Case Synopsis & Summary

The case concerns challenges to the 1959 notification issued under Section 4 of the Land Acquisition Act by the Government for the planned development of Delhi, involving 34,070 acres. Between 1959 and 1961, thousands of objections were filed under Section 5A, most of which were rejected. In 1966 the Section 6 declaration covered a portion of the area, and in 1970 notices under Section 9 were issued to assess compensation. The appellants argued that the public purpose of ‘planned development of Delhi’ was vague because there was no Master Plan or Zonal Plan on the date of notification, that there was inordinate delay which deprived them of post-notification value appreciation, that Section 23’s market-value compensation on the date of notification violated Article 19(1)(f), and that since the acquisition was for planned development the Central Government should issue the notification under the Delhi Development Act’s Section 15. They also contended that the land was ultimately allotted to housing/cooperative societies, arguing Part VII of the Act applied to a “company.” The High Court dismissed the petitions; the Supreme Court dismissed the appeals, upholding the validity of the notification and the acquisition process. It held that (i) a valid Section 4 notification is a sine qua non for initiation; (ii) public purpose specification depends on the area’s facts; (iii) petitions were barred by laches and Article 31(5); (iv) the Land Acquisition Act is pre-Constitution and not subject to Article 31(2) challenges; (v) Part VII not applicable to the facts.”

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • A. N. Ray
  • K. K. Mathew
  • A. Alaguduswami
  • P. K. Goswami
  • R. S. Sarkaria
Judgment Date
1974-08-23
Court Decision / Holding
Writ petitions and civil appeals dismissed; the notification under Section 4 and the consequential proceedings were upheld as valid; no interference with the acquisition was warranted; laches and Article 31(5) precluded challenges to compensation; Part VII not applicable to this acquisition.
Final Disposition
Writ petitions and civil appeals dismissed; the notification under Section 4 and ensuing proceedings upheld; petitions dismissed with costs.

Parties to the Case

Appellants / Petitioners

  • Aflatoon and Others

Respondents

  • Lt. Governor of Delhi
  • Union of India
  • Central Government
  • Delhi Development Authority (implied)

Legal Representation & Advocates

Counsels for Petitioners

  • • A. K. Sen
  • • L. M. Singhvi
  • • S. K. Dhingra
  • • B. Dutta

Counsels for Respondents

  • • L. N. Sinha
  • • S. N. Prasad
  • • R. N. Sachthey
  • • Ashok Grover
  • • S. K. Dholakia
  • • T. V. S. Narasimhachari
  • • Vinoo Bhagat

Provisions of Law Cited

Land Acquisition Act, Section 4 (sub-sections 1 and 2)Land Acquisition Act, Section 6Land Acquisition Act, Section 9(1)Land Acquisition Act, Section 23Land Acquisition Act, Section 3(a) and Part VIIDelhi Development Act, Sections 12 and 15Constitution of India, Articles 19(1)(f), 31(2), 31(5)Delhi Development Act, Sections 12(1), 12(3), 12(4), 12(5)Delhi Development Act, Section 15Land Acquisition Amendment and Validation Act, 1957, Section 4(3)Land Acquisition Act, Section 24Article 31(5) (preclusion)Article 19(5)

Legal Doctrines & Maxims

  • Sine qua non
  • Laches and acquiescence
  • Procedural reasonableness
  • Pre-Constitution status of the Land Acquisition Act
  • Development may be pursued under separate statutory regime (Delhi Development Act)

Submissions & Arguments

Contentions of Appellants / Petitioners

The applicants contended that the public purpose stated in the Section 4 notification—'the planned development of Delhi'—was vague since no Master Plan or Zonal Plan existed at the time. They challenged the delay between notification and compensation, arguing it deprived them of value appreciation. They attacked Section 23 as incompatible with Article 19(1)(f), claiming compensation computed on the market value as of the notification date restricted their fundamental rights. They argued that because the plan concerned Delhi's development, the notification under Section 4 should have been issued by the Central Government under the Delhi Development Act, and that the acquisition could amount to a “company” under Part VII if land was allotted to cooperative housing societies. They urged that the proceedings were invalid ab initio due to lack of Central authorisation and the absence of a precise public purpose.

Contentions of Respondents

The respondents argued that a valid Section 4 notification is the sine qua non for initiating acquisition proceedings. They asserted that the public purpose of planned development is a valid objective even without a Master or Zonal Plan at the time of notification, and that the State may proceed under the Land Acquisition Act prior to Master Plans with subsequent local approvals. They defended Section 23 by appealing to Article 31(5) and the pre-Constitution status of the Act, arguing that challenges should be about procedural fairness rather than adequacy of compensation. They maintained that the Delhi Development Act’s regime permits acquisition by the Central Government (Section 15) and that development may proceed prior to a Master Plan, with Part VII not triggered since the acquisition was not for a company; laches and acquiescence barred belated challenges.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (6)

Case NameCitationTreatmentExplanation
Munshi Singh and Others v. Union of India[1973] 1 SCR 973PositiveUsed to support the need to specify public purpose in Section 4 notifications and to define the scope of subsequent objections.
Arnold Rodricks and Another v. State of Maharashtra and Others[1966] 3 SCR 885PositiveCited to illustrate that broad public purposes like development may be valid when a large area is involved.
Tilok Chand Motichand and Others v. H. B. Munshi and Another[1969] 2 SCR 824PositiveCited for the doctrine of laches as a bar to belated challenges.
Rabindranath Bose and Others v. Union of India and Others[unknown]PositiveUsed in the context of laches and procedural objections to challenges.
R. C. Cooper v. Union of India[1970] 3 SCR 530PositiveSupporting the principle that challenges to pre-Constitution laws focus on procedural reasonableness.
Patna Improvement Trust v. Smt. Lakshmi Devi and Others[1963] SCR 812PositiveCited to explain development could proceed under Act before Master Plan and the general approach to planned development.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•6,613 words•~31 min read

In The Court Record

Aflatoon and Others v. Lt. Governor of Delhi and Others

8 02 AFLATOON AND OTHERS _V._ LT. GOVERNOR OF DELHI & OTHERS _August_ 23, 1974 [A. N. R,\Y, C.J.; K. K. MATHEW, A. ALAGDUSWAMI, P. K. GOSWAMI AND R. S. SARKARIA, JJ.] _Land _Acquisition_ _Act,_ _Section_ 4, _suJ;-sections_ (1) _and_ _(2)-lnitiation_ _of_ _proceedings under, a valid notification_ sine qua non- Delay in moving the _Court-Effect._ _Ltind Acquisition Act, Section_ 23 _and Co.nstilution_ _of_ _India,_ 1950, _Articles_ 19(1)(f) 31(2) _and_ _31(5)-Campensation_ _with reference to_ _valrw_ _of_ _property_ _on the date_ _of ·notification under sec._ _4-Adequacy_ _of_ _compensation, challenge_ _of-Challenge_ _oonfined only to question_ _of_ _procedural reasonableness._ _Delhi Development Act, sections_ 12 _and_ _15-P/anned_ _development_ _of_ _Delhi_ _to be in accordance with the Act--Ccntral Govt.,_ _if_ _precluded from acquiring_ _land for planned_ _development-Laches_ _and acquiescence on the part_ _of_ _the_ _petitioners-£ fleet._ _Land_ _Acquisition_ _Act,_ _Section_ 3 _(a) and Part_ _Vil-Acquisition_ _of_ _land for_ _planned development_ _of,_ _Delhi..-Landi11g over_ _a_ _portion_ _of_ _tile_ _acquired property_ _to co-operative housing societies-Provisions_ _of_ _Part_ _VII_ _of_ _the Act, whether_ _attracted._ A notification under sec. 4 of the Land Acquisition Act was issued on Nov. 13, 1959, stating that an area of 34,070 acres of land was needed for a public purpose, _viz._ the planned development of Delhi. Between 1959 and 1961, about six thousand objections were filed under sec. _SA_ of the ·Act. The objec~ A B ##### c D # • tions were ov·.::rruled. On March 18, 1966, the declaration under sec. 6 of E the Act was published in respect of a portion of the area. Therefore, in 1970, notices were issued under sec. 9 ( l) of the Act requiring the appellants to,.._ state their objections, if any, to the assessment of compensation. The appellants thereupon challenged the validity of proceedings for acquisition before the High Cou.rt of Delhi. 'fhe High Court negatived _their contentions a·nd dismissed the writ petitions. In the writ p.~titions and civil appeals fil·:!d in the Supreme Cou1t it was contended _:_ (i) The public purpose specified in the notification issued under sec. 4, nan1ely, the planned development of Delhi WM F vague as neither a Master Plan nor a Zonal Plan was in existence on the date of the notification and as the purpose specified in the notification was vague, the appellants and the petitioners were unable to exercisei effectively their right under sec. SA of the Act; (ii) As there was inordinate delay in finalising- the acquisition proceedings, they were deprived of the benefit of the appreciation in the value of the property between the date of notification under sec. 4 and the date of taking possession of the property. (iii) The provisions of sec. 23 of the Act laying down that compensation should be determined with reference -\ to the market value of the land as on the date of notification under sec. 4 was G an unreasonable restriCtion on the fundamental right of the appellants to hold and dispose of property under Article 19(1) (b); (iv) As the acquisition of the property was for the purpose of planned development of Delhi, the only authority competent to issue the notification under sec. 4 'vas the Central Govt. ~ under sec. 15 of Delhi Development Act and since the proceedings were initiated by the Chief Commissioner of Delhi, the proceedings were _a}J_ _initio_ invalid; iand ( v) Thei acquisition was not for any public purpose, but for companie~ as the major portion of the land acquired was. allotted without any development to co~operative housing "Societies which were companies within the definition of H the word ''company'• in the Act and as the provisions of part VII of the Act were not complied with the proceedings for acquisition were bad. Rejecting the contention and dis1nissing the appeals and the petitions, AFLATOON _':v._ LT, GOVERNOR _(Mmhew;_ _],)_ . 8 03 ' . . . . . A HELD : . (i) A valid mtiJication under s~. 4 iS a _sine qua non_ for lnitiatiolt "of pro>eedings Jor acquisition of property, ·It is neccssazy to spe<:ify !he parti c:ular public purpo<e in tho notiJication fot which tho land is needed or likely to be needed as otherwise, the, matters specified in sub-see: (2) of sec. (4/ ~anilot be ·carried out. (807q B _Munshi Singh and Others_ v. _Union_ _o/lndia;_ _[191U_ 1 _s.C.R.:_ 973 (975 _and_ _984) fr/ied on._ _Arnold RodriCks and A,,other_ v. · _Siate_ _of Maharashtra and others,_ [1966] 3 S.C.R. _88S_ referred to. In the case of all a~ciuisition of· a large area of land comprising -~Vera.I pJots belonging to different persons, the specification of the purpose can. only. be with reference ·to the acquisi_tioii_ of the whole area.· - Unlike in. the case of an acquisitiOn of a small area, it might be practically difficult -to specify the particular purpose for which each and every- item of land comprised _in the area is. needed. [807G] ### c' D F .H Th~ appellants did nol move in the matter-even after ihe declaraticn 1n;1de1 sec. 6 _was_ published in 1966. • They approached the High court with their writ petitions only in· 1970- when the notices -under sec. 9 were issued to them. That apart, the appellants did not contend- before the Hi&h'" Court that as the particulars of. public purpose wefe not specified in the notification issued und~r sec. 4, they were prejudiced_ "in that they -could not effectiv~y exercise their right under sec. _SA._ As the plea was not raised by them before the High - Court~ thC appellants are not entitled to have the plea tonsidered in these -appeaJs.. To have s<_1.t on the_ fence and allowed the Govt. to complete the acqu~sition proceedings on the basis of the notification under sec .. 4 .and the declatation under sec.· 6 were valid and tlien to attack the notification on grounds whii;h were available to the Writ petitioners at the _time when the no~i"". fl.cation wa-3 _ published would 00 putldng a premium on dilatory ta,c!ics. The wnt Petitions ·are ·liable to .. be dismissed on the ground of laches and delay on the part of the petitio11<rs. [808A-B; D & F-G] . _Tilok Chand 1\-loti_ _Chand_ _arzd_ _othl"rs_ .v. _H: B:_ _Munlhi_ _and Another,_ f1969]2 S.C.R. 824 and _Rabindranath Bose and Others_ v. _Union_ _of_ _India_ _and_ _other1_ _R:_ _C._ _Cooper_ v. _U;i.ic!n_ _of_ _India._ [1970] 3 S.C.R. _S30,_ (577) reli<d on. It foIJows that altho~gh sec. ·23 of the Act -~ii -b~ challen!?~d O~ the gr~~d th_at it violates the fundamental right of a citizen to hold and' dispose of property under Article 19(l)(b), the challenge would practically be limited to tho question of procedural reasonablertess. Put- sec. _Z3_ does not deal '\\ith procedure and cannot, the~efore, suffer from any proced1.1ra1- unreasonabJene,s. -.. l~lOE-F] [1970] 2 S.C.R: 697 referred to. - (ii) About 6,ooo· objec!ions ~ere filed -.:inde·r seC. _SA_ by persons- interested in the property. Several writ petitions wire also filed in 1966 and 1967 challenging the. validity of the acquisition proceedings. The Govt. had necessarily to wait for the ·disposal of the objections and petitions before proceeding further in -the matter. The High Court was of- the_ view that there was no inordinate . delay on the p·art of the· Govt in Con1pletin_~-·-the acquisitioD. proceedings. The - conc [1] usion of the High Coe.rt is corre:t. __ [809B-C] . . ; ' (iii) The Land Acquisitioii Act is a prC-:Constitution Act. Its provision! are not, therefore, liable to be challenged on the ground that they ·are not in conformity with the requirement of Articll! 31(2) of the Constitution. What the appellants and writ petitioners complain · is that the.ir properties· were acquired by paying them compensation cpmputed with reference to the market! value of thf!' land as on the date of the notification under sec. 4 ·and that sec. 23 is, therefore, bad. This, in substance is ·nothing but a· challenge to the ade-_ quacv 'of compensation. Such a challenge is precluded by reason of Art. 31(5) - of the Constitution. [809F-G] Although-. a Jaw for acquisitio~ of pfooenv. must pass the test of Article 19(5), the challenge to the law would ordinarily be limited to _the question· of procedural unreasonab!eness. '[810D] ·, . -· . . . 8 04 SUPREME COURT REPORTS (1975] 1 S.C.R. (iv) The planned development of Delhi had been decided upon by the Govt. before 1959, _viz.,_ even before the Delhi Development Act came into force·. It is true that there· could be no planned development of Delhi except in accordance with the provisions of Delhi Development Act after that Act came into force but there \Vas no inhibition in acquiring land for planned development of Delhi und.!r the Act before the l.Vlaster Plan was ready. [812E] _Patna bnprovement Trust_ v. _Snit._ _Lakslinii Devi_ _and others_ [1963] Sur:-r. 2 S.C.R. 812 referred to. In other words, the fact that actual development is pern1issible in an area other than a development area with th:.:i approval or sanction of the local authority did not preclude the.. Central Govt. from acquiring the land fo·r planned de·velopment under the Acts. Se.ction 12 is concerned only with the planned development. It has nothing to do with acquisition of property; acquisition generally precedes development. For planned development in an area other than a development area, iti is only necessary to obtain the, sanction or approval of the local authori:y as provided in sec. 12 ( 3). The Centr:!l Govt. coulJ. acquire any property under the Act and develop it after c•btaining the approval of the local authority. As already held the appellant<> an<l the writ petitioner" cannot be allowed to challenge the validity of notification under sec. 4 on the ground of !aches and acquiescence. The plea thati the Chief Commissioner of Delhi had no authority to initiate the proceedings for acquisition by issuing the notification under sec. 4 of the Act as sec. 15 of the De1hi Development Act ,gives that power only _to_ the Centn\l Govt. relates primarily to the validity of the notification. Even assuming that the Chief Commissioner \¥'as not so authorised, since the appellants and the writ petitioners are precluded by their laches and acquiescence from questioning the notification, the plea must be negatived. [812F-H; 813A-B] A E ##### c D ( v) The plea that the provisions o:f Patt VII Of the Act have not been complied _\vith_ has also to be rejected. The High_ Court \Vas correct i.n giving the finding thnt the acquisition \vas not for 'Company'. The mere fact that af~cr the acquisition the Govt. proposed to hand over, or, in fact, handed over, a portion of the property acquired for development to the co-operative hou5ing societies \V(iuld not make the acquisi\·ion one for 'company' and therefore, Part E VII of the Act was not attracted. l813C-E] ORIGINAL JURISDICTION : Writ Petitions Nos. 362 & 363 of 1972. Petitions under Article 32 of the Constitution of India. _Civil Appeals Nos._ 107, 968 to 971 and 1185 of 1972. Appeals by special leave from the judgment and order dated the September 24, 1971 of the Delhi High Court in L.PsAs. Nc6. 172, 177, 151, 170, 171 and 152 of 1971 respectively. _Civil Appeal No._ 1168 of 1972. Appeal by Special Leave from the judgment and Order dated the 17th April, 1971 of the Delhi High Court in L.P.A. No. 94 of 1971. _A. K. Sen,_ (in W.P. No. 362/72), _L._ _M. Singhvi_ (in W.P. No. 363/72 & C.A. No. 968/72), S. _K._ _Dhingra_ (in C.A. No. 968/72) and _B._ _Dutta,_ for the petiticjners (in W.Ps.) and appellants (in C.AB.) _L._ _N. Sinha,_ Sol. General of India, S. _N. Prasad_ (in W.P. No. 363/72 and C.A. No. 968 of 1972 only) and _R._ _N. Sachthey,_ for the respondents Nos. 1-3 (in C.A. No. 968, 970, 107/72 and W.P. Nos. 362-363 elf 1972 and respondents in other appeals. F G H I AFLATOON _v._ LT. GOVERNOR _(Matl:e1r,_ _!.)_ 8 05 A _Sardar Bahadur Saharya_ and _Vishnu Bahadur Saharya,_ for respon dent No. 4 (in C.As. Nos. 107 & 968/72). _K. K. Sinha,_ S. _K. Sinha_ and _B. B. Sinha,_ for respondent Nos. 5, 6, 8 (in C.A. No. 968/72). _Vinoo Bhagat,_ for respondent no. 4 (in C.A. "10. 970/72). B ##### c D E F G H _Ashok_ _Grover,_ for respondent no. 5 (in C.A. No. 107 /72). S. _K._ _Dholakia,_ for respondent no. 6 (in C.A. No. 107 /72). _T._ _V._ S. _Narasimhachari,_ for respondent no. 7 (in C.A. No. 107 / 72). _L._ _M._ _Singhvi_ and S. _K._ _Dhingra,_ for the interveners. The Judgment of the Conrt was delivered by MATHEW, J. These writ petitions and civil appeals raise commcln questions and they are, therefore, disposed of by a ommon judgment. The Civil Appeals arise out of the decision of High Court of Delhi dis· missing the writ petitions filed by the appellants challenging the validity cif the proceedings for acquisition of the land in question for "planned development of Delhi". In the writ petitions, the validity of the same proceediugs is being challenged on certain additional grounds also. A notification under s. 4 of the Land Acquisition Act (hereinafter referred to as 'the Act') was issued on November 13. 1950, stating that an area of 34,070 acres of land was needed for a public pnrpose, _viz.,_ the planned development of Delhi. Between 1959 and 1961, about six thousand objections were filed under s. SA of the Act. The objections were civerruled. On March 18, 1966, the declaration under s. 6 of the Act was published in respect of a portion of the area. Thereafter, in 1970, notices were issued under s. 9 ( !) of the Act requiring the appellants to state their objections, if any, to the assessment of com· pensation. The appe!lants thereupw challenged the validity of proceedings for acquisition before the High Court of Delhi on the following grounds : (I) that the acquisition was not for public purpose but for companies and so the provisions of Part VII of the Act ought to have been complied with, (2) since no part of the compensation payable came from the public exchequer, the acquisition was not for a public purpose and ( 3) that the proceedings for acquisition vic!ated the fundamental right •of the appellants under Article 19(1) (f) as there was unreasonable delay between the publication of the notification under s. 4 and the issue of the notices under s. 9 of the Act with the result that the appellants were deprived of the benefit of the appreciatim in value of the property after the date of the notification under s. 4. The High Court negatived the contentions and dismissed the writ petitions. The main arguments addressed before us on behalf of the appellants and the writ petitioners were that the public purpose specified in the notification issued under s. 4, namely, the 'planned development of Delhi' was vague as neither a Master Plan nor a Zonal Plan was in existence cl1. the date of the notification and as the purpose specified ###### a 06 SUPREME COURT REPORTS [1975] 1 S.C.R. in the notification was vague, the appellants were unable to qercisc effectively their right under s. SA of the Act and that as the nc~ifica­ tion under s. 4 was published in 1959, the compensation awarded was wholly inadequate with reference to the market value of the property on the date when the appellants are to be deprived of their possession of the property. In other words the content10n was that as there was inordinate delay in finalizing the acquisition proceedings, the appel· !ants were deprived of the benefit of the appreciation in the value c1! the property between the date of the notification under s. 4 and the date of taking possession of the property. Linked with .this contention was the submission that the prcjvisions of s. 23 of the Act which Jay down that compensation should be determined with reference to the market value of the land as on the date of the notification under s. 4 was an unreasonable restriction on the fundamental right of the appellants tci hold and dispose of property under Article 19(1) (f). It was further contended that as the acquisition of the property was for the purpose of planned development of Delhi, the only authority compe· tent to issue the notification under s. 4 was the Central GciVermnent under s. 15 of'the Delhi Development Act and since the proceedings were initiated by the Chief Commissioner of Delhi, the proceedings were _ab_ _initio_ invalid. The argument was that, as the acquisition was made for the planned development of Delhi, it cc1Uld be carried out only in accordance with the provisions of the Delhi Development Act, and that, under s. 15 of that Act, it was only the Central Government which could have issued the notification under s. 4, after having fcirmed the opinion that the acquisition of the land was necessary for the planned development of Delhi and, since the notification was issued by the Chief Commissioner of Delhi, the ncltification wai .. 7oid _ab_ _initio._ ###### The last contention was that the acquisition was not for any public purpose, but for companies, as the major portion of the land acquired was allcl!ted without any development to cooperative housing societies which were companies within the definition of the word 'Company' in the Act and as the provisions of Part VII of the Act were not complied with, the proceedings for acquisition were bad. The influx of displaced persc1ns in 1947 from West Pakistan into Delhi aggravated the problem of housing accommodation in Delhi. With the extension of industrial and commercial activities and the set· ting up of the foreign embassies, Delhi acquired enormous potential as an emplc1Yment centre. The consequent increase in the population was **not accompanied** **by** **an** **adequate expansion of housing:** **facilities. There** was haphazard and unplanned growth of houses in different areas; land also was not available at reasonable price as substantial portion of the available land, suitable for develcipment, had passed into the hands of private enterprisers. The Govermnent found it necessary to take effec· tive steps to check the haphazard growth of houses and to prevent substandard construction. Therefore, the Government framed a scheme for "planned development c~ Delhi". It was in order to implement the scheme of planned development of Delhi that the Government decided to acquire 34,070 acres of land in 1959 and published the notification under s. 4 specifying the public purpose as "the planned development of Delhi". B ##### c **D** E F _G_ **H** t A **B** ##### c **D** E AFLATOON _V._ LT. GOVERNOR _(Mathew,/.)_ 8 07 Section 4 of the Act says that whenever it appears tel the appropriate Government that land in any locality is needed or is likely to be needed for any public purpose, a notification to that effect shall be published in the official Gazette and the Collector shali cause public notice d the substance of such notification to be given at convenient places in the said locality. According to the section, therefore, it is only necessary to state in the notification that the land is needed for a public purpose. The wording of s. 5A would make it further clear that all that is necessary tel be specified in a notification under s. 4 is that the land is needed for a public purpose. One reason for specification of the particular public purpose in the notification is to enable the person whose land is sought to be acquired to file cibjection under s. 5A. Unless a person is told about the specific purpose of the acquisition, it may not be possible for him to file a meaningful cibjection against the acquisition under s. 5A. This Court has laid down that it is necessary to specify the particular public purpose in the notification for which the land is needed or likely to be needed as, citherwise, the matters specified in sub-section (2) of s. 4 cannot be carried out. In _Munshi Singh and Others_ v. _Union_ _of_ _India, etc.(_ _[1]_ _)_ the Court said: "It is apparent from sub-section (2) of s. 4 that the public purpose which has to be stated in sub-secticro. ( 1) of s. 4 has to be particularised because, unless that is done, the various matters which were mentioned in sub-section (2) cannot be carried out and if the public purpoSe stated in s. 4 (I) is planned development, without anything more, it is extremely difficnlt to comprehend hciw all the matters set out in sub-section (2) can be carried out by the officer COJ1**cerned."** We think that the question whether the purpose specified in a notification under s. 4 is sufficient to enable an objection to be filed under s. 5A would depend upcl:l the facts and circumstances of each case. In _Arnold Rodricks and Another_ v. _State_ _of_ _Maharashtra and_ **F** _Others('),_ this Court held that a notification under s. 4 of the Act which stated that the land was needed for "Development and utilisation of the said lands as an industrial and residential area" was sufficient specification of public purpc6e. In the case of an acquisition of a large area of land comprising several plots belonging tci different persons, the specification of the G purpose can only be with reference to the acquisition of the whole area. Unlike in the case of an acquisition of a small area, it might be practically difficult to specify the particular public purpose for which each and every item of land comprised in the area is needed. Assuming **for** the moment that the public purpose was not sufficiently specrned in the notification, did the appellan~s make a grievance **H** of it at the appropriate time? If the appellants had really been pre· judiced by the non-specification of the public purpose for which the #### --·----- (I) [1973] I SCR 973, at 975 and 984. (2) [19£6] 3 S.C.R. 885. 8 08 SUPREME COURT REPORTS [1975] 1 S.C.R, plots in which they were interested were needed they shonld have taken steps t~ have the no.tification qnashed on 'that gronnd within a reaso~able time. They did not move in the matter even after the dedaralion under s. 6 was. publis)led in 1966. They approached the High Court with .their wnt petit10ns only in 1970 when the notices under s. 9 were 1ss.ued to them. In the concluding portion of the JUdgmcnt .m _Munshi Smgh_ & _Others_ v. _Union_ _,1f_ _India_ (supra) it **was observed** : ' **"In** **n1atters** **of** **this nature we would have** **taken due** notice of !aches on the part of the appellants while granting the above relief but we are satisfied that so far as the present appellants are concerned they have not been guilty of !aches, delay or acquiescence at any stage." We do not think that the appellants were vigilant. That apart, the appellants did not contend before the High Court that as the particulars of the public purpose were not specified in the notification issued under s. 4, they were prejudiced in that they could not effectively exercise their right under s. _SA._ As the plea was not raised by the appellants in the writ petitions filed before the High Court, we do not think that the appellants are entitled to have the plea considered in these appeals. A **B** ##### c **D** ##### • Nor do we think that the petitioners in the wri,t petitions should be allowed to raise this plea in view of their conduct in not challenging the validity of the notification even after the publication of the declaration under s. 6 in 1966. Of the two writ petitions, one is filed **E** by one of the appellants. There was apparently no reason why the writ petitioners should have waited till 1972 to come to this Court for challenging the validity of the notification issued in 1959 on the ground that the particulars of the public purpose were not specified. A valid notification under s. 4 is a _sine_ _qua_ _non_ for initiation of proceedings for acquisition of property. To have sat on the fence and allowed the Government to complete the acquisition proceedings on **F** the basis that the notification under s. 4 and the declaration under s. 6 were valid and then to attack the notification on grounds which were available to them at the time when the notification was published would be putting a premium on dilatory tactics. The writ petitions are liable to he dismissed on the ground of !aches and delay on the ; part of the petitioners (see _Tilokchand Motichand and Others_ v. _H._ _B._ _Munshi and_ _Another(');_ and _Rabindra1wth Bose and Others_ v. _Union_ G _ni India_ _&_ _Others(')._ From the count"r affidavit filed on behalf of the Government, it is clear that the Government have allotted a large portion of the land after the acquisition proceedings were finalised to Cooperative housing societies. To quash the notification at this stage would disturb the rights of third parties who are not before the Court. (!) [1969) 2 S.C.R. 824. (2) [1970] 2 S.C. R. 697. **H** AFLATOON _v._ LT. GOVERi-IOR _(Mathew,_ _!.)_ 8 09 As regards the second contention that there was inordinate delay in finalising the acquisition proceedings, and that the appellants and writ petitioners were deprived of the appreciation in value of the land in which they were interested, it may be noted that about 6,000 objections were filed under s. _SA_ by persons interested in the property. Several writ petitions were also filed in 1966 and 1967 challenging the validity of the acquisition proceedings. **The** Government had necessarily to wait for the disposal of tne objectlons and petitions before proceeding further in the matter. Both the learned Single Judge as well as the Division Bench of the High Court were of the view that there was no inordinate delay on the part of the Government in completing the acquisition proceedings. We are not persuaded to come to a different conclusion. Linked with the above contention was the arugment that the provisions of s. 23 of the Act imposes unreasonable restrictions upon the fundamental right of the appellants and writ petitioners to hold and dispose of property under Article 19 (1 )(f) of the Constitution as compensation is awardable only with reference to the value of the property on the date of notification under s. **4** however long the proceedings for acquisition may drag on,and not with reference to the market value of property when it is taken possession of. It was submitted that compensation should be paid with reference to the value of the property as on the date when possession of the property is taken and the section, as it lays down that compensation should be fixed with reference to the market value as on the date of the notifica tion under s. 4, abridges the fundamental right of a citizen under Article 19 (I) (f). We find that the argument is not persuasive. Article 31 ( 5) (a) provides : "(5) Nothing in clause (2) shall alfoet- (a) the provisions of any existing law other than a law to which the provisions of clause (6) apply," The Land Acquisition Act is a pre-Constitution Act. Its provisions are not, therefore, liable DJ be challenged on the grwnd that they are not in conformity with the requirement of article 31 ( 2). What the appellants and writ petitioners complain is that their properties were acquired by paying them compensation computed with reference to the market value of the land as on the date of the notification under s. 4 and that s. 23 is. therefore, bad. This, in substance, is nothing but a challenge to ihe adequacy of compensation. Such a challenge is precluded by reason of Article 31(5). In other words, the appeilants and the writ petitioners cannot challenge the validity of s. 23 on the ground that compensation payable under its provisions is in any way inadequate, because, such a challenge would fly in the face of Article 31 ( 5). It is noteworthy that s. 4 ( 3) of the Land Acquisition Amendment and Validation Act, 1957 provides for payment of interest at 6 per cent of the market value after the exoiry of 3 years from the date of the !lotification under s. **4** to the date of payment of compensation. Seet10n 24 of the Act provides that any outlay or improvements on, ## • **A** **B** ##### **c** **D** **E** **F** G **H** 8 10 SUPREME COURT REPORTS [1975] 1 S.C.R. or disposal of, the land acquired, commenced, made or effected without the sanction of the Collector after the date of the publication or the notification under s. 4(1) shall not be taken into consideration by the Court in awarding compensation. This provision means that any outlay or improvement made with the sanction of the Collector after the date of the notification will be taken into consideration in awarding compensation. In _R._ _C. Cooper_ v. _Union of_ _India('),_ this Court has observed that although a law for acquisition of property must pass the test of Article 19(5), the challenge to the law would ordinarily be limited to the question of procedural unreasonableness. This is what the Court said : " Where the law provides for compulsory acquisition of property for a public purpose, it may be presumed that the acquisition or the law relating thereto imposes a reasonable restriction in the interest of the general public. If there is no public purpose to sustain compulsory acquisition, the law violates Art. 31 (2). If the acquisition is for a public purpose, substantive reasonableness of the restriction which includes deprivation may, unless otherwise established, be presumed, but enquiry into reasonableness of the procedural provisions will not be excluded. For instance, if a tribunal is authorised by an Act to determine compensation for property compulsorily accquired, without hearing the owner of the property, the Act would be liable to be struck down under Art. 19(1)(f)." It follows that although s. 23 of the Act can be challenged on the ground that it violates the fundamental right 0£ a citizen to hold and dispose of property under Article 19(1 )(f), the challenge would practically be limited to the question of procedural reasonableness. But section 23 does not deal with procedure and cannot, therefore, suffer from any procedural unreasonableness. When it is seen that s. 23 is not liable to be challenged on the ground that the compensation provided by its provisions is inadequate in view of the provisions of Art. 31 ( 5), there is no point in the contention that it can be challenged for that very reason on the basis that it imposes unreasonable restriction upon a citizen's right to hold and dispose of property. It was argued that there could be no planned development of Delhi otherwise than in accordance with the provisions of the Delhi Development Act and, therefore, the notification under s. 4 of the Act should have been issued by the Central Government in view of s. 15 of that Act and not by the Chief Commissioner of Delhi. Section 12 of the Delhi Development Act, 1957 provides: "12(1) As soon as may be after the commencement of this Act, the Central Government may, by notification in the !) [1970] 3 S.C.R. 530, at 577. A ### B • ##### c D E F G H AFLATOON _v._ LT. GOVERNOR _(Mathew,_ _!.)_ 8 11 **A** official Gazette, declare any area in Delhi to be a development area for the purposes of this Act : ##### • ## • t ( 4) After the coming into operation of any of the plans in any area no development shall be undertaken or carried out in that area G unless such development is also in accordance with such plans. (5) Nc~withstanding anything contained in sub-sections (3) and ( 4) development of any land begnn by any department of Government or any local authority before the commencement of this Act may be completed by that department or local authority without compliance with the requirements of those sub-sections., B ##### c **D** E **F** Provided that no such declaration shall be made unless , a proposal for such declaration has been referred by the Central Government to the Authority and the Municipal Corporation of Delhi for expressing their views thereon within thirty days from the date of the receipt of the reference or within such further period as the Central Government may allow and the period so specified or allowed has expired . (2) Save as otherwise provided in this Act, the Authority shall not undertake or carry out any development of land in any area which is not a development area. (3) After the commencement of this Ac.t no development of land shall be undertaken or carried out in any area by any person or body (including a department of Government) unless, (i) where that area is a development **arc•,** permission for such development has b~en obtained in writing from the Authority in accordance with the provisions of this Act; (ii) where that area is an area other than a development area, approval of, or sanction for, such development bas been obtained in writing from the local authority concerned or any officer or authority thereof empowered or authorised in this behalf, in accordance with the provisions made by or under the law governing such authority or until such provisions have been **made,** **in** **accordance** **with** **the** **provisions of** **the** regu~ lations relating to the grant of permission for development made under the Delhi (Control of Building Operations) Act, 1955, and in force immediately before the commencement of this Act. Provided that the local authority concerned may subject to the provisions of s. 53A amend those regulations in their application to such area. **H** Section 15 of the Delhi Development Act, 1957 states : "15(1) If in the opinion of the Central Government, any land is required for the purpose of development, or for any 8 12 SUPREME COURT REPORTS [1975] 1 S.C.R. other purpose, under thi~ Act, the Central Government may A acquire such land under the provisions of the Land Acquisition Act, 1894. (2) Where any land has been acquired by the Central Government, that Government may, after it has taken possess10n of the fand, transfer the land .to .the Authority or any local authority for the purpose for which the land has been a.::quired on payment by the Authority or the local authority of the compensation awarded under that Act and of thr, charges incurred by the Government in connection with the **ncquisition.** '' Counsel contended that on the date when the notification und<r s. 4 was published, the Government had not declared any area in Delhi as a development area under s. 12(1) of the Delhi Development Act, nor was there a master plan drawn up in accordance with s. 7 of that Act and so the acquisition of the property for planned development of Delhi was illegal. Under s. 12(3) of the Delhi Development Act, no development of land can be undertaken or carried out except as provided in that' clause. Section 2 ( d) states : "development" with its grammatical variations means the carrying out of building, engineering, mining or other operations in, on, over or under land or the making of any material change in any building or land includes re development. Section 2 ( e) states "developm'1llt area" means any area declared to be a development area under sub-section (1) of s. 12. The planned development of Delhi had been decided upon by tl;e Government before 1959, viz., even before the Delhi Development Act came into force. It is true that there could be no, planned development of Delhi except in accoi:_dance with the provisions of Delhi Development Act after that Act came into force, but there was no inhibition in acquiring Jana for planned development of Delhi under the Act before the Master Plan was ready (see the decision in _Patna_ _Improvement Trust_ v. _Smt. Lakshmi_ _lJeri_ _and_ _Others(')._ In other words, the fact that actual development is permissible in an area other than a development area with the approval or sanction of the local authority did not preclude the Central Government from acquiring the lnnd for planned development under the Act. Section 12 is concerned only with the planned development. It has nothing to do with acquisition of property; acquisition generally precedes development. For planned development in an area other than a development area it is only necessary to obtain the sanction or approval of the local authority as provided in s. 12(3). The Central Government could acquire any property under the Act and develop it after obtaining the approval of the local authority. We do not think it necessary to go into the question whether the power to acquire the land under s. 15 was delegated by the Central Government to the Chief Commissioner of Delhi. We have already held that the appellants and the writ petitioners cannot be allowed to challenge the validity of the notification under s. 4 on the ground of !aches and acquiescence. The plea that the Chief Commissioner of Delhi had no authority to initiate the (I) [19631 Supp. 2 S.C.R. 812. B ##### c D E F G H ###### • # • A B ##### c D E AFLATOON _v._ LT. GOVERNOR _(Mathew,_ _J.)_ 8 13 proceeding for acquisition by issuing the notification under s. 4 of the Act as s. 15 of the Delhi Development Act gives that power only to the Central Government relates pnmarily to the validity of the nolHication. Even assuming that the Chief Commissioner of Delhi was not authorized by the Central Government to issue the notification under s. 4 of the Land Acquisition Act, since the appellants and the writ petitioners are precluded by their !aches and acquiescence from questioning the notification, the contention must, in any event, be negatived and we do so. It may be noted that the validity of the notification under s. 4 am! the declaration under s. 6 was in issue in _Udai_ _Ram_ _Sharma_ _and_ _Others_ v. _Unio!l uf_ _India(!)_ anJ this Court upheld their validity. We see no merit in the appeals and the writ petitions. They arc, thcrefo1e, dismissed with costs. _Petitiom dismissed._ (I) [1968] 3 S.C.R. 41. It was contended by Dr. Singhvi that the acquisition was reolly for the cooperative housjng societies which are compaines within the definition of the word 'company' in s. 3 ( e) of the Act, and, therefore, the provisions of Part VII of the Act should have been complied with. Both the learned Single Judge and the Division Bench of the High Court were of the view that the acquisition was not for 'company. We sec no reason to differ from their view. The mere fact that alter the acquisition the Government proposed to hand over, or, in fact, handed over, a portion of the property acquired for development to the cooperative housing societies would not make the acquisition one _foe_ 'company'. Nor are we satisfied that there is any merit in the contention that compensation to be paid for the acquisition came from the consideration paid by the cooperative societies. In the light of the averments in the counter affidavit filed in the writ petitions here, it is diilicult to hold that it was cooperatives which provided the fund for the acquisition. Merely because the Government allotted a part of the property to cooperative societies for development, it would not follow that the acquisition was for cooperative societies, and therefore, Part VU of the Act was attracted.
End of Judgment Record
Browse All Supreme Court of India (1975) Decisions
1975-12-18

THAKUR PRASAD SAO ETC. v. THE MEMBER. BOARD OF REVENUE & ORS.

These ten appeals arise from writ petitions challenging the licensing regime for outstill shops under the Bihar & Orissa Excise Act, 1915. The licensees, who held licences for manufacturing and retail sale of country liquor in Singhbhum district, argued that what was granted to them was merely a license to retail on their premises and not an exclusive privilege under section 22, nor beyond the reach of section 30. They sought refunds of deposits and damages for loss of anticipated profits, and in the second batch sought reductions of licence fees on grounds of speculative bidding; in the third batch they argued refund of sums charged as consideration for licences to grant exclusive privileges. The State contended that the outstill system confers an exclusive privilege to manufacture and supply country liquor within the area, i.e., a monopoly within the meaning of section 22(1)(d); The High Court had held otherwise. The Supreme Court held that the outstill licences for manufacturing and selling country liquor within the specified area are an exclusive privilege under section 22(1)(d), not a simple retail licence under section 30. It held that the licences continued in force with no right to compensation under Section 44, and that the State could frame rules and collect fees as consideration for the exclusive privilege. The court dismissed all appeals with costs, directing instalment recovery over three years for those able to furnish security.

1975-12-04

Gorelal Dubey v. The State of Madhya Pradesh and Others

This case concerns a dispute over limestone exploitation in Madhya Pradesh under competing mineral classification regimes. Gorelal Dubey (applicant) sought a quarry lease for limestone designated as a minor mineral under the Madhya Pradesh Mineral Rules, 1961, while Ram Chander Badri Prasad Gaur (respondent No. 3) sought a mining lease for limestone as a major mineral under the Central Rules, 1960, with the Central Government initially concluding that the appellant’s application effectively amounted to a major-mineral request. The Madhya Pradesh High Court dismissed related writ petitions, and special leave was granted, leading to two appeals: CA 785/71 and CA 1781/75. The Parliament’s Mines and Minerals Act, 1957 and the Central Rules (1960) are contrasted with the Madhya Pradesh State Rules (1961) and the 1958 and 1961 notifications redefining limestone as a minor mineral. The Court traces the two-notification framework, emphasizing that a lease decision should be based on the quality and partition of limestone in the questioned area, and that when two distinct applications exist, the State Government must consider both and determine whether one should be a minor mineral lease or a major mineral lease. The judgment ultimately resolves the dispute by quashing the central directive and directing fresh consideration by the State, with interim royalty duties allocated per the relevant minor/major rates.

1975-10-10

HIND OVERSEAS PRIVATE LIMITED v. RAGHUNATH PRASAD JHUNJHUNWALLA AND ANR.

This Supreme Court judgment addresses whether a private limited company, formed in 1956 by two family groups for iron and steel business, can be treated as a partnership for the purposes of winding up under Section 433(f) of the Companies Act, 1956. The two groups — RPJ (Raghunath Prasad Jhunjhunwalla) and his family, and the VD J group (V. D. Jhunjhunwalla) along with M.P.J. — held control through a two-family shareholding structure (1875 vs 3125 shares). Allegations arose that, despite formal corporate structure, management and day-to-day control were concentrated in one group, with the other group being ousted from directorship and access to books, ostensibly creating a de facto partnership. The Calcutta High Court dismissed the winding-up petition, but the Division Bench allowed it, holding that the company was in substance a partnership and the just and equitable clause justified winding up. The Supreme Court, however, reverses that view, stressing that the just and equitable remedy is a last resort and must serve the interests of the company and all shareholders, not merely the petitioning party. While English authorities like Yenidje and Ebrahimi are persuasive, Indian conditions require a careful, contextual application. The Court reviews the facts: there was no substratum dissolution, no irreparable mismanagement, and there were procedural remedies within the company’s articles. It concludes that the petition for winding up should not succeed and dismisses the petition, preserving the corporate form and the rights of all shareholders.

1975-03-05

State of Assam v Bhuban Chandra Datia & Anr.

This appeal concerns the legality of fixing the salary and special allowances of the Registrar of the Assam High Court under the Assam & Nagaland High Court Services Rules. Bhuban Chandra Datia (the Registrar) was appointed on 28 April 1967 by the Chief Justice under Article 229 and Rules 7 and 13 of the 1967 Rules, with an order stating an initial pay of Rs 1500 and a special pay of Rs 250 per month, and a two-year tenure. The State of Assam challenged the High Court’s subsequent determination that the Registrar was legally entitled to such a package and that the Chief Justice could fix a special pay up to Rs 1500 by relying on past practice when the initial pay was Rs 850 and six increments were possible. The State argued that Rule 3(1) of the 1956 Rules permits only an initial pay up to Rs 1200 without Governor’s prior approval, and that any higher fixation would require approval under Article 229(2), since rules governing salaries exist to prevent undue financial burden. The High Court had also relied on Rule 11 and Fundamental Rule 19 to justify pay fixation, and on the claim that the post of Presiding Officer, Industrial Tribunal, was included in the Judicial Service only in Aug 1967, making the petitioner a member of the Judicial Service. The Supreme Court reversed, holding that Rule 3(1) governs initial pay (not exceeding Rs 1200 in the revised scale), that Governor’s approval was required for higher pay, and that the Rs 250 special pay was not permissible in this context. It set aside the High Court’s mandamus, awarded costs, and directed that the Registrar be fixed at Rs 1200 (less pension) with no Rs 250 special pay; it also allowed withdrawal of Rs 1000 from security if appropriate.