued to be a preliminary issue under s.11 that should be decided by the Chief Justice or his Designate, not by the arbitrator. The appeal relies on Konkan Railway and related authorities and questions the validity of the appointment while SBP's later decision introduced the doctrine of prospective overruling.

Contentions of Respondents

The respondent argues that the Lease and Management Agreements dated 30 March 2002 described Pampa Hotels Ltd. as the contracting party and contained an arbitration clause; the parties were described as existing for the project; promoters’ pre-incorporation arrangements may be enforceable under s.15(h) of the Specific Relief Act if warranted by incorporation; arbitration exists and the question of existence/validity should be decided by the Chief Justice/Designate under s.11 before appointment; they rely on SBP and National Insurance decisions to support the CJ/Designate approach and contend that the arbitrator should not decide the existence/validity as a preliminary issue.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (6)

Case NameCitationTreatmentExplanation
SBP & Co. v. Patel Engineering Ltd.2005 (8) SCC 618PositiveHeld that the question of existence/validity of an arbitration agreement under s.11 is to be decided by the Chief Justice or his Designate before appointing an arbitrator; SBP's directions are binding and were applied in the present case.
National Insurance Co. Ltd. v. Boghara Polyfab Pvt. Ltd.2009 (1) SCC 267PositiveAffirmed that existence/validity of arbitration agreement is to be decided by the Chief Justice/Designate under s.11 before appointment of arbitrator.
Konkan Railway Corporation Ltd. v. Mehul Construction Co.2000 (7) SCC 201Mentioned OnlyCited as a Konkan Railway decision referenced for context; not followed in the present ruling due to SBP's overruling.
Konkan Railway Corporation Ltd. v. Rani Construction Pvt. Ltd.2002 (2) SCC 388Mentioned OnlyCited as a Konkan Railway decision referenced for context; not treated as binding in this matter.
Sarwan Kumar v. Madan Lal Aggarwal2003 (4) SCC 147PositiveDiscussed the doctrine of prospective overruling and its applicability to statutes; cited to contextualize the SBP doctrine.
Maharishi Dayanand University v. Anand Coop. UC Society Ltd. and Anr.2007 (5) SCC 295PositiveCited for its rule that appointments under s.11 before 26.10.2005 remain valid and for related guidance on pending matters, governing post-SBP directions.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•5,234 words•~24 min read

In The Court Record

Andhra Pradesh Tourism Development Corporation Ltd. v. Pampa Hotels Ltd.

## [2010] 4 S.C.R. 942 A ANDHRA PRADESH TOURISM DEVELOPMENT CORPN. LTD. & ANR. _v._ M/S. PAMPA HOTELS LTD. (Civil Appeal No. 3272 of 2007) B APRIL 20, 2010 [R.V. **RAVEENDRAN AND H.L. DATTU,** JJ.] ## _Arbitration and Conciliation Act, 1996:_ c > _ss._ 7 _and 2(h)_ - _Party to arbitration agreement_ - _Company entering into contract before the date on which it_ - _was entitled to commence business On dispute invoking_ - > _arbitration clause of the contract Held: Since the company_ D _was non-existent on the date of contract, there was no contract_ - - _Consequently there was no arbitration agreement The agreement would have been valid, if the contract were entered_ > _into by the promoters of the non-existing company on its_ - - - _behalf Companies Act, 1956 s. 149 (4) Specific Relief_ E _Act, 1963_ - _s. 15(h)._ ss. _11 and 16_ - _Decision as regards existence or validity_ - _of arbitration agreement Whether to be decided by Chief Justice/Designate or by the arbitrator_ - _Chief Justice! Designate in application uls. 11 appointing the arbitrator and_ F _leaving the question as regards validity of the arbitration agreement to be decided by arbitrator relying on *Konkan Railway cases_ - _Subsequent decision in_ **SBP case _over-_ - _ruling Konkan Railway cases_ SBP case _resorting to prospective over-ruling_ - _Held: In view of decision in_ SBP G _case, validity of arbitration agreement is to be decided by the Chief Justice/Designate_ - _However, in view of prospective over-ruling direction in_ SBP case, _the validity of the arbitration agreement in the present_ case, _has to be decided by the_ - _arbitrator The appeal to the Supreme Court cannot be_ H 942 " ANDHRA PRADESH TOURISM DEV. CORPN. LTD. _v._ 943 PAMPA HOTELS LTD. _treated as a pending application u/s. 11 and hence decision_ A - - _in SBP case will not apply Prospective Over-ruling Doctrine of Merger._ The questions which arose for consideration in the present appeal were: B > (i) where the party seeking arbitration is a company which was not in existence on the date of the signing of the contract containing the arbitration agreement, whether it can be said that there is an arbitration agreement between the parties; and C (ii) whether the question as to the existence or validity of the arbitration agreement, has to be decided by the Chief Justice/Designate while considering the petition u/s. 11 of the Act or by the Arbitrator. D > Disposing of the appeal, the Court HELD: 1.1. The certificate of registration issued by Registrar of companies shows the date of its incorporations as 9.4.2003. Section 149(4) of the E Companies Act, 1956 provides that any contract made by a company (which is already registered) before the date at which it is entitled to commence business shall be provisional only, and shall not be binding on that company until that date, and on that date it shall become F binding. The Lease Agreement and also the Management Agreement were made on 30.3.2002 between the appellant and the respondent. A certificate u/s. 149(3) of the Companies Act was issued by the Registrar of Companies only on 6.6.2003 certifying that respondent is G entitled to commence business. It is thus clear that the applicant in application u/s. 11 of the Act was nonexistent on 30.3.2002 when the arbitration agreement was entered into. [Paras 8 and 9) [951-B-E; 952-D-F] 1.2. Section 7 of Arbitration and Conciliation Act, H 944 SUPREME COURT REPORTS [2010] 4 S.C.R. A 1996 defines an arbitration agreement as an agreement by _the parties_ to submit to arbitration. The word 'party' is defined in Section 2(h) of the Arbitration Act as a party to an arbitration agreement. An agreement enforceable by law is a contract. An agreement has to be between two B or more persons. Therefore if one of the two parties to the arbitration agreement was not in existence when the contract was made, then obviously there was no contract and if there was no contract, there is no question of a clause in such contract being an arbitration agreement c between the parties. [Para 10] [952-G-H; 953-A] 1.3. The agreements are not entered by the.promoters of the company, but purportedly by the company itself, represented by its Managing Director. Admittedly on 30.3.2002 there was no such company in existence. D Admittedly there was no such company having its registered office at the address mentioned on that date. Admittedly, one of the signatories of the agreements was not the Managing Director of any company of that name on that date. When one of the parties to the Lease E Agreement and Management Agreement, was a nonexistent imaginary party, there is no contract. This is not a case of one of the parties being in existence, but being under some legal disability to enter into contracts. This is a case where there was no 'party' at all. but someone F claiming that there was an existing company capable of entering into contracts. [Para 10] [953-B-E] 1.4. The p->sition would have been different, had the agreement been entered by the promoters of the respondent-company before its incorporation for the G purposes of the company and such contract was warranted by the terms of incorporation. It is evident from Section 15(h) of Specific Relief Act, 1963 that if the Lease Agreement and the Management Agreement had been entered into by the promoters of the company stating H that they are entering into the contract for the purpose ANDHRA PRADESH TOURISM DEV. CORPN. LTD. _v._ 945 PAMPA HOTELS LTD. of the company to be incorporated, in their capacity as A promoters and that such contract is warranted by the terrr.s of the incorporation of the company, the agreement would have been valid; and the term regarding arbitration therein could have been enforced. But for reasons best known to themselves, the agreement was entered not by B the promoters on behalf of a company proposed to be incorporated by them, but by a non-existing company _1_ claiming to be an existing company. This clearly shows that there is no arbitration agreement between the respondent (applicant in the applicatiOn u/s. 11 of the Act) c and the appellant-company against whom such agreement is sought to be enforced. [Para 11] [953-E-F; 954-B-D] > 2.1. The question as to who should decide the question whether there is an existing arbitration D agreement or not has been decided in _**SBP_ case holding that the question whether there is an arbitration agreement and whether the party who has applied u/s. 11 of the Arbitration Act, is a party to such an agreement, is an issue which is to be decided by the Chief Justice E or his Designate u/s.11 of the Act before appointing an arbitrator. Therefore there can be no doubt that the issue ought to have been decided by the Designate of the Chief Justice and could not have been left to the arbitrator. But, since the Designate of the Chief Justice proceeded on F . the basis that while acting u/s. 11 of the Arbitration Act, he was not acting under a judicial capacity but only under an administrative capacity and therefore he cannot decide these contentious issues by following the two decisions in _*Konkan Railway_ cases which were then G holding the field. [Para 12] [954-E-H; 955-A-B] 2.2. In _SBP_ case a seven-Judge Bench of Supreme Court overruled the two decisions in _Konkan Railway._ The decision in _SBP_ case was rendered a few weeks after the H [2010] 4 S.C.R. ## 946 SUPREME COURT REPORTS - A impugned decision by the Designate. Having regard to the fact that several decisions rendered under section 11 of the Arbitration Act had followed the decisions in _Konkan Railway_ case, this court, when it rendered its decision in _SBP_ case, resorted to prospective overruling. - B [Para 13] [955-B-D] 2.3. It is not correct to say that the appeal to this Court should be considered as a continuation of the application u/s. 11 of the Arbitration Act or as pending matter to which the decision in _SBP_ case would apply, even C though the Designate had rendered the decision before the judgment passed in SBP case; and that a pending matter would refer not only to the original proceedings but also would include any appeal arising therefrom and therefore any proceeding which has not attained finality D is a pending matter. This would have been the position if there was a statutory provision for appeal and _SBP_ case had directed that in view of prospective overruling of _Konkan Railway_ cases pending matters will not be affected. But sub-section (7) of Section 11 of the E Arbitration Act makes the decision of the Chief Justice or his Designate final. There is no right of appeal against the decision u/s. 11 of the Act. Further, in _SBP_ case, the Court issued the categorical direction that appointment of Arbitrators made till then are to be treated as valid and F all objections are to be left to be decided u/s. 16 of the Act. [Para 15] [956-F-H] > 2.4. On account of the prospective overruling direction in _SBP_ case, any appointment of an arbitrator u/s. 11 of the Act made prior to 26.10.2005 has to be G treated as valid and all objections including the existence or validity of the arbitration agreement, have to be decided by the arbitrator u/s. 16 of the Act. The legal position enunciated in the judgment in _SBP_ case will govern only the applications to be filed u/s. 11 of the Act H from 26.10.2005 as also the applications u/s. 11(6) of the ANDHRA PRADESH TOURISM DEV. CORPN. LTD. _v._ 947 PAMPA HOTELS LTD. Act pending as on 26.10.2005 (where the Arbitrator was A not yet appointed). In view of this categorical direction in _SBP_ case, it is not possible to say that this case should be treated as a pending application. [Para 16] [957-A-C] 2.5. The arbitrator will have to decide the issue as to 8 whether there is an arbitration agreement, with reference to the legal position in regard to the existence of arbitration agreement. Though such an exercise by the arbitrator will only be an academic exercise such an exercise becomes inevitable in view of the peculiar position arising out of the specific direction contained in C para 47 (x) of the decision in _SBP_ case and the subsequent decision in _Maharishi Dayanand University_ case. [Para 17] [957~0-F] _**SBP and_ Co. _v. Patel Engineering Ltd._ 2005 (8) SCC 618, followed. D _National Insurance_ Co. _Ltd. v. Boghara Polyfab Pvt. Ltd_ 2009 (1) SCC 267; _Sarwan Kumar v. Madan Lal Aggarwal_ 2003 (4) SCC 147; _Maharishi Dayanand University v. Anand Coop. UC Society Ltd. and Anr._ 2007 (5) SCC 295, relied on. E _*Konkan Railway Corporation Ltd. v. Mehul Construction_ Co. 2000 (7) SCC 201; _Konkan Railway Corporation Ltd. v. Rani Construction Pvt. Ltd._ 2002 (2) SCC 388, referred to. ## Case Law Reference: F 2005 (8) sec 618 followed. Para 12 2009 (1) sec 267 Relied on. Para 12 2000 (7) sec 201 Referred to. Para 12 G 2002 (2) sec 388 Referred to. Para 12 2003 (4) sec 141 Relied on. Para 13 2001 (5) sec 295 Relied on. Para 16 H 948 SUPREME COURT REPORTS [2010] 4 S.C.R. A CIVIL APPELLATE JURISDICTION : Civil Appeal No. 3272 of 2007. From the Judgment & Order dated 16.8.2005 of the High Court of Andhra Pradesh at Hyderabad in Arbitration B Application No. 24 of 2005. Bhaskar P. Gupta, T.V. Ratnam, K. Paari Vendhan for the Appellants. L. Nageswara Rao, G. Ramakrishna Prasad, c Suyodhan, Amarpal, Bharat J. Joshi for the Respondent. The Judgment of the Court was delivered by R.V. **RAVEENDRAN, J.** 1. The respondent is a company incorporated on 9.4.2003 under the Companies Act, 1956. The D appellant (Andhra Pradesh Tourism Development Corporation Ltd., for short 'APTDC') is a "government company" within the meaning of that expression in section 617 of the Companies Act, 1956. E E 2. According to the respondent, the parties had entered into two agreements in regard to a property known as Hill View Guest House, Alipiri, Tirupathi, measuring 1.08 acres. The first was a lease agreement under which APTDC granted a lease of the said property to the respondent for a term of 33 years; F and the second was a development and management agreement under which APTDC entrusted to the respondent, the development of a Three-Star Hotel in Hill View Guest House property on construction, operation and management basis. According to the respondent, both agreements contained a provision for disputes resolution (clause 17 of the lease G agreement and Article 18 of the management agreement) providing that in the event of disputes, best efforts shall be made to resolve them by mutual discussions, amicably; and in the event of the parties not finding an acceptable solution to the disputes within 30 days (60 days in the case of H ANDHRA PRADESH TOURISM DEV. CORPN. LTD. _v._ 949 PAMPA HOTELS LTD. [R.V. RAVEENDRAN, J.] management agreement), the same shall be referred to arbitration in accordance with the procedure specified in the Act. A > 3. APTDC claims that it had terminated the said agreements on 21.4.2004 and took possession of the property 8 on 21.8.2004. The respondent filed Arbitration Application No. 24/2005 in March, 2005 before the Andhra Pradesh High Court > under section 11 of the Arbitration and Conciliation Act, 1996 ['Act' for short], alleging that certain disputes had arisen between the parties in regard to the said Lease Agreement and Management Agreement, and the parties could not arrive C at a mutually acceptable solution in respect of those disputes. The respondent therefore sought appointment of a sole > arbitrator for adjudication _bf_ the disputes and differences between the parties (respondent and APTDC) in regard to lease agreement dated 30.3.2062 and the management D agreement dated 30.3.2002 entered between the parties. 4. APTDC resisted the application. One of the contentions urged by APTDC was that there was no arbitration Agreement between them and therefore the question of appointing an E Arbitrator under -section 11 of the Act did not arise. It was pointed out that according to the respondent, the arbitration agreement came into existence on 30.3.2002, when parties executed the Lease Agreement and Management Agreement on 30.3.2002 containing the arbitration clause; that admittedly F the respondent was not in existence on that date, as it was incorporated more than a year thereafter on 9.4.2003; and that when it is alleged that the parties to the petition had entered into contracts which contained arbitration agreements on 30.3.2002, and one of the parties thereof had not even come into existence on that date, obviously there was no contract G much less any arbitration agreement between the parties. 5. The Designate of the Chief Justice of Andhra Pradesh allowed the application filed by the respondent under Section 11 of the Act by order dated 16.8.2005 and appointed a retired H 950 SUPREME COURT REPORTS [2010] 4 S.C.R. A Judge of the said High Court as Ar">itrator, with the observation that the appellant herein is entitled to raise all its pleas including the validity of the arbitration agreement before the Arbitrator. He however noticed the contention that there was no arbitration agreement. He held that having regard to the decisions in 8 _[Konkan Railway Corporation ][Ltd. ][v. ][Mehul Construction ]_[Co. ] [2000 (7) SCC 201] and _Konkan Railway Corporation Ltd. v. Rani Construction Pvt. Ltd._ [2002 (2) SCC 388], he had only a limited administrative role under section 11 of the Act, that is, to appoint the arbitrator as per the agreed procedure, leaving C all contentious issues including whether there was any arbitration agreement or not, to be decided by the Arbitrator. The said order is challenged in this appeal by special leave. 6. On the contentions urged, two questions arise for consideration: D E (i) where the party seeking arbitration is a company which was not in existence on the date of the signing of the contract containing the arbitration agreement, whether it can be said that there is an arbitration agreement between the parties ? (ii) whether the question as to the existence or validity of the arbitration agreement, has to be decided by the Chief Justice/Designate when considering the petition under section 11 of the Act or by the Arbitrator ? F ## **Re : Question** (i) : 7. Section 7 of the Act defines an arbitration agreement. Sub-section (1) thereof provides that an arbitration agreement G means an agreement _by the parties_ to submit to arbitration all or certain disputes which have arisen or which may arise between them in respect of a defined legal relationship, whether contractual or not. Sub-section (2) provides that an arbitration agreement may be in the form.of an arbitration clause in a contract or in the form of a separate agreement. Sub- H ANDHRA PRADESH TOURISM DEV. CORPN. LTD. 951 _v._ PAMPA HOTELS LTD. [R.V. RAVEENDRAN, J.] section (3) provides that an arbitration agreement shall be in A writing. Sub-section (4) inter alia provides that an arbitration agreement is in writing if it is contained in a document signed by the parties. The specific and clear case of the respondent is that the arbitration agreement between the parties, is in writing contained in the Lease Agreement and Management B Agreement signed by them on 30.3.2002. 8. The Lease Agreement was made on 30.3.2002 between 'APTDC' (Lessor) and Pampa Hotels Ltd. (Lessee). The opening part containing the description of the parties C describes the lessee as follows: "M/S Pampa Hotels Limited, a company incorporated under the provisions of the Companies Act, 1956, and having its registered office at 209, T.P.Area, Tirupati through its Managing Director Sri S. Jayarama Chowdary D hereinafter referred to as "Lessee", promoted inter alia for the purpose of implementing the project by M/s Sudalagunta Hotels Limited the successful bid:ler, of the other part." E Similarly the Management Agreement which was also made on 30.3.2002 between APTDC (the first party) and Pampa Hotels Ltd (the second party). described the second party as follows: "M/S Pampa Hotels Limited (promoted for the purpose of implementing the project by "the Bidder" Sudalagunta F Hotels Limited) a company incorporated under the Companies Act, 1956, having its registered office at 209, T.P.Area, Tirupati represented by Sri S.Jayarama Chowdary, Managing Director (hereinafter referred to as "Company" which expression unless repugnant to the G context or meaning thereto include its successors, administrators and assigns on the second part)." F It is not disputed that both the agreements contain a provision for arbitration. It is also not disputed that both of them were H 952 SUPREME COURT REPORTS [2010] 4 S.C.R. A signed by Mr. C.Anjaneya Reddy as Chairman of APTDC and Mr. S.Jayarama Chowdary as Managing Director of Pampa Hotels Ltd. 9. Pampa Hotels Ltd., (with the registered office at 209, TP Area, Tirupati, Chittoor District, represented by its 8 Mana!,ing Director Shri Jayarama Chowdary), the applicant in the ar;plication under section 11 of the Act, was incorporated only on 9.4.2003. The certificate of registration issued by the Registrar of Companies shows the date of its incorporation as 9.4.2003. Section 34(2) of the Companies Act, provides that C from the date of incorporation mentioned in the certificate of incorporation, such of the subscribers of the memorandum and other persons, as may from time to time be members of the company, shall be a body corporate by the name contained in the memorandum, capable forthwith of exercising all the D functions of an incorporated company. Sub-section (3) of section 149 provides that Registrar shall, on the filing of declaration/statement as stated therein, certify that the company is entitled to commence business. Section 149(4) of the Companies Act provides that any contract made by a company E (which is already registered) before the date ~t which it is entitled to commence business shall be provisional only, and shall not be binding on that company until that date, and on that date it shall become binding. A certificate under section 149(3) of the Act was issued by the Registrar of Companies only on F 6.6.2003 certifying that respondent is entitled to commence business. It is thus clear that the applicant in application under section 11 of the Act was non-existent on 30.3.2002 when the arbitration agreement was entered into. E F G H 10. Section 7 of the Act as noticed above, defines an arbitration agreement as an agreement by _the parties_ to submit to arbitration. The word 'party' is defined in section 2(h) of the Act as a party to an arbitration agreement. An agreement enforceable by law is a contract. An agreement has to be between two or more persons. Therefore if one of the two ANDHRA PRADESH TOURISM DEV. CORPN. LTD. _v._ 953 PAMPA HOTELS LTD. [R.V. RAVEENDRAN, J.] A. parties to the arbitration agreement was not in existence when the contract was made, then obviously there was no contract and if there was no contract, there is no question of a clause in such contract being an arbitration agreement between the parties. The two agreements dated 30.3.2002 categorically refer to Pampa Hotels Ltd. as an existing company (promoted B for the purpose of implementing the project by Sudalagunta Hotels Ltd.) incorporated under the provisions of the Companies Act, having its registered office at 209, T.P. Area, . Tirupati and represented by its Managing Director Sri S. , Jayarama Chowdary. The agreements are not entered by the c promoters of the company, but purportedly by the company itself, represented by its Managing Director. Admittedly on 30.3.2002 there was no such company in existence. Admittedly there was no such company having its registered office at 209, T.P. Area, Tirupati on that date. Admittedly, S. Jayarama D Chowdary was not the Managing Director of any company of that name on that date. When one of the parties to the Lease Agreement and Management Agreement, was a non-existent imaginary party, there is no contract. This is not a case of one of the parties being in existence, but being under some legal E disability to enter into contracts. This is a case where there was no 'party' at all, but someone claiming that there was an existing company capable of enteringfnto contracts. B E 11. The position would have been different, had the agreement been entered by the promoters of the respondent company before its incorporation for the purposes of the company and such contract was warranted by the terms of incorporation. Section 15 of the Specific Relief Act, 1963 provides as follows: _"Except_ as _otherwise provided by this Chapter,_ the specific performanr,e of a contract may be obtained by - xx xx x (h) when the promoters of a company have, before its incorporation, entered into a contract for the purposes of the company, and such contract is warranted by the F G H 954 SUPREME COURT REPORTS [2010] 4 S.C.R. A terms of the incorporation, the company, provided that the company has accepted the contract and has communicated such acceptance to the other party to the contract." 8[It is evident from section 15(h) of Specific Relief Act that ][if ][the ] lease a Jreement and the management agreement had been enterec. into by the promoters of the company stating that they are entering into the contract for the purpose of the company to be incorporated, in their capacity as promoters and that such C contract is warranted by the terms of the incorporation of the company, the agreement would have been valid; and the term regarding arbitration therein could have been enforced. But for reasons best known to themselves, the agreement was entered not by the promoters of Pampa Hotels Ltd., on behalf of a company proposed to be incorporated by them, but by a nonD existing company claiming to be an existing company. This clearly shows that there is no arbitration agreement between the respondent (applicant in the application urider section 11 of the Act) and APTDC against whom such agreement is sought to be enforced. E ## **Re : Question (ii)** : 12. Let us next consider the question as to who should decide the question whether there is an existing arbitration agreement or not. Should it be decided by the Chief Justice or F his Designate before making an appointment under section 11 of the Act, or by the Arbitrator who is appointed under section 11 of the Act? This question is no longer res integra. It is held in SBP & Co. _v. Patel Engineering Ltd._ [2005 (8) SCC 618] and _National Insurance_ Co. _Ltd. v. Boghara Polyfab Pvt. Ltd._ G [2009 (1) SCC 267] that the question whether there is an arbitration agreement and whether the party who has applied under section 11 of the Act, is a party to such an agreement, is an issue which is to be decided by the Chief Justice or his Designate under section 11 of the Act before appointing an H arbitrator. Therefore there can be no doubt that the issue ought ANDHRA PRADESH TOURISM DEV. CORPN. LTD. _v._ 955 PAMPA HOTELS LTD. [R.V. RAVEENDRAN, J.] to have been decided by the learned Designate of the Chief A Justice and could not have been left to the arbitrator. But as noticed above, the learned Designate proceeded on the basis that while acting under section 11 of the Act, he was not acting under a judicial capacity but only under an administrative capacity and therefore he cannot decide these contentious B issues. He did so by following the two decisions in _Konkan Railway (supra)_ which were then holding the field. 13. In _SBP_ (supra), a seven-Judge .Jench of this Court overruled the two decisions in _Konkan Railway._ The decision C in _SBP_ was rendered on 26.10.2005, a few weeks after the impugned decision by the Designate on 16.8.2005. Having regard to the fact that several decisions rendered under section 11 of the Act had followed the decisions in _Konkan Railway,_ this court, when it rendered its decision in _SBP,_ resorted to prospective .overruling by directing as follows: D D "(x) Since all were guided by the decision of this Court in _Konkan Rly. Corpn. Ltd. v. Rani Construction (P) Ltd._ [2002 (2) SCC 388] and orders under Section 11 (6) of the Act have been made based on the position adopted in that decision, we clarify that _appointments of arbitrator.s or Arbitral Tribunals thus far made; are to be treated as valid,_ all objections being left to be decided under Section 16 of the Act. As and from this date, the position as adopted in this judgment will govern even pending applications under Section 11 (6) of the Act." · E F (emphasis supplied) This Court in _Sarwan Kumar v. Madan Lal Aggarwal_ [2003 (4) SCC 147] observed: G "The doctrine of "prospective overruling" was initially made applicable to the matters arising under the Constitution but we understand the same has since been made applicable to the matters arising under the statutes as well. Under the H 956 SUPREME COURT REPORTS [2010] 4 S.C.R. A doctrine of "prospective overruling" the law declared by the Court applies to the cases arising in future only and its applicability to the cases which have attained finality is saved because the repeal would otherwise work hardship to those who had trusted to its existence. _Invocation of_ s _doctrine of "prospective overruling" is left to the discretion of the court to mould with the justice of the cause or the matter before the court."_ (emphasis supplied) C C 14. Learned counsel for the appellants contended that the impugned order was rendered. on 16.8.2005; that as on 26.10.2005 when the decision in SBP was rendered, the time for filing a special leave petition under Article 136 of the Constitution had not expired; that the special leave petition was D filed by the appellant on 22.11.2005, which has been entertained by granting leave. The appellants therefore contend that this appeal should be considered as a continuation of the application under section 11 of the Act or as pending matter to which the decision in _SBP_ would apply, even though the E Designate had rendered the decision on 16.8.2005. The appellants submitted that a pending matter would refer not only to the original proceedings but also would include any appeal arising therefrom and therefore any proceeding which has not attained finality is a pending matter. F 15. What the appellants contend, would have been the position if there was a statutory provision for appeal and SBP had directed that in view of prospective overruling of _Konkan Railwa,y_ pending matters will not be affected. But sub-section (7) of Section 11 of the Act makes the decision of the Chief G Justice or his designate final. There is no right of appeal against the decision under Section 11 of the Act. Further, the seven Judge Bench in SBP issued the categorical direction that appointment of Arbitrators made till then are to be treated as valid and all objections are to be left to be decided under H Section 16 of the Act. ANDHRA PRADESH TOURISM DEV. CORPN. LTD. _v._ 957 PAMPA HOTELS LTD. [R.V. RAVEENDRAN, J.] 16. On account of the prospective overruling direction in A _SBP,_ any appointment of an arbitrator under Section 11 of the Act made prior to 26.10.2005 has to be treated as valid and all objections including the existence or validity of the arbitration agreement, have to be decided by the arbitrator under section 16 of the Act. The legal position enunciated in the judgment in B _SBP_ will govern only the applications to be filed under Section 11 of the Act from 26.10.2005 as also the applications under section 11 (6) of the Act pending as on 26.1 O.W05 (where the Arbitrator was not yet appointed). In view of this categorical direction in _SBP,_ it is not possible to accept the contention of c the appellant that this case should be treated as a pending application. In fact we may mention that in _Maharishi Dayanand University v. Anand Coop. UC Society Ltd._ & _Anr._ [2007 (5) SCC 295], this Court held that if any appointment has been made before 26.10.2005, that appointment has to be treated 0 as valid even if it is challenged before this Court. 17. In view of the above, we are not in a position to accept the contention of the appellant. But the arbitrator will have to decide the issue as to whether there is an arbitration agreement, with reference to the legal position explained by us in regard to the existence of arbitration agreement. Though such an exercise by the arbitrator will only be an academic exercise having regard to our decision in this case, such an exercise becomes inevitable in view of the peculiar position arising out of the specific direction contained in para 47 (x) of the decision in _SBP_ and the subsequent decision in _Maharishi Dayanand University._ E F 18. We accordingly dispose of the appeal without interfering with the appointment but with a direction to the Arbitrator to decide the issue in regard to the existence/validity of the arbitration agreement as a preliminary issue relating to jurisdiction in the light of what has been stated above. G K.K.T. Appeal disposed of. H
End of Judgment Record
Browse All Supreme Court of India (2010) Decisions
2010-09-24

Department of Telecommunications v. Gujarat Co-operative Milk Marketing Federation Ltd.

This Supreme Court decision concerns a billing dispute arising from two bi-monthly telephone bills totaling Rs. 4,54,652 raised against the Managing Director of the Gujarat Co-operative Milk Marketing Federation Ltd. for calls categorized as international “party” or “sex talk” calls. The respondent subscriber alleged mischarging and that calls were made from another number, prompting a complaint to the Department. Verification upheld the bills; an administrative appeal was dismissed; the matter was referred to arbitration under section 7B of the Indian Telegraph Act, 1885, following a High Court direction. The arbitrator, Vineet Bhatia, concluded the bills were proper. The respondent challenged this award by writ petition, which the High Court (Single Judge) quashed, holding that the arbitrator was junior to the appellate authority, and proceeded to find the award invalid on presumptions and inferences unsupported by evidence; a Letters Patent Appeal was dismissed. The Supreme Court reversed, holding that the High Court exceeded its judicial review scope, misapplied the standard for review of arbitral awards under section 7B, and erred in imputing bias based on rank. It affirmed that the arbitrator’s findings were grounded in the department’s records and meters, and that independence was maintained. The appeal is allowed and the writ petition dismissed, with the High Court orders set aside.

2010-11-23

BHAGWAN BUDHA PRATHMIK TECHNICAL TRAINING COLLEGE NIRMALI v. STATE OF BIHAR

This is a consolidated Supreme Court decision in Civil Appeal Nos. 9896 and 9897 of 2010 arising out of Bihar. Bhagwan Budha Prathmik Technical Training College, Nirmali, a minority Buddhist institution established in 1987, challenged Bihar’s and other authorities’ recognition/approval decisions for its teacher-training course in light of the National Council for Teacher Education Act, 1993 (NCTE Act). The central issue is whether, after the NCTE Act’s appointed day (1 July 1995), State Governments retain power to grant recognition to teacher-education institutes and whether students of unrecognized colleges may sit for qualifying examinations. The matter traces a long litigation history: initial directions in the early 1990s required the Government to decide recognition while allowing students to appear at their own risk; subsequent orders and representations culminated in a 16 March 2007 order recognizing the college from 1987-89 on the ground that inspection warranted it, followed by a 2 September 2008 order withdrawing that recognition in light of NCTE’s sole jurisdiction post-appointed day. The High Court affirmed the sequence, but this Court held that a power to issue an order includes a power to withdraw it for valid reasons, and that recognition is vested in the NCTE after the appointed day. The judgment emphasizes that the NCTE Act must be implemented with full force to protect standards in teacher education. Ultimately, the Supreme Court dismissed the appeals, modified a cost order, and held there should be no further costs in these appeals, while acknowledging the students’ plight and the need for orderly implementation of the regulatory regime.

2010-06-03

State of Punjab & ors. v. G.S. Randhawa

This Civil Appeal arises from a petition challenging a demand for additional price under the Punjab Urban Estate (Sale of Sites) Rules, 1965. The Supreme Court hears counsel for the appellant and notes that the respondent did not enter appearance. Relying on the decision in Smt. Fuljit Kaur v. State of Punjab & Ors., (2010) 7 SCR 317, the Court states that, for the reasons recorded in Civil Appeal No. 5292 of 2004 (the Fuljit Kaur decision) decided on this date, the appeal must be allowed. The High Court’s December 6, 2006 order is set aside and the Demand Notice is upheld. The appellant is entitled to recover the additional price in accordance with law. The decision clarifies that liability to pay additional price under the Punjab Urban Estate Rules can be enforced consistent with the Fuljit Kaur framework, upholding the validity of the demand and permitting recovery by the State. The judgment thus resolves the previous split on allotment price adjustments and prescribes a uniform approach for enforcing such recoveries in analogous cases going forward.

2010-07-15

Harish Singh Nagra & Ors. v. Kapil Sibal & Ors.

Mehfil-e-Wukala, a Supreme Court cultural-literal association of lawyers, published a souvenir containing messages, articles, and poems by judges and senior advocates. Kapil Sibal, a senior advocate and then a candidate for President of the Supreme Court Bar Association, sent a message criticizing the junior Bar and urging reforms, which was circulated within Mehfil’s members but not released to the press or sold publicly. Petitioners, five practicing advocates from the Punjab and Haryana High Court, filed criminal contempt proceedings under Article 215 of the Constitution alleging that Sibal conspired with others to bring the administration of justice into disrepute. The High Court transferred the case to this Court. The central issue was whether the message, read in its proper context, amounted to contempt under Section 2(c) of the Contempt of Courts Act, 1971. The Court held that the message, read in its prospective context, did not scandalize or tend to scandalize any court, nor obstruct the administration of justice; it was a fair critique aimed at improving the system. Citing P.N. Duda, Mulgaokar, Ambard, Vishwanath, and others, the Court reaffirmed that freedom of expression under Article 19(1)(a) protects fair, reasoned criticism of judgments and judicial institutions. It noted that the Times of India article excerpt misrepresented the message, but the souvenir’s limited internal distribution and the respondent’s apology supported dismissal. Accordingly, the contempt petition was dismissed and notices discharged.