A Land Acquisition Collector (South), New Delhi and Anr. v. Suresh B. Kapur & Ors.

Case / Petition Number:
Civil Appeal No. 8197 D of 2022
Neutral Citation:[2022] 15 SCR 832

Case Synopsis & Summary

This Civil Appeal concerns whether the land acquisition proceedings under the Land Acquisition Act, 1894, and under the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (Act, 2013) have lapsed under Section 24(2) of the 2013 Act. The Delhi High Court had held that since possession of the lands had not been taken and/ or compensation had not been paid, the acquisition could be deemed to have lapsed, even though compensation had been deposited with the court. The appellant Land Acquisition Collector contends that the proceedings were under challenge before this Court and that the possession could not be taken due to ongoing litigation; the finality of proceedings cannot be deemed to work in favour of landowners, and the High Court’s conclusion declaring lapse is unsustainable. The respondents argue that mere deposit of compensation in court does not amount to payment and that the lapse provisions apply; reliance was placed on earlier Delhi High Court decisions (e.g., Gyanender Singh) and Pune Municipal Corporation, which the Constitution Bench later overruled or limited. This Court, in a Constitution Bench-reach ruling led by Indore Development Authority v. Manoharlal, overruled the earlier line of cases and clarified the interpretation of Section 24(2): the word “or” between possession and compensation can read as “nor” or “and” depending on inaction; deposit in court alone does not constitute payment; mere non-takeover of possession due to litigation does not automatically benefit landowners. The Court held that the acquisition had attained finality and was not liable to be deemed lapsed, quashing the High Court’s judgment. The appeal is allowed, no costs, and pending applications are disposed of. The decision emphasizes that Section 24(2) applies to proceedings pending as on 1-1-2014 and that the five-year inaction rule excludes interim court orders, with five-year computation anchored to the 2014 Act window. Ultimately, the judgment follows the Indore Development Authority doctrine, setting aside the High Court’s deemed-lapse finding and affirming the validity of the acquisition proceedings.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • M. R. Shah
  • M. M. Sundresh
Judgment Date
2022-12-02
Court Decision / Holding
Appeal allowed. The High Court’s judgment declaring the acquisition to have lapsed under Section 24(2) of the Act, 2013 is quashed and set aside. The acquisition proceedings have attained finality and cannot be deemed lapsed merely for lack of possession due to ongoing litigation or for the mere deposit of compensation in Court. No costs. Pending applications, if any, are disposed of. The decision aligns with Indore Development Authority v. Manoharlal and Ors., overruling prior lines of cases such as Pune Municipal Corporation v. Harakchand Misirimal Solanki and Sree Balaji Nagar Residential Assn. v. State of Tamil Nadu, and clarifies that deposit in Court does not constitute payment, but where possession has not been taken and compensation paid within the 2014 Act framework for proceedings pending as on 1-1-2014, lapses can occur only under the defined conditions.
Final Disposition
Appeal allowed; High Court’s judgment set aside; acquisition not deemed to have lapsed; no costs; pending applications disposed.

Parties to the Case

Appellants / Petitioners

  • A Land Acquisition Collector (South), New Delhi and Anr.

Respondents

  • Suresh B. Kapur and Ors.

Legal Representation & Advocates

Counsels for Petitioners

  • • Ms. Sujeeta Srivastava, Adv.
  • • Devika Gujral (Assisted by: Shevali Monga, LCRA)

Counsels for Respondents

  • • Rishab Nagar
  • • Raghab Nagar
  • • Gopal Singh Chauhan
  • • Deepak Goel
  • • Rajiv Ghawana
  • • Ms. Akshita Chhatwal
  • • Ranjit Singh
  • • T. V. S. Raghavendra Sreyas
  • • Ms. Gayatri Gulati
  • • Siddharth Vasudev
  • • Ms. Sunieta Ojha
  • • Akansh Singh
  • • Ravi Bharuka
  • • Ankit Agarwal
  • • Nitin Mishra
  • • Ishaan Sharma

Provisions of Law Cited

Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 – s.24(2)Land Acquisition Act, 1894 – Section 4Land Acquisition Act, 1894 – Section 6Land Acquisition Act, 1894 – Section 16Land Acquisition Act, 1894 – Section 31Land Acquisition Act, 1894 – Section 34Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 – Section 24(1)(a)Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 – Section 24(1)(b)Proviso to Section 24(2) of the 2013 ActSection 31(1) of the 1894 Act (tendering of compensation)

Legal Doctrines & Maxims

  • Deemed lapse under Section 24(2) of the 2013 Act
  • Deposit of compensation in Court is not payment under Section 24(2)
  • Reading the word 'or' in Section 24(2) as 'nor' or 'and'
  • Five-year inaction rule before 1-1-2014 for proceedings pending as on 1-1-2014
  • Possession taken under the 1894 Act vests land in the State; no lapse under Section 24(2) once possession taken
  • Proviso to Section 24(2) treated as part of Section 24(2) not 24(1)(b)
  • Limitation on reviving or reopening concluded proceedings under Section 24(2) and its scope to be limited to pending cases as on 1-1-2014

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellant contends that the High Court erred in holding the acquisition to have lapsed under Section 24(2) of the Act, 2013, particularly since compensation deposited with the Court satisfies the statutory requirement. Pendency before this Court and the finality of the acquisition proceedings imply that possession could not be taken, and non-taking cannot automatically benefit landowners. The Constitution Bench in Indore Development Authority v. Manoharlal has clarified the proper interpretation of Section 24(2), including the treatment of deposits, possession and payment, and has overruled earlier rulings such as Pune Municipal Corporation and Sree Balaji Nagar. The inaction that leads to lapse is measured from the date of enforcement of the 2013 Act and excludes periods of interim court orders. The appeal prays for setting aside the High Court’s declaration of lapse and affirming that the acquisition remains valid.

Contentions of Respondents

The respondents submit that deposit of compensation in court does not amount to payment and that the High Court rightly held the acquisition to be lapse under Section 24(2) because possession was not taken and compensation was not paid for five years or more prior to 2014; reliance was placed on earlier decisions such as Gyanender Singh, Gurdeep Singh Uban, and Pune Municipal Corporation, which, however, were refined or overruled by Indore Development Authority. The argument emphasizes that the proceedings were under challenge and the pendency before this Court does not nullify the lapse rule; the 2013 Act was not intended to revive stale challenges or to re-open concluded proceedings.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (7)

Case NameCitationTreatmentExplanation
Indore Development Authority v. Manoharlal and Ors.(2020) 8 SCC 129; [2020] 3 SCR 1PositiveConstitution Bench decision followed in this judgment; overruls earlier Pune Balak Ram Gupta line and clarifies Section 24(2) interpretation.
Pune Municipal Corporation and Anr. v. Harakchand Misirimal Solanki and Ors.(2014) 3 SCC 183; [2014] 1 SCR 783OverruledOverruled by Indore Development Authority (Constitution Bench) in the present judgment.
Sree Balaji Nagar Residential Assn. v. State of Tamil Nadu(2015) 3 SCC 353; [2015] 3 SCR 353OverruledOverruled by Indore Development Authority (Constitution Bench) in the present judgment.
Balak Ram Gupta v. Union of IndiaWrit Petition No. 1639 of 1985Mentioned OnlyCited in the narrative to explain earlier lines of authority; not relied upon for the present decision.
Gurdeep Singh Uban v. Union of IndiaNot specifiedMentioned OnlyCited to explain the earlier relief discussions relating to Balak Ram Gupta; not controlling for the present decision.
Gyanender Singh v. Union of India & Ors.W.P. (C) No. 1393 of 2014Mentioned OnlyCited and distinguished; Indore Development Authority directs not to rely on this decision.
Indore Development Authority v. Shailendra(2018) 3 SCC 412Mentioned OnlyMentioned in discussion of related precedents, not central to the ruling.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•3,543 words•~17 min read

In The Court Record

A Land Acquisition Collector (South), New Delhi and Anr. v. Suresh B. Kapur & Ors.

832 SUPREME COURT REPORTS[2022] 15 S.C.R. 832 [2022] 15 S.C.R. ## A LAND ACQUISITION COLLECTOR (SOUTH), NEW DELHI AND ANR. v. ## SURESH B. KAPUR & ORS. B (Civil Appeal No. 8197 of 2022) ## DECEMBER 02, 2022 ## **[M. R. SHAH AND M. M. SUNDRESH, JJ.]** - _Right to Fair Compensation and Transparency in Land_ - _Acquisition, Rehabilitation and Resettlement Act, 2013: s.24(2) –_ - C _Land Acquisition Act, 1894 – Respondent no.1 filed the writ petition before the High Court for declaring that the acquisition of lands in question deemed to be lapsed under s.24(2) of the Act, 2013 on the ground that neither possession of the land taken over nor the compensation has been paid – High Court noted that compensation_ - D _has been deposited with the court but the possession of the land in question is not taken over – High Court allowed the petition and declared the acquisition proceedings to be lapsed – On appeal, held: The issue was settled by the Constitutional Bench of Supreme Court in_ Indore Development Authority Vs. Manoharlal and Ors. _which was not considered by High Court – The acquisition proceedings_ - E _were under the subject matter of litigation due to which authorities were unable to take the possession of the lands – Such non taking of possession cannot be in favour of the landowners – Acquisition proceedings should not deemed to be lapsed – Judgment passed by High Court set aside._ ## F ## **Allowing the appeal, the Court** **HELD: The High Court has not appreciated the reasons why the authority could not take the possession. The acquisition proceedings were under challenge before the High Court as well as thereafter before this Court. The acquisition proceedings have** G **attained finality pursuant to the judgment and order passed by this Court. Therefore, the acquisition proceedings were under challenge and the subject matter of litigation. Therefore, when the acquisition proceedings were the subject matter of litigation and because of that the authority could not take the possession** H **of the lands in question and as such not taking over the** 832 LAND ACQUISITION COLLECTOR (SOUTH), NEW DELHI v. 833 SURESH B. KAPUR [M. R. SHAH, J.] **possession cannot be in favour of the landowners, more** A **particularly, when the acquisition proceedings have been appealed upto this Court. [Paras 6.2]** _Indore Development Authority v. Manoharlal and Ors._ **(2020) 8 SCC 129 : [2020] 3 SCR 1 – Followed.** _Balak Ram Glupta v. Union of India_ **Writ Petition No. 1639 of 1985;** _Gyanender Singh v. Union of India & Ors._ **W.P. (C) No. 1393 of 2014;** _Pune Municipal Corporation and Anr. v. Harakchand Misirimal Solanki and Ors._ **(2014) 3 SCC 183 : [2014] 1 SCR 783 – referred to.** B C ## **Case Law Reference** **[2014] 1 SCR 783 referred to Para 2.4 [2020] 3 SCR 1 followed Para 3** CIVIL APPELLATE JURISDICTION: Civil Appeal No. 8197 D of 2022. From the Judgment and Order dated 06.07.2015 of the High Court of Delhi at New Delhi in Writ Petition (C) No. 2163 of 2015. Ms. Sujeeta Srivastava, Adv. for the Appellants. Rishab Nagar, Raghab Nagar, Gopal Singh Chauhan, Deepak Goel, Rajiv Ghawana, Ms. Akshita Chhatwal, Ranjit Singh, T. V. S. Raghavendra Sreyas, Ms. Gayatri Gulati, Siddharth Vasudev, Ms. Sunieta Ojha, Akansh Singh, Ravi Bharuka, Ankit Agarwal, Nitin Mishra, Ishaan Sharma, Advs. for the Respondents. E F The Judgment of the Court was delivered by ## **M. R. SHAH, J.** 1. Feeling aggrieved and dissatisfied with the impugned judgment and order passed by the High Court of Delhi at New Delhi in Writ Petition (C) No. 2163 of 2015 by which the High Court has allowed the said writ G petition preferred by the respondent No. 1 herein – original writ petitioner and has declared that the acquisition with respect to the lands in question is deemed to have lapsed by virtue of Section 24(2) of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and H 834 SUPREME COURT REPORTS [2022] 15 S.C.R. - A Resettlement Act, 2013 (hereinafter referred to as “Act, 2013”), the Land Acquisition Collector has preferred the present appeal. 2. That the dispute is with respect to the land comprised in Khasra Nos. 717 (3-02), 718/1 (3-05), 756/2/1 (2-17) and 757/1 (3-07) measuring 12 bighas and 11 biswas in village Chattarpur, New Delhi. A notification B under Section 4 of the Land Acquisition Act, 1894 (hereinafter referred to as “Act, 1894”) was issued on 25.11.1980, which was followed by declaration under Section 6 of the Act, 1894 issued vide notification/ declaration dated 07.06.1985. - 2.1 It appears that under the said acquisition proceedings some - C affected parties challenged the same before the High Court by way of filing Writ Petition No. 1639 of 1985 titled “ **Balak Ram Gupta Vs. Union of India** ”, which batch of petitions were allowed by the High Court vide judgment and order dated 18.11.1988 and the declaration under Section 6 of the Act, 1894 was quashed. That during the period, this Court while dealing with the impugned acquisition proceedings in - D the case of **Union of India Vs. Gurdeep Singh Uban** held that the relief of the judgment pronounced in **Balak Ram Gupta (supra)** would be applicable only to the petitioners therein and it would not be a judgment in rem. This Court further held in **Gurdeep Singh Uban (supra)** that quashing of notification in **Balak Ram Gupta (supra)** cannot be treated - E as quashing of the entire proceedings. 2.2 It appears that after the pronouncement of the judgment in **Gurdeep Singh Uban (supra)** sometimes in August, 1999, few of the landowners again filed writ petitions challenging therein the acquisition proceedings. The High Court dismissed the said writ petitions vide F judgment and order dated 19.05.2005. That during the period, the then Land Acquisition Collector passed an award. The judgment and order passed by the High Court in the case of **Gurdeep Singh Uban (supra)** dated 19.05.2005 was challenged by the landowners before this Court by way of Special Leave Petition (C) No. 26537 of 2005. This Court dismissed the said special leave petition vide judgment and order dated G 08.02.2010. That thereafter the authority deposited the compensation with respect to the land in question with the Court on 30.12.2013. 2.3 That thereafter the respondent No. 1 – original writ petitioner filed the writ petition before the High Court in the month of February, 2015 for a declaration that the acquisition with respect to the lands in H LAND ACQUISITION COLLECTOR (SOUTH), NEW DELHI v. 835 SURESH B. KAPUR [M. R. SHAH, J.] question is deemed to have lapsed under Section 24(2) of the Act, 2013 A contending inter alia that neither the possession of the land in question has been taken over nor the compensation has been paid. 2.4 By the impugned judgment and order, though, the High Court has specifically noted that the compensation has been deposited with the Court, but the possession of the land in question is not taken over and relying upon its earlier decision in the case of **Gyanender Singh Vs. Union of India & Ors., W.P. (C) No. 1393 of 2014** decided on 23.09.2014 by which the High Court took the view that unless and until the compensation is tendered to the persons interested, mere deposit of the compensation in Court would not be sufficient and cannot be regarded as having been paid. Relying upon the decision of this Court in the case of **Pune Municipal Corporation and Anr. Vs. Harakchand Misirimal Solanki and Ors., (2014) 3 SCC 183** , the High Court by the impugned judgment and order has allowed the said writ petition and has declared that the acquisition with respect to the land in question is deemed to have lapsed under Section 24(2) of the Act, 2013. The impugned judgment and order passed by the High Court is the subject matter of the present appeal. 3. Ms. Sujeeta Srivastava, learned counsel appearing on behalf of the appellant has vehemently submitted that the impugned judgment and order passed by the High Court is just contrary to the decision of the Constitution Bench of this Court in the case of **Indore Development Authority Vs. Manoharlal and Ors., (2020) 8 SCC 129** . 3.1 It is submitted that in the present case and even as noted by the High Court, the compensation with respect to the land in question was deposited in the Court. It is submitted that therefore once the compensation was deposited in the Court, one of the conditions mentioned in Section 24(2) of the Act, 2013 is satisfied and therefore, the acquisition with respect to the lands in question could not have been declared as deemed to have lapsed. 3.2 It is further submitted that even otherwise, the Hon’ble High Court has failed to appreciate that the acquisition proceedings were under challenge, which came to be appealed upto this Hon’ble Court. It is submitted that therefore, because of the pendency of the proceedings challenging the land acquisition proceedings, the possession could not be taken over and the benefit of that could not be given to the landowners. B C D E F G H 836 SUPREME COURT REPORTS [2022] 15 S.C.R. - A It is submitted that the aforesaid aspect ought to have been considered by the High Court while passing the impugned judgment and order. 3.3 It is submitted that the decision of this Court in the case of **Pune Municipal Corporation and Anr. (supra)** has been subsequently overruled by the Constitution Bench of this Court in the case of **Indore** B **Development Authority (supra)** . 3.4 Making above submissions, it is prayed to allow the present appeal. 4. Present appeal is vehemently opposed by Shri Rajiv Ghawana, learned counsel appearing on behalf of the respondent No. 1 – original C writ petitioner. 4.1 It is submitted that even as mentioned in the counter filed on behalf of the appellant, the possession of the land in question was not taken over. It is submitted that as rightly observed by the Hon’ble High Court that unless and until the possession is taken, the compensation D even if it is lying deposited in a Court or in any designated account maintained, would not come to the aid of the appellant/authority. 4.2 It is further submitted that the decision of the Delhi High Court in the case of **Gyanender Singh (supra)** , which has been relied upon by the High Court while passing the impugned judgment and order, the E appeal against the same has been dismissed by this Court vide order dated 31.08.2016. 4.3 It is further submitted that the original writ petitioner was never offered or tendered the compensation by the Land Acquisition Collector. It is submitted that the Land Acquisition Collector has failed F to disclose whether the respondent No. 1 was offered compensation by the land Acquisition Collector at any point of time and whether it was paid to him or not. 4.4 It is submitted that therefore when neither the possession was taken over nor the compensation was actually paid to the respondent G No. 1 – original writ petitioner, the Hon’ble High Court has not committed any error in declaring the acquisition with respect to the land in question is deemed to have lapsed under Section 24(2) of the Act, 2013. 5. We have heard the learned counsel for the respective parties at length. H LAND ACQUISITION COLLECTOR (SOUTH), NEW DELHI v. 837 SURESH B. KAPUR [M. R. SHAH, J.] 6. We have gone through the impugned judgment and order passed by the High Court. By the impugned judgment and order, the High Court has declared that the acquisition with respect to the lands in question is deemed to have lapsed under Section 24(2) of the Act, 2013 solely on the ground that the possession of the lands in question has not been taken over. From the impugned judgment and order passed by the High Court, it appears that though it was the case on behalf of the authority that the compensation was deposited in the Court, thereafter, the High Court has declared that the acquisition deemed to be lapsed by observing that the question of compensation lying deposited in the Court only arise in a case where possession has been taken over. That thereafter the High Court relying upon its earlier decision in the case of **Gyanender Singh (supra)** , in which the High Court held that unless and until the compensation is tendered to the persons interested, mere deposit of the compensation in Court would not be sufficient and cannot be regarded as having been paid. 6.1 By the impugned judgment and order, the High Court has declared the acquisition as deemed to have lapsed, however, it is required to be noted that the decision of the High Court in the case of **Gyanender Singh (supra)** and even the view taken by the High Court in the impugned judgment and order is just contrary to the decision of the Constitution Bench of this Court in the case of **Indore Development Authority (supra).** In paragraphs 365 and 366, the Constitution Bench of this Court has observed and held as under:- “ **365.** Resultantly, the decision rendered in Pune Municipal Corpn. [Pune Municipal Corpn. v. Harakchand Misirimal Solanki, (2014) 3 SCC 183] is hereby overruled and all other decisions in which Pune Municipal Corpn. [Pune Municipal Corpn. v. Harakchand Misirimal Solanki, (2014) 3 SCC 183] has been followed, are also overruled. The decision in Sree Balaji Nagar Residential Assn. [Sree Balaji Nagar Residential Assn. v. State of T.N., (2015) 3 SCC 353] cannot be said to be laying down good law, is overruled and other decisions following the same are also overruled. In Indore Development Authority v. Shailendra [(2018) 3 SCC 412], the aspect with respect to the proviso to Section 24(2) and whether “or” has to be read as “nor” or as “and” was not placed for consideration. Therefore, that decision too cannot prevail, in the light of the discussion in the present judgment. A B C D E F G H 838 SUPREME COURT REPORTS [2022] 15 S.C.R. A B C D **366.** In view of the aforesaid discussion, we answer the questions as under: **366.1.** Under the provisions of Section 24(1)(a) in case the award is not made as on 1-1-2014, the date of commencement of the 2013 Act, there is no lapse of proceedings. Compensation has to be determined under the provisions of the 2013 Act. **366.2.** In case the award has been passed within the window period of five years excluding the period covered by an interim order of the court, then proceedings shall continue as provided under Section 24(1)(b) of the 2013 Act under the 1894 Act as if it has not been repealed. **366.3.** The word “or” used in Section 24(2) between possession and compensation has to be read as “nor” or as “and”. The deemed lapse of land acquisition proceedings under Section 24(2) of the 2013 Act takes place where due to inaction of authorities for five years or more prior to commencement of the said Act, the possession of land has not been taken nor compensation has been paid. In other words, in case possession has been taken, compensation has not been paid then there is no lapse. Similarly, if compensation has been paid, possession has not been taken then there is no lapse. E F G **366.4.** The expression “paid” in the main part of Section 24(2) of the 2013 Act does not include a deposit of compensation in court. The consequence of non-deposit is provided in the proviso to Section 24(2) in case it has not been deposited with respect to majority of landholdings then all beneficiaries (landowners) as on the date of notification for land acquisition under Section 4 of the 1894 Act shall be entitled to compensation in accordance with the provisions of the 2013 Act. In case the obligation under Section 31 of the Land Acquisition Act, 1894 has not been fulfilled, interest under Section 34 of the said Act can be granted. Non-deposit of compensation (in court) does not result in the lapse of land acquisition proceedings. In case of non-deposit with respect to the majority of holdings for five years or more, compensation under the 2013 Act has to be paid to the “landowners” as on the date of notification for land acquisition under Section 4 of the 1894 Act. H ## LAND ACQUISITION COLLECTOR (SOUTH), NEW DELHI v. 839 SURESH B. KAPUR [M. R. SHAH, J.] **366.5.** In case a person has been tendered the compensation as provided under Section 31(1) of the 1894 Act, it is not open to him to claim that acquisition has lapsed under Section 24(2) due to non-payment or non-deposit of compensation in court. The obligation to pay is complete by tendering the amount under Section 31(1). The landowners who had refused to accept compensation or who sought reference for higher compensation, cannot claim that the acquisition proceedings had lapsed under Section 24(2) of the 2013 Act. **366.6.** The proviso to Section 24(2) of the 2013 Act is to be treated as part of Section 24(2), not part of Section 24(1)(b). **366.7.** The mode of taking possession under the 1894 Act and as contemplated under Section 24(2) is by drawing of inquest report/memorandum. Once award has been passed on taking possession under Section 16 of the 1894 Act, the land vests in State there is no divesting provided under Section 24(2) of the 2013 Act, as once possession has been taken there is no lapse under Section 24(2). **366.8.** The provisions of Section 24(2) providing for a deemed lapse of proceedings are applicable in case authorities have failed due to their inaction to take possession and pay compensation for five years or more before the 2013 Act came into force, in a proceeding for land acquisition pending with the authority concerned as on 1-1-2014. The period of subsistence of interim orders passed by court has to be excluded in the computation of five years. **366.9.** Section 24(2) of the 2013 Act does not give rise to new cause of action to question the legality of concluded proceedings of land acquisition. Section 24 applies to a proceeding pending on the date of enforcement of the 2013 Act i.e. 1-1-2014. It does not revive stale and time-barred claims and does not reopen concluded proceedings nor allow landowners to question the legality of mode of taking possession to reopen proceedings or mode of deposit of compensation in the treasury instead of court to invalidate acquisition.” In the case of **Indore Development Authority (supra)** , the decision of this Court in the case of **Pune Municipal Corporation and Anr. (supra)** has been specifically overruled. A B C D E F G H 840 SUPREME COURT REPORTS [2022] 15 S.C.R. - A 6.2 Now, so far as the submission on behalf of the respondent No. 1 – original writ petitioner that the decision of the High Court in the case of **Gyanender Singh (supra)** , which has been relied upon by the High Court while passing the impugned judgment and order, against which, special leave petition has been dismissed by this Court is concerned, at the outset, it is required to be noted that at the relevant time when the - B appeal was dismissed by this Court, the issue was not settled, which has been settled by the Constitution Bench of this Court in the case of **Indore Development Authority (supra).** Under the circumstances, no reliance can be placed upon the decision of the High Court in the case of **Gyanender Singh (supra)** and/or dismissal of the appeal against the - C said order in light of the decision of this Court in the case of **Indore Development Authority (supra).** Even the High Court has also not appreciated the reasons why the authority could not take the possession. The acquisition proceedings were under challenge before the High Court as well as thereafter before this Court. The acquisition proceedings have attained finality pursuant to the judgment and order passed by this Court. - D Therefore, the acquisition proceedings were under challenge and the subject matter of litigation. Therefore, when the acquisition proceedings were the subject matter of litigation and because of that the authority could not take the possession of the lands in question and as such not taking over the possession cannot be in favour of the landowners, more - E particularly, when the acquisition proceedings have been appealed upto this Court. 7. In view of the above and for the reasons stated above and more particularly, in view of the decision of the Constitution Bench of this Court in the case of **Indore Development Authority (supra),** the F view taken by the High Court in the impugned judgment and order is unsustainable. The impugned judgment and order passed by the High Court deserves to be quashed and set aside and is accordingly quashed and set aside. Present appeal is accordingly allowed. No costs. - Pending applications, if any, also stand disposed of. - G Devika Gujral (Assisted by : Shevali Monga, LCRA) Appeal allowed. - H
End of Judgment Record
Browse All Supreme Court of India (2022) Decisions
2022-12-09

MOHD. SABEER @ SHABIR HUSSAIN v. RM, U. P. STATE ROAD TRANSPORT CORP.

The appellant, Mohd. Sabeer (also known as Shabir Hussain), a scrap dealer, was a passenger in a UP State Road Transport Corporation bus when the driver rashly and negligently drove the vehicle, causing a collision near Ghaziabad in 2009. He sustained grave injuries including an amputation of the right lower limb and other bodily injuries. The Motor Accident Claims Tribunal (MACT) awarded Rs. 15,76,465 with interest; the High Court of Delhi enhanced the amount to Rs. 16,70,932. The Disability Certificate recorded 70% permanent disability. The High Court had treated the claimant’s functional disability as 35%, relying on post‑accident income reflected in IT returns, and erred in not adequately recognizing the impact on earning capacity of a self‑employed person who cannot drive. The Supreme Court held that the appellant’s functional disability should be treated as 60% for loss of future earning capacity and that permanent disablement warrants consideration of future prospects in addition to future income. It invoked National Insurance Co. v. Pranay Sethi to apply a 40% addition for future prospects, and directed compensation for prosthetic limb purchase and maintenance, as well as enhanced non‑pecuniary damages. The final award was increased to Rs. 38,70,120 with 9% interest from the date of application, and the appeals were allowed, emphasizing liberal, holistic justice to restore the claimant to his pre‑accident position in light of socio‑economic factors.

2022-01-25

Intercontinental Hotels Group (India) Pvt. Ltd. & ANR. v. Waterline Hotels Pvt. Ltd.

Intercontinental Hotels Group (India) Pvt. Ltd. & Anr. v Waterline Hotels Pvt. Ltd. is a Supreme Court decision addressing appointment of a sole arbitrator under Section 11(6) read with Section 11(12)(a) of the Arbitration and Conciliation Act, 1996, in a dispute arising from a Hotel Management Agreement (HMA) for renovating the Holiday Inn & Suites Bengaluru, Whitefield. The petitioners allege breach by Waterline Hotels, including non-payment of incentive management fee and related charges, culminating in Waterline’s email termination of the HMA on 12 October 2018 after rebranding the hotel as Miraya. The petitioners invoked arbitration; Waterline challenged the enforceability of the arbitration clause on the ground that the HMA is an unstamped instrument under the Karnataka Stamp Act. A Karnataka High Court ad‑interim relief was granted in 2018, but the Supreme Court’s judgment focuses on the scope of judicial interference at the pre‑appointment stage. The Court reiterates a pro‑arbitration stance, noting that arbitrability/validity are generally matters for the arbitrators, with a narrow exception to cut deadwood or to refer for authoritative settlement where necessary, invoking Vidya Drolia. It also analyzes stamp duty, observing that stamp duty has been paid (albeit disputed) and that the question of the correct stamp duty may be resolved later, not as a precondition to appointing an arbitrator. Consequently, the Court appoints Justice A. V. Chandrashekara as a sole arbitrator, directs SIAC to proceed under its rules, and allows the petition in terms stated, while leaving stamp duty issues for arbitration to determine later.

2022-02-01

The State of Sikkim v. Jasbir Singh & ANR

This appeal by the State of Sikkim challenges a High Court judgment upholding a Sessions Judge’s order directing a written notice to the Army’s commanding officer to transfer the case to a court-martial. The case concerns concurrent jurisdiction between a court-martial and an ordinary criminal court under the Army Act for an offence allegedly committed by Lance Naik Jasbir Singh during active service in Sikkim, with the FIR under IPC 302 and related charges. The High Court held that the procedure under Sections 125/126 Army Act, the 1978 Rules (Rules 3-5) and CrPC Rule 475 had not been observed and that the Army authorities had exercised their discretion to prefer a court-martial; thus, the court-martial alone would have jurisdiction. The Supreme Court, however, held that the offence falls into a category with concurrent jurisdiction under Sections 69 and 70 of the Army Act, and that where there is concurrent jurisdiction, the first instance discretion to choose the forum lies with the designated officer under Section 125. In the present case there was no decision by the designated officer to institute proceedings before a court-martial, and the sequence of events showed significant cooperation with the CrPC process. Consequently, the Sessions Judge’s competence to proceed in the criminal court was not in error, the High Court’s order is set aside, and the respondent-accused is to be transferred to civil custody to face trial in the criminal court. The appeal is allowed.

2022-07-22

Hemant Kumar Verma & Ors. v. Employees State Insurance Corporation & Ors.

This writ petition concerns whether junior resident doctors in ESIC-run medical colleges should be eligible for the 50% in-service reservation for postgraduate medical courses, a benefit presently available to Insurance Medical Officers Grade-II (IMO-II) recruited through competitive selection. ESIC recruits IMO-II and provides a 50% in-service quota for PG seats; however junior residents, who complete MBBS under bond and serve as part of ESIC's residency scheme, are not deemed in-service doctors. The petitioners argued parity with IMO-II because their qualifications, duties, and work environment are similar, and urged the Court to treat them as in-service to extend the 50% reservation to their batch. ESIC contends that junior residents are contractual, bond-based appointees governed by the ESIC Residency Scheme; IMO-II is a permanent post governed by the ESIC Staff and Condition of Service Regulations 1959; the bond reduction in 2020 and the 2018/2020 memoranda cannot convert junior residents into in-service doctors. The Court relies on precedents establishing institutional preference in PG admissions—Saurabh Chaudri v. Union of India, Yatin Kuma Jasubahi v. State of Gujarat, and Pradeep Jain v. Union of India — to acknowledge the legitimacy of institutional preference, but ultimately holds that junior residents and regular ESIC doctors are distinct categories and the in-service quota cannot be equitably extended to junior residents. The petition is dismissed.