Allied Hospital (P) Ltd. v. Arthat St. Mary's Simhasana Church and Arthat Grama Panchayat

Case / Petition Number:
FAO No. 110 of 2003

Case Synopsis & Summary

Allied Hospital (P) Ltd. v. Arthat St. Mary’s Simhasana Church and Arthat Grama Panchayat, FAO No. 110 of 2003, Kerala High Court (Single Judge V. Ramkumar) delivered on 23 May 2009, concerns a dispute over public access to a religious cemetery via a path adjacent to the hospital property. The plaintiff church sought a declaration that the hospital’s wall at the western boundary illegally blocked a historic public pathway, and prayed for removal of the wall and a prohibitory injunction restraining obstruction to the path. The hospital, on the other hand, contends there is no purambokku land or established right of way through its southern property; it claims the alleged pathway lacks the requisite particulars as per Order VII Rule 3 CPC and asserts the path did not exist for decades. The trial court dismissed the suit, finding the wall older than 15 years, no user of a right of way had been proven, and the plaint lacked material particulars. The District Court remanded to give the plaintiff an opportunity to amend. The High Court set aside that remand, and remitted the matter to the lower appellate court for disposal on merits with the existing evidence, directing a prompt resolution within eight months, thereby clarifying limits on remand in such disputes.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • V. Ramkumar
Judgment Date
2009-05-23
Court Decision / Holding
The High Court set aside the lower appellate court’s remand order and remitted the matter to the lower appellate court for disposal on merits with the evidence already on record, directing expeditious resolution within eight months and without further remand to the trial court.
Final Disposition
Remanded to the lower appellate court for disposal on merits; no further remand to the trial court.

Parties to the Case

Appellants / Petitioners

  • Allied Hospital (P) Ltd.

Respondents

  • Arthat St. Mary’s Simhasana Church
  • Arthat Grama Panchayat

Legal Representation & Advocates

Counsels for Petitioners

  • • SMT. M. Hemalatha

Counsels for Respondents

  • • SRI M. Balagovindan
  • • SRI Biju KuriaKose
  • • SMT. MINI V.A.

Provisions of Law Cited

Order XLIII Rule 1 (u) C.P.C.Order VII Rule 3 C.P.C.Sec. 100 C.P.C.Kerala Land Reforms Act

Submissions & Arguments

Contentions of Appellants / Petitioners

Allied Hospital contends there is no purambokku land or established pathway through the southern property. The plaint lacks material particulars as required by Order VII Rule 3 CPC. It asserts the purported pathway had not existed for about 25 years and that the gate to the cemetery opens from the church compound, with the northern Mar Osthathios road providing direct access; there is no proven user of any right of way over the hospital’s property, and the wall is not erected to block a public right but to protect boundaries.

Contentions of Respondents

The Church and Panchayat contend that a public pathway exists along the southern boundary to reach the cemetery, with historical use of the route through purambokku land. They argue the hospital wall obstructs access and that the plaint and evidence establish a right of way across the hospital property; the trial court’s findings and remand orders were misapplied and the matter should be decided on merits.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (1)

Case NameCitationTreatmentExplanation
Narayanan v. Kumaran2004 (4) SCC 26Mentioned OnlyCited to discuss the requirement of formulating substantial questions of law in an appeal; treated as background authority rather than a binding directive for this decision.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,079 words•~10 min read

In The Court Record

Allied Hospital (P) Ltd. v. Arthat St. Mary's Simhasana Church and Arthat Grama Panchayat

IN THE HIGH COURT OF KERALA AT ERNAKULAM PRESENT : THE HONOURABLE MR. JUSTICE V.RAMKUMAR SATURDAY, THE 23RD MAY 2009/9TH JYAISTHA, 1931 FAO.No. 110 of 2003() --------------------AS.188/1999 of ADDL.DISTRICT COURT, THRISSUR OS.740/1995 of MUNSIFF COURT,CHAVAKKAD .................... APPELLANT/1ST RESPONDENT: --------------------------------------------- ALLIED HOSPITAL (P) LTD.,GURUVAYOOR ROAD ARTHAT VILLAGE DESOM,TALAPPILLY TALUK, REP. BY ITS MANAGING DIRECTOR, DR.K.N.BHASKARANUNNI, AGED 49 YEARS, S/O.VYLERI MANARKAD NARAYANAN NAMBOOTHIRI,GURUVAYOOR AMSOM,THIRUVENKIDOM DESOM, CHAVAKKAD TALUK. BY ADV. SMT.M.HEMALATHA RESPONDENT(S): APPELLANT & 2ND RESPONDENT: ------------------------------------------ - 1.ARTHAT ST.MARY'S SIMHASANA CHURCH, ARTHAT VILLAGE, THALAPPILLY TALUK, REPRESENTED BY TRUSTEE, T.C.IPE, AGED 75 YEARS,ST/O.THOLATH CHERU THRISSUR ROAD, KUNNAMKULAM VILLAGE, THALAPPILLY TALUK. - 2.ARTHAT GRAMA PANCHAYAT, ARTHAT VILLAGE, THALAPPILLY TALUK, REP.BY ITS SECRETARY, ARTHAT GRAMA PANCHAYAT, P.O. ARTHAT, THRISSUR DISTRICT. ADV. SRI.M.BALAGOVINDAN FOR R1 SRI.BIJU KURIAKOSE FOR R1 SMT.MINI.V.A. FOR R1 THIS FIRST APPEAL FROM ORDERS HAVING BEEN FINALLY HEARD on 23-05-2009 THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING: **==> picture [250 x 82] intentionally omitted <==** ## JUDGMENT The first defendant in O.S. 740 of 1995 on the file of the Munsiff's Court, Chavakkad is the appellant. The said suit instituted by the first respondent herein is one for a declaration that the act of the first defendant/appellant in constructing a wall at the entrance of the pathway in dispute and thereby closing the same preventing access to the plaintiff Church namely, Arthat St. Mary's Simhasana Church was illegal and for a mandatory injunction directing the first defendant to remove the newly constructed wall and for a prohibitory injunction restraining the first defendant from obstructing the disputed pathway. 2. The case of the first respondent/plaintiff can be summarised as follows:- The plaint schedule Church compound including the Arthat Simhasana Church building absolutely belongs to the plaintiff Church the Church and its cemetery are situated in the plaint schedule property. To the south of the Church compound, there is an ancient pathway running west to east parallel to the southern F.A.O. 110 of 2003 -:2:- boundary of the plaint schedule property providing entry into the cemetery which is situated towards east of the church compound. The said pathway is passing through the purambokku property vested in the Arthat Panchayath. The pathway starts from the Guruvayoor-Kunnamkulam main road running north-south along the western boundary of the plaint schedule property. The first defendant who has property to the south of the plaint schedule property and who is running a hospital by name Allied Hospital has constructed a compound wall along the western boundary of the first defendant's property in such a way as to obstruct the access to the public pathway referred to above. Hence, the suit. 2. The suit was resisted by the first defendant contending inter alia as follows:- The suit is not maintainable and the plaintiff has no cause of action. The property to the south of the plaint schedule property was the property of one David. The said property was purchased by this defendant about 4 years back. There is no purambokku land or a pathway in the said property purchased by this defendant, as alleged by the plaintiffs. There is no pathway on the southern side of the plaint schedule property. Along the western boundary of the property purchased by this defendant from David there is a compound wall which is about 25 years old. The said compound wall has been constructed in continuation of the western boundary wall of the plaint schedule property. This defendant has not put up any compound wall on the western side after this defendant F.A.O. 110 of 2003 -:3:- purchased the property from David referred to above. There were certain kudikidappucars of David in the property purchased by this defendant and a way had been provided for them through the northern side of this defendant's property. But after the coming into force of the Kerala Land Reforms Act, the kudikidappukars were shifted to the southern side of the property and thereafter there was no pathway retained or used for the aforesaid purpose. The plaintiff had no right of way through this defendants' property formerly and there was no entry into the cemetery from that way. There is a tarred road along the northern boundary of the plaint schedule property and having access to the cemetery. Mention about the pathway along the northern boundary of the property of this defendant in the title deed came to be made as it was carried forward from the anterior title deed. For the past 25 years the said pathway is not in existence. This defendant has constructed a compound wall along the northern boundary of this defendant's property. It is the said construction which has provoked the plaintiff to institute the present suit. The suit is without any bona fides and liable to be dismissed with costs. 3. The 2[nd] defendant Arthat Grama Panchayath filed a written statement contending as follows:- On the southern side of the plaintiff's property, there is a purambokku which belongs to this Panchayath. The first defendant informed the Panchayath about the construction of a compound wall and this defendant permitted construction F.A.O. 110 of 2003 -:4:- excluding the purambokku. 4. The Trial Court framed 7 issues for trial. On the side of the plaintiff, two witnesses were examined as P.Ws 1 and 2 and 10 documents were got marked as Exts.A1 to A10. On the side of the defendants, two witnesses were examined as Dws 1 and 2 and Exts.B1 and B2 were marked. The Advocate Commissioners deputed by the trial court filed Exts.C1 and C3 reports and Ext.C2 plan and Exts. C4 report and C5 plan. 5. The learned Munsiff, after trial, as per judgment dated 27-1-1999 dismissed the suit holding that the evidence disclosed that the western boundary wall of the southern property of the first defendant was constructed more than 15 years ago, that the plaintiff had failed to prove any user as of right of the alleged pathway passing through the defendants' property situated outside the plaint schedule property so as to reach the cemetery, that the evidence showed that the dead bodies were brought into the Church through the wide gate provided for the church compound (plaint schedule property) from the Guruvayoor-Kunnamkulam main road and the dead bodies after the funeral obsequies were taken to the cemetery from the church compound directly, that along the northern boundary of the plaint schedule property there is the Mar Osthathios road which is a tarred road from which there is a direct access into the cemetery immediately after the church compound, that the plaintiff cannot claim any right over the southern property of the first defendant for having access to the F.A.O. 110 of 2003 -:5:- cemetery situated towards the eastern side of the church compound and that the alleged pathway over which the plaintiff claimed right of user was not described giving material particulars in the plaint nor was it scheduled to the plaint as required by Order VII Rule 3 C.P.C. 6. Aggrieved by the judgment and decree dated 27-1-1999 passed by the plaintiff filed an appeal as A.S. No. 188/1999 before the District Court, Thrissur. As per judgment dated 17-7-2003, the I Addl. District Judge set aside the judgment and decree passed by the trial court and remanded the case to the trial court for fresh disposal after giving the plaintiff an opportunity to amend the plaint so as to give full particulars regarding the pathway in respect of which relief was claimed. Hence, this appeal filed under Order XLIII Rule 1 (u) C.P.C. by the first defendant. 7. Since this appeal is virtually a Second Appeal, in the light of the decision of the Apex Court in **Narayanan v. Kumaran – 2004 (4) SCC 26,** the Memorandum of Appeal ought to have formulated substantial questions of law in terms of Sec. 100 C.P.C. This Appeal will lie only on such substantial questions of law, formulated in the memorandum of appeal. But, then, there is no express provision in the C.P.C., obliging the appellant in an appeal under Order XLIII Rule 1 (u) C.P.C. to formulate substantial questions of law in the memorandum of Appeal. It was only on 16-3-2004 that the Apex Court ruled that such substantial questions of law should be formulated in the F.A.O. 110 of 2003 -:6:- memorandum of appeal. Hence, the appellant cannot be found fault with for not formulating any substantial question of law. From the facts and circumstances of the case, the following substantial question of law arises for consideration in this Appeal:- _“When, inspite of the specific plea taken by the first defendant in the written statement that the plaintiff had failed to give particulars of the alleged pathway as enjoined by Order VII Rule 3 C.P.C., no attempt was made by the plaintiff to amend the plaint and the parties went for trial knowing fully well that the right which was claimed was a right of user over the pathway allegedly passing through the southern property of the first defendant, was the lower appellate court justified in setting aside the decree passed by the trial court and remanding the case to that court for the sole purpose of giving the plaintiff an opportunity to comply with Order VII Rule 3 C.P.C. “ ?_ 8. Apart from the oral evidence in the case, or the three Commission reports filed in the case conclusively showed that the western boundary wall of the southern property of the first defendant was constructed more than 15 years old. If, so, the case of the plaintiff that the first defendant recently obstructed the plaintiff in using the alleged pathway passing through the first defendant's property was demonstrably false. The evidence in F.A.O. 110 of 2003 -:7:- the case would clearly show that the plaint schedule church compound with the cemetery at its rear portion and the southern property of the first defendant are lying adjacent on the eastern side of the Guruvayoor-Kunnamkulam main road which runs north-south. The evidence on record further shows that the church compound which opens into the GuruvayoorKunnamkulam road has a large gate through which dead bodies used to be brought into the Church and after the funeral obsequies the dead bodies used to be taken to the cemetery directly from the church compound itself. There is also the evidence showing that the northern boundary of the Church compound is also a road by name Mar Osthathios road from which after the Church compound there is a direct access into the cemetery through a convenient opening in the old compound wall. It is over and above the said access to the cemetery that the plaintiff was claiming a third access to the cemetery through the southern property of the first defendant laying a claim over the alleged pathway starting from the Guruvayoor-Kunnamkulam main road and passing along the southern boundary of the church compound but outside the church compound. All those particulars of the said parthway were not furnished in the plaint. But both parties were very well aware of the claim made by the plaintiff. That apart, sufficient opportunities also had been given to the plaintiff to comply with Order VII Rule 3 C.P.C. That had not been done. The lower appellant court was therefore not at all justified in F.A.O. 110 of 2003 -:8:- setting aside the judgment and decree passed by the trial court and remitting the case to the trial court merely for enabling the plaintiff to comply with Order VII Rule 3 C.P.C. In this view of the matter, the order of remand passed by the lower appellate court is not sustainable. The substantial question of law formulated as above is answered in the negative. The impugned judgment passed by the lower appellate court is set aside and the matter is remitted to the lower appellate court for disposal of the appeal namely, A.S. 188 of 1999 afresh on the merits with the evidence already on record and without a further remand of the case to the trial court. The appeal shall be disposed of uninfluenced by the observations and findings in this judgment. The parties shall appear before the lower appellate court on 22-62009 without any further notice. The lower appellate court shall dispose of the appeal on the merits expeditiously and at any rate within 8 months of receipt of a copy of this judgment. The Registry shall re-transmit the lower Court records forthwith. _Dated this the 23[rd] day of May 2009._ ## **Sd/- V. RAMKUMAR, (JUDGE)** ani. F.A.O. 110 of 2003 -:9:-
End of Judgment Record
Browse All High Court of Kerala (2009) Decisions
2009-06-26

Nishana Mol.N v Alappuzha Municipality & Secretary, Alappuzha Municipality

This writ petition concerns the registration of a marriage under the Kerala Registration of Marriages (Common) Rules, 2008 (Common Rules). The petitioner Nishana Mol.N, whose marriage was solemnized on 8 March 2009, sought registration of her marriage by the Local Registrar. Her husband was abroad, and she submitted Form No. 1 along with documents; however, the Local Registrar demanded the presence of both spouses for registration, a point contested by the petitioner. The court recalls the apex court’s directions in Seema v. Ashwani Kumar (2006) to frame rules ensuring compulsory registration to protect women and provide evidence of marriage, while noting that registration under the Rules does not itself create a marriage but evidences one solemnized otherwise. The Rules specify that registration is mandatory for marriages solemnized within the state, with various procedural requirements (Rules 5, 6, 9, 10, 11, 13, 16, 17) and mechanisms for correction, appeal, and re-registration. The court clarifies that the presence of both parties is not ordinarily required; the registrar may require appearance only in cases where there is reasonable doubt about identity, and even then as an exception rather than a rule. Ultimately, the court directs that registration and certificate issuance be completed within one month from copy of the judgment, without insisting on joint appearance, provided the memorandum is in order.

2009-07-27

Abdul Majeed Kalathil v. District Collector, Malappuram & Others

This batch of writ petitions concerns the constitutional validity of Section 17 of the Kerala Anti-Social Activities (Prevention) Act, 2007, and the power of District Magistrates to confiscate vehicles used in anti-social activities. The petitions challenge the absence of a substantive prohibition against using vehicles for anti-social activities and the lack of a defined procedure for confiscation or an appellate remedy. In W.P.C. No. 9925 of 2009 (the lead case), Abdul Majeed Kalathil contends that his goods carriage KL 11-B/6651 was seized by the Sub Inspector of Pandikkad Police and reported to the District Collector, Exts.P1–P2. The court scrutinizes Section 17's scope, defining anti-social activity (Section 2(a)) and whether the District Collector’s power to confiscate is constitutionally tenable. It finds Section 17 to be vague and violative of Articles 14, 19(1)(g) and 21, as it rests on subjective police satisfaction with no clear standards or process. It also notes environmental objectives but concludes that fundamental rights must prevail. The court does not sustain confiscation under Section 17; instead, it directs that such vehicles be dealt with under the Kerala Protection of River Banks and Regulation of Removal of Sand Act, 2001 and Rules, with interim release under specified conditions. It further directs initiation of Sand Act proceedings within a month and finalization within another month. The writ petitions are disposed of accordingly, preserving the rule of law and environmental protection.

2009-06-11

WA No. 671 of 2006 (Fertilizers and Chemicals Travancore Ltd v Union of India)

This writ appeal concerns the pay revision and pensionary benefits of employees of the Fertilizers and Chemicals Travancore Ltd (FACT). The long-term settlement covering terms of employment expired on 31 December 1996. A fresh settlement was concluded (notified 28 August 2001) and made retroactive to 1 January 1997, with revisions in wages and benefits. Clause 29 of Ext. P1 provides that arrears relating to wage revision and dearness allowance for the period 1 January 1997 to 30 June 2001 will be reviewed and decided by management/government only when the company earns profits for at least three consecutive years; Clause 33.1 provides that employees who retired on or after 1 January 1997 will be eligible for arrears calculated from 1 January 1997 to the date of retirement, subject to adjustments for interim relief already paid, with any unclaimed amount transferred to a Welfare Fund. The appellants—the retirees who fall in the 1 January 1997 to 1 July 2001 window—argue that they were denied arrears and were paid pensionary benefits at pre-revised rates, creating discrimination. Respondents contend Ext. P1 binds the parties and arrears depend on profits, and that pay revision administered to others does not compel retroactive change. The court held that Ext. P1 terms survive as terms of employment and directed the management to consider terminal benefits at revised rates within two months and to release arrears when paid to current workers, with connected matters following."

2009-05-29

M/S. Palm Fibers & Yars Trading Co. v. State of Kerala & Others

The petitioner, a Small Scale Industrial unit, ran two LT power connections (No.13070 and No.13427) with commercial production starting in July 1994 and July 1995. On 06/02/1992, the Government issued Ext.P1 guaranteeing concessional tariffs (pre-1992 tariff) for five years from the date of commencement or substantial capacity expansion, certified by the District Industries Centre. Ext.P2 certified eligibility for this concession. Subsequently, the petitioner increased power demand to 300 KVA and was reclassified/advised to HT status from 15/05/1998, converting LT supply to HT. The petitioner argued that Ext.P1 benefits should extend for the full five-year period, covering the LT quantities certified in Ext.P2, and that the HT conversion was a mere reclassification directed by the Board, not a cessation of eligibility. The Board argued Ext.P1 targets only those who commenced production during 1992–1996 and that HT conversion from 15/05/1998 falls outside the Ext.P1 window, rendering the petitioner eligible only up to 15/05/1998. Earlier orders (Ext.P3) had set aside a cut-off date for merits, and Ext.P6/Ext.P4 handled appeals. Ultimately, the Court held that the HT conversion was outside Ext.P1’s period, but directed that the LT benefits for the two LT connections be extended only until 23/05/1998 (LT dismantling date) and without reimbursement from the Industries Department, as held in OP No.7622/1998. The petition was disposed of as above.